The California Hydrogen Infrastructure Project aims to demonstrate a cost-effective hydrogen fueling infrastructure model through the design, construction and operation of seven hydrogen fueling stations. The project is 70% complete, with the first permanent fueling station opened at UCI and the first mobile station opened in Long Beach. Near term activities include permitting the first pipeline-supplied station and completing equipment fabrication. Continued efforts involve developing additional station locations and operators.
Federal Energy Regulatory approval and certificate that allows the Eastern Shore Natural Gas Company to build their White Oak Mainline Expansion Project--with new pipeline and compressor station upgrades in Chester County, PA and New Castle County, DE. It is a short, 7-mile pipeline to help de-bottleneck natural gas flows coming from the PA Marcellus Shale into ESNG's Delmarva Peninsula pipeline network.
Federal Energy Regulatory approval and certificate that allows the Eastern Shore Natural Gas Company to build their System Reliability Project--to construct and operate facilities in New Castle, Kent and Sussex counties in DE.
If your company needs to submit a Pipeline Operator Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/3eMSS4p
Federal Energy Regulatory approval and certificate that allows the Eastern Shore Natural Gas Company to build their White Oak Mainline Expansion Project--with new pipeline and compressor station upgrades in Chester County, PA and New Castle County, DE. It is a short, 7-mile pipeline to help de-bottleneck natural gas flows coming from the PA Marcellus Shale into ESNG's Delmarva Peninsula pipeline network.
Federal Energy Regulatory approval and certificate that allows the Eastern Shore Natural Gas Company to build their System Reliability Project--to construct and operate facilities in New Castle, Kent and Sussex counties in DE.
If your company needs to submit a Pipeline Operator Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/3eMSS4p
UK offshore wind vision of the market and technology development Giles Hundl...BVG Associates
An overview of the EU offshore wind market, including the UK and analysis of the cost of energy drives with an assessment potential impact of technology changes
What is the ASME Code and Why is it Important?Mark Mitchell
What is the ASME Code and Why is it Important?
02 December 2015
Presented at Nuclear Supply Chain Conference
Cape Town 01-02 December 2015
Presenter: John Fletcher
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...marcus evans Network
Trino Pedraza, New Braunfels Utilities - Speaker at the marcus evans Water & Wastewater Management Summit 2012, held in Summerlin, NV, May 3-4, 2012, delivered his presentation on the topic Taking the Bull by the Horns with Reliability Centered Maintenance
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015BVG Associates
Bruce Valpy explains how a useful cost of energy can be calculated and what the trends in the CAPEX and LCOE in Europe can tell us about the future. the impact of a systems engineering approach on LCOE is also discussed
Ciaran Callan, Maintenance & Services Manager of Dublin Port Company, presents the energy measures taken at the Dublin Port Centre during Codema's Information Seminar on Energy Performance Contracting (EPC) on 13 October 2015 at The Morgan Hotel in Dublin.
Project Management: Execution of a Pump Installation in an Industry - Executi...Harender Singh
Incorrect wiring, the pump is not properly grounded, Low Power, Improperly installed check valve, Pump not primed, Improper pump and motor alignment, Not enough room for the float switch
Assumptions - Motor and Pump already purchased and readily available
Execution of plans - In MSP not only time but resources and task prerequisites are also mentioned to ensure a smoother flow of activities.
MSP Project Timeline - Dividing the full project till level 3-Activity-based and ensuring proper timings for project completion
Raventech & University of North West presentation - emperors - 9 nov 2016-...John M Riggs
Naf-Tech combustion enhancer is a South-African product. Naf-Tech is a proprietary mixture of hydrocarbons that reduces the surface tension of the fuel when activated. Targeted activation ensures that Naf-Tech will not alter the distinct characteristics of the base fuel before the physical injection of the fuel takes place.
Naf-Tech improves fuel vaporisation during injection thereby increasing the burn velocity of the fuel transforming more of the fuel’s potential energy into mechanical energy. Naf-Tech is widely used in various applications such as transport, mining, earthmoving, diesel generators and shipping.
Naf-Tech is used by a number of companies, some of which are listed on the JSE. The majority of these companies have been using Naf-Tech for several years and have also concluded successful R&D programs using Naf-Tech.
6. Process forward
Should you wish to engage with us on drastically reducing your company’s energy efficiency (and carbon footprint) as described above please note that we do not enter into a “proof of testing-period” without payment. We have been testing and proving our product’s quality for over a decade. For this reason, a minimum order of 2000 lt/month is required for a 3 month period. Upon payment of the first order we will provide assistance to you through a team of experts to help you achieve maximum benefit from our product.
