This presentation presents an agile approach to the deployment of project methodologies across an entire organization. It considers different aspects of project culture, strategy, change management and technological requirements
Product Owner Team: Leading Agile Program Management from Agile2015 by Dean S...LeadingAgile
This deck was used at the Agile Alliance Conference of the year Agile2015 in Washington, DC. The content was presented to a group of around 200 attendees by Enterprise Transformation Consultant, Dean Stevens.
System of Delivery: An Intro to Our Governance ModelLeadingAgile
Our governance model and team design may look a little complicated at first glance. However, there's a lot of intentionality within our system of delivery to ensure that you're solving the right problems, at the right time, to maximize throughput and the value delivered to your customers.
In this video, our Chief Methodologist, Dennis Stevens will remove the noise and walk you through our governance model and team design to help you better understand the LeadingAgile system of delivery.
For more information on our approach to Transformation, check out our latest white paper:
www.leadingagile.com/whitepaper
If you're interested in helping other organizations achieve their Agility goals within a system such as this, check out our careers page:
www.leadingagile.com/careers
Rick Austin - Portfolio mangement in an agile world [Agile DC]LeadingAgile
When organizations move to agile for software delivery, there is often tension with traditional portfolio management. This talk will illustrate how an organization can move from traditional portfolio management approaches to one that embraces agile software delivery. Doing so enables organizations to become predictable, improve the flow of value delivered, and pivot more quickly if necessary.
We will demonstrate the use of governance that allows a more adaptive portfolio management approach. We will cover topics that enable agile portfolio management including:
Lean techniques for managing flow
Effective prioritization techniques
Long range road-mapping
Demand management and planning
Progressively elaborated business cases
Validation of outcomes
Support for audit and compliance needs
These topics will be illustrated by real-world examples of portfolio management that have been proven over the last five years with a wide range of clients.
Faster Food and a Better Place to Sleep: Exploring Agile in Non-IT DomainsLeadingAgile
Agile methods aren’t just for software anymore. Actually, they haven’t been just for software for quite a while now. That said, the types of companies, and the types of industries, that are exploring team-based, collaborative, iterative, and incremental approaches to do their work is rather breathtaking. Agile is truly going mainstream. The question at hand is can we apply team-based Agile straight out of the box in a non-software context? Can we take our scaled Agile approaches and apply them without modification? Mike Cottmeyer’s experience is that most of the principles and patterns apply, but sometimes the practices and frameworks need modification for a particular context.
Portfolio Management in an Agile World - Rick AustinLeadingAgile
When organizations move to agile for software delivery, there is often tension with traditional portfolio management. Rick Austin illustrates how an organization can move from traditional portfolio management approaches to one that embraces agile software delivery. Doing so enables organizations to become predictable, improve the flow of value delivered, and pivot more quickly if necessary.
This is the version of the talk that I did at Agilepalooza Charlotte and Agile 2009. I will be doing this talk at the PMI Global Congress and Agile Dev Practices in the next few months.
Product Owner Team: Leading Agile Program Management from Agile2015 by Dean S...LeadingAgile
This deck was used at the Agile Alliance Conference of the year Agile2015 in Washington, DC. The content was presented to a group of around 200 attendees by Enterprise Transformation Consultant, Dean Stevens.
System of Delivery: An Intro to Our Governance ModelLeadingAgile
Our governance model and team design may look a little complicated at first glance. However, there's a lot of intentionality within our system of delivery to ensure that you're solving the right problems, at the right time, to maximize throughput and the value delivered to your customers.
In this video, our Chief Methodologist, Dennis Stevens will remove the noise and walk you through our governance model and team design to help you better understand the LeadingAgile system of delivery.
