This presentation discusses quick changeover techniques for manufacturing processes. It introduces the SMED (Single Minute Exchange of Die) method, which aims to reduce changeover times to under 10 minutes. The SMED method separates changeover activities into internal tasks that can be performed while the equipment is running and external tasks that are performed when the equipment is stopped. Proper application of SMED principles can dramatically cut changeover times and improve overall equipment effectiveness.