Should you find the above in order we look forward to hearing from you.
Export development by John M Riggs and Yuliya Lutsenko - contact via jophnmriggs@gmail.com and carbon copy at john.riggs@swiss-commodity.ch
Opening Global Markets to Booming U.S. Shale Gas and NGL ProductionICF
ICF International experts join an industry expert from Vinson and Elkins, LLP to discuss the boom in shale gas and natural gas liquids (NGL) production.
Key topics covered include:
• Marketing issues created by the boost in production
• Outlook for gas supply development
• Regulatory and contractual considerations that shape infrastructure development investments
The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely destroy 2,611 tons of mustard agent in mortar rounds and artillery projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).
Neutralization followed by biotreatment is the technology selected by the Department of Defense to destroy the Pueblo chemical weapons stockpile.
The Program Manager, Assembled Chemical Weapons Alternatives (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in Colorado and Kentucky.
The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc., URS, Parsons, and Battelle Memorial Institute. The BPT functions as the systems contractor selected to design, build, systemize, pilot test, operate, and close the PCAPP.
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
UK offshore wind vision of the market and technology development Giles Hundl...BVG Associates
An overview of the EU offshore wind market, including the UK and analysis of the cost of energy drives with an assessment potential impact of technology changes
What is the ASME Code and Why is it Important?Mark Mitchell
What is the ASME Code and Why is it Important?
02 December 2015
Presented at Nuclear Supply Chain Conference
Cape Town 01-02 December 2015
Presenter: John Fletcher
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...marcus evans Network
Trino Pedraza, New Braunfels Utilities - Speaker at the marcus evans Water & Wastewater Management Summit 2012, held in Summerlin, NV, May 3-4, 2012, delivered his presentation on the topic Taking the Bull by the Horns with Reliability Centered Maintenance
Offshore Cost of Energy NREL WESE Workship Bruce Valpy 14 Jan 2015BVG Associates
Bruce Valpy explains how a useful cost of energy can be calculated and what the trends in the CAPEX and LCOE in Europe can tell us about the future. the impact of a systems engineering approach on LCOE is also discussed
Ciaran Callan, Maintenance & Services Manager of Dublin Port Company, presents the energy measures taken at the Dublin Port Centre during Codema's Information Seminar on Energy Performance Contracting (EPC) on 13 October 2015 at The Morgan Hotel in Dublin.
Project Management: Execution of a Pump Installation in an Industry - Executi...Harender Singh
Incorrect wiring, the pump is not properly grounded, Low Power, Improperly installed check valve, Pump not primed, Improper pump and motor alignment, Not enough room for the float switch
Assumptions - Motor and Pump already purchased and readily available
Execution of plans - In MSP not only time but resources and task prerequisites are also mentioned to ensure a smoother flow of activities.
MSP Project Timeline - Dividing the full project till level 3-Activity-based and ensuring proper timings for project completion
Raventech & University of North West presentation - emperors - 9 nov 2016-...John M Riggs
Naf-Tech combustion enhancer is a South-African product. Naf-Tech is a proprietary mixture of hydrocarbons that reduces the surface tension of the fuel when activated. Targeted activation ensures that Naf-Tech will not alter the distinct characteristics of the base fuel before the physical injection of the fuel takes place.
Naf-Tech improves fuel vaporisation during injection thereby increasing the burn velocity of the fuel transforming more of the fuel’s potential energy into mechanical energy. Naf-Tech is widely used in various applications such as transport, mining, earthmoving, diesel generators and shipping.
Naf-Tech is used by a number of companies, some of which are listed on the JSE. The majority of these companies have been using Naf-Tech for several years and have also concluded successful R&D programs using Naf-Tech.
6. Process forward
Should you wish to engage with us on drastically reducing your company’s energy efficiency (and carbon footprint) as described above please note that we do not enter into a “proof of testing-period” without payment. We have been testing and proving our product’s quality for over a decade. For this reason, a minimum order of 2000 lt/month is required for a 3 month period. Upon payment of the first order we will provide assistance to you through a team of experts to help you achieve maximum benefit from our product.
Should you find the above in order we look forward to hearing from you.
Export development by John M Riggs and Yuliya Lutsenko - contact via jophnmriggs@gmail.com and carbon copy at john.riggs@swiss-commodity.ch
Opening Global Markets to Booming U.S. Shale Gas and NGL ProductionICF
ICF International experts join an industry expert from Vinson and Elkins, LLP to discuss the boom in shale gas and natural gas liquids (NGL) production.
Key topics covered include:
• Marketing issues created by the boost in production
• Outlook for gas supply development
• Regulatory and contractual considerations that shape infrastructure development investments
The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely destroy 2,611 tons of mustard agent in mortar rounds and artillery projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).