For more information on our approach to Transformation, check out our latest white paper:
www.leadingagile.com/whitepaper
If you're interested in helping other organizations achieve their Agility goals within a system such as this, check out our careers page:
www.leadingagile.com/careers
Rick Austin - Portfolio mangement in an agile world [Agile DC]LeadingAgile
When organizations move to agile for software delivery, there is often tension with traditional portfolio management. This talk will illustrate how an organization can move from traditional portfolio management approaches to one that embraces agile software delivery. Doing so enables organizations to become predictable, improve the flow of value delivered, and pivot more quickly if necessary.
We will demonstrate the use of governance that allows a more adaptive portfolio management approach. We will cover topics that enable agile portfolio management including:
Lean techniques for managing flow
Effective prioritization techniques
Long range road-mapping
Demand management and planning
Progressively elaborated business cases
Validation of outcomes
Support for audit and compliance needs
These topics will be illustrated by real-world examples of portfolio management that have been proven over the last five years with a wide range of clients.
Faster Food and a Better Place to Sleep: Exploring Agile in Non-IT DomainsLeadingAgile
Agile methods aren’t just for software anymore. Actually, they haven’t been just for software for quite a while now. That said, the types of companies, and the types of industries, that are exploring team-based, collaborative, iterative, and incremental approaches to do their work is rather breathtaking. Agile is truly going mainstream. The question at hand is can we apply team-based Agile straight out of the box in a non-software context? Can we take our scaled Agile approaches and apply them without modification? Mike Cottmeyer’s experience is that most of the principles and patterns apply, but sometimes the practices and frameworks need modification for a particular context.
Portfolio Management in an Agile World - Rick AustinLeadingAgile
When organizations move to agile for software delivery, there is often tension with traditional portfolio management. Rick Austin illustrates how an organization can move from traditional portfolio management approaches to one that embraces agile software delivery. Doing so enables organizations to become predictable, improve the flow of value delivered, and pivot more quickly if necessary.
This is the version of the talk that I did at Agilepalooza Charlotte and Agile 2009. I will be doing this talk at the PMI Global Congress and Agile Dev Practices in the next few months.
The Agile PMO - practical value driven change leadership in projects and portfolios
Conclusive research findings show that approximately %50 of PMOs are disbanded in two years. Yet, we repeat the same mistakes in our PMO implementations – wasting money, resources and most important – wasting time. In this presentation we focus on the value driven PMO as an integrator, enabler, differentiator, and change agent in business, development and the organization in general.
We analyze the essential model for PMO value enablement which answers:
• What is the strategic role of the value driven PMO in business;
• How to ensure effective streamlined delivery;
• How to effectively select and prioritize opportunities;
• How to manage resource allocation.
Key take away – a PMO must deliver value to the organization constantly. Value isn’t templates, tools and processes rather it is the ability to finish the right projects faster!
هذه المحاضرة تتحدث عن مكتب إدارة المشاريع الرشيق
The Agile PMO
قمت في هذه المحاضرة بتعريف الإدارة الرشيقة للمشاريع او ال
Agile
وعرفت أيضا مكتب إدارة المشاريع
PMO
ومن ثم شرحت معني مكتب إدارة المشاريع الرشيق
Agile PMO.
بعد ذلك شرحت الأسباب التي أدت لقيام مكتب إدارة المشاريع الرشيق
Agile PMO
والفوائد الناتجة من تطبيقه في المؤسسات.
ومن ثم تطرقت للطرق الأربعة التي يمكن أن يلجأ إليها مكتب إدارة المشاريع الرشيق
Agile PMO
وذلك لجلب الرشاقة او ال
Agility
للمؤسسة التي يعمل فيها ال
PMO.
What changes are needed to your PMO to allow agile projects to be successful and for your business to get the most out of Lean Thinking. These combined approaches can boost the ROI of your entire business.
So you are considering going agile, huh? Your biggest question is probably "where do I start"? This session will help you answer that question and get you started down the road to agility . Mike will explore how to choose your first project and ensure that the pilot team is setup for success. He will talk through common organizational challenges and show you how to overcome them. You'll leave this talk with the knowledge necessary to get your first team going while laying the foundation to build on that success.
