Summary of HR 3684, Infrastructure Investment and Jobs Act, August 10, 2021 version, Passed Senate with amendments
117th Congress (2021-2022), 1st Session
https://www.congress.gov/117/bills/hr3684/generated/BILLS-117hr3684eas.html
Accessed: 9/24/2021, 9/25/2021
Compiled by: Gabriel Putnam
Questions/Corrections/Commentary:
Contact: gabriel.putnam@gmail.com
Excel table available upon request
Caveats:
This is a only summary of an "enormous" bill
Printed, it is approximately 2700 pages long (depending on formatting)
I have attempted to note appropriations, yet there may be financial effects I missed (2700 pages of legalese)
I am not a lawyer, this should not be construed as legal advice
I am not an accountant, this should not be construed as financial advice
I do not represent the government or the authors of this bill
Use this information at your own risk
The bill itself is the definitive copy of this information
Summary
This bill is divided into 11 major Divisions (A-K), each usually with several Titles and Subtitles and then Sections
Based on my initial reading of this bill it is unclear whether A-I appropriations are simply rephrased in J or in addition to J
There is usually a large discrepancy between A-I and J, no matter how they are summarized
Division A almost equals all the spending in J except for 2022
Appropriation Summaries for each Division 2022 2023 2024 2025 2026
A - SURFACE TRANSPORTATION $65,404,474,533 $66,931,526,025 $68,469,508,545 $69,911,880,714 $71,480,610,183
B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 $14,187,755,767 $13,660,245,219 $14,058,262,024 $14,462,923,780 $14,917,734,652
C - TRANSIT $16,505,000,000 $16,784,000,000 $17,140,000,000 $17,429,000,000 $17,792,000,000
D - ENERGY $85,064,868,000 $2,357,450,000 $2,129,962,500 $2,270,540,625 $862,987,656
E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE $5,990,000,000 $6,690,000,000 $7,215,000,000 $7,750,000,000 $7,770,000,000
F - BROADBAND $45,000,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000
G - OTHER AUTHORIZATIONS $4,034,000,000 $1,709,000,000 $1,605,000,000 $1,405,000,000 $1,305,000,000
H - REVENUE PROVISIONS Note: this is primarily transfers to trust funds $118,000,000,000 $0 $0 $0 $0
I - OTHER MATTERS Note: this is primarily recission of prior funding ($41,755,000,000) $0 $0 $0 $0
J - APPROPRIATIONS Note: this is itemized spending by Departments (very long) $179,330,736,000 $71,669,494,000 $69,645,205,500 $68,897,783,625 $67,025,347,656
K - MINORITY BUSINESS DEVELOPMENT $110,000,000 $110,000,000 $110,000,000 $110,000,000 $0
Appropriations rephrased as jobs per $'s spent
Using the average: 52,378
$ of the 2019 real median earnings of men ($57,456) and women ($47,299) in 2019 from: https://www.census.gov/library/publications/2020/demo/p60-270.html
Using the average: 52% overhead rate for government contracting
For a final rate of: $79,614
Saying every dollar is turned into a salary+overhead job:
These numbers work out to employment figures of:
2022 2023 2024 2025 2026
A - SURFACE TRANSPORTATION 821,522 840,703 860,021 878,138 897,842
B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 178,207 171,581 176,581 181,664 187,376
C - TRANSIT 207,313 210,818 215,289 218,919 223,479
D - ENERGY 1,068,469 29,611 26,754 28,519 10,840
E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE 75,238 84,031 90,625 97,345 97,596
F - BROADBAND 565,229 6,908 6,908 6,908 6,908
G - OTHER AUTHORIZATIONS 50,670 21,466 20,160 17,648 16,392
H - REVENUE PROVISIONS 1,482,155 0 0 0 0
I - OTHER MATTERS -524,469 0 0 0 0
J - APPROPRIATIONS 2,252,508 900,214 874,788 865,400 841,881
K - MINORITY BUSINESS DEVELOPMENT 1,382 1,382 1,382 1,382 0
A - SURFACE TRANSPORTATION Major contributor is Federal-aid Highway Program
B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 Major contributors: Multimodal Investment and Amtrak
C - TRANSIT Major contributors: Financial assistance for urbanized areas, Competitive grants for rail vehicle replacement, andd Capital Investment Grants
D - ENERGY Major contributors: Grid infrastructure resiliency and reliability, Battery processing and manufacturing, Carbon Storage and Removal,
Regional clean hydrogen hubs, Nuclear Energy, Weatherization Assistance Program, Orphaned Well Site Plugging, Abandoned Mine Reclamation,
Wildfire Reduction and Ecosystem Restoration, and Aging Water Infrastructure
E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE Major contributors: Drinking Water State Revolving Loan Fund and Clean Water State Revolving Funds
F - BROADBAND Major contributors: Broadband equity, access, and deployment program
G - OTHER AUTHORIZATIONS Major contributors: Indian Water Rights Settlement Completion Fund and Clean School Buses
H - REVENUE PROVISIONS Major contributors: Transfers to Highway Account and Mass Transit Account Trust Funds
I - OTHER MATTERS Major contributors: Recission of: Disaster Loans, Targeted EIDL Advance, Business Loans, Pandemic Relief for Aviation Workers
J - APPROPRIATIONS Major contributors: This is itemized appropriations for each Department individually
K - MINORITY BUSINESS DEVELOPMENT Major contributors: Minority Business Development Agency
Itemized Spending for Each Division
Spending as has been summarized by: Division TITLE Department
Where a: is shown, it means: for the period of fiscal years X to Y Ex: $1,000,000,000 for the period of fiscal years 2022 through 2026, to remain available until expended
Many appropriations are simply set in 2022 and "to remain available until expended"
Green text means: "This is an allocation" of how appropriated funds shall be spent
Several calculations use forms such as: prior year*CPI Δ These have not been include in summaries (CPI meaning Consumer Price Index in this example)
(Red text) means: "These funds are recinded" from prior sources of funding (removed, taken away)
Note: Its still really long, even the summary is 11 pages long
A - SURFACE TRANSPORTATION 2022 2023 2024 2025 2026
Total - Division A $65,404,474,533 $66,931,526,025 $68,469,508,545 $69,911,880,714 $71,480,610,183
TITLE I-Federal-aid highways $65,321,974,533 $66,847,026,025 $68,383,008,545 $69,823,380,714 $71,390,110,183
In general
Federal-aid highway program $52,488,065,375 $53,537,826,683 $54,608,583,217 $55,700,754,881 $56,814,769,844
Transportation Infrastructure Finance And Innovation Program $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000
Federal Lands and Tribal Transportation Program
Tribal transportation program $578,460,000 $589,960,000 $602,460,000 $612,960,000 $627,960,000
Federal lands transportation program
In general $421,965,000 $429,965,000 $438,965,000 $447,965,000 $455,965,000
Allocation
National Park Service $332,427,450 $338,867,450 $346,237,450 $353,607,450 $360,047,450
United States Fish and Wildlife Service $36,000,000 $36,000,000 $36,000,000 $36,000,000 $36,000,000
Forest Service $24,000,000 $25,000,000 $26,000,000 $27,000,000 $28,000,000
Federal lands access program $285,975,000 $291,975,000 $296,975,000 $303,975,000 $308,975,000
Territorial And Puerto Rico Highway Program $219,000,000 $224,000,000 $228,000,000 $232,500,000 $237,000,000
Puerto Rico highway program $173,010,000 $176,960,000 $180,120,000 $183,675,000 $187,230,000
Territorial highway program $45,990,000 $47,040,000 $47,880,000 $48,825,000 $49,770,000
Nationally Significant Freight And Highway Projects $1,000,000,000 $1,000,000,000 $1,000,000,000 $900,000,000 $900,000,000
Additional Authorization (Sec 11110, (s)) $1,000,000,000 $1,100,000,000 $1,200,000,000 $1,300,000,000 $1,400,000,000
Other programs
In general
Bridge investment program $600,000,000 $640,000,000 $650,000,000 $675,000,000 $700,000,000
Tribal transportation facility bridge set aside (Sec 11118, (a), (q)) $16,000,000 $18,000,000 $20,000,000 $22,000,000 $24,000,000
Congestion relief program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Charging and fueling infrastructure grants $300,000,000 $400,000,000 $500,000,000 $600,000,000 $700,000,000
Rural surface transportation grant program $300,000,000 $350,000,000 $400,000,000 $450,000,000 $500,000,000
PROTECT grants
In general $250,000,000 $250,000,000 $300,000,000 $300,000,000 $300,000,000
Allocation
for planning grants $25,000,000 $25,000,000 $30,000,000 $30,000,000 $30,000,000
for resilience improvement grants $175,000,000 $175,000,000 $210,000,000 $210,000,000 $210,000,000
https://www.bostonglobe.com/news/nation/2013/03/17/harvard-mit-and-other-research-schools-thwart-obama-administration-effort-cap-overhead-
payments/Nk5PT0Mc8MQZihFVNs5gNK/story.html
for community resilience and evacuation route grants $25,000,000 $25,000,000 $30,000,000 $30,000,000 $30,000,000
for at-risk coastal infrastructure grants $25,000,000 $25,000,000 $30,000,000 $30,000,000 $30,000,000
Reduction of truck emissions $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Nationally significant Federal lands and Tribal projects $55,000,000 $55,000,000 $55,000,000 $55,000,000 $55,000,000
General fund
Bridge investment program $600,000,000 $640,000,000 $650,000,000 $675,000,000 $700,000,000
Nationally significant Federal lands and Tribal projects program $300,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000
Healthy Streets program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Transportation Resilience and Adaptation Centers of Excellence $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Open challenge and research proposal pilot program $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000
Research, technology, and education authorizations
In general
Highway research and development program $147,000,000 $147,000,000 $147,000,000 $147,000,000 $147,000,000
Technology and innovation deployment program $110,000,000 $110,000,000 $110,000,000 $110,000,000 $110,000,000
Training and education $25,000,000 $25,250,000 $25,500,000 $25,750,000 $26,000,000
Intelligent transportation systems program $110,000,000 $110,000,000 $110,000,000 $110,000,000 $110,000,000
University transportation centers program $80,000,000 $80,500,000 $81,000,000 $81,500,000 $82,000,000
Bureau of transportation statistics $26,000,000 $26,250,000 $26,500,000 $26,750,000 $27,000,000
Pilot programs
Wildlife crossings pilot program $60,000,000 $65,000,000 $70,000,000 $75,000,000 $80,000,000
Prioritization process pilot program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Reconnecting communities pilot program
Planning grants $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000
Capital construction grants $65,000,000 $68,000,000 $70,000,000 $72,000,000 $75,000,000
Modifications to existing programs
Administrative expenses $490,964,697 $500,783,991 $510,799,671 $521,015,664 $531,435,977
Congestion mitigation and air quality improvement program $2,536,490,803 $2,587,220,620 $2,638,965,032 $2,691,744,332 $2,745,579,213
national highway freight program $1,373,932,519 $1,401,411,169 $1,429,439,392 $1,458,028,180 $1,487,188,740
Metropolitan planning $438,121,139 $446,883,562 $455,821,233 $464,937,657 $474,236,409
Construction of ferry boats and ferry terminal facilities (Sec 11121) $110,000,000 $112,000,000 $114,000,000 $116,000,000 $118,000,000
Tribal high priority projects program (Sec 11128)
Set aside $9,000,000 $9,000,000 $9,000,000 $9,000,000 $9,000,000
Appropriations $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000
Appalachian regional energy hub initiative (Sec 11506) $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Denali Commission (Sec 11507) $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Invasive plant elimination program (Sec 11522) $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Pollinator-friendly practices on roadsides and highway rights-of-way (Sec 11528) $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
Active transportation infrastructure investment program (Sec 11529) $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
TITLE II-Transportation infrastructure finance and innovation $0 $0 $0 $0 $0
(No specific appropriations, lots of limitations and percentage changes)
TITLE III-Research, technology, and education $32,500,000 $32,500,000 $32,500,000 $32,500,000 $32,500,000
Strategic innovation for revenue collection $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000
National motor vehicle per-mile user fee pilot $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Data integration pilot program $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000
Emerging technology research pilot program $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
TITLE IV-Indian Affairs $50,000,000 $52,000,000 $54,000,000 $56,000,000 $58,000,000
Bureau of Indian Affairs road maintenance program $50,000,000 $52,000,000 $54,000,000 $56,000,000 $58,000,000
B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 2022 2023 2024 2025 2026
Total - Division B $14,187,755,767 $13,660,245,219 $14,058,262,024 $14,462,923,780 $14,917,734,652
TITLE !-Multimodal and freight transportation $4,428,750,000 $4,428,750,000 $4,428,750,000 $4,428,750,000 $4,428,750,000
Subtitle A - Multimodal freight policy
Office of Multimodal Freight Infrastructure and Policy "such sums as are necessary to carry out this section"???
Multi-State freight corridor planning $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
Subtitle B - Multimodal investment
National infrastructure project assistance
Multimodal infrastructure investments $2,000,000,000 $2,000,000,000 $2,000,000,000 $2,000,000,000 $2,000,000,000
Local and regional project assistance $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000
National culvert removal, replacement, and restoration grant program $800,000,000 $800,000,000 $800,000,000 $800,000,000 $800,000,000
National multimodal cooperative freight research program $3,750,000 $3,750,000 $3,750,000 $3,750,000 $3,750,000
Subtitle C - Railroad rehabilitation and improvement financing reforms
RRIF codification and reforms
In general $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Refund of credit risk premium $70,000,000 $70,000,000 $70,000,000 $70,000,000 $70,000,000
TITLE II-Rail $7,245,000,000 $6,682,500,000 $7,035,500,000 $7,395,000,000 $7,804,500,000
Subtitle A - Authorization of appropriations
Grants to Amtrak
Northeast Corridor $1,570,000,000 $1,100,000,000 $1,200,000,000 $1,300,000,000 $1,400,000,000
National Network $2,300,000,000 $2,200,000,000 $2,450,000,000 $2,700,000,000 $3,000,000,000
Federal Railroad Administration
Safety and operations $248,000,000 $254,000,000 $263,000,000 $271,000,000 $279,000,000
Railroad research and development $43,000,000 $44,000,000 $45,000,000 $46,000,000 $47,000,000
Consolidated rail infrastructure and safety improvements grants $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Railroad crossing elimination program $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000
Restoration and enhancement grants $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Federal-State partnership for intercity passenger rail grants $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000
Amtrak Office of Inspector General $26,500,000 $27,000,000 $27,500,000 $28,000,000 $28,500,000
Subtitle B - Amtrak reforms
Enhancing cross border service Secretaries may "provide support requested by Amtrak that is necessary"
Amtrak daily long-distance service study $7,500,000 $7,500,000
Subtitle C - Intercity passenger rail policy
(No specific appropriations)
Subtitle D - Rail Safety
(No specific appropriations)
TITLE III-Motor carrier safety $856,000,000 $873,650,000 $891,300,000 $908,950,000 $926,600,000
Administrative expenses $360,000,000 $367,500,000 $375,000,000 $382,500,000 $390,000,000
Financial assistance programs
motor carrier safety assistance program $390,500,000 $398,500,000 $406,500,000 $414,500,000 $422,500,000
high priority program $57,600,000 $58,800,000 $60,000,000 $61,200,000 $62,400,000
commercial motor vehicle enforcement training and support grant program $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
commercial motor vehicle operators grant program $1,100,000 $1,200,000 $1,300,000 $1,400,000 $1,500,000
financial assistance program for commercial driver’s license implementation $41,800,000 $42,650,000 $43,500,000 $44,350,000 $45,200,000
TITLE IV-Highway and Motor Vehicle Safety $1,367,394,333 $1,396,520,219 $1,422,887,024 $1,449,398,780 $1,476,059,652
Subtitle A - Highway traffic safety
Highway safety programs $363,400,000 $370,900,000 $378,400,000 $385,900,000 $393,400,000
Highway safety research and development $186,000,000 $190,000,000 $194,000,000 $198,000,000 $202,000,000
High-visibility enforcement program $36,400,000 $38,300,000 $40,300,000 $42,300,000 $44,300,000
National priority safety programs $336,500,000 $346,500,000 $353,500,000 $360,500,000 $367,500,000
Administrative expenses $38,000,000 $39,520,000 $41,100,800 $42,744,832 $44,454,625
National driver register $6,800,000 $7,000,000 $7,200,000 $7,400,000 $7,600,000
Safe Streets and Roads for All grant program (Sec 24112) $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Subtitle B - Vehicle Safety
Appropriations $200,294,333 $204,300,219 $208,386,224 $212,553,948 $216,805,027
TITLE V-Research and innovation $160,000,000 $160,000,000 $160,000,000 $160,000,000 $160,000,000
Bureau of Transportation Statistics (Sec 25004) $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Strengthening mobility and revolutionizing transportation grant program (Sec 25005) $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Advanced transportation research (Sec 25012) "such sums as are necessary to carry out this section"???
Open research initiative (Sec 25013)
Advanced transportation research initiative (Sec 5506) $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
TITLE IV-Hazardous materials $117,825,000 $118,825,000 $119,825,000 $120,825,000 $121,825,000
Appropriations
In general $67,000,000 $68,000,000 $69,000,000 $70,000,000 $71,000,000
Hazardous Materials Emergency Preparedness Fund
Planning and Training Grants (5516(a)) $39,050,000 $39,050,000 $39,050,000 $39,050,000 $39,050,000
Monitoring and Technical Assistance (5516(e)) $150,000 $150,000 $150,000 $150,000 $150,000
Emergency Response Guidebook(5116(h)(3)) $625,000 $625,000 $625,000 $625,000 $625,000
Supplemental Training Grants(5116(I)) $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
Hazardous materials training grants $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
Community safety grants $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000
TITLE VII-General provisions $0 $0 $0 $0 $0
(No specific appropriations)
TITLE VIII-Sport fish restoration and recreational boating safety $12,786,434 $0 $0 $0 $0
Set-aside for administration prior year+$979500 prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ
Set-aside for Coast Guard administration $12,786,434 prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ
Wildlife restoration fund administration prior year+$979500 prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ
C - TRANSIT 2022 2023 2024 2025 2026
Total - Division C $16,505,000,000 $16,784,000,000 $17,140,000,000 $17,429,000,000 $17,792,000,000
Authorizations
Grants
In general $13,355,000,000 $13,634,000,000 $13,990,000,000 $14,279,000,000 $14,642,000,000
Allocations
5305 $184,647,343 $188,504,820 $193,426,906 $197,422,644 $202,441,512
20005(b) of the Federal Public Transportation Act of 2012 $13,157,184 $13,432,051 $13,782,778 $14,067,497 $14,425,121
Financial assistance for urbanized areas $6,408,288,249 $6,542,164,133 $6,712,987,840 $6,851,662,142 $7,025,844,743
Enhanced mobility of seniors and individuals with disabilities $371,247,094 $379,002,836 $388,899,052 $396,932,778 $407,023,583
Innovative coordinated access and mobility $4,605,014 $4,701,218 $4,823,972 $4,923,624 $5,048,792
Financial assistance for rural areas $875,289,555 $893,575,275 $916,907,591 $935,848,712 $959,639,810
5132 $36,840,115 $37,609,743 $38,591,779 $39,388,993 $40,390,337
5132(h) $5,000,000 $5,104,455 $5,237,739 $5,345,938 $5,481,842
5132(I) $6,578,592 $6,716,026 $6,891,389 $7,033,749 $7,212,560
5314 $11,841,465 $12,088,846 $12,404,500 $12,660,748 $12,982,608
National transit institute $6,578,592 $6,716,026 $6,891,389 $7,033,749 $7,212,560
Sec 5318 $5,000,000 $5,104,455 $5,237,739 $5,345,938 $5,481,842
Sec 5334 $131,000,000 $134,930,000 $138,977,900 $143,147,237 $147,441,654
Sec 5335 $5,262,874 $5,372,820 $5,513,111 $5,626,999 $5,770,048
Sec 5337(f), Competitive grants for rail vehicle replacement $3,515,528,226 $3,587,778,037 $3,680,934,484 $3,755,675,417 $3,850,496,668
Buses and bus facilities program $603,992,657 $616,610,699 $632,711,140 $645,781,441 $662,198,464
Buses and bus facilities and low emission competitive grants $447,257,433 $456,601,111 $468,523,511 $478,202,088 $490,358,916
Low emission grants $71,561,189 $73,056,178 $74,963,762 $76,512,334 $78,457,427
Financial assistance for urban and rural areas $741,042,792 $756,523,956 $776,277,698 $792,313,742 $812,455,901
Growing States $392,752,680 $400,957,696 $411,427,180 $419,926,283 $430,601,628
High Density States $348,290,112 $355,566,259 $364,850,518 $372,387,459 $381,854,274
Capital investment grants $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000
Capital and preventive maintenance grants to Washington Metropolitan Area Transit Authority $150,000,000 $150,000,000 $150,000,000 $150,000,000 $150,000,000
D - ENERGY 2022 2023 2024 2025 2026
Total - Division D $85,064,868,000 $2,357,450,000 $2,129,962,500 $2,270,540,625 $862,987,656
TITLE I-Grid infrastructure resiliency $15,220,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Subtitle A - Grid infrastructure resiliency and reliability
Preventing outages and enhancing the resilience of the electric grid $5,000,000,000
Electric grid reliability and resilience research, development, and demonstration
Energy infrastructure Federal financial assistance program $5,000,000,000
Energy improvement in rural or remote areas $1,000,000,000
Transmission facilitation program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Deployment of technologies to enhance grid flexibility $3,000,000,000
State energy program $500,000,000
Columbia Basin power management
Transmission Coordination and Expansion Aggregated amount of the Canadian Entitlement during the 5-year period preceding
Increased Hydroelectric Capacity $100,000,000
Power Coordination Study $10,000,000
Subtitle B - Cybersecurity
Rural and municipal utility advanced cybersecurity grant and technical assistance program $250,000,000
Enhanced grid security
Cybersecurity for the energy sector research, development, and demonstration program $250,000,000
Energy sector operational support for cyberresilience program $50,000,000
Modeling and assessing energy infrastructure risk $50,000,000
TITLE II-Supply chains for clean energy technologies $7,812,000,000 $100,000,000 $100,000,000 $0 $0
Earth Mapping Resources Initiative $320,000,000
USGS energy and minerals research facility $167,000,000
Rare earth elements demonstration facility $140,000,000
Battery processing and manufacturing
Battery material processing grants $3,000,000,000
Battery manufacturing and recycling grants $3,000,000,000
Lithium-Ion Battery Recycling Prize Competition $10,000,000
Battery and critical mineral recycling
Battery recycling research, development, and demonstration grants $60,000,000
State and local programs $50,000,000
Retailers as collection points $15,000,000
Electric drive vehicle battery recycling and second-life applications program
Electric drive vehicle battery second-Life applications and recycling $200,000,000
Advanced energy manufacturing and recycling grant program $750,000,000
Critical minerals mining and recycling research
Grant program for processing of critical minerals and development of critical minerals and metals $100,000,000 $100,000,000 $100,000,000
TITLE III-Fuels and technology infrastructure investments $23,546,600,000 $667,250,000 $368,562,500 $369,940,625 $371,387,656
Subtitle A - Carbon capture, utilization, storage, and transportation infrastructure
Carbon utilization program $41,000,000 $65,250,000 $66,562,500 $67,940,625 $69,387,656
Carbon capture technology program $100,000,000
Carbon dioxide transportation infrastructure finance and innovation $600,000,000 $600,000,000 $300,000,000 $300,000,000 $300,000,000
Carbon storage validation and testing $2,500,000,000
Secure geologic storage permitting $50,000,000
Carbon removal $3,500,000,000
Subtitle B - Hydrogen research and development
Additional clean hydrogen programs
Regional clean hydrogen hubs $8,000,000,000
Clean hydrogen manufacturing and recycling $500,000,000
Clean hydrogen electrolysis program $1,000,000,000
Subtitle C - Nuclear Energy Infrastructure
Civil nuclear credit program $6,000,000,000
Subtitle D - Hydropower
Hydroelectric production incentives $125,000,000
Hydroelectric efficiency improvement incentives $75,000,000
Maintaining and enhancing hydroelectricity incentives $553,600,000
Pumped storage hydropower wind and solar integration and system reliability initiative $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
Subtitle E - Miscellaneous
Clean energy demonstration program on current and former mine land $500,000,000
TITLE IV-Enabling energy infrastructure investment and data collection $0 $0 $0 $0 $0
Subtitle A - Department of Energy loan program
(No specific appropriations)
Subtitle B - Energy Information Administration
(No specific appropriations)
Subtitle C - Miscellaneous
(No specific appropriations)
TITLE V-Energy efficiency and building infrastructure $6,005,000,000 $20,000,000 $0 $0 $0
Subtitle A - Residential and commercial energy efficiency
Energy efficiency revolving loan fund capitalization grant program $250,000,000
Energy auditor training grant program $40,000,000
Subtitle B - Buildings
Cost-effective codes implementation for efficiency and resilience $225,000,000
Building, training, and assessment centers $10,000,000
Career skills training $10,000,000
Subtitle C - Industrial energy efficiency
Part I - Industry
Future of industry program and industrial research and assessment centers
In general $150,000,000
Implementation grants $400,000,000
Part II - Smart Manufacturing
State manufacturing leadership $50,000,000
Subtitle D - Schools and nonprofits
Grants for energy efficiency improvements and renewable energy improvements at public school facilities $500,000,000
Energy efficiency materials pilot program $50,000,000
Subtitle E - Miscellaneous
Weatherization assistance program $3,500,000,000
Energy Efficiency and Conservation Block Grant Program $550,000,000
Assisting Federal Facilities with Energy Conservation Technologies grant program $250,000,000
Rebates - extended product system $10,000,000 $10,000,000
Rebates - energy efficient transformer $10,000,000 $10,000,000
TITLE VI-Methane reduction infrastructure $4,707,000,000 $0 $0 $0 $0
Orphaned well site plugging, remediation, and restoration
Federal program $250,000,000
State program - Initial grants $775,000,000
State program - Formula grants $2,000,000,000
State program - Performance grants $1,500,000,000
Tribal orphaned well site plugging, remediation, and restoration $150,000,000
To Secretary of Energy - Interstate Oil and Gas Compact Commission R&D $30,000,000
To the Interstate Oil and Gas Compact Commission $2,000,000
TITLE VII-Abandoned mine land reclamation $14,318,000,000 $0 $0 $0 $0
Abandoned Mine Reclamation Fund authorization of appropriations $11,293,000,000
To Secretary of Interior - States and Indian Tribes with the financial and technical assistance $25,000,000