Neutralization followed by biotreatment is the technology selected by the Department of Defense to destroy the Pueblo chemical weapons stockpile.
The Program Manager, Assembled Chemical Weapons Alternatives (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in Colorado and Kentucky.
The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc., URS, Parsons, and Battelle Memorial Institute. The BPT functions as the systems contractor selected to design, build, systemize, pilot test, operate, and close the PCAPP.
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Jeffrey Haguewood
Sidekick Solutions uses Bonterra Impact Management (fka Social Solutions Apricot) and automation solutions to integrate data for business workflows.
We believe integration and automation are essential to user experience and the promise of efficient work through technology. Automation is the critical ingredient to realizing that full vision. We develop integration products and services for Bonterra Case Management software to support the deployment of automations for a variety of use cases.
This video focuses on the notifications, alerts, and approval requests using Slack for Bonterra Impact Management. The solutions covered in this webinar can also be deployed for Microsoft Teams.
Interested in deploying notification automations for Bonterra Impact Management? Contact us at sales@sidekicksolutionsllc.com to discuss next steps.
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Albert Hoitingh
In this session I delve into the encryption technology used in Microsoft 365 and Microsoft Purview. Including the concepts of Customer Key and Double Key Encryption.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
1. California Hydrogen
Infrastructure Project
Edward C. Heydorn
Air Products and Chemicals, Inc.
18 May 2007
Project ID #TV7
This presentation does not contain any proprietary, confidential, or
otherwise restricted information
2. Overview
Timeline Barriers
• Start – Aug. 2005 • Cost of delivered hydrogen
• End – Sept. 2008
• 70% Complete
Budget Partners
• Total project funding • Various collaborators and
– DOE $5.5 million share funding groups including:
– Contractor $5.4 million share – SCAQMD
– OEM’s
• Funding received through
– UC Irvine
FY06
– Energy Companies
– Total $2.2 million
• Funding for FY07
– Total $1.1 million (2/28/07)
2
3. Objectives
• Demonstrate a cost effective infrastructure model in
California for possible nationwide implementation
– Design, construct and operate seven hydrogen fueling
stations
– Collect and Report Infrastructure Data
– Document permitting requirements and experiences
– Validate expected performance, cost, reliability,
maintenance, and environmental impacts
• Implement a variety of new technologies with the
objective of lowering costs of delivered hydrogen
– New Delivery Concept (NDC)
– Hydrogen Based Unit (HBU)
3
4. Approach
• Work with OEM’s to determine vehicle usage needs and
general station equipment requirements
• Work with OEM’s and others to determine preferred
locations/areas for fueling station deployment
• Select potential Station Operators and work to locate
suitable sites
• Initiate and complete required agreements, determine
and address specific site issues including liability,
billing, etc.
• Complete detailed Station Design, permits, installation,
operation, and maintenance of stations
• Collect and report Infrastructure Data to the DOE once
stations put online
• Monitor and collect feedback which can be incorporated
to improve station user’s fueling experience
4
5. Project Tasks
• UCI Fueling Station
• Torrance Pipeline Fueling Station
• Hydrogen Fuelers (HF-150) – 3 Units Planned
• New Delivery Concept (NDC) – 2 Trailers Planned
• Hydrogen Based Unit (HBU) – 2 Units Planned
• Infrastructure Data Acquisition, Analysis and
Delivery (includes eRAM)
• Novel Compressor Development
• Hydrogen Infrastructure Study (UCI) – recently
initiated work
5
6. UCI Fueling Station
2006 Status:
• Design, permitting,
equipment fabrication
complete for 350 bar
system
• Design and equipment
fabrication started on
700 bar system
• Early design started
on LHy system
2007 Status:
• 350 bar system in
operation August
2006
• 700 bar system in
operation February
2007
• LHy system in
procurement phase
6
7. Torrance Hydrogen Fueling
Station
2006 Status:
• Working on developing
suitable location for station
• Equipment design
completed for 350 bar
system
• Equipment fabrication
started for 350 bar system
2007 Status:
• Finalizing plans for station
location
• Site permit applications
submitted
• Equipment fabrication
completed for 350 bar
system
• Equipment fabrication
started for 700 bar system
• Testing of pipeline
hydrogen purifier underway
7
8. Hydrogen Fuelers (HF-150)
2006 Status:
• Equipment fabrication almost
complete
• Location and Station Operator
determined for one station
• Station Operators and locations
not finalized for other stations
2007 Status: Long Beach Gas & Oil -
HF-150 location
• Equipment fabrication complete
• Lease agreement signed with
Long Beach Gas and Oil
• Station Operators and locations
not finalized for other stations
8
9. New Delivery Concept (NDC)
New method of hydrogen distribution capable of supplying low,
medium, and high pressure systems using a single liquid
hydrogen trailer. NDC trailer allows for increased integration of
the merchant bulk hydrogen, hydrogen fueling stations, and
liquid hydrogen supply chains, driving improved operating
efficiency. Patents pending.