Pressure to deliver business value faster, and more efficiently is everywhere. Companies are adopting Agile practices and going though the Agile Transformation because moving to agile methods offers any organization to outperform its former measures of productivity and profits. Several years ago, IBM Software Group began adapting agile software development practices and related products to their needs. This session will provide details where we started and what was our agile journey.
This presentation was part of my session in "Agile in Business" seminar in Chennai on July 27th, 2013, organized by Unicom. This addresses the different aspects to be considered when a test team is transformed in an Agile set-up performing Agile Testing.
Conclusive research findings inform us that many PMOs are disbanded in two years. Yet; we repeat the same mistakes in our PMO implementations – wasting money, resources and time. In this practical, interactive discussion the focus will be on the value driven PMO as an integrator, enabler, differentiator, and change agent in business, development and the organization in general.
Michael’s will address the essential model for PMO value enablement:
1. The two key concept of the Agile PMO – a PMO that is inherently agile, adaptive and value driven and a PMO that interfaces between Agile product delivery and the traditional Waterfall organization
2. How to ensure effective streamlined delivery by abolishing waste
3. How to effectively select and prioritize opportunities
4. How to manage resource allocation from a top down approach in an effective manner by targeting critical resources
This is a basic overview on some of the aspects of Lean PMO during the every day agile practice world
The author writes regularly at www.madhavanwrites.blogspot.com
The reality is that a paradigm shift is needed to enable the Agile PMO to deliver the correct support and provide an acceptable level of guidance for project managers in a collaborative and co-operative approach.
This will result in the ability to work with the project and business teams to fast track projects through to delivery while ensuring that the components of the triple constraints evolves into a managed agile enterprise project and programme environment.
Introduction to Agile Project Planning and Project ManagementMike Cottmeyer
Agile introduces a number of tools and techniques designed to help the team figure out how much software we can build for the time we have, and the amount of money our customer is willing to spend. This talk will introduce the fundamental concepts necessary to break down and estimate our product backlog, how to organize delivery of that backlog for early risk reduction and rapid customer feedback, and how to get stable throughput and predictability as you mature your agile practices. This talk is for those looking to understand how (and why) agile methods lead to better business outcomes.
How to measure the outcome of agile transformationRahul Sudame
This presentation covers details on how we can measure that Agile Transformation is providing the intended outcome or not. I presents a research & survey which tries to understand how different people measure value of Agile Transformation
The Agile PMO - practical value driven change leadership in projects and portfolios
Conclusive research findings show that approximately %50 of PMOs are disbanded in two years. Yet, we repeat the same mistakes in our PMO implementations – wasting money, resources and most important – wasting time. In this presentation we focus on the value driven PMO as an integrator, enabler, differentiator, and change agent in business, development and the organization in general.
We analyze the essential model for PMO value enablement which answers:
• What is the strategic role of the value driven PMO in business;
• How to ensure effective streamlined delivery;
• How to effectively select and prioritize opportunities;
• How to manage resource allocation.
Key take away – a PMO must deliver value to the organization constantly. Value isn’t templates, tools and processes rather it is the ability to finish the right projects faster!
Hoshin Kanri process is a powerful strategy deployment methodology for defining long-range key entity objectives. These are breakthrough objectives that extend two to five years with little change. In addition, the Hoshin Kanri process does not lose sight of the day-to-day business measures required to run the business successfully. This dual approach provides an extended period of time for the organization to focus its breakthrough effort, and at the same time, continuously improving key business processes day to day. This methodology continues to be used by some of the world's most successful companies such as Toyota, Hewlett-Packard and Texas Instruments.
