This HSR, Belmont, Tracy Division is the proposed corridor to connect San
Francisco/San Jose with Los Angeles and Sacramento.
Direct trains run from Sacramento to Stockton, Tracy, Livermore, Pleasanton,
Fremont, Redwood City, and San Francisco/San Jose with additional stations
between Redwood City and San Francisco/Fremont and San Jose.
Direct trains also run from San Francisco to Tracy, Lathrop loop with stops in
between, then to Modesto, “new intersect loop to BNSF corridor” Denair, Merced,
Chowchilla, Madera, Fresno, Kingsburg, Goshen, Tulare, Bakersfield, Lancaster,
(with stations in between) and Los Angeles.
Also direct trans run between Sacramento and Los Angeles.
Not all trains will stop at all the stations indicated.
The electrified HSR Belmont, Tracy Division corridor proposal serves multi Cities,
the proposed HSR corridor via Gilroy, Merced does not and is therefore not
economically viable. San Jose, Gilroy, and Hollister may still receive train
service. Note; both corridors need tunnels, so chose the B/T division for better
economic results.
HSR Belmont, Tracy Div
Des by R.N.
Legend
x
Flyovers
Cuts
Fills
Tunnels
Roadway over or under passes
Revised Roadways
= Closed RR Crossings
On ground
El = Rail Elevation
E = Ground surface Elevation
R = Radius
Freight Railroads (BNSF) (UPRR) (Shasta RR) existing
CHSR Stations Sheltered commuter platforms
HSR_Legend
Des by R.N.
Freight Railroads modified or existing
EPS are HV power lines and supply fot the TBM
x = Closed RR Corridor linex EPS = Electrical power supply
Dep = tunnel muck sorting and deposit
HSR Belmont, Tracy Div_01
Des. by R.N.
Existing
Cal Trans
Tracks
Existing
Frt. Tracks
New HSR route tracks
Alternative #2
Below is the former Central California corridor route, rejuvenate this for HSR
trains. On the left side is the existing San Francisco/San Jose commuter and
freight line. The showns HSR corridor segment are all elevated.
HSR Belmont, Tracy Div_02
E 14'
HSR El 67'
E 41'
Grade flat
E 41'
El 66'
Grade 0.5%
Old SP corridor
HWY 82
El 43'
Redwood City Sta.
HSR on the flyover, note the grade solutions. Use pre-stressed, pre-fabricated
panels to construct the flyovers to speed up construction.
HSR Belmont, Tracy Div_03
E 6'
El 94'
Grade 1.5%
P L
Option; raise power line,
lower flyover El, or both
to lower rail grade on this segment
X ?
Grade 0.2%E 6'On fill with tunnel muck
Additional fill area,
then to housing
Newark Area with B/T HSR flyover and the ACE flyover intersection
from/to San Jose, single track ACE flyover is between freight tracks.
HSR Belmont, Tracy Div_04
6'
E 14'
El 41'
E 50'
El 74'
Grade 0.24%
Existing ACE corridor
Grade 0.6%
The Fremont area HSR corridor with a possible second HSR/Commuter
Station at an additional BART transfer stop. Tunnel has large S curve.
HSR Belmont, Tracy Div_05
WP/E 61'
Ba/El 116'
HSR/El 140'
Tunnel entrance El 140'
37° 34'46 N 121° 57'41W
R9300' 1.6° Grade less than 1%
Fremont Sta.
BART Sta.
E 150'
Tunnel entrance El 212'
Tunnel entrance El 209'
Existing track E 188'
37° 35'48 N
121° 56'12 W
37° 35'45' N
121° 56'18 W
HSR El 140'E 80'
Grade 0.95% tunnel length 1.4 miles
Flyover length 500'
E 97'
Area west of Pleasanton, HSR is from the tunnel to the flyover and
then to ground corridor elevation.
HSR Belmont, Tracy Div_06
E 315'
Tunnel entrance El 342'
Grade 1%
37° 38'18 N 121° 53'49W
Tunnel length 3.4 miles
Pleasanton area, HSR tracks are on the north side of the existing freight line.
Here we need a 2 mile long flyover to eliminate grade crossings and a radius
enlargement to 3400’
HSR Belmont, Tracy Div_07
Plesanton Sta.
E 315'
To Sunol
Ridge tunnel
Radius enlargement
HSR Belmont, Tracy Div_07a
X
X
X
X
Possible area to fabricate
the flyover panels.
E 372'
Overpass El 398'
New roadways to provide access
for closed crossings
Livermore/Vasco area, HSR tracks are on the north side of the existing line and
with 1.8 miles of flyovers, other ways the tracks are at ground level.
Not all trains will stop here.
HSR Belmont, Tracy Div_08
Livermore Sta.
Vasco Sta.
Ulmar Station area, the trench cut on the north side will allow existing
buildings on the south side to remain intact.