Amounts distributed from Abandoned Mine Reclamation Fund prior year+adjust prior year+adjust prior year+adjust prior year+adjust prior year+adjust
Abandoned hardrock mine reclamation $3,000,000,000
Grants to States and Indian Tribes $1,500,000,000
Inventory, assess, decommission, reclaim, respond to hazardous substance releases $1,500,000,000
TITLE VIII-Natural resources-related infrastructure, wildfire management, and ecosystem restoration $5,839,200,000 $90,000,000 $0 $0 $800,000
Forest Service Legacy Road and Trail Remediation Program $250,000,000
Wildfire risk reduction $3,369,200,000
NOAA - Rapidly detect and report wildfires $20,000,000
Secretary of the Interior $10,000,000
Secretary of Agriculture $10,000,000
Federal wildland firefighters salaries $600,000,000
Secretary of the Interior $120,000,000
Secretary of Agriculture $480,000,000
Secretary of the Interior - Acquire incident management technology $10,000,000
Secretary of Agriculture - Reverse-911 telecommunication systems $30,000,000
Secretary of the Interior - Slip-on tanker units for local governments $50,000,000
Secretary of Agriculture - Map depicting at-risk communities $1,200,000
Workshops and workforce training $100,000,000
Secretary of the Interior $50,000,000
Secretary of Agriculture $50,000,000
Secretary of Agriculture - To Southwest Ecological Restoration Institute $20,000,000
Joint Fire Science Program $20,000,000
Secretary of the Interior $10,000,000
Secretary of Agriculture $10,000,000
Secretary of Agriculture - Collaborative Forest Landscape Restoration Program $100,000,000
Thinning and timber harvesting $500,000,000
Secretary of the Interior $100,000,000
Secretary of Agriculture $400,000,000
Secretary of Agriculture - community wildfire defense grants $500,000,000
Prescribed fires $500,000,000
Secretary of the Interior $250,000,000
Secretary of Agriculture $250,000,000
Developing or improving potential control locations (firebreaks, fuelbreaks) $500,000,000
Secretary of the Interior $250,000,000
Secretary of Agriculture $250,000,000
Modify and remove flammable vegetation on Federal land $200,000,000
Secretary of the Interior $100,000,000
Secretary of Agriculture $100,000,000
Post-fire restoration activities $200,000,000
Secretary of the Interior $100,000,000
Secretary of Agriculture $100,000,000
Secretary of Agriculture - Firewood banks $8,000,000
Procurement and placement of wildfire detection and real-time monitoring equipment $10,000,000
Ecosystem restoration $2,130,000,000
Stewardship contracts and Health Forests Restoration Act of 2003 $300,000,000
Secretary of the Interior $50,000,000
Secretary of Agriculture $150,000,000
Secretary of the Interior - Healthy Forests Restoration Act working capital fund $100,000,000
State and Indian Tribes restoration projects $200,000,000
Secretary of the Interior $40,000,000
Secretary of Agriculture $160,000,000
Secretary of Agriculture - purchase and process byproducts from ecosystem restoration projects $400,000,000
Secretary of the Interior - grants for implementing voluntary ecosystem restoration projects $400,000,000
Secretary of Agriculture - temporary water crossing structures $50,000,000
Invasive species detection, prevention, and eradication $200,000,000
Secretary of the Interior $100,000,000
Secretary of Agriculture $100,000,000
Restore, prepare, or adapt recreation sites $100,000,000
Secretary of the Interior $45,000,000
Secretary of Agriculture $35,000,000
Secretary of Agriculture - Restore cabins and historic buildings $20,000,000
Restore native vegetation and mitigate environmental hazards on mined land $200,000,000
Secretary of the Interior $100,000,000
Secretary of Agriculture $100,000,000
National revegetation effort $200,000,000
Secretary of the Interior $70,000,000
Secretary of Agriculture $130,000,000
Secretary of Agriculture - Landscape scale restoration of water quality or fish passage $80,000,000
GAO study $800,000
Joint Chiefs Landscape Restoration Partnership program $90,000,000 $90,000,000
TITLE IX-Western water infrastructure $4,350,000,000 $0 $0 $0 $0
Water storage, groundwater storage, and conveyance projects $1,150,000,000
Grants for small surface water and groundwater storage $100,000,000
Aging Infrastructure Account $3,200,000,000
Bureau of Reclamation works that have suffered a critical failure $100,000,000
Rehabilitation, reconstruction, or replacement of a dam $100,000,000
Rural water projects $1,000,000,000
Water recycling and reuse projects $1,000,000,000
Reclamation Wastewater and Groundwater Study and Facilities Act $550,000,000
Large-scale water recycling and reuse projects $450,000,000
Water Desalination Act $250,000,000
Reclamation Safety of Dams Act $500,000,000
WaterSMART grants $400,000,000
Projects that improve the condition of a natural feature or nature-based feature $100,000,000
Colorado River Basin Drought Contingency Plan $300,000,000
Drought Contingency Plan for the Upper Colorado River Basin $50,000,000
Financial assistance for watershed management projects $100,000,000
Design, study, and construction of aquatic ecosystem restoration and protection projects $250,000,000
Multi-benefit projects to improve watershed health $100,000,000
Endangered species recovery and conservation programs in the Colorado River Basin $50,000,000
TITLE X-Authorization of appropriations for Energy Act of 2020 $3,267,068,000 $1,470,200,000 $1,651,400,000 $1,890,600,000 $480,800,000
Energy Storage Demonstration Projects
Energy Storage Demonstration Projects $355,000,000
Long-duration Demonstration Initiative and Joint Program $150,000,000
Advanced Reactor Demonstrations $511,000,000 $506,000,000 $636,000,000 $824,000,000 $453,000,000
Mineral Security Projects
National Geological and Geophysical Data Preservation Program $8,668,000 $5,000,000 $5,000,000 $5,000,000
Rare Earth Mineral Security $23,000,000 $24,200,000 $25,400,000 $26,600,000 $27,800,000
Critical Material Innovation, Efficiency, and Alternatives $230,000,000 $100,000,000 $135,000,000 $135,000,000
Critical Material Supply Chain Research Facility $40,000,000 $35,000,000
Carbon Capture Demonstration and Pilot Programs
Carbon Capture Large-scale Pilot Projects $387,000,000 $200,000,000 $200,000,000 $150,000,000
Carbon Capture Demonstration Projects Program $937,000,000 $500,000,000 $500,000,000 $600,000,000
Direct Air Capture Technologies Prize Competition
Precommercial $15,000,000
Commercial $100,000,000
Water Power Projects
Hydropower and Marine Energy
Section 634 of the Energy Independence and Security Act of 2007 $36,000,000
Section 635 of the Energy Independence and Security Act of 2007 $70,400,000
National Marine Energy Centers $40,000,000
Renewable Energy Projects
Geothermal Energy $84,000,000
Wind Energy
Section 3003(b)(2) of the Energy Act of 2020 $60,000,000
Section 3003(b)(4) of the Energy Act of 2020 $40,000,000
Solar Energy
Section 3004(b)(2) of the Energy Act of 2020 $40,000,000
Section 3004(b)(3) of the Energy Act of 2020 $20,000,000
Section 3004(b)(4) of the Energy Act of 2020 $20,000,000
Industrial Emissions Demonstration Projects $100,000,000 $100,000,000 $150,000,000 $150,000,000
TITLE XI-Wage Rate Requirements $0 $0 $0 $0 $0
(No specific appropriations)
TITLE XII-Miscellaneous $0 $0 $0 $0 $0
(No specific appropriations)
E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE 2022 2023 2024 2025 2026
Total - Division E $5,990,000,000 $6,690,000,000 $7,215,000,000 $7,750,000,000 $7,770,000,000
TITLE I-Drinking Water $2,915,000,000 $3,270,000,000 $3,545,000,000 $3,820,000,000 $3,845,000,000
Technical assistance and grants for emergencies affecting public water systems
Safe Drinking Water Act
Subsection (b) $35,000,000 $35,000,000 $35,000,000 $35,000,000 $35,000,000
Subsection (e) $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000
Drinking Water State Revolving Loan Fund
Drinking Water State Revolving Funds Capitalization Grant Reauthorization $2,400,000,000 $2,750,000,000 $3,000,000,000 $3,250,000,000 $3,250,000,000
Assistance for small and disadvantaged communities
Existing Programs
In general $70,000,000 $80,000,000 $100,000,000 $120,000,000 $140,000,000
Drinking water infrastructure resilience and sustainability $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000
Connection to Public Water Systems $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Competitive Grant Pilot Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Reducing lead in drinking water
Section 1459B of the Safe Drinking Water Act $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Lead Inventorying Utilization Grant Pilot Program $10,000,000
Operational sustainability of small public water systems $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Midsize and large drinking water system infrastructure resilience and sustainability program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Lead contamination in school drinking water $30,000,000 $35,000,000 $40,000,000 $45,000,000 $50,000,000
Indian reservation drinking water program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Advanced drinking water technologies $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
TITLE II-Clean Water $3,075,000,000 $3,420,000,000 $3,670,000,000 $3,930,000,000 $3,925,000,000
Research, investigations, training, and information $75,000,000 $75,000,000 $75,000,000 $75,000,000 $75,000,000
Make grants to nonprofit organizations $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Wastewater efficiency grant pilot program $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Pilot program for alternative water source projects $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000
Sewer overflow and stormwater reuse municipal grants $280,000,000 $280,000,000 $280,000,000 $280,000,000 $280,000,000
Clean water infrastructure resiliency and sustainability program $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000
Small and medium publicly owned treatment works circuit rider program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Grants for construction and refurbishing of individual household decentralized wastewater systems
for individuals with low or moderate income $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Connection to publicly owned treatment works $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000
Clean water state revolving funds $2,400,000,000 $2,750,000,000 $3,000,000,000 $3,250,000,000 $3,250,000,000
Water infrastructure and workforce investment $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
Grants to Alaska to improve sanitation in rural and native villages $40,000,000 $40,000,000 $40,000,000 $50,000,000 $60,000,000
Water data sharing pilot program $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000
Water infrastructure financing reauthorization $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Stormwater infrastructure technology
Centers of excellence for stormwater control infrastructure technologies $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
Stormwater control infrastructure project grants $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Clean watersheds needs survey $5,000,000
Water resources research act amendments
In general $12,000,000 $12,000,000 $12,000,000 $12,000,000
Research focused on water problems of interstate nature $3,000,000 $3,000,000 $3,000,000 $3,000,000
Enhanced aquifer use and recharge $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
F - BROADBAND 2022 2023 2024 2025 2026
Total - Division F $45,000,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000
TITLE I-Broadband grants for states, district of columbia, puerto rico, and territories $42,450,000,000 $0 $0 $0 $0
Grants for broadband deployment
Broadband equity, access, and deployment program $42,450,000,000
TITLE II-Tribal connectivity technical amendments $0 $0 $0 $0 $0
(No specific appropriations)
TITLE III-Digital equity act of 2021 $1,550,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000
State digital equity capacity grant program
Planning grants $60,000,000
State capacity grants $240,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000
Digital equity competitive grant program $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000
Policy research, data collection, analysis and modeling, evaluation, and dissemination "such sums as are necessary to carry out this section"???
General provisions, To the Office of the Inspector General $1,000,000,000
TITLE IV-Enabling middle mile broadband infrastructure $1,000,000,000 $0 $0 $0 $0
Enabling middle mile broadband infrastructure $1,000,000,000 -------------------------------------------------------------------------------------------------------->
TITLE V-Broadband affordability $0 $0 $0 $0 $0
(No specific appropriations)
TITLE VI-Telecommunications industry workforce $0 $0 $0 $0 $0
(No specific appropriations)
G - OTHER AUTHORIZATIONS 2022 2023 2024 2025 2026
Total - Division G $4,034,000,000 $1,709,000,000 $1,605,000,000 $1,405,000,000 $1,305,000,000
TITLE I-Indian water rights settlement completion fund $2,500,000,000 $0 $0 $0 $0
Indian water rights settlement completion fund $2,500,000,000
TITLE II-Wildfire mitigation $0 $0 $0 $0 $0
(No specific appropriations)
TITLE III-Reforestation $0 $0 $0 $0 $0
(No specific appropriations)
TITLE IV-Recycling practices $42,000,000 $17,000,000 $15,000,000 $15,000,000 $15,000,000
Best practices for battery recycling and labeling guidelines
Best practices for collection of batteries to be recycled $10,000,000
Voluntary labeling guidelines $15,000,000
Consumer recycling education and outreach grant program; federal procurement $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000
Pilot program on use of agricultural commodities in construction and consumer products $2,000,000 $2,000,000
TITLE V-Bioproduct pilot program $2,000,000 $2,000,000 $0 $0 $0
Pilot program on use of agricultural commodities in construction and consumer products $2,000,000 $2,000,000
TITLE VI-Cybersecurity $220,000,000 $420,000,000 $320,000,000 $120,000,000 $20,000,000
Subtitle A - Cyber response and recovery act
Cyber response and recovery fund $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Subtitle B - State and local cybersecurity improvement act
State and local cybersecurity grant program $200,000,000 $400,000,000 $300,000,000 $100,000,000
TITLE VII-Public-private partnerships $0 $0 $0 $0 $0
(No specific appropriations)
TITLE VIII-Federal permitting improvement $0 $0 $0 $0 $0
TITLE XI-Build America, buy America $0 $0 $0 $0 $0
Subtitle A - Build America, buy America
Part I-Buy America sourcing requirements
(No specific appropriations)
Part II-Make it in America
(No specific appropriations)
Subtitle B - BuyAmerican.gov
(No specific appropriations)
Subtitle C - Make PPE in America
TITLE X-Asset concessions $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Asset concessions $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
TITLE XI-Clean school buses and ferries $1,250,000,000 $1,250,000,000 $1,250,000,000 $1,250,000,000 $1,250,000,000
Clean school buses and ferries
Clean school bus program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Clean school buses and zero-emission school buses $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000
Zero-emission school buses $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000
Electric or low-emitting ferry pilot program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Ferry service for rural communities $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
H - REVENUE PROVISIONS 2022 2023 2024 2025 2026
Total - Division H $118,000,000,000 $0 $0 $0 $0
TITLE I-Highway trust fund $118,000,000,000 $0 $0 $0 $0
Further additional transfers to trust fund
Highway Account $90,000,000,000
Mass Transit Account $28,000,000,000
TITLE II-Chemical superfund $0 $0 $0 $0 $0
(No specific appropriations)
TITLE III-Customs user fees $0 $0 $0 $0 $0
(No specific appropriations)
TITLE IV-Bond provisions $0 $0 $0 $0 $0
(No specific appropriations)
(Numerous tax changes)
TITLE V-Relief for taxpayers affected by disasters or other critical events $0 $0 $0 $0 $0
(No specific appropriations)
(Numerous tax changes)
TITLE VI-Other provisions $0 $0 $0 $0 $0
(No specific appropriations)
(Numerous tax changes)
I - OTHER MATTERS 2022 2023 2024 2025 2026
Total - Division I ($41,755,000,000) $0 $0 $0 $0
Balanced Budget and Emergency Deficit Control Act of 1985 Changes
Strategic petroleum reserve drawdown and sale
Secretary of Energy shall sell 87,600,000 barrels of crude oil from the Strategic Petroleum Reserve
during fiscal years 2028 through 2031
Secretary of the Treasury shall deposit in the SPR Petroleum Account $43,500,000
The Secretary of Energy shall not sell after $6,100,000,000 has been deposited in Treasury
Rescission of covid-19 appropriations
Small Business Administration--Disaster Loans Program Account ($13,500,000,000)
Small Business Administration--Targeted EIDL Advance ($17,578,000,000)
Economic Stabilization Program ($1,366,100,000)
Business Loans Program Account
Small Business Administration--Business Loans Program Account, CARES Act ($4,684,000,000)
Small Business Administration--Business Loans Program Account ($992,000,000)
Pandemic Relief for Aviation Workers, Coronavirus Aid, Relief, and Economic Security Act ($3,000,000,000)
Education Stabilization Fund ($353,400,000)
Small Business Administration, Salaries and Expenses ($175,000,000)
Pandemic Relief for Aviation Workers ($200,000,000)
Spectrum auctions
Pre-auction funding for DoD R&D (OMB to DoD) $50,000,000
J - APPROPRIATIONS 2022 2023 2024 2025 2026
Total - Division J $179,330,736,000 $71,669,494,000 $69,645,205,500 $68,897,783,625 $67,025,347,656
Editor's Note (1): In this Division, the Office of the Inspector General "usually" receives 0.2% to 1% of the funding in each category for oversight of funding
These contributions have been left out for brevity
Editor's Note (2): In this Division, almost every section carries a caveat that 2-3% may be used for "salaries and expenses, administration, and oversight"
These contributions have been left out for brevity
TITLE I-Agriculture, rural development, food and drug administration, and related agencies $2,505,000,000 $5,000,000 $0 $0 $0
Department of Agriculture $2,505,000,000 $5,000,000 $0 $0 $0
Farm production and conservation programs
Natural Resources Conservation Service
Watershed and flood prevention operations $500,000,000
Watershed rehabilitation program $118,000,000
Emergency watershed protection program $300,000,000
Rural development programs
Rural Utilities Service
Distance learning, telemedicine, and broadband program $2,000,000,000
Broadband loans $74,000,000
Broadband loan and grant pilot program $1,926,000,000
Section 70501 of division G $5,000,000 $5,000,000
TITLE II-Commerce, justice, science, and related agencies $46,771,650,000 $1,099,984,000 $1,099,983,000 $1,099,983,000 $1,091,400,000
Department of Commerce $46,771,650,000 $1,099,984,000 $1,099,983,000 $1,099,983,000 $1,091,400,000
National Telecommunications and Information Administration
Broadband equity, access, and deployment program $42,450,000,000
Broadband connectivity fund $2,000,000,000
Digital equity $550,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000
Award of grants under section 60304 (c)(3) of division F $300,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000
Award of grants under section 60304(d) of division F $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000
Middle mile deployment $1,000,000,000
Salaries and expenses $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
National Oceanic and Atmospheric Administration
Operations, research, and facilities $557,250,000 $515,584,000 $515,583,000 $515,583,000 $507,000,000
National Oceans and Coastal Security Fund grants $98,400,000 $98,400,000 $98,400,000 $98,400,000 $98,400,000
Restoring habitats or protecting features from flooding and storms $98,200,000 $98,200,000 $98,200,000 $98,200,000 $98,200,000
Flood and inundation mapping and forecasting $98,400,000 $98,400,000 $98,400,000 $98,400,000 $98,400,000
Data acquisition activities, section 511(b) of the Water Resources Development Act of 2020 $8,334,000 $8,333,000 $8,333,000
Wildfire prediction, detection, observation, modeling $50,000,000
Soil moisture and snowpack monitoring network in the Upper Missouri River Basin $250,000 $250,000 $250,000 $250,000
Marine debris assessment prevention, mitigation, and removal $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000
Marine debris prevention and removal through the National Sea Grant College Program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Habitat restoration projects, Coastal Zone Management Act $41,400,000 $41,400,000 $41,400,000 $41,400,000 $41,400,000
Habitat restoration projects, National Estuarine Research Reserve System $15,400,000 $15,400,000 $15,400,000 $15,400,000 $15,400,000
Enhanced coastal, ocean, and Great Lakes observing systems $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Regional Ocean Partnerships $11,200,000 $11,200,000 $11,200,000 $11,200,000 $11,200,000
Endangered Species Act, Marine Mammal Protection Act, and Essential Fish Habitat $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000
Restoring fish passage by removing in-stream barriers $80,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000
Procurement, acquisition and construction $180,000,000
Observation and dissemination infrastructure used for wildfire prediction $50,000,000
Research supercomputing infrastructure used for weather and climate model development $80,000,000
Coastal, ocean, and Great Lakes observing systems $50,000,000
Pacific coastal salmon recovery $34,400,000 $34,400,000 $34,400,000 $34,400,000 $34,400,000
TITLE III-Energy and water development and related agencies $36,076,700,000 $15,959,500,000 $13,638,212,500 $12,690,790,625 $10,932,187,656
Department of the Army $15,099,000,000 $1,000,000,000 $1,000,000,000 $0 $0
Corps of Engineers-Civil $15,099,000,000 $1,000,000,000 $1,000,000,000
Investigations $150,000,000
Water Resources Development Act of 1974 $30,000,000
1960 Flood Control Act $45,000,000
Studies authorized prior to the date of enactment of this Act $75,000,000
Section 118 of division AA of the Consolidated Appropriations Act, 2021 $30,000,000
Construction $11,615,000,000
Major rehabilitation, construction, for rivers and harbors $1,500,000,000
Work at harbors, section 2006, Water Resources Development Act of 2007 <$250,000,000
Require repair, Water Infrastructure Improvements for the Nation Act <$250,000,000
Water-related environmental infrastructure assistance $200,000,000
Construction, replacement, rehabilitation, and expansion of inland waterways projects $2,500,000,000
"Long list" (8) of Flood Control, River and Harbor, and Water Resource Acts $465,000,000
Aquatic ecosystem restoration program, restore fish and wildlife passage $115,000,000
Aquatic ecosystem restoration projects $1,900,000,000
Multi-purpose projects or multi-purpose programs $1,000,000,000
Coastal storm risk management, states with disasters in last six years $2,550,000,000
Multi-purpose projects or multi-purpose programs $1,000,000,000
Shore protection projects $100,000,000 $50,000,000 $50,000,000
Inland flood risk management projects $2,500,000,000
Multi-purpose projects or multi-purpose programs $750,000,000
Mississippi river and tributaries $808,000,000
Emergency situations at Corps of Engineers Federal projects caused by natural disasters $258,000,000
Operation and maintenance $2,000,000,000 $1,000,000,000 $1,000,000,000
Emergency situations at Corps of Engineers Federal projects caused by natural disasters $626,000,000
Soil moisture and snowpack monitoring $40,000,000
Regulatory program, for an emergency requirement $160,000,000
Flood control and coastal emergencies, for an emergency requirement $251,000,000
Expenses, for an emergency requirement $40,000,000
Water infrastructure finance and innovation program account $75,000,000
Cost of direct and guarenteed loans to maintain, upgrade, and repair dams $64,000,000
Administrative expenses to carry out loans $11,000,000
Department of the Interior $1,710,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000
Central Utah Project
Central Utah Project Completion Account $50,000,000
Utah Reclamation Mitigation and Conservation Account $10,000,000
Bureau of Reclamation
Water and related resources $1,660,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000
Allocations among all projects over 2022 to 2026
Water storage, groundwater storage $1,150,000,000
Small surface water and ground water storage $100,000,000
Aging Infrastructure Account $3,200,000,000
Reserved or transferred works that have suffered a critical failure $100,000,000
Dam rehabilitation, reconstruction, or replacement $100,000,000
Rural water projects authorized before July 1, 2021 $1,000,000,000
Water recycling and reuse projects $1,000,000,000
Reclamation Wastewater and Groundwater Study and Facilities Act $550,000,000
Large-scale water recycling and reuse projects $450,000,000
Water desalination projects $250,000,000
Reclamation Safety of Dams Act of 1978 $500,000,000
WaterSMART Grants $400,000,000
Improve the condition of a natural feature or nature-based feature $100,000,000
Colorado River Drought Contingency Plan $300,000,000
Drought Contingency Plan for the Upper Colorado River Basin $50,000,000
Watershed management projects $100,000,000
Aquatic ecosystem restoration and protection projects $250,000,000
Multi-benefit projects to improve watershed health $100,000,000
Endangered species recovery and conservation in the Colorado River Basin $50,000,000
Department of Energy $18,686,450,000 $13,099,500,000 $10,778,212,500 $10,830,790,625 $9,072,187,656
Energy Programs
Energy efficiency and renewable energy $8,207,200,000 $2,221,800,000 $1,945,000,000 $1,945,000,000 $1,945,000,000
Energy Efficiency Revolving Loan Fund Capitalization Grant Program $250,000,000
Energy Auditor Training Grant Program $40,000,000
Updated building energy codes $45,000,000 $45,000,000 $45,000,000 $45,000,000 $45,000,000
Building, Training, and Assessment Centers $10,000,000
Career Skills Training $10,000,000
Industrial Research and Assessment Centers $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000
Implementation Grants for Industrial Research and Assessment Centers $80,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000
Manufacturing Leadership $50,000,000
Energy Efficiency Improvements and Renewable Energy Improvements
at Public School Facilities $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Energy Efficiency Materials Pilot Program $50,000,000
Weatherization Assistance Program (addition to other amounts) $3,500,000,000
Energy Efficiency and Conservation Block
Grant Program (addition to other amounts) $550,000,000
Assisting Federal Facilities with Energy Conservation
Technologies Grant Program $250,000,000
Extended product system rebates $10,000,000
Energy efficient transformer rebates $10,000,000
Battery Material Processing Grants $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000
Battery Manufacturing and Recycling Grants $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000
Section 40207(f) of division D $125,000,000
Lithium-Ion Battery Recycling Prize Competition $10,000,000
Electric Drive Vehicle Battery Recycling and Second-Life
Applications Program $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000
Advanced Energy Manufacturing and Recycling Grant Program $150,000,000 $150,000,000 $150,000,000 $150,000,000 $150,000,000
Clean Hydrogen Manufacturing Recycling Research,