BENEFITS
1. Focuses the entire company on a few vital goals, rather than the trivial many
2. Creates alignment towards breakthrough objectives through involvement of the whole management team in the planning process
3. Communicates the key goals to all managers and staff
4. Integrates and encourages cross-functional cooperation to achieve breakthroughs
5. A review process which holds participants accountable for achieving their part of the plan
CONTENTS
1. Introduction to Hoshin Kanri
2. Underlying Principles of Hoshin Kanri
3. Hoshin Kanri Process Using PDCA Approach
4. Hoshin Kanri Tools
5. Elements of Hoshin Kanri
6. Management Reviews
7. Success Factors for Effective Hoshin Kanri Deployment
To download this complete presentation, please go to: http://www.oeconsulting.com.sg
Five immutable principles of project successGlen Alleman
All successful projects adhere to five immutable principles during their lifecycle. These principles are independent of any project or program domain or context in that domain. They are also independent of any project management or product development method as well, including Agile. They ask five questions that must have credible answers that establish the foundation for success. Without credible answers to these 5 questions, the project has little hope of success.
The Agile PMO - practical value driven change leadership in projects and portfolios
Conclusive research findings show that approximately %50 of PMOs are disbanded in two years. Yet, we repeat the same mistakes in our PMO implementations – wasting money, resources and most important – wasting time. In this presentation we focus on the value driven PMO as an integrator, enabler, differentiator, and change agent in business, development and the organization in general.
We analyze the essential model for PMO value enablement which answers:
• What is the strategic role of the value driven PMO in business;
• How to ensure effective streamlined delivery;
• How to effectively select and prioritize opportunities;
• How to manage resource allocation.
Key take away – a PMO must deliver value to the organization constantly. Value isn’t templates, tools and processes rather it is the ability to finish the right projects faster!
هذه المحاضرة تتحدث عن مكتب إدارة المشاريع الرشيق
The Agile PMO
قمت في هذه المحاضرة بتعريف الإدارة الرشيقة للمشاريع او ال
Agile
وعرفت أيضا مكتب إدارة المشاريع
PMO
ومن ثم شرحت معني مكتب إدارة المشاريع الرشيق
Agile PMO.
بعد ذلك شرحت الأسباب التي أدت لقيام مكتب إدارة المشاريع الرشيق
Agile PMO
والفوائد الناتجة من تطبيقه في المؤسسات.
ومن ثم تطرقت للطرق الأربعة التي يمكن أن يلجأ إليها مكتب إدارة المشاريع الرشيق
Agile PMO
وذلك لجلب الرشاقة او ال
Agility
للمؤسسة التي يعمل فيها ال
PMO.
What changes are needed to your PMO to allow agile projects to be successful and for your business to get the most out of Lean Thinking. These combined approaches can boost the ROI of your entire business.
So you are considering going agile, huh? Your biggest question is probably "where do I start"? This session will help you answer that question and get you started down the road to agility . Mike will explore how to choose your first project and ensure that the pilot team is setup for success. He will talk through common organizational challenges and show you how to overcome them. You'll leave this talk with the knowledge necessary to get your first team going while laying the foundation to build on that success.
Pressure to deliver business value faster, and more efficiently is everywhere. Companies are adopting Agile practices and going though the Agile Transformation because moving to agile methods offers any organization to outperform its former measures of productivity and profits. Several years ago, IBM Software Group began adapting agile software development practices and related products to their needs. This session will provide details where we started and what was our agile journey.
This presentation was part of my session in "Agile in Business" seminar in Chennai on July 27th, 2013, organized by Unicom. This addresses the different aspects to be considered when a test team is transformed in an Agile set-up performing Agile Testing.
Conclusive research findings inform us that many PMOs are disbanded in two years. Yet; we repeat the same mistakes in our PMO implementations – wasting money, resources and time. In this practical, interactive discussion the focus will be on the value driven PMO as an integrator, enabler, differentiator, and change agent in business, development and the organization in general.