HSR Belmont, Tracy Div_09
Tunnel entrance El 560'
E 714'
l 560'
E 1400'37° 41'55 N 121° 42'16 W
Trench cut on north side of existing track, grade flat
Ulmar Sta.
ACE track El 592'
HSR Belmont, Tracy Div_09a
ACE track El 592'
HSR tunnel entrance El
560', trench section is flat
grade 0.5%
HSR in trench,
parallel to ACE
The Altamont tunnel will shorten the line, eliminate elevation climb
and the speed restricting curves.
HSR Belmont, Tracy Div_10
E 950'
Existing Altamont Pass corridor
Tracy Station and Altamont tunnel with fill and underpasses in Lacy
HSR Belmont, Tracy Div_11
E 224'
Tunnel entrance El 263'
Tunnel length 11.85 mi 19 Km
Grade 0.5%
37° 41'45 N 121° 29,28 W
Tracy Sta.E 170'
El 192'
Grade 0.63%
Tracy station area; flyover for HSR is needed to allow unimpeded SPRR
cross traffic and avoid the track diamond.
HSR Belmont, Tracy Div_12
R3200' 1.79° maximum speed 80 mph
Freight track is on ground
with intersect to SPRR
SPRR
HSR flyover length 0.2 miles
El 103' grade 0.8%
HSR on 22' high fill to
allow road under passes
Farm Rd underpass
S Bird Rd overpass
Tracks are
below I-5
E 77'
E 151'
E 153'
E 145'
HSR Belmont, Tracy Div_12b
S Tracy Blvd
W Linne Rd
Freight tracks
Freight track
E 150'
Underpass
HSR tracks
El 173'
Park and Ride with overpass to
the elevated Station Platform
HSR Belmont, Tracy Div_12a
E 169'
E 170'
Underpass El 169'
W Linne Rd
Coral Hollow Rd
El 191' on fill
HSR tracks
Freight track
HSR Belmont, Tracy Div_12c
E 145'
E 145'
E 145'
Underpass E 145'
S MacArthur Dr
W Linne Rd
X?
Freight track
HSR tracks
R 3200' 1.79°
Alternative corridor, option #1 to enlarge the track radius in Tracy.
HSR Belmont, Tracy Div_12aa
W Linne Rd
underpass
Radius correction
to 5400' 1.06°
Alternative corridor
route, option # 1
Radius 5400' 1.06°
Alternative corridor, option #1 and 2, the # 2 corridor is the best option,
eliminating the tight curves in Tracy, the ICE trains will bypass this station.
HSR Belmont, Tracy Div_12cc
R 36000' 0.16°
R 36000' 0.16°
Route alternative # 1
Tunnel length 11.85 miles 19 Km
Route alternative # 1
Tunnel length 15.7 miles 25.2 Km
HSR Belmont, Tracy Div_12bb
E 164'
E 183'
E 200'
E 193'
Tunnel entrance El 165'
Tunnel to Ulmar
15 miles 23.5 Km
Existing ACE and freight corridor
Tunnel muck sorting and
deposit area, forward mock
by conveyor or side-dump rail
cars for corridor fills. Later,
use this area for the major
HSR train maintenance and
storage.
Northeast of Tracy, upgrade corridor to doubletrack for HSR traffic, keep one
track for freight and provide over/underpasses for roads/streets, not shown on
this map.
HSR Belmont, Tracy Div_13
HSR Belmont, Tracy Div_14a
To/from LA
To/from Sacramento
To/from San Francisco/San Jose
Underpass
Increase HSR radius to 5300'
Manteca/Lathrop train corridor intersects, station, park and ride, and new
access road area; LA/San Francisco trains will stop here. Corridor line from
Lathrop to Stockton is eight miles. Note the unique tri-station layout.
Ramp grades are less than 1% - all trains stop here.
HSR Belmont, Tracy Div_14
R7300' 0.8°
R10500' 0.54°
R5300' 1.08°
R5300' 1.08°
SP/UPRR
R2200'
P/R
HSR Belmont, Tracy Div_14b
Palm Ave
HSR is on west side of SPRR
Modesto corridor changeover alternative from SPRR to BNSF will provide seamless
connection south of Lathrop to Los Angeles. Some of the shown on-fill tracks will need short
bridges and have underpasses. Santa FE Ave and E Hatch Rd will have overpass.
HSR ICE train trip time, SFO/Modesto is 75 minutes or less.
BNSF
SPRR
HSR Belmont, Tracy Div_15
Modesto
Preferred route
Conveyor system to transport Tunnel excavation material and re-naturalization
(Alpine Tunnel Switzerland)
The Altamont Hill Tunnel is a twin bore system to provide
emergency rescue if needed.
The cross cuts will have airlocks to block out “smoke”
6.5 Miles 10.5 Km
1025' 312.5m 1025' 312.5m
Salem Hill Tunnel - length estimated
Cross cuts to provide emergency escape
32 cross cuts will be needed
31.43'9.58m
HSR twin-bore tunnel entrances. The slots in the exposed tunnel section
work as a wind impact damper, this will reduce air pressure shock to
trains and uncomfortable pressure changes for passengers as well.
Des by Spain