2006 Status:
• Equipment design complete for NDC #1 and NDC #2
• Equipment on order
2007 Status:
• Equipment fabrication for NDC #1 complete
• Field trials of components underway
• Deployment to CA anticipated in coming months
9
10. Hydrogen Based Unit (HBU)
New approach to reduce costs associated with stationary fueling
stations. HBU product is deployed at customer sites in
conjunction with New Delivery Concept (NDC) Liquid Hydrogen
Trailer.
2006 Status:
• Equipment design complete for HBU #1 LH2 NDC
and HBU #2 HBU
• Equipment on order
• Station Operators and locations to be
determined
2007 Status:
• Equipment fabrication for HBU #1
complete
• Deployment to CA to follow roll-out of
NDC
10
11. ERAM Hydrogen Data Service
Air Products and Chem icals Inc. - Inventory Management
Tank 111 FL96
53483
HENKEL ADHESIVES
Generates
1345 G ASKET DR
Station Owner needs Information
ELGIN IL-60120 US
All times and dates are quoted in the local time of the monitoring point.
Ad-hoc
Start Date: 09 Apr 2005 00:00
End Date: 16 Apr 2005 00:00
Inventory
Inventory
Value Reading UOM Reading Date/Tim e Reading Source
Report 44,152.13
44,152.13
44,152.13
44,152.13
44,152.13
LB
LB
LB
LB
LB
4/15/05 0:00
4/14/05 23:30
4/14/05 23:00
4/14/05 22:30
4/14/05 22:00
Telemetry
Telemetry
Telemetry
Telemetry
Telemetry
44,152.13 LB 4/14/05 22:00 Telemetry
44,152.13 LB 4/14/05 21:30 Telemetry
H2 Data
Views
Service Offering
Information
Online
Service Support
Processes
Service
Policies & Standards
APDirect
Driver initiates
Fill
Software Tools and
ERAM CMS Data Repository
PLC Software
* Government or
Vehicle Owner / Lessee
Requests information
* These requests must be validated in order to
maintain data security / privacy
for Station Owners
AP Engineer
11
12. Novel Compressor System
New equipment design which can compress hydrogen
from 100 psi to 14,000 psi in one stage. If successful,
capital cost will be 50-75% less than conventional
systems. Patents pending.
Features:
• Isothermal Operation – gas cooled during compression
• Single Stage
• Simple Fabrication – no exotic materials
• Liquid Pump – inherently lubricates all dynamic seals
• Small Footprint
• No External Cooling
• Dynamic Gas Seals Eliminated
• Low Maintenance Costs
12
13. Novel Compressor System Status
Compressor Installation and
Commissioning
• System leak-checked to 14,000 psi
• Function test performed at 4,000 psi
• Functional test completed on all
major components
• System ready for next phase of
operation
13
14. Future Work
• UCI Fueling Station – Finalize LHy Dispensing System
• Torrance Pipeline Fueling Station – Complete Agreement with
Station Operator; Install and Commission both 350 and 700 bar
Systems
• Hydrogen Fuelers (HF-150) – Begin Operation at Long Beach;
Identify Other Locations and Station Operators
• New Delivery Concept (NDC) – Complete Fabrication of NDC #1
and Deploy; Fabricate NDC #2 and Deploy
• Hydrogen Based Unit (HBU) – Fabricate HBU #2; Identify
Locations and Station Operators
• Infrastructure Data Acquisition, Analysis and Delivery – Report
Data to DOE
• Novel Compressor Development – Complete Operating Program
• Hydrogen Infrastructure Study by UCI – Perform Scope of Work
14
15. Summary
• Demonstrate a variety of options for delivery of low-cost
hydrogen in the deployment of Hydrogen Infrastructure
– First permanent CHIP station (350 and 700 bar gaseous hydrogen)
opened at UCI
– First mobile CHIP station (HF-150) opened in Long Beach
– Commissioning of Novel Compression System
– Infrastructure Data Reporting at each station
• Near Term Activities
– First pipeline supplied hydrogen station in permit phase
– Equipment fabrication nearly complete in most cases
• Continuing to develop site locations and Station Operators for
other stations
• Initiating Hydrogen Infrastructure Study at UCI
15