Michael’s will address the essential model for PMO value enablement:
1. The two key concept of the Agile PMO – a PMO that is inherently agile, adaptive and value driven and a PMO that interfaces between Agile product delivery and the traditional Waterfall organization
2. How to ensure effective streamlined delivery by abolishing waste
3. How to effectively select and prioritize opportunities
4. How to manage resource allocation from a top down approach in an effective manner by targeting critical resources
This is a basic overview on some of the aspects of Lean PMO during the every day agile practice world
The author writes regularly at www.madhavanwrites.blogspot.com
The reality is that a paradigm shift is needed to enable the Agile PMO to deliver the correct support and provide an acceptable level of guidance for project managers in a collaborative and co-operative approach.
This will result in the ability to work with the project and business teams to fast track projects through to delivery while ensuring that the components of the triple constraints evolves into a managed agile enterprise project and programme environment.
Introduction to Agile Project Planning and Project ManagementMike Cottmeyer
Agile introduces a number of tools and techniques designed to help the team figure out how much software we can build for the time we have, and the amount of money our customer is willing to spend. This talk will introduce the fundamental concepts necessary to break down and estimate our product backlog, how to organize delivery of that backlog for early risk reduction and rapid customer feedback, and how to get stable throughput and predictability as you mature your agile practices. This talk is for those looking to understand how (and why) agile methods lead to better business outcomes.
How to measure the outcome of agile transformationRahul Sudame
This presentation covers details on how we can measure that Agile Transformation is providing the intended outcome or not. I presents a research & survey which tries to understand how different people measure value of Agile Transformation
The Agile PMO - practical value driven change leadership in projects and portfolios
Conclusive research findings show that approximately %50 of PMOs are disbanded in two years. Yet, we repeat the same mistakes in our PMO implementations – wasting money, resources and most important – wasting time. In this presentation we focus on the value driven PMO as an integrator, enabler, differentiator, and change agent in business, development and the organization in general.
We analyze the essential model for PMO value enablement which answers:
• What is the strategic role of the value driven PMO in business;
• How to ensure effective streamlined delivery;
• How to effectively select and prioritize opportunities;
• How to manage resource allocation.
Key take away – a PMO must deliver value to the organization constantly. Value isn’t templates, tools and processes rather it is the ability to finish the right projects faster!
Hoshin Kanri process is a powerful strategy deployment methodology for defining long-range key entity objectives. These are breakthrough objectives that extend two to five years with little change. In addition, the Hoshin Kanri process does not lose sight of the day-to-day business measures required to run the business successfully. This dual approach provides an extended period of time for the organization to focus its breakthrough effort, and at the same time, continuously improving key business processes day to day. This methodology continues to be used by some of the world's most successful companies such as Toyota, Hewlett-Packard and Texas Instruments.
BENEFITS
1. Focuses the entire company on a few vital goals, rather than the trivial many
2. Creates alignment towards breakthrough objectives through involvement of the whole management team in the planning process
3. Communicates the key goals to all managers and staff
4. Integrates and encourages cross-functional cooperation to achieve breakthroughs
5. A review process which holds participants accountable for achieving their part of the plan
CONTENTS
1. Introduction to Hoshin Kanri
2. Underlying Principles of Hoshin Kanri
3. Hoshin Kanri Process Using PDCA Approach
4. Hoshin Kanri Tools
5. Elements of Hoshin Kanri
6. Management Reviews
7. Success Factors for Effective Hoshin Kanri Deployment
To download this complete presentation, please go to: http://www.oeconsulting.com.sg
Five immutable principles of project successGlen Alleman
All successful projects adhere to five immutable principles during their lifecycle. These principles are independent of any project or program domain or context in that domain. They are also independent of any project management or product development method as well, including Agile. They ask five questions that must have credible answers that establish the foundation for success. Without credible answers to these 5 questions, the project has little hope of success.
Creating a Lean PMO. Empower People, Enable FlowJulee Everett
Align. Fund teams, not projects. Leave them alone to do what they said they would do. Adapt. Sound easy? Then why do we make it so complicated? Stop being good at process & start getting good at business.