Development, and Demonstration Program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Clean Hydrogen Electrolysis Program $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
State Energy Program $500,000,000
Section 242 of the Energy Policy Act of 2005 $125,000,000
Section 243 of the Energy Policy Act of 2005 $75,000,000
Hydroelectric Incentives, section 247 of the Energy Policy Act of 2005 $276,800,000 $276,800,000
Pumped Storage Hydropower Wind and Solar
Integration and System Reliability Initiative $10,000,000
Section 634 of the Energy Independence and Security Act of 2007 $36,000,000
Section 635 of the Energy Independence and Security Act of 2007 $70,400,000
National Marine Energy Centers $40,000,000
Section 615(d) of the Energy Independence and Security Act of 2007 $84,000,000
Wind Energy Technology Program $60,000,000
Wind Energy Technology Recycling Research,
Development, and Demonstration Program $40,000,000
Section 3004(b)(2) of the Energy Act of 2020 $40,000,000
Section 3004(b)(3) of the Energy Act of 2020 $20,000,000
Section 3004(b)(4) of the Energy Act of 2020 $20,000,000
Cybersecurity, Energy Security, and Emergency Response $150,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Cybersecurity for the Energy Sector Research,
Development, and Demonstration Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Energy Sector Operational Support for Cyberresilience Program $50,000,000
Rural and Municipal Utility Advanced Cybersecurity
Grant and Technical Assistance Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Electricity $1,660,000,000 $1,610,000,000 $1,610,000,000 $1,610,000,000 $1,610,000,000
Section 40101 of division D of this Act $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Transmission Facilitation Program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Smart Grid Investment Matching Grant Program (addition to other amounts) $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000
Advanced energy security program to secure energy networks $50,000,000
Nuclear Energy $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000
Program direction $36,000,000 $36,000,000 $36,000,000 $36,000,000 $36,000,000
Fossil Energy and Carbon Management $1,839,000,000 $1,444,450,000 $1,446,962,500 $1,449,540,625 $1,317,187,656
Carbon Utilization Program $41,000,000 $65,250,000 $66,562,500 $67,940,625 $69,387,656
Carbon Capture Technology Program $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Carbon Storage Validation and Testing $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000
Develop four regional clean direct air capture hubs $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000
Precommercial direct air capture technology
prize competitions (addition to other amounts) $15,000,000
Commercial direct air capture technology
prize competitions (addition to other amounts) $100,000,000
Rare Earth Elements Demonstration Facility $140,000,000
Rare earth mineral security activities $23,000,000 $24,200,000 $25,400,000 $26,600,000 $27,800,000
Critical material innovation, efficiency, and alternatives $230,000,000 $100,000,000 $135,000,000 $135,000,000
Critical Material Supply Chain Research Facility $40,000,000 $35,000,000
Section 349(b)(2) of the Energy Policy Act of 2005
and section 40601, division D of this Act $30,000,000
Carbon Dioxide Transportation Infrastructure Finance and Innovation Program Account $3,000,000 $2,097,000,000
Office of Clean Energy Demonstrations $5,127,250,000 $4,426,250,000 $4,476,250,000 $4,526,250,000 $2,900,000,000
Energy Storage Demonstration Pilot Grant Program $88,750,000 $88,750,000 $88,750,000 $88,750,000
Long-duration Demonstration Initiative and Joint Program $37,500,000 $37,500,000 $37,500,000 $37,500,000
Advanced Reactor Demonstration Program $677,000,000 $600,000,000 $600,000,000 $600,000,000
Carbon Capture Large-scale Pilot Projects $387,000,000 $200,000,000 $200,000,000 $150,000,000
Carbon Capture Demonstration Projects Program $937,000,000 $500,000,000 $500,000,000 $600,000,000
Industrial Emission Demonstration Projects $100,000,000 $100,000,000 $150,000,000 $150,000,000
Clean Energy Demonstration Program on Current and Former Mine Land $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Regional Clean Hydrogen Hubs $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000
Program Upgrading Our Electric Grid and Ensuring Reliability and Resiliency $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Energy improvement in rural and remote areas $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Power Marketing Administrations
Construction, Rehabilitation, Operation And Maintenance, Western Area Power Administration $500,000,000
Independent Agencies $581,250,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Appalachian Regional Commission $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Delta Regional Authority $150,000,000
Denali Commission $75,000,000
Northern Border Regional Commission $150,000,000
Southeast Crescent Regional Commission $5,000,000
Southwest Border Regional Commission $1,250,000
TITLE IV-Financial Services and General Government $17,639,658,000 $650,000 $650,000 $650,000 $400,000
Executive Office of the President and Funds Appropriation $17,639,658,000 $650,000 $650,000 $650,000 $400,000
Office Of The National Cyber Director
Salaries and expenses $21,000,000
Federal Communications Commission
Affordable Connectivity Fund $14,200,000,000
Federal permitting improvement steering council
Environmental Review Improvement Fund $650,000 $650,000 $650,000 $650,000 $400,000
General Services Administration
Real property activities
Federal Buildings Fund
Construction and acquisition, and repairs and alterations of border stations $3,418,008,000
Program Contingency and Operational Support <$250,000,000
U.S. Customs and Border Protection five-year plan $2,527,808,000
American Jobs Plan Project List projects (with feasibility studies) $430,200,000
Land ports of entry (LPOE) infrastructure paving;
acquisition of leased LPOEs; and Federal Motor Carrier
Safety Administration requirements at the Southern Border $210,000,000
TITLE V-Department of Homeland Security $3,076,500,000 $1,420,000,000 $1,320,000,000 $1,120,000,000 $1,020,000,000
Department of Homeland Security $3,076,500,000 $1,420,000,000 $1,320,000,000 $1,120,000,000 $1,020,000,000
Security, Enforcement, and Investigation
U.S Customs and Border Protection
Operations and support $330,000,000
Procurement, Construction, and Improvements $100,000,000
Coast Guard
Operations and support $5,000,000
Procurement, Construction, and Improvements $429,000,000
Housing, family support, safety, and training facilities $131,500,000
Shore construction addressing facility deficiencies $158,000,000
Shore construction supporting operational assets and maritime commerce $19,500,000
Construction and improvement of childcare development centers $120,000,000
Protection, Preparedness, Response, and Recovery
Cybersecurity And Infrastructure Security Agency
Operations and support $35,000,000
Cybersecurity Response and Recovery Fund $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Federal Emergency Management Agency
Operations and support $67,000,000
Federal Assistance $1,033,000,000 $500,000,000 $400,000,000 $200,000,000 $100,000,000
Robert T. Stafford Disaster Relief and Emergency Assistance Act $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Grants to States, section 8(e) of the National Dam Safety Program Act $148,000,000
Grants to States, section 8A of the National Dam Safety Program Act $585,000,000
Removal of dams >$75,000,000
Grants for improvement to cybersecurity and critical infrastructure $200,000,000 $400,000,000 $300,000,000 $100,000,000
Disaster Relief Fund $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
FEMA-Operations and Support, salaries and expenses <$16,500,000 <$16,500,000 <$16,500,000 <$16,500,000 <$16,500,000
National Flood Insurance Fund $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000
Science And Technology Directorate
Research and Development $157,500,000
TITLE VI-Department of the Interior, Environment, and Related Agencies $36,325,628,000 $16,273,760,000 $16,675,760,000 $17,075,760,000 $17,070,760,000
Department of the Interior $17,138,468,000 $657,800,000 $657,800,000 $657,800,000 $652,800,000
United States Fish And Wildlife Service
Resource Management $91,000,000 $91,000,000 $91,000,000 $91,000,000 $91,000,000
Regional ecosystem restoration purposes $51,000,000 $51,000,000 $51,000,000 $51,000,000 $51,000,000
Delaware River Basin Conservation Act $5,200,000 $5,200,000 $5,200,000 $5,200,000 $5,200,000
Klamath Basin restoration activities $32,400,000 $32,400,000 $32,400,000 $32,400,000 $32,400,000
Lake Tahoe Restoration Act, section 5(d)(2) $3,400,000 $3,400,000 $3,400,000 $3,400,000 $3,400,000
Sagebrush steppe ecosystem $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
National Fish Passage Program, restoring fish and wildlife passage $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000
United States Geological Survey
Surveys, Investigations, and Research $239,668,000 $69,000,000 $69,000,000 $69,000,000 $64,000,000
Section 40201 of division D of this Act $64,000,000 $64,000,000 $64,000,000 $64,000,000 $64,000,000
Section 40204 of division D of this Act $167,000,000
Section 41003(a) of division D of this Act $8,668,000 $5,000,000 $5,000,000 $5,000,000
Office Of Surface Mining Reclamation And Enforcement
Abandoned Mine Reclamation Fund $11,293,000,000
Section 40701(g) of division D of this Act $25,000,000
Indian Affairs
Bureau Of Indian Affairs
Operation of Indian Programs (facing climate challenges) $43,200,000 $43,200,000 $43,200,000 $43,200,000 $43,200,000
Community relocation $26,000,000 $26,000,000 $26,000,000 $26,000,000 $26,000,000
Tribal climate resilience and adaptation projects $17,200,000 $17,200,000 $17,200,000 $17,200,000 $17,200,000
Construction $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Addressing irrigation and power systems $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Safety of dams, water sanitation, and other facilities $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000
Departmental Offices
Office Of The Secretary
Departmental Operations $337,000,000 $142,000,000 $142,000,000 $142,000,000 $142,000,000
Department-wide Programs
Wildland Fire Management $407,600,000 $262,600,000 $262,600,000 $262,600,000 $262,600,000
Section 40803 of division D of this Act, including fuels management activities $327,000,000 $182,000,000
Fuels management activities $35,600,000 $35,600,000 $35,600,000 $35,600,000 $35,600,000
Burned area rehabilitation $45,000,000 $45,000,000 $45,000,000 $45,000,000 $45,000,000
Tribal Forestry Protection Act (Fuels management and Burned rehab) $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
Energy Community Revitalization Program $4,677,000,000
Section 349(b) of the Energy Policy Act of 2005 $250,000,000
Section 349(c)(3) of the Energy Policy Act of 2005 $775,000,000
Section 349(c)(4) of the Energy Policy Act of 2005 $2,000,000,000
Section 349(c)(5) of the Energy Policy Act of 2005 $1,500,000,000
Section 349(d) of the Energy Policy Act of 2005 $150,000,000
Interstate Oil and Gas Compact Commission $2,000,000
Environmental Protection Agency $16,820,800,000 $13,970,800,000 $14,372,800,000 $14,772,800,000 $14,772,800,000
Environmental Programs And Management $411,800,000 $386,800,000 $386,800,000 $386,800,000 $386,800,000
Geographic Programs $343,400,000 $343,400,000 $343,400,000 $343,400,000 $343,400,000
Great Lakes Restoration Initiative $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Chesapeake Bay $47,600,000 $47,600,000 $47,600,000 $47,600,000 $47,600,000
San Francisco Bay $4,800,000 $4,800,000 $4,800,000 $4,800,000 $4,800,000
Puget Sound $17,800,000 $17,800,000 $17,800,000 $17,800,000 $17,800,000
Long Island Sound $21,200,000 $21,200,000 $21,200,000 $21,200,000 $21,200,000
Gulf of Mexico $10,600,000 $10,600,000 $10,600,000 $10,600,000 $10,600,000
South Florida $3,200,000 $3,200,000 $3,200,000 $3,200,000 $3,200,000
Lake Champlain $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000
Lake Pontchartrain $10,600,000 $10,600,000 $10,600,000 $10,600,000 $10,600,000
Southern New England Estuaries $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000
Columbia River Basin $15,800,000 $15,800,000 $15,800,000 $15,800,000 $15,800,000
Other geographic activities which includes Pacific Northwest $800,000 $800,000 $800,000 $800,000 $800,000
National Estuary Program $26,400,000 $26,400,000 $26,400,000 $26,400,000 $26,400,000
Gulf Hypoxia Action Plan $12,000,000 $12,000,000 $12,000,000 $12,000,000 $12,000,000
Class VI wells as authorized under section 40306 of division D of this Act, Drinking Water Programs $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
Battery recycling best practices $10,000,000
Battery labeling guidelines $15,000,000
Hazardous Substance Superfund $3,500,000,000
State And Tribal Assistance Grants $10,144,000,000 $10,819,000,000 $11,221,000,000 $11,621,000,000 $11,621,000,000
Capitalization grants for the Clean Water State Revolving Funds $1,902,000,000 $2,202,000,000 $2,403,000,000 $2,603,000,000 $2,603,000,000
Capitalization grants for the Drinking Water State Revolving Funds $1,902,000,000 $2,202,000,000 $2,403,000,000 $2,603,000,000 $2,603,000,000
Capitalization grants for the Drinking Water State Revolving Funds,
lead service line replacement projects $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000
Capitalization grants for the Clean Water State Revolving Funds,
address emerging contaminants $100,000,000 $225,000,000 $225,000,000 $225,000,000 $225,000,000
Capitalization grants for the Drinking Water State Revolving Funds,
perfluoroalkyl and polyfluoroalkyl substances $800,000,000 $800,000,000 $800,000,000 $800,000,000 $800,000,000
Grants for addressing emerging contaminants supporting a community, not subject to cost sharing $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Award Underground Injection Control grants $50,000,000
Brownfields activities $300,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000
Grants, interagency agreements and associated program support costs $240,000,000 $240,000,000 $240,000,000 $240,000,000 $240,000,000
Grants $120,000,000 $120,000,000 $120,000,000 $120,000,000 $120,000,000
Section 128, Comprehensive Environmental Response, Compensation, and Liability Act $60,000,000 $60,000,000 $60,000,000 $60,000,000 $60,000,000
Pollution Prevention Act, Section 6605 $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Save Our Seas 2.0 Act, section 302(a) $55,000,000 $55,000,000 $55,000,000 $55,000,000 $55,000,000
Improving material recycling, recovery, management, and reduction $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000
Clean School Bus Program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
General Provisions-Environmental Protection Agency
Drinking water, Safe Drinking Water Act, (additional amount) $1,126,000,000 $1,126,000,000 $1,126,000,000 $1,126,000,000 $1,126,000,000
Clean water, Federal Water Pollution Control Act, (additional amount) $1,639,000,000 $1,639,000,000 $1,639,000,000 $1,639,000,000 $1,639,000,000
Department of Agriculture $1,666,360,000 $945,160,000 $945,160,000 $945,160,000 $945,160,000
Forest Service
Forest and Rangeland Research $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
State and Private Forestry $305,360,000 $305,360,000 $305,360,000 $305,360,000 $305,360,000
Sections 40803 and 40804 of division D of this Act $143,600,000 $143,600,000 $143,600,000 $143,600,000 $143,600,000
Grants to at-risk communities for wildfire mitigation activities $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
State Fire Assistance $17,600,000 $17,600,000 $17,600,000 $17,600,000 $17,600,000
Volunteer Fire Assistance $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000
National Forest System $734,800,000 $529,800,000 $529,800,000 $529,800,000 $529,800,000
Sections 40803 and 40804 of division D of this Act $587,000,000 $382,000,000 $382,000,000 $382,000,000 $382,000,000
Hazardous fuels management activities $102,800,000 $102,800,000 $102,800,000 $102,800,000 $102,800,000
Incentivize biomass use $12,000,000 $12,000,000 $12,000,000 $12,000,000 $12,000,000
Tribal Forestry Protection Act $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000
Burned area recovery $45,000,000 $45,000,000 $45,000,000 $45,000,000 $45,000,000
Capital Improvement and Maintenance $72,000,000 $72,000,000 $72,000,000 $72,000,000 $72,000,000
Legacy Road and Trail Remediation Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Roads to facilitate forest restoration and projects that reduce wildfire risk $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Removal of non-hydropower Federal dams $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
Wildland Fire Management $552,200,000 $36,000,000 $36,000,000 $36,000,000 $36,000,000
Department of Health and Human Services $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000
Indian Health Service
Indian Health Facilities
Domestic and community sanitation facilities for Indians $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000
Projects that exceed the economical unit cost $440,000,000 $440,000,000 $440,000,000 $440,000,000 $440,000,000
TITLE VII-Labor, Health, and Human Services, and Education, and Related Agencies $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Department of Health and Human Services $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Administration For Children And Families
Low Income Home Energy Assistance $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
If total appropriation for payments for fiscal year was less than $1,975,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
TITLE VIII-Transportation, Housing, and Urban Development, and Related Agencies $36,835,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000
Department of Transportation $36,835,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000
Office Of The Secretary
National Infrastructure Investments $2,500,000,000 $2,500,000,000 $2,500,000,000 $2,500,000,000 $2,500,000,000
Chapter 67 of title 49, United States Code, section 6701 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Chapter 67 of title 49, United States Code, section 6702 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000
Safe Streets and Roads for All Grants $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
National Culvert Removal, Replacement, and Restoration Grants $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Strengthening Mobility and Revolutionizing Transportation Grant Program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Federal Aviation Administration
Facilities and Equipment $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
FAA air traffic control towers $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Airport Infrastructure Grants $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000
Limitations on total usage until 2030
Primary airports and certain cargo airports <$2480000000
General aviation and commercial service airports that are not primary airports <$500000000
Grants to sponsors of airports participating in the contract tower program $20,000,000
Airport Terminal Program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Large hub airports <$550000000 <$550000000 <$550000000 <$550000000 <$550000000
Medium hub airports <$150000000 <$150000000 <$150000000 <$150000000 <$150000000
Small hub airports <$200000000 <$200000000 <$200000000 <$200000000 <$200000000
Nonhub and nonprimary airports >$100000000 >$100000000 >$100000000 >$100000000 >$100000000
Federal Highway Administration
Highway Infrastructure Programs $9,454,400,000 $9,454,400,000 $9,454,400,000 $9,454,400,000 $9,454,400,000
Bridge replacement, rehabilitation, preservation, protection, and construction program $5,500,000,000 $5,500,000,000 $5,500,000,000 $5,500,000,000 $5,500,000,000
Bridges classified in poor condition $4,125,000,000 $4,125,000,000 $4,125,000,000 $4,125,000,000 $4,125,000,000
Bridges classified in fair condition $1,375,000,000 $1,375,000,000 $1,375,000,000 $1,375,000,000 $1,375,000,000
Amount each state shall receive per year >$45000000 >$45000000 >$45000000 >$45000000 >$45000000
Amount for off-system bridges >$6750000 >$6750000 >$6750001 >$6750002 >$6750003
National Electric Vehicle Formula Program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Approximate distribution per State per year $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Joint Office described in the twenty-fourth proviso of this paragraph <$60,000,000 <$60,000,000 <$60,000,000 <$60,000,000 <$60,000,000
Grants for assistance to deploy electric vehicle charging infrastructure $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Available for each eligible Federal agency >$1,400,000 >$1,400,000 >$1,400,000 >$1,400,000 >$1,400,000
Nationally Significant Freight and Highway Projects $640,000,000 $640,000,000 $640,000,000 $640,000,000 $640,000,000
Bridge Investment Program $1,847,000,000 $1,847,000,000 $1,847,000,000 $1,847,000,000 $1,847,000,000
Section 202(d) of title 23, United States Code $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Provide grants for planning, feasibility analysis, and revenue forecasting $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Reduction of Truck Emissions at Port Facilities Program $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000
University Transportation Centers Program $19,000,000 $19,000,000 $19,000,000 $19,000,000 $19,000,000
Reconnecting Communities Pilot Program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000
Planning grants $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Capital construction grants $80,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000
Limit on Secretary providing technical assistance <$15,000,000
Construction of Ferry Boats and Ferry Terminal Facilities $68,400,000 $68,400,000 $68,400,000 $68,400,000 $68,400,000
Appalachian Development Highway System $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000
Maximum per Appalacian State $75,000,000 $75,000,000 $75,000,000 $75,000,000 $75,000,000
Minimum per Appalacian State $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Federal Motor Carrier Safety Administration
Motor Carrier Safety Operations and Program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000
Motor Carrier Safety Grants $124,500,000 $124,500,000 $124,500,000 $124,500,000 $124,500,000
Motor carrier safety assistance program <$80,000,000 <$80,000,000 <$80,000,000 <$80,000,000 <$80,000,000
Commercial driver’s license program implementation program <$16,000,000 <$16,000,000 <$16,000,000 <$16,000,000 <$16,000,000
High priority activities program <$26,500,000 <$26,500,000 <$26,500,000 <$26,500,000 <$26,500,000
Commercial motor vehicle operators grants <$2,000,000 <$2,000,000 <$2,000,000 <$2,000,000 <$2,000,000
National Highway Traffic Safety Administration
Crash Data $150,000,000 $150,000,000 $150,000,000 $150,000,000 $150,000,000
Vehicle Safety and Behavioral Research Programs $109,700,000 $109,700,000 $109,700,000 $109,700,000 $109,700,000
Amount transferable to Operations and Research (over all years) <$350,000,000
Supplemental Highway Traffic Safety Programs $62,000,000 $62,000,000 $62,000,000 $62,000,000 $62,000,000
Highway safety programs $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
National priority safety programs $22,000,000 $22,000,000 $22,000,000 $22,000,000 $22,000,000
Administrative expenses $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000
Federal Railroad Administration
Consolidated Rail Infrastructure and Safety Improvements $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000
Northeast Corridor Grants to the National Railroad Passenger Corporation $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000
Facilitate a coordinated and efficient delivery of projects $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000
National Network Grants to the National Railroad Passenger Corporation $3,200,000,000 $3,200,000,000 $3,200,000,000 $3,200,000,000 $3,200,000,000
State-Supported Route Committee $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000
Interstate rail compact grants $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000
Grants, as authorized under section 22908 of title 49 United States Code >$50,000,000 >$50,000,000 >$50,000,000 >$50,000,000 >$50,000,000
Railroad Crossing Elimination Program $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000
Federal-State Partnership for Intercity Passenger Rail Grants $7,200,000,000 $7,200,000,000 $7,200,000,000 $7,200,000,000 $7,200,000,000
Limitation on Northeast Corridor Funding (for all years) <$24,000,000,000
Federal Transit Administration
Transit Infrastructure Grants $2,050,000,000 $2,050,000,000 $2,050,000,000 $2,050,000,000 $2,050,000,000
State of good repair grants $950,000,000 $950,000,000 $950,000,000 $950,000,000 $950,000,000
Low or no emission grants $1,050,000,000 $1,050,000,000 $1,050,000,000 $1,050,000,000 $1,050,000,000
Grants for the enhanced mobility of seniors and individuals with disabilities $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Capital Investment Grants $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000
Section 5309(d) of title 49, United States Code $880,000,000 $880,000,000 $880,000,000 $880,000,000 $880,000,000
Section 5309(e) of title 49, United States Code $320,000,000 $320,000,000 $320,000,000 $320,000,000 $320,000,000
Section 5309(e) of title 49, United States Code $240,000,000 $240,000,000 $240,000,000 $240,000,000 $240,000,000
Section 3005(b) of the Fixing America’s Surface Transportation Act $160,000,000 $160,000,000 $160,000,000 $160,000,000 $160,000,000
All Stations Accessibility Program $350,000,000 $350,000,000 $350,000,000 $350,000,000 $350,000,000
Electric or Low-Emitting Ferry Pilot Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
Ferry Service for Rural Communities $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Maritime Administration
Operations and Training $25,000,000
Port Infrastructure Development Program $450,000,000 $450,000,000 $450,000,000 $450,000,000 $450,000,000
Pipeline And Hazardous Materials Safety Administration
Natural Gas Distribution Infrastructure Safety and Modernization Grant Program $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000
Limit on money to a single utility $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000
K - MINORITY BUSINESS DEVELOPMENT 2022 2023 2024 2025 2026
Total - Division K $110,000,000 $110,000,000 $110,000,000 $110,000,000 $0
TITLE I-Existing Initiatives $0 $0 $0 $0 $0
Subtitle A - Market development, research, and information
(No specific appropriations)
Subtitle B-Minority Business Development Agency Business Center Program
(No specific appropriations)
TITLE II-New initiatives to promote economic resiliency for minority businesses $0 $0 $0 $0 $0
(No specific appropriations)
TITLE III-Rural minority business center program $0 $0 $0 $0 $0
(No specific appropriations)
TITLE IV-Minority business development grants $0 $0 $0 $0 $0
(No specific appropriations)
TITLE V-Minority business enterprises advisory council $0 $0 $0 $0 $0
TITLE VI-Federal coordination of minority business programs $0 $0 $0 $0 $0
TITLE VII-Administrative powers of the Agency; miscellaneous provisions $110,000,000 $110,000,000 $110,000,000 $110,000,000 $0
Authorization of appropriations $110,000,000 $110,000,000 $110,000,000 $110,000,000
Amount used specifically for TITLE III-Rural minority business center program $20,000,000 $20,000,000 $20,000,000 $20,000,000