More Related Content

Recently uploaded

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 

Featured

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
Skeleton Technologies
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
GetSmarter
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Project for Public Spaces & National Center for Biking and Walking
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
DevGAMM Conference
 

Featured (20)

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 

Hsr belmont, tracy division

  • 1. This HSR, Belmont, Tracy Division is the proposed corridor to connect San Francisco/San Jose with Los Angeles and Sacramento. Direct trains run from Sacramento to Stockton, Tracy, Livermore, Pleasanton, Fremont, Redwood City, and San Francisco/San Jose with additional stations between Redwood City and San Francisco/Fremont and San Jose. Direct trains also run from San Francisco to Tracy, Lathrop loop with stops in between, then to Modesto, “new intersect loop to BNSF corridor” Denair, Merced, Chowchilla, Madera, Fresno, Kingsburg, Goshen, Tulare, Bakersfield, Lancaster, (with stations in between) and Los Angeles. Also direct trans run between Sacramento and Los Angeles. Not all trains will stop at all the stations indicated. The electrified HSR Belmont, Tracy Division corridor proposal serves multi Cities, the proposed HSR corridor via Gilroy, Merced does not and is therefore not economically viable. San Jose, Gilroy, and Hollister may still receive train service. Note; both corridors need tunnels, so chose the B/T division for better economic results. HSR Belmont, Tracy Div Des by R.N.
  • 2. Legend x Flyovers Cuts Fills Tunnels Roadway over or under passes Revised Roadways = Closed RR Crossings On ground El = Rail Elevation E = Ground surface Elevation R = Radius Freight Railroads (BNSF) (UPRR) (Shasta RR) existing CHSR Stations Sheltered commuter platforms HSR_Legend Des by R.N. Freight Railroads modified or existing EPS are HV power lines and supply fot the TBM x = Closed RR Corridor linex EPS = Electrical power supply Dep = tunnel muck sorting and deposit
  • 3. HSR Belmont, Tracy Div_01 Des. by R.N. Existing Cal Trans Tracks Existing Frt. Tracks New HSR route tracks Alternative #2
  • 4. Below is the former Central California corridor route, rejuvenate this for HSR trains. On the left side is the existing San Francisco/San Jose commuter and freight line. The showns HSR corridor segment are all elevated. HSR Belmont, Tracy Div_02 E 14' HSR El 67' E 41' Grade flat E 41' El 66' Grade 0.5% Old SP corridor HWY 82 El 43' Redwood City Sta.
  • 5. HSR on the flyover, note the grade solutions. Use pre-stressed, pre-fabricated panels to construct the flyovers to speed up construction. HSR Belmont, Tracy Div_03 E 6' El 94' Grade 1.5% P L Option; raise power line, lower flyover El, or both to lower rail grade on this segment X ? Grade 0.2%E 6'On fill with tunnel muck Additional fill area, then to housing
