2. What is HydroSpatium?
• Knowledge management
system used as decision support
tool in the scope of water planning
and management.
• It keeps properly organized and
easily accessible information
required to water planning and
integrated management, under the
perspective of the European Water
Framework Directive (WFD).
• It can be adapted to other legal
frameworks and languages.
HydroSpatium
Web publication
Visualization on
maps
Analyses and
reports
Processing and
calculations
Sensors
Field work
Reports
Experts
External
Systems
3. Main functionalities
• It´s a web system to access and
edit different kind of information
related to water and implied in water
planning process.
• All information is associated to
geographic elements that can be
visualized on a map inside of the
application: river sections, lakes,
aquifers, masses of surface water,
masses of groundwater, water
collection points, and other points of
interest.
•Each element has its data sheet including a lot
of attributes that render possible a detailed
characterization and than can be adapted adding
or eliminating fields.
4. Main functionalities
• Link to any kind of document, image,
diagram, spreadsheet or even audios.
This option allows the use of existent
information of an element and improve its
description. All documents have their
associated metadata under ISO standards
an can be located by external catalogues
• Visualization on a map. HydroSpatium
has its own specialized viewer but can use
other viewers clients have installed in their
information systems.
• Link with external information
• Generation of reports with useful
information to decision making process Visualization of lakes using an aerean image like base
cartography
5. Modular and configurable
• HydroSpatium is a system constructed from
adapted instances, using only modules needed
in any particular case.
• Technology is independent from operating
systems and can be installed in any type of
equipment.
• Operation with different data sources
simultaneously
• Connection with Spatial Data
Infrastructures as a module for water and
geological resources planning and management.
6. Success Cases
SIA Rioja is the information system
implemented in Water Directorate of La Rioja to
manage information required by hydrological
planning and Water Framework Directive
HydroGeoEbro manages Ebro River Basin
Authority data and is used as a support tool for
hydrological planning process.
Hydrogeological
information system of
Alava Provincial Council
Available information
provided by Alava Provincial
Council itself and by other
entities such the Ministry of
Environment, through SIA
(Water Information System),
or Ebro River Basin
Authorithy, through its Spatial
Data Infrastructure (IDE-
Ebro).
Esta plantilla se puede usar como archivo de inicio para proporcionar actualizaciones de los hitos del proyecto.SeccionesLas secciones pueden ayudarle a organizar las diapositivas o a facilitar la colaboración entre varios autores. En la ficha Inicio, en Diapositivas, haga clic en Sección y, a continuación, en Agregar sección.NotasUse el panel Notas para las notas de entrega o para proporcionar detalles adicionales al público. Puede ver estas notas en la vista Moderador durante la presentación. Tenga en cuenta el tamaño de la fuente (es importante para la accesibilidad, visibilidad, grabación en vídeo y producción en línea)Colores coordinados Preste especial atención a los gráficos, diagramas y cuadros de texto. Tenga en cuenta que los asistentes imprimirán en blanco y negro o escala de grises. Ejecute una prueba de impresión para asegurarse de que los colores son los correctos cuando se imprime en blanco y negro puros y escala de grises.Gráficos y tablasEn breve: si es posible, use colores y estilos uniformes y que no distraigan.Etiquete todos los gráficos y tablas.
¿Sobre qué es el proyecto ?Defina el objetivo del proyecto¿Es similar a otros proyectos anteriores o es nuevo?Defina el ámbito del proyecto¿Es un proyecto independiente o está relacionado con otros proyectos?* Tenga en cuenta que no se necesita esta diapositiva para las reuniones semanales
* Si alguno de estos problema causaron una demora en el programa o se deben analizar en profundidad, coloque los detalles en la siguiente diapositiva.
Si hay más de un problema, duplique esta diapositiva tantas veces como sea necesario.Ésta y las diapositivas relacionadas se pueden colocar en el apéndice u ocultarlas si fuera necesario.
¿Cuáles son las dependencias que afectan a la escala de tiempo, costo y resultado de este proyecto?
Prepare las diapositivas para el apéndice por si se necesitan más detalles o diapositivas complementarias. Además, el apéndice resulta útil si la presentación se distribuye más adelante.