More Related Content

What's hot

Lenox Financial Forecast v3
Lenox Financial Forecast v3Lenox Financial Forecast v3
Lenox Financial Forecast v3channinggibson
 
Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5channinggibson
 
Fy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget PresentationFy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget Presentationdarrekferrell
 
Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9fascinating_heart
 
Centerville Project
Centerville ProjectCenterville Project
Centerville ProjectRick Bailey
 
The United States Debt 2000 Through 2011
The United States Debt 2000 Through 2011The United States Debt 2000 Through 2011
The United States Debt 2000 Through 2011hnelson22
 
2012 Jim Thorpe Municipal Budget Presentation
2012 Jim Thorpe Municipal Budget Presentation2012 Jim Thorpe Municipal Budget Presentation
2012 Jim Thorpe Municipal Budget PresentationMunicipalGunslinger
 
Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13cityofevanston
 
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13cityofevanston
 
Feb 2011 repair bill lfb analysis
Feb 2011 repair bill lfb analysisFeb 2011 repair bill lfb analysis
Feb 2011 repair bill lfb analysismarkhorn
 
Supporting Documents Gloucester board of Supervisors Bond Issue
Supporting Documents Gloucester board of Supervisors Bond IssueSupporting Documents Gloucester board of Supervisors Bond Issue
Supporting Documents Gloucester board of Supervisors Bond IssueChuck Thompson
 
2012-13 Budget Assumptions
2012-13 Budget Assumptions2012-13 Budget Assumptions
2012-13 Budget Assumptionsdvodicka
 
The Way We Were -The Way We Are
The Way We Were -The Way We AreThe Way We Were -The Way We Are
The Way We Were -The Way We Aremecocca5
 

What's hot (15)

Lenox Financial Forecast v3
Lenox Financial Forecast v3Lenox Financial Forecast v3
Lenox Financial Forecast v3
 
Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5Everything you ever wanted to know about lenox v5
Everything you ever wanted to know about lenox v5
 
Gujrat
GujratGujrat
Gujrat
 
Fy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget PresentationFy 2013 Proposed Budget Presentation
Fy 2013 Proposed Budget Presentation
 
Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9
 
Centerville Project
Centerville ProjectCenterville Project
Centerville Project
 
The United States Debt 2000 Through 2011
The United States Debt 2000 Through 2011The United States Debt 2000 Through 2011
The United States Debt 2000 Through 2011
 
2012 Jim Thorpe Municipal Budget Presentation
2012 Jim Thorpe Municipal Budget Presentation2012 Jim Thorpe Municipal Budget Presentation
2012 Jim Thorpe Municipal Budget Presentation
 
Budget town hall meeting
Budget town hall meetingBudget town hall meeting
Budget town hall meeting
 
Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13
 
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
Apw1 utilities july 22 2013 ws presentation dds final 7.22.13
 
Feb 2011 repair bill lfb analysis
Feb 2011 repair bill lfb analysisFeb 2011 repair bill lfb analysis
Feb 2011 repair bill lfb analysis
 
Supporting Documents Gloucester board of Supervisors Bond Issue
Supporting Documents Gloucester board of Supervisors Bond IssueSupporting Documents Gloucester board of Supervisors Bond Issue
Supporting Documents Gloucester board of Supervisors Bond Issue
 
2012-13 Budget Assumptions
2012-13 Budget Assumptions2012-13 Budget Assumptions
2012-13 Budget Assumptions
 
The Way We Were -The Way We Are
The Way We Were -The Way We AreThe Way We Were -The Way We Are
The Way We Were -The Way We Are
 

Similar to Hr 3684 infrastructure_investment_and_jobs_act_summary

Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17RudySturkCGB
 
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...San Diego County Water Authority
 
Wkshp Item 3.C. Discussion of FY 17-21
Wkshp Item 3.C. Discussion of FY 17-21Wkshp Item 3.C. Discussion of FY 17-21
Wkshp Item 3.C. Discussion of FY 17-21CityofGalveston
 
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...ckrout
 
Fy 2013 proposed budget presentation 10-29-12 v3
Fy 2013 proposed budget presentation 10-29-12 v3Fy 2013 proposed budget presentation 10-29-12 v3
Fy 2013 proposed budget presentation 10-29-12 v3cityofevanston
 
Item # 4 - FY 2021-22 Budget Amendment
Item # 4 - FY 2021-22 Budget AmendmentItem # 4 - FY 2021-22 Budget Amendment
Item # 4 - FY 2021-22 Budget Amendmentahcitycouncil
 
City of Cerritos Draft Budget for 2022-23 FY
City of Cerritos Draft Budget for 2022-23 FYCity of Cerritos Draft Budget for 2022-23 FY
City of Cerritos Draft Budget for 2022-23 FYMurali Vasudevan
 
Item # 8 - PPT Proposed FY 2020- 2021 Budget
Item # 8 - PPT Proposed FY 2020- 2021 BudgetItem # 8 - PPT Proposed FY 2020- 2021 Budget
Item # 8 - PPT Proposed FY 2020- 2021 Budgetahcitycouncil
 
Sunnyvale Budget 2011-2012 Presentation
Sunnyvale Budget 2011-2012 PresentationSunnyvale Budget 2011-2012 Presentation
Sunnyvale Budget 2011-2012 PresentationCityofSunnyvale
 
Item # 8 - PPT Proposed Budget FY 2022-23
Item # 8 - PPT Proposed Budget FY 2022-23Item # 8 - PPT Proposed Budget FY 2022-23
Item # 8 - PPT Proposed Budget FY 2022-23ahcitycouncil
 
Budget Committee Presentation
Budget Committee PresentationBudget Committee Presentation
Budget Committee PresentationBrett Deaton
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumGW Solar Institute
 
Item # 6 - FY2021 Budget Amendment
Item # 6 - FY2021 Budget AmendmentItem # 6 - FY2021 Budget Amendment
Item # 6 - FY2021 Budget Amendmentahcitycouncil
 
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013San Diego County Water Authority
 
Oakland A's Waterfront Ballpark
Oakland A's Waterfront BallparkOakland A's Waterfront Ballpark
Oakland A's Waterfront Ballparkostadium
 

Similar to Hr 3684 infrastructure_investment_and_jobs_act_summary (20)

Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
 
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
 
Wkshp Item 3.C. Discussion of FY 17-21
Wkshp Item 3.C. Discussion of FY 17-21Wkshp Item 3.C. Discussion of FY 17-21
Wkshp Item 3.C. Discussion of FY 17-21
 
FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2
 
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
 
FY19 Budget Workshop (Day 2)
FY19 Budget Workshop (Day 2)FY19 Budget Workshop (Day 2)
FY19 Budget Workshop (Day 2)
 
Fy 2013 proposed budget presentation 10-29-12 v3
Fy 2013 proposed budget presentation 10-29-12 v3Fy 2013 proposed budget presentation 10-29-12 v3
Fy 2013 proposed budget presentation 10-29-12 v3
 
Item # 4 - FY 2021-22 Budget Amendment
Item # 4 - FY 2021-22 Budget AmendmentItem # 4 - FY 2021-22 Budget Amendment
Item # 4 - FY 2021-22 Budget Amendment
 
City of Cerritos Draft Budget for 2022-23 FY
City of Cerritos Draft Budget for 2022-23 FYCity of Cerritos Draft Budget for 2022-23 FY
City of Cerritos Draft Budget for 2022-23 FY
 
Item # 8 - PPT Proposed FY 2020- 2021 Budget
Item # 8 - PPT Proposed FY 2020- 2021 BudgetItem # 8 - PPT Proposed FY 2020- 2021 Budget
Item # 8 - PPT Proposed FY 2020- 2021 Budget
 
Sunnyvale Budget 2011-2012 Presentation
Sunnyvale Budget 2011-2012 PresentationSunnyvale Budget 2011-2012 Presentation
Sunnyvale Budget 2011-2012 Presentation
 
Item # 8 - PPT Proposed Budget FY 2022-23
Item # 8 - PPT Proposed Budget FY 2022-23Item # 8 - PPT Proposed Budget FY 2022-23
Item # 8 - PPT Proposed Budget FY 2022-23
 
DCNR Department Budget Overview
DCNR Department Budget OverviewDCNR Department Budget Overview
DCNR Department Budget Overview
 
FY16 Budget Adoption
FY16 Budget AdoptionFY16 Budget Adoption
FY16 Budget Adoption
 
Budget Committee Presentation
Budget Committee PresentationBudget Committee Presentation
Budget Committee Presentation
 
April Forum Powerpoint
April Forum PowerpointApril Forum Powerpoint
April Forum Powerpoint
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
 
Item # 6 - FY2021 Budget Amendment
Item # 6 - FY2021 Budget AmendmentItem # 6 - FY2021 Budget Amendment
Item # 6 - FY2021 Budget Amendment
 
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
 
Oakland A's Waterfront Ballpark
Oakland A's Waterfront BallparkOakland A's Waterfront Ballpark
Oakland A's Waterfront Ballpark
 

More from Gabriel Putnam

Farming Concepts (Aquaculture and Elevated Farming)
Farming Concepts (Aquaculture and Elevated Farming)Farming Concepts (Aquaculture and Elevated Farming)
Farming Concepts (Aquaculture and Elevated Farming)Gabriel Putnam
 
Critical earth elements
Critical earth elementsCritical earth elements
Critical earth elementsGabriel Putnam
 
Military Animal Companions
Military Animal CompanionsMilitary Animal Companions
Military Animal CompanionsGabriel Putnam
 
Direct representative government
Direct representative governmentDirect representative government
Direct representative governmentGabriel Putnam
 
Shipping Container Possibilities
Shipping Container PossibilitiesShipping Container Possibilities
Shipping Container PossibilitiesGabriel Putnam
 
Multi level Reforestation
Multi level ReforestationMulti level Reforestation
Multi level ReforestationGabriel Putnam
 

More from Gabriel Putnam (14)

Farming Concepts (Aquaculture and Elevated Farming)
Farming Concepts (Aquaculture and Elevated Farming)Farming Concepts (Aquaculture and Elevated Farming)
Farming Concepts (Aquaculture and Elevated Farming)
 
Submarine gliders
Submarine glidersSubmarine gliders
Submarine gliders
 
Critical earth elements
Critical earth elementsCritical earth elements
Critical earth elements
 
Energy Conservation
Energy ConservationEnergy Conservation
Energy Conservation
 
Military Animal Companions
Military Animal CompanionsMilitary Animal Companions
Military Animal Companions
 
Oil supply and_demand
Oil supply and_demandOil supply and_demand
Oil supply and_demand
 
Sanitation update
Sanitation updateSanitation update
Sanitation update
 
Sanitation
SanitationSanitation
Sanitation
 
Direct representative government
Direct representative governmentDirect representative government
Direct representative government
 
Shipping Container Possibilities
Shipping Container PossibilitiesShipping Container Possibilities
Shipping Container Possibilities
 
Fast Fashion Reuse
Fast Fashion ReuseFast Fashion Reuse
Fast Fashion Reuse
 
Multi level Reforestation
Multi level ReforestationMulti level Reforestation
Multi level Reforestation
 
Underwater Cities
Underwater CitiesUnderwater Cities
Underwater Cities
 
Superconductivity
SuperconductivitySuperconductivity
Superconductivity
 

Recently uploaded

Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsPooja Nehwal
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
Identifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking ToolsIdentifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking ToolsUjjwal Acharya
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Ismail Fahmi
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfauroraaudrey4826
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 

Recently uploaded (20)

Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call GirlsVashi Escorts, {Pooja 09892124323}, Vashi Call Girls
Vashi Escorts, {Pooja 09892124323}, Vashi Call Girls
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf23042024_First India Newspaper Jaipur.pdf
23042024_First India Newspaper Jaipur.pdf
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
Identifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking ToolsIdentifying & Combating Misinformation w/ Fact Checking Tools
Identifying & Combating Misinformation w/ Fact Checking Tools
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdf
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 