  • 6. Newark Area with B/T HSR flyover and the ACE flyover intersection from/to San Jose, single track ACE flyover is between freight tracks. HSR Belmont, Tracy Div_04 6' E 14' El 41' E 50' El 74' Grade 0.24% Existing ACE corridor Grade 0.6%
  • 7. The Fremont area HSR corridor with a possible second HSR/Commuter Station at an additional BART transfer stop. Tunnel has large S curve. HSR Belmont, Tracy Div_05 WP/E 61' Ba/El 116' HSR/El 140' Tunnel entrance El 140' 37° 34'46 N 121° 57'41W R9300' 1.6° Grade less than 1% Fremont Sta. BART Sta. E 150' Tunnel entrance El 212' Tunnel entrance El 209' Existing track E 188' 37° 35'48 N 121° 56'12 W 37° 35'45' N 121° 56'18 W HSR El 140'E 80' Grade 0.95% tunnel length 1.4 miles Flyover length 500' E 97'
  • 8. Area west of Pleasanton, HSR is from the tunnel to the flyover and then to ground corridor elevation. HSR Belmont, Tracy Div_06 E 315' Tunnel entrance El 342' Grade 1% 37° 38'18 N 121° 53'49W Tunnel length 3.4 miles
  • 9. Pleasanton area, HSR tracks are on the north side of the existing freight line. Here we need a 2 mile long flyover to eliminate grade crossings and a radius enlargement to 3400’ HSR Belmont, Tracy Div_07 Plesanton Sta. E 315' To Sunol Ridge tunnel Radius enlargement
  • 10. HSR Belmont, Tracy Div_07a X X X X Possible area to fabricate the flyover panels. E 372' Overpass El 398' New roadways to provide access for closed crossings
  • 11. Livermore/Vasco area, HSR tracks are on the north side of the existing line and with 1.8 miles of flyovers, other ways the tracks are at ground level. Not all trains will stop here. HSR Belmont, Tracy Div_08 Livermore Sta. Vasco Sta.
  • 12. Ulmar Station area, the trench cut on the north side will allow existing buildings on the south side to remain intact. HSR Belmont, Tracy Div_09 Tunnel entrance El 560' E 714' l 560' E 1400'37° 41'55 N 121° 42'16 W Trench cut on north side of existing track, grade flat Ulmar Sta. ACE track El 592'
  • 13. HSR Belmont, Tracy Div_09a ACE track El 592' HSR tunnel entrance El 560', trench section is flat grade 0.5% HSR in trench, parallel to ACE
  • 14. The Altamont tunnel will shorten the line, eliminate elevation climb and the speed restricting curves. HSR Belmont, Tracy Div_10 E 950' Existing Altamont Pass corridor
  • 15. Tracy Station and Altamont tunnel with fill and underpasses in Lacy HSR Belmont, Tracy Div_11 E 224' Tunnel entrance El 263' Tunnel length 11.85 mi 19 Km Grade 0.5% 37° 41'45 N 121° 29,28 W Tracy Sta.E 170' El 192' Grade 0.63%
  • 16. Tracy station area; flyover for HSR is needed to allow unimpeded SPRR cross traffic and avoid the track diamond. HSR Belmont, Tracy Div_12 R3200' 1.79° maximum speed 80 mph Freight track is on ground with intersect to SPRR SPRR HSR flyover length 0.2 miles El 103' grade 0.8% HSR on 22' high fill to allow road under passes Farm Rd underpass S Bird Rd overpass Tracks are below I-5 E 77'
  • 17. E 151' E 153' E 145' HSR Belmont, Tracy Div_12b S Tracy Blvd W Linne Rd Freight tracks Freight track E 150' Underpass HSR tracks El 173' Park and Ride with overpass to the elevated Station Platform