Hr 3684 infrastructure_investment_and_jobs_act_summary

  • 1. Summary of HR 3684, Infrastructure Investment and Jobs Act, August 10, 2021 version, Passed Senate with amendments 117th Congress (2021-2022), 1st Session https://www.congress.gov/117/bills/hr3684/generated/BILLS-117hr3684eas.html Accessed: 9/24/2021, 9/25/2021 Compiled by: Gabriel Putnam Questions/Corrections/Commentary: Contact: gabriel.putnam@gmail.com Excel table available upon request Caveats: This is a only summary of an "enormous" bill Printed, it is approximately 2700 pages long (depending on formatting) I have attempted to note appropriations, yet there may be financial effects I missed (2700 pages of legalese) I am not a lawyer, this should not be construed as legal advice I am not an accountant, this should not be construed as financial advice I do not represent the government or the authors of this bill Use this information at your own risk The bill itself is the definitive copy of this information Summary This bill is divided into 11 major Divisions (A-K), each usually with several Titles and Subtitles and then Sections Based on my initial reading of this bill it is unclear whether A-I appropriations are simply rephrased in J or in addition to J There is usually a large discrepancy between A-I and J, no matter how they are summarized Division A almost equals all the spending in J except for 2022 Appropriation Summaries for each Division 2022 2023 2024 2025 2026 A - SURFACE TRANSPORTATION $65,404,474,533 $66,931,526,025 $68,469,508,545 $69,911,880,714 $71,480,610,183 B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 $14,187,755,767 $13,660,245,219 $14,058,262,024 $14,462,923,780 $14,917,734,652 C - TRANSIT $16,505,000,000 $16,784,000,000 $17,140,000,000 $17,429,000,000 $17,792,000,000 D - ENERGY $85,064,868,000 $2,357,450,000 $2,129,962,500 $2,270,540,625 $862,987,656 E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE $5,990,000,000 $6,690,000,000 $7,215,000,000 $7,750,000,000 $7,770,000,000 F - BROADBAND $45,000,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000 G - OTHER AUTHORIZATIONS $4,034,000,000 $1,709,000,000 $1,605,000,000 $1,405,000,000 $1,305,000,000 H - REVENUE PROVISIONS Note: this is primarily transfers to trust funds $118,000,000,000 $0 $0 $0 $0 I - OTHER MATTERS Note: this is primarily recission of prior funding ($41,755,000,000) $0 $0 $0 $0 J - APPROPRIATIONS Note: this is itemized spending by Departments (very long) $179,330,736,000 $71,669,494,000 $69,645,205,500 $68,897,783,625 $67,025,347,656 K - MINORITY BUSINESS DEVELOPMENT $110,000,000 $110,000,000 $110,000,000 $110,000,000 $0 Appropriations rephrased as jobs per $'s spent Using the average: 52,378 $ of the 2019 real median earnings of men ($57,456) and women ($47,299) in 2019 from: https://www.census.gov/library/publications/2020/demo/p60-270.html Using the average: 52% overhead rate for government contracting For a final rate of: $79,614 Saying every dollar is turned into a salary+overhead job: These numbers work out to employment figures of: 2022 2023 2024 2025 2026 A - SURFACE TRANSPORTATION 821,522 840,703 860,021 878,138 897,842 B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 178,207 171,581 176,581 181,664 187,376 C - TRANSIT 207,313 210,818 215,289 218,919 223,479 D - ENERGY 1,068,469 29,611 26,754 28,519 10,840 E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE 75,238 84,031 90,625 97,345 97,596 F - BROADBAND 565,229 6,908 6,908 6,908 6,908 G - OTHER AUTHORIZATIONS 50,670 21,466 20,160 17,648 16,392 H - REVENUE PROVISIONS 1,482,155 0 0 0 0 I - OTHER MATTERS -524,469 0 0 0 0 J - APPROPRIATIONS 2,252,508 900,214 874,788 865,400 841,881 K - MINORITY BUSINESS DEVELOPMENT 1,382 1,382 1,382 1,382 0 A - SURFACE TRANSPORTATION Major contributor is Federal-aid Highway Program B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 Major contributors: Multimodal Investment and Amtrak C - TRANSIT Major contributors: Financial assistance for urbanized areas, Competitive grants for rail vehicle replacement, andd Capital Investment Grants D - ENERGY Major contributors: Grid infrastructure resiliency and reliability, Battery processing and manufacturing, Carbon Storage and Removal, Regional clean hydrogen hubs, Nuclear Energy, Weatherization Assistance Program, Orphaned Well Site Plugging, Abandoned Mine Reclamation, Wildfire Reduction and Ecosystem Restoration, and Aging Water Infrastructure E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE Major contributors: Drinking Water State Revolving Loan Fund and Clean Water State Revolving Funds F - BROADBAND Major contributors: Broadband equity, access, and deployment program G - OTHER AUTHORIZATIONS Major contributors: Indian Water Rights Settlement Completion Fund and Clean School Buses H - REVENUE PROVISIONS Major contributors: Transfers to Highway Account and Mass Transit Account Trust Funds I - OTHER MATTERS Major contributors: Recission of: Disaster Loans, Targeted EIDL Advance, Business Loans, Pandemic Relief for Aviation Workers J - APPROPRIATIONS Major contributors: This is itemized appropriations for each Department individually K - MINORITY BUSINESS DEVELOPMENT Major contributors: Minority Business Development Agency Itemized Spending for Each Division Spending as has been summarized by: Division TITLE Department Where a: is shown, it means: for the period of fiscal years X to Y Ex: $1,000,000,000 for the period of fiscal years 2022 through 2026, to remain available until expended Many appropriations are simply set in 2022 and "to remain available until expended" Green text means: "This is an allocation" of how appropriated funds shall be spent Several calculations use forms such as: prior year*CPI Δ These have not been include in summaries (CPI meaning Consumer Price Index in this example) (Red text) means: "These funds are recinded" from prior sources of funding (removed, taken away) Note: Its still really long, even the summary is 11 pages long A - SURFACE TRANSPORTATION 2022 2023 2024 2025 2026 Total - Division A $65,404,474,533 $66,931,526,025 $68,469,508,545 $69,911,880,714 $71,480,610,183 TITLE I-Federal-aid highways $65,321,974,533 $66,847,026,025 $68,383,008,545 $69,823,380,714 $71,390,110,183 In general Federal-aid highway program $52,488,065,375 $53,537,826,683 $54,608,583,217 $55,700,754,881 $56,814,769,844 Transportation Infrastructure Finance And Innovation Program $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000 Federal Lands and Tribal Transportation Program Tribal transportation program $578,460,000 $589,960,000 $602,460,000 $612,960,000 $627,960,000 Federal lands transportation program In general $421,965,000 $429,965,000 $438,965,000 $447,965,000 $455,965,000 Allocation National Park Service $332,427,450 $338,867,450 $346,237,450 $353,607,450 $360,047,450 United States Fish and Wildlife Service $36,000,000 $36,000,000 $36,000,000 $36,000,000 $36,000,000 Forest Service $24,000,000 $25,000,000 $26,000,000 $27,000,000 $28,000,000 Federal lands access program $285,975,000 $291,975,000 $296,975,000 $303,975,000 $308,975,000 Territorial And Puerto Rico Highway Program $219,000,000 $224,000,000 $228,000,000 $232,500,000 $237,000,000 Puerto Rico highway program $173,010,000 $176,960,000 $180,120,000 $183,675,000 $187,230,000 Territorial highway program $45,990,000 $47,040,000 $47,880,000 $48,825,000 $49,770,000 Nationally Significant Freight And Highway Projects $1,000,000,000 $1,000,000,000 $1,000,000,000 $900,000,000 $900,000,000 Additional Authorization (Sec 11110, (s)) $1,000,000,000 $1,100,000,000 $1,200,000,000 $1,300,000,000 $1,400,000,000 Other programs In general Bridge investment program $600,000,000 $640,000,000 $650,000,000 $675,000,000 $700,000,000 Tribal transportation facility bridge set aside (Sec 11118, (a), (q)) $16,000,000 $18,000,000 $20,000,000 $22,000,000 $24,000,000 Congestion relief program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Charging and fueling infrastructure grants $300,000,000 $400,000,000 $500,000,000 $600,000,000 $700,000,000 Rural surface transportation grant program $300,000,000 $350,000,000 $400,000,000 $450,000,000 $500,000,000 PROTECT grants In general $250,000,000 $250,000,000 $300,000,000 $300,000,000 $300,000,000 Allocation for planning grants $25,000,000 $25,000,000 $30,000,000 $30,000,000 $30,000,000 for resilience improvement grants $175,000,000 $175,000,000 $210,000,000 $210,000,000 $210,000,000 https://www.bostonglobe.com/news/nation/2013/03/17/harvard-mit-and-other-research-schools-thwart-obama-administration-effort-cap-overhead- payments/Nk5PT0Mc8MQZihFVNs5gNK/story.html
  • 2. for community resilience and evacuation route grants $25,000,000 $25,000,000 $30,000,000 $30,000,000 $30,000,000 for at-risk coastal infrastructure grants $25,000,000 $25,000,000 $30,000,000 $30,000,000 $30,000,000 Reduction of truck emissions $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Nationally significant Federal lands and Tribal projects $55,000,000 $55,000,000 $55,000,000 $55,000,000 $55,000,000 General fund Bridge investment program $600,000,000 $640,000,000 $650,000,000 $675,000,000 $700,000,000 Nationally significant Federal lands and Tribal projects program $300,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000 Healthy Streets program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Transportation Resilience and Adaptation Centers of Excellence $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Open challenge and research proposal pilot program $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000 Research, technology, and education authorizations In general Highway research and development program $147,000,000 $147,000,000 $147,000,000 $147,000,000 $147,000,000 Technology and innovation deployment program $110,000,000 $110,000,000 $110,000,000 $110,000,000 $110,000,000 Training and education $25,000,000 $25,250,000 $25,500,000 $25,750,000 $26,000,000 Intelligent transportation systems program $110,000,000 $110,000,000 $110,000,000 $110,000,000 $110,000,000 University transportation centers program $80,000,000 $80,500,000 $81,000,000 $81,500,000 $82,000,000 Bureau of transportation statistics $26,000,000 $26,250,000 $26,500,000 $26,750,000 $27,000,000 Pilot programs Wildlife crossings pilot program $60,000,000 $65,000,000 $70,000,000 $75,000,000 $80,000,000 Prioritization process pilot program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Reconnecting communities pilot program Planning grants $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000 Capital construction grants $65,000,000 $68,000,000 $70,000,000 $72,000,000 $75,000,000 Modifications to existing programs Administrative expenses $490,964,697 $500,783,991 $510,799,671 $521,015,664 $531,435,977 Congestion mitigation and air quality improvement program $2,536,490,803 $2,587,220,620 $2,638,965,032 $2,691,744,332 $2,745,579,213 national highway freight program $1,373,932,519 $1,401,411,169 $1,429,439,392 $1,458,028,180 $1,487,188,740 Metropolitan planning $438,121,139 $446,883,562 $455,821,233 $464,937,657 $474,236,409 Construction of ferry boats and ferry terminal facilities (Sec 11121) $110,000,000 $112,000,000 $114,000,000 $116,000,000 $118,000,000 Tribal high priority projects program (Sec 11128) Set aside $9,000,000 $9,000,000 $9,000,000 $9,000,000 $9,000,000 Appropriations $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000 Appalachian regional energy hub initiative (Sec 11506) $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Denali Commission (Sec 11507) $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Invasive plant elimination program (Sec 11522) $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Pollinator-friendly practices on roadsides and highway rights-of-way (Sec 11528) $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 Active transportation infrastructure investment program (Sec 11529) $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 TITLE II-Transportation infrastructure finance and innovation $0 $0 $0 $0 $0 (No specific appropriations, lots of limitations and percentage changes) TITLE III-Research, technology, and education $32,500,000 $32,500,000 $32,500,000 $32,500,000 $32,500,000 Strategic innovation for revenue collection $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000 National motor vehicle per-mile user fee pilot $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Data integration pilot program $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 Emerging technology research pilot program $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 TITLE IV-Indian Affairs $50,000,000 $52,000,000 $54,000,000 $56,000,000 $58,000,000 Bureau of Indian Affairs road maintenance program $50,000,000 $52,000,000 $54,000,000 $56,000,000 $58,000,000 B - SURFACE TRANSPORTATION INVESTMENT ACT OF 2021 2022 2023 2024 2025 2026 Total - Division B $14,187,755,767 $13,660,245,219 $14,058,262,024 $14,462,923,780 $14,917,734,652 TITLE !-Multimodal and freight transportation $4,428,750,000 $4,428,750,000 $4,428,750,000 $4,428,750,000 $4,428,750,000 Subtitle A - Multimodal freight policy Office of Multimodal Freight Infrastructure and Policy "such sums as are necessary to carry out this section"??? Multi-State freight corridor planning $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Subtitle B - Multimodal investment National infrastructure project assistance Multimodal infrastructure investments $2,000,000,000 $2,000,000,000 $2,000,000,000 $2,000,000,000 $2,000,000,000 Local and regional project assistance $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 National culvert removal, replacement, and restoration grant program $800,000,000 $800,000,000 $800,000,000 $800,000,000 $800,000,000 National multimodal cooperative freight research program $3,750,000 $3,750,000 $3,750,000 $3,750,000 $3,750,000 Subtitle C - Railroad rehabilitation and improvement financing reforms RRIF codification and reforms In general $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Refund of credit risk premium $70,000,000 $70,000,000 $70,000,000 $70,000,000 $70,000,000 TITLE II-Rail $7,245,000,000 $6,682,500,000 $7,035,500,000 $7,395,000,000 $7,804,500,000 Subtitle A - Authorization of appropriations Grants to Amtrak Northeast Corridor $1,570,000,000 $1,100,000,000 $1,200,000,000 $1,300,000,000 $1,400,000,000 National Network $2,300,000,000 $2,200,000,000 $2,450,000,000 $2,700,000,000 $3,000,000,000 Federal Railroad Administration Safety and operations $248,000,000 $254,000,000 $263,000,000 $271,000,000 $279,000,000 Railroad research and development $43,000,000 $44,000,000 $45,000,000 $46,000,000 $47,000,000 Consolidated rail infrastructure and safety improvements grants $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Railroad crossing elimination program $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000 Restoration and enhancement grants $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Federal-State partnership for intercity passenger rail grants $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 Amtrak Office of Inspector General $26,500,000 $27,000,000 $27,500,000 $28,000,000 $28,500,000 Subtitle B - Amtrak reforms Enhancing cross border service Secretaries may "provide support requested by Amtrak that is necessary" Amtrak daily long-distance service study $7,500,000 $7,500,000 Subtitle C - Intercity passenger rail policy (No specific appropriations) Subtitle D - Rail Safety (No specific appropriations) TITLE III-Motor carrier safety $856,000,000 $873,650,000 $891,300,000 $908,950,000 $926,600,000 Administrative expenses $360,000,000 $367,500,000 $375,000,000 $382,500,000 $390,000,000 Financial assistance programs motor carrier safety assistance program $390,500,000 $398,500,000 $406,500,000 $414,500,000 $422,500,000 high priority program $57,600,000 $58,800,000 $60,000,000 $61,200,000 $62,400,000 commercial motor vehicle enforcement training and support grant program $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 commercial motor vehicle operators grant program $1,100,000 $1,200,000 $1,300,000 $1,400,000 $1,500,000 financial assistance program for commercial driver’s license implementation $41,800,000 $42,650,000 $43,500,000 $44,350,000 $45,200,000 TITLE IV-Highway and Motor Vehicle Safety $1,367,394,333 $1,396,520,219 $1,422,887,024 $1,449,398,780 $1,476,059,652 Subtitle A - Highway traffic safety Highway safety programs $363,400,000 $370,900,000 $378,400,000 $385,900,000 $393,400,000 Highway safety research and development $186,000,000 $190,000,000 $194,000,000 $198,000,000 $202,000,000 High-visibility enforcement program $36,400,000 $38,300,000 $40,300,000 $42,300,000 $44,300,000 National priority safety programs $336,500,000 $346,500,000 $353,500,000 $360,500,000 $367,500,000 Administrative expenses $38,000,000 $39,520,000 $41,100,800 $42,744,832 $44,454,625 National driver register $6,800,000 $7,000,000 $7,200,000 $7,400,000 $7,600,000 Safe Streets and Roads for All grant program (Sec 24112) $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Subtitle B - Vehicle Safety Appropriations $200,294,333 $204,300,219 $208,386,224 $212,553,948 $216,805,027 TITLE V-Research and innovation $160,000,000 $160,000,000 $160,000,000 $160,000,000 $160,000,000 Bureau of Transportation Statistics (Sec 25004) $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Strengthening mobility and revolutionizing transportation grant program (Sec 25005) $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Advanced transportation research (Sec 25012) "such sums as are necessary to carry out this section"??? Open research initiative (Sec 25013) Advanced transportation research initiative (Sec 5506) $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000
  • 3. TITLE IV-Hazardous materials $117,825,000 $118,825,000 $119,825,000 $120,825,000 $121,825,000 Appropriations In general $67,000,000 $68,000,000 $69,000,000 $70,000,000 $71,000,000 Hazardous Materials Emergency Preparedness Fund Planning and Training Grants (5516(a)) $39,050,000 $39,050,000 $39,050,000 $39,050,000 $39,050,000 Monitoring and Technical Assistance (5516(e)) $150,000 $150,000 $150,000 $150,000 $150,000 Emergency Response Guidebook(5116(h)(3)) $625,000 $625,000 $625,000 $625,000 $625,000 Supplemental Training Grants(5116(I)) $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 Hazardous materials training grants $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Community safety grants $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 TITLE VII-General provisions $0 $0 $0 $0 $0 (No specific appropriations) TITLE VIII-Sport fish restoration and recreational boating safety $12,786,434 $0 $0 $0 $0 Set-aside for administration prior year+$979500 prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ Set-aside for Coast Guard administration $12,786,434 prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ Wildlife restoration fund administration prior year+$979500 prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ prior year*CPI Δ C - TRANSIT 2022 2023 2024 2025 2026 Total - Division C $16,505,000,000 $16,784,000,000 $17,140,000,000 $17,429,000,000 $17,792,000,000 Authorizations Grants In general $13,355,000,000 $13,634,000,000 $13,990,000,000 $14,279,000,000 $14,642,000,000 Allocations 5305 $184,647,343 $188,504,820 $193,426,906 $197,422,644 $202,441,512 20005(b) of the Federal Public Transportation Act of 2012 $13,157,184 $13,432,051 $13,782,778 $14,067,497 $14,425,121 Financial assistance for urbanized areas $6,408,288,249 $6,542,164,133 $6,712,987,840 $6,851,662,142 $7,025,844,743 Enhanced mobility of seniors and individuals with disabilities $371,247,094 $379,002,836 $388,899,052 $396,932,778 $407,023,583 Innovative coordinated access and mobility $4,605,014 $4,701,218 $4,823,972 $4,923,624 $5,048,792 Financial assistance for rural areas $875,289,555 $893,575,275 $916,907,591 $935,848,712 $959,639,810 5132 $36,840,115 $37,609,743 $38,591,779 $39,388,993 $40,390,337 5132(h) $5,000,000 $5,104,455 $5,237,739 $5,345,938 $5,481,842 5132(I) $6,578,592 $6,716,026 $6,891,389 $7,033,749 $7,212,560 5314 $11,841,465 $12,088,846 $12,404,500 $12,660,748 $12,982,608 National transit institute $6,578,592 $6,716,026 $6,891,389 $7,033,749 $7,212,560 Sec 5318 $5,000,000 $5,104,455 $5,237,739 $5,345,938 $5,481,842 Sec 5334 $131,000,000 $134,930,000 $138,977,900 $143,147,237 $147,441,654 Sec 5335 $5,262,874 $5,372,820 $5,513,111 $5,626,999 $5,770,048 Sec 5337(f), Competitive grants for rail vehicle replacement $3,515,528,226 $3,587,778,037 $3,680,934,484 $3,755,675,417 $3,850,496,668 Buses and bus facilities program $603,992,657 $616,610,699 $632,711,140 $645,781,441 $662,198,464 Buses and bus facilities and low emission competitive grants $447,257,433 $456,601,111 $468,523,511 $478,202,088 $490,358,916 Low emission grants $71,561,189 $73,056,178 $74,963,762 $76,512,334 $78,457,427 Financial assistance for urban and rural areas $741,042,792 $756,523,956 $776,277,698 $792,313,742 $812,455,901 Growing States $392,752,680 $400,957,696 $411,427,180 $419,926,283 $430,601,628 High Density States $348,290,112 $355,566,259 $364,850,518 $372,387,459 $381,854,274 Capital investment grants $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 Capital and preventive maintenance grants to Washington Metropolitan Area Transit Authority $150,000,000 $150,000,000 $150,000,000 $150,000,000 $150,000,000 D - ENERGY 2022 2023 2024 2025 2026 Total - Division D $85,064,868,000 $2,357,450,000 $2,129,962,500 $2,270,540,625 $862,987,656 TITLE I-Grid infrastructure resiliency $15,220,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Subtitle A - Grid infrastructure resiliency and reliability Preventing outages and enhancing the resilience of the electric grid $5,000,000,000 Electric grid reliability and resilience research, development, and demonstration Energy infrastructure Federal financial assistance program $5,000,000,000 Energy improvement in rural or remote areas $1,000,000,000 Transmission facilitation program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Deployment of technologies to enhance grid flexibility $3,000,000,000 State energy program $500,000,000 Columbia Basin power management Transmission Coordination and Expansion Aggregated amount of the Canadian Entitlement during the 5-year period preceding Increased Hydroelectric Capacity $100,000,000 Power Coordination Study $10,000,000 Subtitle B - Cybersecurity Rural and municipal utility advanced cybersecurity grant and technical assistance program $250,000,000 Enhanced grid security Cybersecurity for the energy sector research, development, and demonstration program $250,000,000 Energy sector operational support for cyberresilience program $50,000,000 Modeling and assessing energy infrastructure risk $50,000,000 TITLE II-Supply chains for clean energy technologies $7,812,000,000 $100,000,000 $100,000,000 $0 $0 Earth Mapping Resources Initiative $320,000,000 USGS energy and minerals research facility $167,000,000 Rare earth elements demonstration facility $140,000,000 Battery processing and manufacturing Battery material processing grants $3,000,000,000 Battery manufacturing and recycling grants $3,000,000,000 Lithium-Ion Battery Recycling Prize Competition $10,000,000 Battery and critical mineral recycling Battery recycling research, development, and demonstration grants $60,000,000 State and local programs $50,000,000 Retailers as collection points $15,000,000 Electric drive vehicle battery recycling and second-life applications program Electric drive vehicle battery second-Life applications and recycling $200,000,000 Advanced energy manufacturing and recycling grant program $750,000,000 Critical minerals mining and recycling research Grant program for processing of critical minerals and development of critical minerals and metals $100,000,000 $100,000,000 $100,000,000 TITLE III-Fuels and technology infrastructure investments $23,546,600,000 $667,250,000 $368,562,500 $369,940,625 $371,387,656 Subtitle A - Carbon capture, utilization, storage, and transportation infrastructure Carbon utilization program $41,000,000 $65,250,000 $66,562,500 $67,940,625 $69,387,656 Carbon capture technology program $100,000,000 Carbon dioxide transportation infrastructure finance and innovation $600,000,000 $600,000,000 $300,000,000 $300,000,000 $300,000,000 Carbon storage validation and testing $2,500,000,000 Secure geologic storage permitting $50,000,000 Carbon removal $3,500,000,000 Subtitle B - Hydrogen research and development Additional clean hydrogen programs Regional clean hydrogen hubs $8,000,000,000 Clean hydrogen manufacturing and recycling $500,000,000 Clean hydrogen electrolysis program $1,000,000,000 Subtitle C - Nuclear Energy Infrastructure Civil nuclear credit program $6,000,000,000 Subtitle D - Hydropower Hydroelectric production incentives $125,000,000 Hydroelectric efficiency improvement incentives $75,000,000 Maintaining and enhancing hydroelectricity incentives $553,600,000 Pumped storage hydropower wind and solar integration and system reliability initiative $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 Subtitle E - Miscellaneous Clean energy demonstration program on current and former mine land $500,000,000 TITLE IV-Enabling energy infrastructure investment and data collection $0 $0 $0 $0 $0 Subtitle A - Department of Energy loan program
  • 4. (No specific appropriations) Subtitle B - Energy Information Administration (No specific appropriations) Subtitle C - Miscellaneous (No specific appropriations) TITLE V-Energy efficiency and building infrastructure $6,005,000,000 $20,000,000 $0 $0 $0 Subtitle A - Residential and commercial energy efficiency Energy efficiency revolving loan fund capitalization grant program $250,000,000 Energy auditor training grant program $40,000,000 Subtitle B - Buildings Cost-effective codes implementation for efficiency and resilience $225,000,000 Building, training, and assessment centers $10,000,000 Career skills training $10,000,000 Subtitle C - Industrial energy efficiency Part I - Industry Future of industry program and industrial research and assessment centers In general $150,000,000 Implementation grants $400,000,000 Part II - Smart Manufacturing State manufacturing leadership $50,000,000 Subtitle D - Schools and nonprofits Grants for energy efficiency improvements and renewable energy improvements at public school facilities $500,000,000 Energy efficiency materials pilot program $50,000,000 Subtitle E - Miscellaneous Weatherization assistance program $3,500,000,000 Energy Efficiency and Conservation Block Grant Program $550,000,000 Assisting Federal Facilities with Energy Conservation Technologies grant program $250,000,000 Rebates - extended product system $10,000,000 $10,000,000 Rebates - energy efficient transformer $10,000,000 $10,000,000 TITLE VI-Methane reduction infrastructure $4,707,000,000 $0 $0 $0 $0 Orphaned well site plugging, remediation, and restoration Federal program $250,000,000 State program - Initial grants $775,000,000 State program - Formula grants $2,000,000,000 State program - Performance grants $1,500,000,000 Tribal orphaned well site plugging, remediation, and restoration $150,000,000 To Secretary of Energy - Interstate Oil and Gas Compact Commission R&D $30,000,000 To the Interstate Oil and Gas Compact Commission $2,000,000 TITLE VII-Abandoned mine land reclamation $14,318,000,000 $0 $0 $0 $0 Abandoned Mine Reclamation Fund authorization of appropriations $11,293,000,000 To Secretary of Interior - States and Indian Tribes with the financial and technical assistance $25,000,000 Amounts distributed from Abandoned Mine Reclamation Fund prior year+adjust prior year+adjust prior year+adjust prior year+adjust prior year+adjust Abandoned hardrock mine reclamation $3,000,000,000 Grants to States and Indian Tribes $1,500,000,000 Inventory, assess, decommission, reclaim, respond to hazardous substance releases $1,500,000,000 TITLE VIII-Natural resources-related infrastructure, wildfire management, and ecosystem restoration $5,839,200,000 $90,000,000 $0 $0 $800,000 Forest Service Legacy Road and Trail Remediation Program $250,000,000 Wildfire risk reduction $3,369,200,000 NOAA - Rapidly detect and report wildfires $20,000,000 Secretary of the Interior $10,000,000 Secretary of Agriculture $10,000,000 Federal wildland firefighters salaries $600,000,000 Secretary of the Interior $120,000,000 Secretary of Agriculture $480,000,000 Secretary of the Interior - Acquire incident management technology $10,000,000 Secretary of Agriculture - Reverse-911 telecommunication systems $30,000,000 Secretary of the Interior - Slip-on tanker units for local governments $50,000,000 Secretary of Agriculture - Map depicting at-risk communities $1,200,000 Workshops and workforce training $100,000,000 Secretary of the Interior $50,000,000 Secretary of Agriculture $50,000,000 Secretary of Agriculture - To Southwest Ecological Restoration Institute $20,000,000 Joint Fire Science Program $20,000,000 Secretary of the Interior $10,000,000 Secretary of Agriculture $10,000,000 Secretary of Agriculture - Collaborative Forest Landscape Restoration Program $100,000,000 Thinning and timber harvesting $500,000,000 Secretary of the Interior $100,000,000 Secretary of Agriculture $400,000,000 Secretary of Agriculture - community wildfire defense grants $500,000,000 Prescribed fires $500,000,000 Secretary of the Interior $250,000,000 Secretary of Agriculture $250,000,000 Developing or improving potential control locations (firebreaks, fuelbreaks) $500,000,000 Secretary of the Interior $250,000,000 Secretary of Agriculture $250,000,000 Modify and remove flammable vegetation on Federal land $200,000,000 Secretary of the Interior $100,000,000 Secretary of Agriculture $100,000,000 Post-fire restoration activities $200,000,000 Secretary of the Interior $100,000,000 Secretary of Agriculture $100,000,000 Secretary of Agriculture - Firewood banks $8,000,000 Procurement and placement of wildfire detection and real-time monitoring equipment $10,000,000 Ecosystem restoration $2,130,000,000 Stewardship contracts and Health Forests Restoration Act of 2003 $300,000,000 Secretary of the Interior $50,000,000 Secretary of Agriculture $150,000,000 Secretary of the Interior - Healthy Forests Restoration Act working capital fund $100,000,000 State and Indian Tribes restoration projects $200,000,000 Secretary of the Interior $40,000,000 Secretary of Agriculture $160,000,000 Secretary of Agriculture - purchase and process byproducts from ecosystem restoration projects $400,000,000 Secretary of the Interior - grants for implementing voluntary ecosystem restoration projects $400,000,000 Secretary of Agriculture - temporary water crossing structures $50,000,000 Invasive species detection, prevention, and eradication $200,000,000 Secretary of the Interior $100,000,000 Secretary of Agriculture $100,000,000 Restore, prepare, or adapt recreation sites $100,000,000 Secretary of the Interior $45,000,000 Secretary of Agriculture $35,000,000 Secretary of Agriculture - Restore cabins and historic buildings $20,000,000 Restore native vegetation and mitigate environmental hazards on mined land $200,000,000 Secretary of the Interior $100,000,000 Secretary of Agriculture $100,000,000 National revegetation effort $200,000,000 Secretary of the Interior $70,000,000 Secretary of Agriculture $130,000,000 Secretary of Agriculture - Landscape scale restoration of water quality or fish passage $80,000,000 GAO study $800,000 Joint Chiefs Landscape Restoration Partnership program $90,000,000 $90,000,000 TITLE IX-Western water infrastructure $4,350,000,000 $0 $0 $0 $0
  • 5. Water storage, groundwater storage, and conveyance projects $1,150,000,000 Grants for small surface water and groundwater storage $100,000,000 Aging Infrastructure Account $3,200,000,000 Bureau of Reclamation works that have suffered a critical failure $100,000,000 Rehabilitation, reconstruction, or replacement of a dam $100,000,000 Rural water projects $1,000,000,000 Water recycling and reuse projects $1,000,000,000 Reclamation Wastewater and Groundwater Study and Facilities Act $550,000,000 Large-scale water recycling and reuse projects $450,000,000 Water Desalination Act $250,000,000 Reclamation Safety of Dams Act $500,000,000 WaterSMART grants $400,000,000 Projects that improve the condition of a natural feature or nature-based feature $100,000,000 Colorado River Basin Drought Contingency Plan $300,000,000 Drought Contingency Plan for the Upper Colorado River Basin $50,000,000 Financial assistance for watershed management projects $100,000,000 Design, study, and construction of aquatic ecosystem restoration and protection projects $250,000,000 Multi-benefit projects to improve watershed health $100,000,000 Endangered species recovery and conservation programs in the Colorado River Basin $50,000,000 TITLE X-Authorization of appropriations for Energy Act of 2020 $3,267,068,000 $1,470,200,000 $1,651,400,000 $1,890,600,000 $480,800,000 Energy Storage Demonstration Projects Energy Storage Demonstration Projects $355,000,000 Long-duration Demonstration Initiative and Joint Program $150,000,000 Advanced Reactor Demonstrations $511,000,000 $506,000,000 $636,000,000 $824,000,000 $453,000,000 Mineral Security Projects National Geological and Geophysical Data Preservation Program $8,668,000 $5,000,000 $5,000,000 $5,000,000 Rare Earth Mineral Security $23,000,000 $24,200,000 $25,400,000 $26,600,000 $27,800,000 Critical Material Innovation, Efficiency, and Alternatives $230,000,000 $100,000,000 $135,000,000 $135,000,000 Critical Material Supply Chain Research Facility $40,000,000 $35,000,000 Carbon Capture Demonstration and Pilot Programs Carbon Capture Large-scale Pilot Projects $387,000,000 $200,000,000 $200,000,000 $150,000,000 Carbon Capture Demonstration Projects Program $937,000,000 $500,000,000 $500,000,000 $600,000,000 Direct Air Capture Technologies Prize Competition Precommercial $15,000,000 Commercial $100,000,000 Water Power Projects Hydropower and Marine Energy Section 634 of the Energy Independence and Security Act of 2007 $36,000,000 Section 635 of the Energy Independence and Security Act of 2007 $70,400,000 National Marine Energy Centers $40,000,000 Renewable Energy Projects Geothermal Energy $84,000,000 Wind Energy Section 3003(b)(2) of the Energy Act of 2020 $60,000,000 Section 3003(b)(4) of the Energy Act of 2020 $40,000,000 Solar Energy Section 3004(b)(2) of the Energy Act of 2020 $40,000,000 Section 3004(b)(3) of the Energy Act of 2020 $20,000,000 Section 3004(b)(4) of the Energy Act of 2020 $20,000,000 Industrial Emissions Demonstration Projects $100,000,000 $100,000,000 $150,000,000 $150,000,000 TITLE XI-Wage Rate Requirements $0 $0 $0 $0 $0 (No specific appropriations) TITLE XII-Miscellaneous $0 $0 $0 $0 $0 (No specific appropriations) E - DRINKING WATER AND WASTEWATER INFRASTRUCTURE 2022 2023 2024 2025 2026 Total - Division E $5,990,000,000 $6,690,000,000 $7,215,000,000 $7,750,000,000 $7,770,000,000 TITLE I-Drinking Water $2,915,000,000 $3,270,000,000 $3,545,000,000 $3,820,000,000 $3,845,000,000 Technical assistance and grants for emergencies affecting public water systems Safe Drinking Water Act Subsection (b) $35,000,000 $35,000,000 $35,000,000 $35,000,000 $35,000,000 Subsection (e) $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000 Drinking Water State Revolving Loan Fund Drinking Water State Revolving Funds Capitalization Grant Reauthorization $2,400,000,000 $2,750,000,000 $3,000,000,000 $3,250,000,000 $3,250,000,000 Assistance for small and disadvantaged communities Existing Programs In general $70,000,000 $80,000,000 $100,000,000 $120,000,000 $140,000,000 Drinking water infrastructure resilience and sustainability $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000 Connection to Public Water Systems $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Competitive Grant Pilot Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Reducing lead in drinking water Section 1459B of the Safe Drinking Water Act $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Lead Inventorying Utilization Grant Pilot Program $10,000,000 Operational sustainability of small public water systems $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Midsize and large drinking water system infrastructure resilience and sustainability program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Lead contamination in school drinking water $30,000,000 $35,000,000 $40,000,000 $45,000,000 $50,000,000 Indian reservation drinking water program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Advanced drinking water technologies $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 TITLE II-Clean Water $3,075,000,000 $3,420,000,000 $3,670,000,000 $3,930,000,000 $3,925,000,000 Research, investigations, training, and information $75,000,000 $75,000,000 $75,000,000 $75,000,000 $75,000,000 Make grants to nonprofit organizations $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Wastewater efficiency grant pilot program $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Pilot program for alternative water source projects $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000 Sewer overflow and stormwater reuse municipal grants $280,000,000 $280,000,000 $280,000,000 $280,000,000 $280,000,000 Clean water infrastructure resiliency and sustainability program $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000 Small and medium publicly owned treatment works circuit rider program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Grants for construction and refurbishing of individual household decentralized wastewater systems for individuals with low or moderate income $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Connection to publicly owned treatment works $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000 Clean water state revolving funds $2,400,000,000 $2,750,000,000 $3,000,000,000 $3,250,000,000 $3,250,000,000 Water infrastructure and workforce investment $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Grants to Alaska to improve sanitation in rural and native villages $40,000,000 $40,000,000 $40,000,000 $50,000,000 $60,000,000 Water data sharing pilot program $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000 Water infrastructure financing reauthorization $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Stormwater infrastructure technology Centers of excellence for stormwater control infrastructure technologies $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Stormwater control infrastructure project grants $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Clean watersheds needs survey $5,000,000 Water resources research act amendments In general $12,000,000 $12,000,000 $12,000,000 $12,000,000 Research focused on water problems of interstate nature $3,000,000 $3,000,000 $3,000,000 $3,000,000 Enhanced aquifer use and recharge $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 F - BROADBAND 2022 2023 2024 2025 2026 Total - Division F $45,000,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000 TITLE I-Broadband grants for states, district of columbia, puerto rico, and territories $42,450,000,000 $0 $0 $0 $0 Grants for broadband deployment Broadband equity, access, and deployment program $42,450,000,000 TITLE II-Tribal connectivity technical amendments $0 $0 $0 $0 $0 (No specific appropriations)
  • 6. TITLE III-Digital equity act of 2021 $1,550,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000 State digital equity capacity grant program Planning grants $60,000,000 State capacity grants $240,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000 Digital equity competitive grant program $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000 Policy research, data collection, analysis and modeling, evaluation, and dissemination "such sums as are necessary to carry out this section"??? General provisions, To the Office of the Inspector General $1,000,000,000 TITLE IV-Enabling middle mile broadband infrastructure $1,000,000,000 $0 $0 $0 $0 Enabling middle mile broadband infrastructure $1,000,000,000 --------------------------------------------------------------------------------------------------------> TITLE V-Broadband affordability $0 $0 $0 $0 $0 (No specific appropriations) TITLE VI-Telecommunications industry workforce $0 $0 $0 $0 $0 (No specific appropriations) G - OTHER AUTHORIZATIONS 2022 2023 2024 2025 2026 Total - Division G $4,034,000,000 $1,709,000,000 $1,605,000,000 $1,405,000,000 $1,305,000,000 TITLE I-Indian water rights settlement completion fund $2,500,000,000 $0 $0 $0 $0 Indian water rights settlement completion fund $2,500,000,000 TITLE II-Wildfire mitigation $0 $0 $0 $0 $0 (No specific appropriations) TITLE III-Reforestation $0 $0 $0 $0 $0 (No specific appropriations) TITLE IV-Recycling practices $42,000,000 $17,000,000 $15,000,000 $15,000,000 $15,000,000 Best practices for battery recycling and labeling guidelines Best practices for collection of batteries to be recycled $10,000,000 Voluntary labeling guidelines $15,000,000 Consumer recycling education and outreach grant program; federal procurement $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000 Pilot program on use of agricultural commodities in construction and consumer products $2,000,000 $2,000,000 TITLE V-Bioproduct pilot program $2,000,000 $2,000,000 $0 $0 $0 Pilot program on use of agricultural commodities in construction and consumer products $2,000,000 $2,000,000 TITLE VI-Cybersecurity $220,000,000 $420,000,000 $320,000,000 $120,000,000 $20,000,000 Subtitle A - Cyber response and recovery act Cyber response and recovery fund $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Subtitle B - State and local cybersecurity improvement act State and local cybersecurity grant program $200,000,000 $400,000,000 $300,000,000 $100,000,000 TITLE VII-Public-private partnerships $0 $0 $0 $0 $0 (No specific appropriations) TITLE VIII-Federal permitting improvement $0 $0 $0 $0 $0 TITLE XI-Build America, buy America $0 $0 $0 $0 $0 Subtitle A - Build America, buy America Part I-Buy America sourcing requirements (No specific appropriations) Part II-Make it in America (No specific appropriations) Subtitle B - BuyAmerican.gov (No specific appropriations) Subtitle C - Make PPE in America TITLE X-Asset concessions $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Asset concessions $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 TITLE XI-Clean school buses and ferries $1,250,000,000 $1,250,000,000 $1,250,000,000 $1,250,000,000 $1,250,000,000 Clean school buses and ferries Clean school bus program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Clean school buses and zero-emission school buses $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000 Zero-emission school buses $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000 Electric or low-emitting ferry pilot program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Ferry service for rural communities $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 H - REVENUE PROVISIONS 2022 2023 2024 2025 2026 Total - Division H $118,000,000,000 $0 $0 $0 $0 TITLE I-Highway trust fund $118,000,000,000 $0 $0 $0 $0 Further additional transfers to trust fund Highway Account $90,000,000,000 Mass Transit Account $28,000,000,000 TITLE II-Chemical superfund $0 $0 $0 $0 $0 (No specific appropriations) TITLE III-Customs user fees $0 $0 $0 $0 $0 (No specific appropriations) TITLE IV-Bond provisions $0 $0 $0 $0 $0 (No specific appropriations) (Numerous tax changes) TITLE V-Relief for taxpayers affected by disasters or other critical events $0 $0 $0 $0 $0 (No specific appropriations) (Numerous tax changes) TITLE VI-Other provisions $0 $0 $0 $0 $0 (No specific appropriations) (Numerous tax changes) I - OTHER MATTERS 2022 2023 2024 2025 2026 Total - Division I ($41,755,000,000) $0 $0 $0 $0 Balanced Budget and Emergency Deficit Control Act of 1985 Changes Strategic petroleum reserve drawdown and sale Secretary of Energy shall sell 87,600,000 barrels of crude oil from the Strategic Petroleum Reserve during fiscal years 2028 through 2031 Secretary of the Treasury shall deposit in the SPR Petroleum Account $43,500,000 The Secretary of Energy shall not sell after $6,100,000,000 has been deposited in Treasury Rescission of covid-19 appropriations Small Business Administration--Disaster Loans Program Account ($13,500,000,000) Small Business Administration--Targeted EIDL Advance ($17,578,000,000) Economic Stabilization Program ($1,366,100,000) Business Loans Program Account Small Business Administration--Business Loans Program Account, CARES Act ($4,684,000,000) Small Business Administration--Business Loans Program Account ($992,000,000) Pandemic Relief for Aviation Workers, Coronavirus Aid, Relief, and Economic Security Act ($3,000,000,000) Education Stabilization Fund ($353,400,000) Small Business Administration, Salaries and Expenses ($175,000,000) Pandemic Relief for Aviation Workers ($200,000,000)
  • 7. Spectrum auctions Pre-auction funding for DoD R&D (OMB to DoD) $50,000,000 J - APPROPRIATIONS 2022 2023 2024 2025 2026 Total - Division J $179,330,736,000 $71,669,494,000 $69,645,205,500 $68,897,783,625 $67,025,347,656 Editor's Note (1): In this Division, the Office of the Inspector General "usually" receives 0.2% to 1% of the funding in each category for oversight of funding These contributions have been left out for brevity Editor's Note (2): In this Division, almost every section carries a caveat that 2-3% may be used for "salaries and expenses, administration, and oversight" These contributions have been left out for brevity TITLE I-Agriculture, rural development, food and drug administration, and related agencies $2,505,000,000 $5,000,000 $0 $0 $0 Department of Agriculture $2,505,000,000 $5,000,000 $0 $0 $0 Farm production and conservation programs Natural Resources Conservation Service Watershed and flood prevention operations $500,000,000 Watershed rehabilitation program $118,000,000 Emergency watershed protection program $300,000,000 Rural development programs Rural Utilities Service Distance learning, telemedicine, and broadband program $2,000,000,000 Broadband loans $74,000,000 Broadband loan and grant pilot program $1,926,000,000 Section 70501 of division G $5,000,000 $5,000,000 TITLE II-Commerce, justice, science, and related agencies $46,771,650,000 $1,099,984,000 $1,099,983,000 $1,099,983,000 $1,091,400,000 Department of Commerce $46,771,650,000 $1,099,984,000 $1,099,983,000 $1,099,983,000 $1,091,400,000 National Telecommunications and Information Administration Broadband equity, access, and deployment program $42,450,000,000 Broadband connectivity fund $2,000,000,000 Digital equity $550,000,000 $550,000,000 $550,000,000 $550,000,000 $550,000,000 Award of grants under section 60304 (c)(3) of division F $300,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000 Award of grants under section 60304(d) of division F $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000 Middle mile deployment $1,000,000,000 Salaries and expenses $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 National Oceanic and Atmospheric Administration Operations, research, and facilities $557,250,000 $515,584,000 $515,583,000 $515,583,000 $507,000,000 National Oceans and Coastal Security Fund grants $98,400,000 $98,400,000 $98,400,000 $98,400,000 $98,400,000 Restoring habitats or protecting features from flooding and storms $98,200,000 $98,200,000 $98,200,000 $98,200,000 $98,200,000 Flood and inundation mapping and forecasting $98,400,000 $98,400,000 $98,400,000 $98,400,000 $98,400,000 Data acquisition activities, section 511(b) of the Water Resources Development Act of 2020 $8,334,000 $8,333,000 $8,333,000 Wildfire prediction, detection, observation, modeling $50,000,000 Soil moisture and snowpack monitoring network in the Upper Missouri River Basin $250,000 $250,000 $250,000 $250,000 Marine debris assessment prevention, mitigation, and removal $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000 Marine debris prevention and removal through the National Sea Grant College Program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Habitat restoration projects, Coastal Zone Management Act $41,400,000 $41,400,000 $41,400,000 $41,400,000 $41,400,000 Habitat restoration projects, National Estuarine Research Reserve System $15,400,000 $15,400,000 $15,400,000 $15,400,000 $15,400,000 Enhanced coastal, ocean, and Great Lakes observing systems $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Regional Ocean Partnerships $11,200,000 $11,200,000 $11,200,000 $11,200,000 $11,200,000 Endangered Species Act, Marine Mammal Protection Act, and Essential Fish Habitat $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 Restoring fish passage by removing in-stream barriers $80,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000 Procurement, acquisition and construction $180,000,000 Observation and dissemination infrastructure used for wildfire prediction $50,000,000 Research supercomputing infrastructure used for weather and climate model development $80,000,000 Coastal, ocean, and Great Lakes observing systems $50,000,000 Pacific coastal salmon recovery $34,400,000 $34,400,000 $34,400,000 $34,400,000 $34,400,000 TITLE III-Energy and water development and related agencies $36,076,700,000 $15,959,500,000 $13,638,212,500 $12,690,790,625 $10,932,187,656 Department of the Army $15,099,000,000 $1,000,000,000 $1,000,000,000 $0 $0 Corps of Engineers-Civil $15,099,000,000 $1,000,000,000 $1,000,000,000 Investigations $150,000,000 Water Resources Development Act of 1974 $30,000,000 1960 Flood Control Act $45,000,000 Studies authorized prior to the date of enactment of this Act $75,000,000 Section 118 of division AA of the Consolidated Appropriations Act, 2021 $30,000,000 Construction $11,615,000,000 Major rehabilitation, construction, for rivers and harbors $1,500,000,000 Work at harbors, section 2006, Water Resources Development Act of 2007 <$250,000,000 Require repair, Water Infrastructure Improvements for the Nation Act <$250,000,000 Water-related environmental infrastructure assistance $200,000,000 Construction, replacement, rehabilitation, and expansion of inland waterways projects $2,500,000,000 "Long list" (8) of Flood Control, River and Harbor, and Water Resource Acts $465,000,000 Aquatic ecosystem restoration program, restore fish and wildlife passage $115,000,000 Aquatic ecosystem restoration projects $1,900,000,000 Multi-purpose projects or multi-purpose programs $1,000,000,000 Coastal storm risk management, states with disasters in last six years $2,550,000,000 Multi-purpose projects or multi-purpose programs $1,000,000,000 Shore protection projects $100,000,000 $50,000,000 $50,000,000 Inland flood risk management projects $2,500,000,000 Multi-purpose projects or multi-purpose programs $750,000,000 Mississippi river and tributaries $808,000,000 Emergency situations at Corps of Engineers Federal projects caused by natural disasters $258,000,000 Operation and maintenance $2,000,000,000 $1,000,000,000 $1,000,000,000 Emergency situations at Corps of Engineers Federal projects caused by natural disasters $626,000,000 Soil moisture and snowpack monitoring $40,000,000 Regulatory program, for an emergency requirement $160,000,000 Flood control and coastal emergencies, for an emergency requirement $251,000,000 Expenses, for an emergency requirement $40,000,000 Water infrastructure finance and innovation program account $75,000,000 Cost of direct and guarenteed loans to maintain, upgrade, and repair dams $64,000,000 Administrative expenses to carry out loans $11,000,000 Department of the Interior $1,710,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000 Central Utah Project Central Utah Project Completion Account $50,000,000 Utah Reclamation Mitigation and Conservation Account $10,000,000 Bureau of Reclamation Water and related resources $1,660,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000 $1,660,000,000 Allocations among all projects over 2022 to 2026 Water storage, groundwater storage $1,150,000,000 Small surface water and ground water storage $100,000,000 Aging Infrastructure Account $3,200,000,000 Reserved or transferred works that have suffered a critical failure $100,000,000 Dam rehabilitation, reconstruction, or replacement $100,000,000 Rural water projects authorized before July 1, 2021 $1,000,000,000 Water recycling and reuse projects $1,000,000,000 Reclamation Wastewater and Groundwater Study and Facilities Act $550,000,000 Large-scale water recycling and reuse projects $450,000,000 Water desalination projects $250,000,000 Reclamation Safety of Dams Act of 1978 $500,000,000 WaterSMART Grants $400,000,000 Improve the condition of a natural feature or nature-based feature $100,000,000 Colorado River Drought Contingency Plan $300,000,000 Drought Contingency Plan for the Upper Colorado River Basin $50,000,000 Watershed management projects $100,000,000 Aquatic ecosystem restoration and protection projects $250,000,000 Multi-benefit projects to improve watershed health $100,000,000