  • 18. HSR Belmont, Tracy Div_12a E 169' E 170' Underpass El 169' W Linne Rd Coral Hollow Rd El 191' on fill HSR tracks Freight track
  • 19. HSR Belmont, Tracy Div_12c E 145' E 145' E 145' Underpass E 145' S MacArthur Dr W Linne Rd X? Freight track HSR tracks R 3200' 1.79°
  • 20. Alternative corridor, option #1 to enlarge the track radius in Tracy. HSR Belmont, Tracy Div_12aa W Linne Rd underpass Radius correction to 5400' 1.06° Alternative corridor route, option # 1 Radius 5400' 1.06°
  • 21. Alternative corridor, option #1 and 2, the # 2 corridor is the best option, eliminating the tight curves in Tracy, the ICE trains will bypass this station. HSR Belmont, Tracy Div_12cc R 36000' 0.16° R 36000' 0.16° Route alternative # 1 Tunnel length 11.85 miles 19 Km Route alternative # 1 Tunnel length 15.7 miles 25.2 Km
  • 22. HSR Belmont, Tracy Div_12bb E 164' E 183' E 200' E 193' Tunnel entrance El 165' Tunnel to Ulmar 15 miles 23.5 Km Existing ACE and freight corridor Tunnel muck sorting and deposit area, forward mock by conveyor or side-dump rail cars for corridor fills. Later, use this area for the major HSR train maintenance and storage.
  • 23. Northeast of Tracy, upgrade corridor to doubletrack for HSR traffic, keep one track for freight and provide over/underpasses for roads/streets, not shown on this map. HSR Belmont, Tracy Div_13
  • 24. HSR Belmont, Tracy Div_14a To/from LA To/from Sacramento To/from San Francisco/San Jose Underpass Increase HSR radius to 5300'
  • 25. Manteca/Lathrop train corridor intersects, station, park and ride, and new access road area; LA/San Francisco trains will stop here. Corridor line from Lathrop to Stockton is eight miles. Note the unique tri-station layout. Ramp grades are less than 1% - all trains stop here. HSR Belmont, Tracy Div_14 R7300' 0.8° R10500' 0.54° R5300' 1.08° R5300' 1.08° SP/UPRR R2200' P/R
  • 26. HSR Belmont, Tracy Div_14b Palm Ave HSR is on west side of SPRR
  • 27. Modesto corridor changeover alternative from SPRR to BNSF will provide seamless connection south of Lathrop to Los Angeles. Some of the shown on-fill tracks will need short bridges and have underpasses. Santa FE Ave and E Hatch Rd will have overpass. HSR ICE train trip time, SFO/Modesto is 75 minutes or less. BNSF SPRR HSR Belmont, Tracy Div_15 Modesto Preferred route
  • 28. Conveyor system to transport Tunnel excavation material and re-naturalization (Alpine Tunnel Switzerland)
  • 29. The Altamont Hill Tunnel is a twin bore system to provide emergency rescue if needed. The cross cuts will have airlocks to block out “smoke” 6.5 Miles 10.5 Km 1025' 312.5m 1025' 312.5m Salem Hill Tunnel - length estimated Cross cuts to provide emergency escape 32 cross cuts will be needed 31.43'9.58m
  • 30. HSR twin-bore tunnel entrances. The slots in the exposed tunnel section work as a wind impact damper, this will reduce air pressure shock to trains and uncomfortable pressure changes for passengers as well. Des by Spain