  • 8. Endangered species recovery and conservation in the Colorado River Basin $50,000,000 Department of Energy $18,686,450,000 $13,099,500,000 $10,778,212,500 $10,830,790,625 $9,072,187,656 Energy Programs Energy efficiency and renewable energy $8,207,200,000 $2,221,800,000 $1,945,000,000 $1,945,000,000 $1,945,000,000 Energy Efficiency Revolving Loan Fund Capitalization Grant Program $250,000,000 Energy Auditor Training Grant Program $40,000,000 Updated building energy codes $45,000,000 $45,000,000 $45,000,000 $45,000,000 $45,000,000 Building, Training, and Assessment Centers $10,000,000 Career Skills Training $10,000,000 Industrial Research and Assessment Centers $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000 Implementation Grants for Industrial Research and Assessment Centers $80,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000 Manufacturing Leadership $50,000,000 Energy Efficiency Improvements and Renewable Energy Improvements at Public School Facilities $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Energy Efficiency Materials Pilot Program $50,000,000 Weatherization Assistance Program (addition to other amounts) $3,500,000,000 Energy Efficiency and Conservation Block Grant Program (addition to other amounts) $550,000,000 Assisting Federal Facilities with Energy Conservation Technologies Grant Program $250,000,000 Extended product system rebates $10,000,000 Energy efficient transformer rebates $10,000,000 Battery Material Processing Grants $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000 Battery Manufacturing and Recycling Grants $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000 Section 40207(f) of division D $125,000,000 Lithium-Ion Battery Recycling Prize Competition $10,000,000 Electric Drive Vehicle Battery Recycling and Second-Life Applications Program $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000 Advanced Energy Manufacturing and Recycling Grant Program $150,000,000 $150,000,000 $150,000,000 $150,000,000 $150,000,000 Clean Hydrogen Manufacturing Recycling Research, Development, and Demonstration Program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Clean Hydrogen Electrolysis Program $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 State Energy Program $500,000,000 Section 242 of the Energy Policy Act of 2005 $125,000,000 Section 243 of the Energy Policy Act of 2005 $75,000,000 Hydroelectric Incentives, section 247 of the Energy Policy Act of 2005 $276,800,000 $276,800,000 Pumped Storage Hydropower Wind and Solar Integration and System Reliability Initiative $10,000,000 Section 634 of the Energy Independence and Security Act of 2007 $36,000,000 Section 635 of the Energy Independence and Security Act of 2007 $70,400,000 National Marine Energy Centers $40,000,000 Section 615(d) of the Energy Independence and Security Act of 2007 $84,000,000 Wind Energy Technology Program $60,000,000 Wind Energy Technology Recycling Research, Development, and Demonstration Program $40,000,000 Section 3004(b)(2) of the Energy Act of 2020 $40,000,000 Section 3004(b)(3) of the Energy Act of 2020 $20,000,000 Section 3004(b)(4) of the Energy Act of 2020 $20,000,000 Cybersecurity, Energy Security, and Emergency Response $150,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Cybersecurity for the Energy Sector Research, Development, and Demonstration Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Energy Sector Operational Support for Cyberresilience Program $50,000,000 Rural and Municipal Utility Advanced Cybersecurity Grant and Technical Assistance Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Electricity $1,660,000,000 $1,610,000,000 $1,610,000,000 $1,610,000,000 $1,610,000,000 Section 40101 of division D of this Act $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Transmission Facilitation Program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Smart Grid Investment Matching Grant Program (addition to other amounts) $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000 Advanced energy security program to secure energy networks $50,000,000 Nuclear Energy $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000 Program direction $36,000,000 $36,000,000 $36,000,000 $36,000,000 $36,000,000 Fossil Energy and Carbon Management $1,839,000,000 $1,444,450,000 $1,446,962,500 $1,449,540,625 $1,317,187,656 Carbon Utilization Program $41,000,000 $65,250,000 $66,562,500 $67,940,625 $69,387,656 Carbon Capture Technology Program $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Carbon Storage Validation and Testing $500,000,000 $500,000,000 $500,000,000 $500,000,000 $500,000,000 Develop four regional clean direct air capture hubs $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000 Precommercial direct air capture technology prize competitions (addition to other amounts) $15,000,000 Commercial direct air capture technology prize competitions (addition to other amounts) $100,000,000 Rare Earth Elements Demonstration Facility $140,000,000 Rare earth mineral security activities $23,000,000 $24,200,000 $25,400,000 $26,600,000 $27,800,000 Critical material innovation, efficiency, and alternatives $230,000,000 $100,000,000 $135,000,000 $135,000,000 Critical Material Supply Chain Research Facility $40,000,000 $35,000,000 Section 349(b)(2) of the Energy Policy Act of 2005 and section 40601, division D of this Act $30,000,000 Carbon Dioxide Transportation Infrastructure Finance and Innovation Program Account $3,000,000 $2,097,000,000 Office of Clean Energy Demonstrations $5,127,250,000 $4,426,250,000 $4,476,250,000 $4,526,250,000 $2,900,000,000 Energy Storage Demonstration Pilot Grant Program $88,750,000 $88,750,000 $88,750,000 $88,750,000 Long-duration Demonstration Initiative and Joint Program $37,500,000 $37,500,000 $37,500,000 $37,500,000 Advanced Reactor Demonstration Program $677,000,000 $600,000,000 $600,000,000 $600,000,000 Carbon Capture Large-scale Pilot Projects $387,000,000 $200,000,000 $200,000,000 $150,000,000 Carbon Capture Demonstration Projects Program $937,000,000 $500,000,000 $500,000,000 $600,000,000 Industrial Emission Demonstration Projects $100,000,000 $100,000,000 $150,000,000 $150,000,000 Clean Energy Demonstration Program on Current and Former Mine Land $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Regional Clean Hydrogen Hubs $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000 Program Upgrading Our Electric Grid and Ensuring Reliability and Resiliency $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Energy improvement in rural and remote areas $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Power Marketing Administrations Construction, Rehabilitation, Operation And Maintenance, Western Area Power Administration $500,000,000 Independent Agencies $581,250,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Appalachian Regional Commission $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Delta Regional Authority $150,000,000 Denali Commission $75,000,000 Northern Border Regional Commission $150,000,000 Southeast Crescent Regional Commission $5,000,000 Southwest Border Regional Commission $1,250,000 TITLE IV-Financial Services and General Government $17,639,658,000 $650,000 $650,000 $650,000 $400,000 Executive Office of the President and Funds Appropriation $17,639,658,000 $650,000 $650,000 $650,000 $400,000 Office Of The National Cyber Director Salaries and expenses $21,000,000 Federal Communications Commission Affordable Connectivity Fund $14,200,000,000 Federal permitting improvement steering council Environmental Review Improvement Fund $650,000 $650,000 $650,000 $650,000 $400,000 General Services Administration Real property activities Federal Buildings Fund Construction and acquisition, and repairs and alterations of border stations $3,418,008,000 Program Contingency and Operational Support <$250,000,000 U.S. Customs and Border Protection five-year plan $2,527,808,000 American Jobs Plan Project List projects (with feasibility studies) $430,200,000 Land ports of entry (LPOE) infrastructure paving; acquisition of leased LPOEs; and Federal Motor Carrier Safety Administration requirements at the Southern Border $210,000,000
  • 9. TITLE V-Department of Homeland Security $3,076,500,000 $1,420,000,000 $1,320,000,000 $1,120,000,000 $1,020,000,000 Department of Homeland Security $3,076,500,000 $1,420,000,000 $1,320,000,000 $1,120,000,000 $1,020,000,000 Security, Enforcement, and Investigation U.S Customs and Border Protection Operations and support $330,000,000 Procurement, Construction, and Improvements $100,000,000 Coast Guard Operations and support $5,000,000 Procurement, Construction, and Improvements $429,000,000 Housing, family support, safety, and training facilities $131,500,000 Shore construction addressing facility deficiencies $158,000,000 Shore construction supporting operational assets and maritime commerce $19,500,000 Construction and improvement of childcare development centers $120,000,000 Protection, Preparedness, Response, and Recovery Cybersecurity And Infrastructure Security Agency Operations and support $35,000,000 Cybersecurity Response and Recovery Fund $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Federal Emergency Management Agency Operations and support $67,000,000 Federal Assistance $1,033,000,000 $500,000,000 $400,000,000 $200,000,000 $100,000,000 Robert T. Stafford Disaster Relief and Emergency Assistance Act $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Grants to States, section 8(e) of the National Dam Safety Program Act $148,000,000 Grants to States, section 8A of the National Dam Safety Program Act $585,000,000 Removal of dams >$75,000,000 Grants for improvement to cybersecurity and critical infrastructure $200,000,000 $400,000,000 $300,000,000 $100,000,000 Disaster Relief Fund $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 FEMA-Operations and Support, salaries and expenses <$16,500,000 <$16,500,000 <$16,500,000 <$16,500,000 <$16,500,000 National Flood Insurance Fund $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000 Science And Technology Directorate Research and Development $157,500,000 TITLE VI-Department of the Interior, Environment, and Related Agencies $36,325,628,000 $16,273,760,000 $16,675,760,000 $17,075,760,000 $17,070,760,000 Department of the Interior $17,138,468,000 $657,800,000 $657,800,000 $657,800,000 $652,800,000 United States Fish And Wildlife Service Resource Management $91,000,000 $91,000,000 $91,000,000 $91,000,000 $91,000,000 Regional ecosystem restoration purposes $51,000,000 $51,000,000 $51,000,000 $51,000,000 $51,000,000 Delaware River Basin Conservation Act $5,200,000 $5,200,000 $5,200,000 $5,200,000 $5,200,000 Klamath Basin restoration activities $32,400,000 $32,400,000 $32,400,000 $32,400,000 $32,400,000 Lake Tahoe Restoration Act, section 5(d)(2) $3,400,000 $3,400,000 $3,400,000 $3,400,000 $3,400,000 Sagebrush steppe ecosystem $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 National Fish Passage Program, restoring fish and wildlife passage $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000 United States Geological Survey Surveys, Investigations, and Research $239,668,000 $69,000,000 $69,000,000 $69,000,000 $64,000,000 Section 40201 of division D of this Act $64,000,000 $64,000,000 $64,000,000 $64,000,000 $64,000,000 Section 40204 of division D of this Act $167,000,000 Section 41003(a) of division D of this Act $8,668,000 $5,000,000 $5,000,000 $5,000,000 Office Of Surface Mining Reclamation And Enforcement Abandoned Mine Reclamation Fund $11,293,000,000 Section 40701(g) of division D of this Act $25,000,000 Indian Affairs Bureau Of Indian Affairs Operation of Indian Programs (facing climate challenges) $43,200,000 $43,200,000 $43,200,000 $43,200,000 $43,200,000 Community relocation $26,000,000 $26,000,000 $26,000,000 $26,000,000 $26,000,000 Tribal climate resilience and adaptation projects $17,200,000 $17,200,000 $17,200,000 $17,200,000 $17,200,000 Construction $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Addressing irrigation and power systems $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Safety of dams, water sanitation, and other facilities $40,000,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000 Departmental Offices Office Of The Secretary Departmental Operations $337,000,000 $142,000,000 $142,000,000 $142,000,000 $142,000,000 Department-wide Programs Wildland Fire Management $407,600,000 $262,600,000 $262,600,000 $262,600,000 $262,600,000 Section 40803 of division D of this Act, including fuels management activities $327,000,000 $182,000,000 Fuels management activities $35,600,000 $35,600,000 $35,600,000 $35,600,000 $35,600,000 Burned area rehabilitation $45,000,000 $45,000,000 $45,000,000 $45,000,000 $45,000,000 Tribal Forestry Protection Act (Fuels management and Burned rehab) $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 Energy Community Revitalization Program $4,677,000,000 Section 349(b) of the Energy Policy Act of 2005 $250,000,000 Section 349(c)(3) of the Energy Policy Act of 2005 $775,000,000 Section 349(c)(4) of the Energy Policy Act of 2005 $2,000,000,000 Section 349(c)(5) of the Energy Policy Act of 2005 $1,500,000,000 Section 349(d) of the Energy Policy Act of 2005 $150,000,000 Interstate Oil and Gas Compact Commission $2,000,000 Environmental Protection Agency $16,820,800,000 $13,970,800,000 $14,372,800,000 $14,772,800,000 $14,772,800,000 Environmental Programs And Management $411,800,000 $386,800,000 $386,800,000 $386,800,000 $386,800,000 Geographic Programs $343,400,000 $343,400,000 $343,400,000 $343,400,000 $343,400,000 Great Lakes Restoration Initiative $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Chesapeake Bay $47,600,000 $47,600,000 $47,600,000 $47,600,000 $47,600,000 San Francisco Bay $4,800,000 $4,800,000 $4,800,000 $4,800,000 $4,800,000 Puget Sound $17,800,000 $17,800,000 $17,800,000 $17,800,000 $17,800,000 Long Island Sound $21,200,000 $21,200,000 $21,200,000 $21,200,000 $21,200,000 Gulf of Mexico $10,600,000 $10,600,000 $10,600,000 $10,600,000 $10,600,000 South Florida $3,200,000 $3,200,000 $3,200,000 $3,200,000 $3,200,000 Lake Champlain $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 Lake Pontchartrain $10,600,000 $10,600,000 $10,600,000 $10,600,000 $10,600,000 Southern New England Estuaries $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 Columbia River Basin $15,800,000 $15,800,000 $15,800,000 $15,800,000 $15,800,000 Other geographic activities which includes Pacific Northwest $800,000 $800,000 $800,000 $800,000 $800,000 National Estuary Program $26,400,000 $26,400,000 $26,400,000 $26,400,000 $26,400,000 Gulf Hypoxia Action Plan $12,000,000 $12,000,000 $12,000,000 $12,000,000 $12,000,000 Class VI wells as authorized under section 40306 of division D of this Act, Drinking Water Programs $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Battery recycling best practices $10,000,000 Battery labeling guidelines $15,000,000 Hazardous Substance Superfund $3,500,000,000 State And Tribal Assistance Grants $10,144,000,000 $10,819,000,000 $11,221,000,000 $11,621,000,000 $11,621,000,000 Capitalization grants for the Clean Water State Revolving Funds $1,902,000,000 $2,202,000,000 $2,403,000,000 $2,603,000,000 $2,603,000,000 Capitalization grants for the Drinking Water State Revolving Funds $1,902,000,000 $2,202,000,000 $2,403,000,000 $2,603,000,000 $2,603,000,000 Capitalization grants for the Drinking Water State Revolving Funds, lead service line replacement projects $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 Capitalization grants for the Clean Water State Revolving Funds, address emerging contaminants $100,000,000 $225,000,000 $225,000,000 $225,000,000 $225,000,000 Capitalization grants for the Drinking Water State Revolving Funds, perfluoroalkyl and polyfluoroalkyl substances $800,000,000 $800,000,000 $800,000,000 $800,000,000 $800,000,000 Grants for addressing emerging contaminants supporting a community, not subject to cost sharing $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Award Underground Injection Control grants $50,000,000 Brownfields activities $300,000,000 $300,000,000 $300,000,000 $300,000,000 $300,000,000 Grants, interagency agreements and associated program support costs $240,000,000 $240,000,000 $240,000,000 $240,000,000 $240,000,000 Grants $120,000,000 $120,000,000 $120,000,000 $120,000,000 $120,000,000 Section 128, Comprehensive Environmental Response, Compensation, and Liability Act $60,000,000 $60,000,000 $60,000,000 $60,000,000 $60,000,000 Pollution Prevention Act, Section 6605 $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Save Our Seas 2.0 Act, section 302(a) $55,000,000 $55,000,000 $55,000,000 $55,000,000 $55,000,000 Improving material recycling, recovery, management, and reduction $15,000,000 $15,000,000 $15,000,000 $15,000,000 $15,000,000 Clean School Bus Program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 General Provisions-Environmental Protection Agency Drinking water, Safe Drinking Water Act, (additional amount) $1,126,000,000 $1,126,000,000 $1,126,000,000 $1,126,000,000 $1,126,000,000
  • 10. Clean water, Federal Water Pollution Control Act, (additional amount) $1,639,000,000 $1,639,000,000 $1,639,000,000 $1,639,000,000 $1,639,000,000 Department of Agriculture $1,666,360,000 $945,160,000 $945,160,000 $945,160,000 $945,160,000 Forest Service Forest and Rangeland Research $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 State and Private Forestry $305,360,000 $305,360,000 $305,360,000 $305,360,000 $305,360,000 Sections 40803 and 40804 of division D of this Act $143,600,000 $143,600,000 $143,600,000 $143,600,000 $143,600,000 Grants to at-risk communities for wildfire mitigation activities $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 State Fire Assistance $17,600,000 $17,600,000 $17,600,000 $17,600,000 $17,600,000 Volunteer Fire Assistance $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 National Forest System $734,800,000 $529,800,000 $529,800,000 $529,800,000 $529,800,000 Sections 40803 and 40804 of division D of this Act $587,000,000 $382,000,000 $382,000,000 $382,000,000 $382,000,000 Hazardous fuels management activities $102,800,000 $102,800,000 $102,800,000 $102,800,000 $102,800,000 Incentivize biomass use $12,000,000 $12,000,000 $12,000,000 $12,000,000 $12,000,000 Tribal Forestry Protection Act $8,000,000 $8,000,000 $8,000,000 $8,000,000 $8,000,000 Burned area recovery $45,000,000 $45,000,000 $45,000,000 $45,000,000 $45,000,000 Capital Improvement and Maintenance $72,000,000 $72,000,000 $72,000,000 $72,000,000 $72,000,000 Legacy Road and Trail Remediation Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Roads to facilitate forest restoration and projects that reduce wildfire risk $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Removal of non-hydropower Federal dams $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 Wildland Fire Management $552,200,000 $36,000,000 $36,000,000 $36,000,000 $36,000,000 Department of Health and Human Services $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000 Indian Health Service Indian Health Facilities Domestic and community sanitation facilities for Indians $700,000,000 $700,000,000 $700,000,000 $700,000,000 $700,000,000 Projects that exceed the economical unit cost $440,000,000 $440,000,000 $440,000,000 $440,000,000 $440,000,000 TITLE VII-Labor, Health, and Human Services, and Education, and Related Agencies $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Department of Health and Human Services $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Administration For Children And Families Low Income Home Energy Assistance $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 If total appropriation for payments for fiscal year was less than $1,975,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 TITLE VIII-Transportation, Housing, and Urban Development, and Related Agencies $36,835,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000 Department of Transportation $36,835,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000 $36,810,600,000 Office Of The Secretary National Infrastructure Investments $2,500,000,000 $2,500,000,000 $2,500,000,000 $2,500,000,000 $2,500,000,000 Chapter 67 of title 49, United States Code, section 6701 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Chapter 67 of title 49, United States Code, section 6702 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 $1,500,000,000 Safe Streets and Roads for All Grants $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 National Culvert Removal, Replacement, and Restoration Grants $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Strengthening Mobility and Revolutionizing Transportation Grant Program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Federal Aviation Administration Facilities and Equipment $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 FAA air traffic control towers $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Airport Infrastructure Grants $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 $3,000,000,000 Limitations on total usage until 2030 Primary airports and certain cargo airports <$2480000000 General aviation and commercial service airports that are not primary airports <$500000000 Grants to sponsors of airports participating in the contract tower program $20,000,000 Airport Terminal Program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Large hub airports <$550000000 <$550000000 <$550000000 <$550000000 <$550000000 Medium hub airports <$150000000 <$150000000 <$150000000 <$150000000 <$150000000 Small hub airports <$200000000 <$200000000 <$200000000 <$200000000 <$200000000 Nonhub and nonprimary airports >$100000000 >$100000000 >$100000000 >$100000000 >$100000000 Federal Highway Administration Highway Infrastructure Programs $9,454,400,000 $9,454,400,000 $9,454,400,000 $9,454,400,000 $9,454,400,000 Bridge replacement, rehabilitation, preservation, protection, and construction program $5,500,000,000 $5,500,000,000 $5,500,000,000 $5,500,000,000 $5,500,000,000 Bridges classified in poor condition $4,125,000,000 $4,125,000,000 $4,125,000,000 $4,125,000,000 $4,125,000,000 Bridges classified in fair condition $1,375,000,000 $1,375,000,000 $1,375,000,000 $1,375,000,000 $1,375,000,000 Amount each state shall receive per year >$45000000 >$45000000 >$45000000 >$45000000 >$45000000 Amount for off-system bridges >$6750000 >$6750000 >$6750001 >$6750002 >$6750003 National Electric Vehicle Formula Program $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Approximate distribution per State per year $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Joint Office described in the twenty-fourth proviso of this paragraph <$60,000,000 <$60,000,000 <$60,000,000 <$60,000,000 <$60,000,000 Grants for assistance to deploy electric vehicle charging infrastructure $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Available for each eligible Federal agency >$1,400,000 >$1,400,000 >$1,400,000 >$1,400,000 >$1,400,000 Nationally Significant Freight and Highway Projects $640,000,000 $640,000,000 $640,000,000 $640,000,000 $640,000,000 Bridge Investment Program $1,847,000,000 $1,847,000,000 $1,847,000,000 $1,847,000,000 $1,847,000,000 Section 202(d) of title 23, United States Code $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Provide grants for planning, feasibility analysis, and revenue forecasting $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Reduction of Truck Emissions at Port Facilities Program $30,000,000 $30,000,000 $30,000,000 $30,000,000 $30,000,000 University Transportation Centers Program $19,000,000 $19,000,000 $19,000,000 $19,000,000 $19,000,000 Reconnecting Communities Pilot Program $100,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 Planning grants $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Capital construction grants $80,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000 Limit on Secretary providing technical assistance <$15,000,000 Construction of Ferry Boats and Ferry Terminal Facilities $68,400,000 $68,400,000 $68,400,000 $68,400,000 $68,400,000 Appalachian Development Highway System $250,000,000 $250,000,000 $250,000,000 $250,000,000 $250,000,000 Maximum per Appalacian State $75,000,000 $75,000,000 $75,000,000 $75,000,000 $75,000,000 Minimum per Appalacian State $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Federal Motor Carrier Safety Administration Motor Carrier Safety Operations and Program $10,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 Motor Carrier Safety Grants $124,500,000 $124,500,000 $124,500,000 $124,500,000 $124,500,000 Motor carrier safety assistance program <$80,000,000 <$80,000,000 <$80,000,000 <$80,000,000 <$80,000,000 Commercial driver’s license program implementation program <$16,000,000 <$16,000,000 <$16,000,000 <$16,000,000 <$16,000,000 High priority activities program <$26,500,000 <$26,500,000 <$26,500,000 <$26,500,000 <$26,500,000 Commercial motor vehicle operators grants <$2,000,000 <$2,000,000 <$2,000,000 <$2,000,000 <$2,000,000 National Highway Traffic Safety Administration Crash Data $150,000,000 $150,000,000 $150,000,000 $150,000,000 $150,000,000 Vehicle Safety and Behavioral Research Programs $109,700,000 $109,700,000 $109,700,000 $109,700,000 $109,700,000 Amount transferable to Operations and Research (over all years) <$350,000,000 Supplemental Highway Traffic Safety Programs $62,000,000 $62,000,000 $62,000,000 $62,000,000 $62,000,000 Highway safety programs $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 National priority safety programs $22,000,000 $22,000,000 $22,000,000 $22,000,000 $22,000,000 Administrative expenses $20,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 Federal Railroad Administration Consolidated Rail Infrastructure and Safety Improvements $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 $1,000,000,000 Northeast Corridor Grants to the National Railroad Passenger Corporation $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000 $1,200,000,000 Facilitate a coordinated and efficient delivery of projects $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 National Network Grants to the National Railroad Passenger Corporation $3,200,000,000 $3,200,000,000 $3,200,000,000 $3,200,000,000 $3,200,000,000 State-Supported Route Committee $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 Interstate rail compact grants $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 Grants, as authorized under section 22908 of title 49 United States Code >$50,000,000 >$50,000,000 >$50,000,000 >$50,000,000 >$50,000,000 Railroad Crossing Elimination Program $600,000,000 $600,000,000 $600,000,000 $600,000,000 $600,000,000 Federal-State Partnership for Intercity Passenger Rail Grants $7,200,000,000 $7,200,000,000 $7,200,000,000 $7,200,000,000 $7,200,000,000 Limitation on Northeast Corridor Funding (for all years) <$24,000,000,000 Federal Transit Administration Transit Infrastructure Grants $2,050,000,000 $2,050,000,000 $2,050,000,000 $2,050,000,000 $2,050,000,000 State of good repair grants $950,000,000 $950,000,000 $950,000,000 $950,000,000 $950,000,000 Low or no emission grants $1,050,000,000 $1,050,000,000 $1,050,000,000 $1,050,000,000 $1,050,000,000 Grants for the enhanced mobility of seniors and individuals with disabilities $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Capital Investment Grants $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000 $1,600,000,000 Section 5309(d) of title 49, United States Code $880,000,000 $880,000,000 $880,000,000 $880,000,000 $880,000,000 Section 5309(e) of title 49, United States Code $320,000,000 $320,000,000 $320,000,000 $320,000,000 $320,000,000 Section 5309(e) of title 49, United States Code $240,000,000 $240,000,000 $240,000,000 $240,000,000 $240,000,000 Section 3005(b) of the Fixing America’s Surface Transportation Act $160,000,000 $160,000,000 $160,000,000 $160,000,000 $160,000,000
  • 11. All Stations Accessibility Program $350,000,000 $350,000,000 $350,000,000 $350,000,000 $350,000,000 Electric or Low-Emitting Ferry Pilot Program $50,000,000 $50,000,000 $50,000,000 $50,000,000 $50,000,000 Ferry Service for Rural Communities $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Maritime Administration Operations and Training $25,000,000 Port Infrastructure Development Program $450,000,000 $450,000,000 $450,000,000 $450,000,000 $450,000,000 Pipeline And Hazardous Materials Safety Administration Natural Gas Distribution Infrastructure Safety and Modernization Grant Program $200,000,000 $200,000,000 $200,000,000 $200,000,000 $200,000,000 Limit on money to a single utility $25,000,000 $25,000,000 $25,000,000 $25,000,000 $25,000,000 K - MINORITY BUSINESS DEVELOPMENT 2022 2023 2024 2025 2026 Total - Division K $110,000,000 $110,000,000 $110,000,000 $110,000,000 $0 TITLE I-Existing Initiatives $0 $0 $0 $0 $0 Subtitle A - Market development, research, and information (No specific appropriations) Subtitle B-Minority Business Development Agency Business Center Program (No specific appropriations) TITLE II-New initiatives to promote economic resiliency for minority businesses $0 $0 $0 $0 $0 (No specific appropriations) TITLE III-Rural minority business center program $0 $0 $0 $0 $0 (No specific appropriations) TITLE IV-Minority business development grants $0 $0 $0 $0 $0 (No specific appropriations) TITLE V-Minority business enterprises advisory council $0 $0 $0 $0 $0 TITLE VI-Federal coordination of minority business programs $0 $0 $0 $0 $0 TITLE VII-Administrative powers of the Agency; miscellaneous provisions $110,000,000 $110,000,000 $110,000,000 $110,000,000 $0 Authorization of appropriations $110,000,000 $110,000,000 $110,000,000 $110,000,000 Amount used specifically for TITLE III-Rural minority business center program $20,000,000 $20,000,000 $20,000,000 $20,000,000