Change Management - How to manage change in your organization successfully. A...HRM Toolshop
Is your organization facing some key changes in their Go-To-Market Offering or in the way the Business operates? Is your Executive Management Team driving a major Efficiency Program across all functions? Are you part of a (Global) Task Force for implementing a new Enterprise-wide IT System? Is your company planning a new Acquisition soon?
Having a step-by-step approach for managing any Change Project within your organization will enhance your success and credibility as an experienced Change Agent. It will provide you with the tools and checkpoints to ensure that any change results in higher business performance and highly engaged staff.
This Change Management How-to Guide explains in detail the 4 major steps in managing the change within your organization succesfully. You can use this manual as a guide during your projects, or as a development tool for your team.
Leading a large-scale agile transformation isn’t about adopting a new set of attitudes, processes, and behaviors at the team level… it’s about helping your company deliver faster to market, and developing the ability to respond to a rapidly changing competitive landscape. First and foremost, it’s about achieving business agility. Business agility comes from people having clarity of purpose, a willingness to be held accountable, and the ability to achieve measurable outcomes. Unfortunately, almost everything in modern organizations gets in the way of teams acting with any sort of autonomy. In most companies, achieving business agility requires significant organizational change.
Agile transformation necessitates a fundamental rethinking of how your company organizes for delivery, how it delivers value to its customers, and how it plans and measures outcomes. Agile transformation is about building enabling structures, aligning the flow of work, and measuring for outcomes-based progress. It’s about breaking dependencies. The reality is that this kind of change can only be led from the top. This talk will explore how executives can define an idealized end-state for the transformation, build a fiscally responsible iterative and incremental plan to realize that end-state, as well as techniques for tracking progress and managing change.
Portfolio Management is widely viewed as the high point of the project management ladder. Our presentation provides more clarity on its benefits including supporting strategic goals for organisations, while also monitoring and managing multiple portfolios successfully.
Enterprise Project Management Solutions - Install and train, job done? by "Da...Project Controls Expo
Enterprise Project Management Solutions - Install and train, job done? by "David Dunning - Chairman for CPS, UK" at Project Controls Expo 2017, Arsenal Stadium, London
Do you know what it takes to build a high-IMPACT PMO?
(attend the free training for this slideshare here: http://bit.ly/2Gu1I7S)
Whether you are starting a PMO for the first time, trying to get your PMO back on track, or just want to ensure that your PMO is as high-IMPACT as possible, this presentation will get right to the heart of what actually makes a difference, where you should start, and how to accelerate your PMO performance to deliver high-IMPACT outcomes for the organization.
It’s time to stop talking about “PMO survival” and ensure that YOU and your PMO are THRIVING!
This system has been developed leveraging more than 20 years of research and application of the most important techniques that Laura has used to transform the careers of hundreds of project managers, enabling them to become an invaluable strategic asset that business leaders are fighting over.
If you would like to attend the free training on this topic, go here: http://bit.ly/2Gu1I7S
After watching this presentation, you will be prepared to leverage a set of immediately applicable techniques to help you Get. It. Done.
1Chapter 11Pick 4 topics and discusstalk about the topics. .docxhyacinthshackley2629
1
Chapter 11
Pick 4 topics and discuss/talk about the topics. No plagiarism will use checker tool. Due in 24 hours. Please highlight each topic. Word count 100 words each topic no less. Please put what chapter it is on. Please no repeating in sentences and make it easy to read and understand.
Terminology:
Champion
Change Theory
Continuous Improvement
Coproduction
Credo
Customer-centric
Direct Competition
General Competition
Indirect Competition
Mission
Problem Statement
Resource Viewpoint
Service Guarantee
Service Mission and Service Vision
Service Process Implementation
Service Strategy
Silo
Strategic Service System
Strategy
SWOT Analysis
Vision
“Failing to plan is planning to fail.”
“Service doesn’t just happen; it must be planned. You need a strategy.”
220 Chapter 11 Strategic Planning for Service
Th is chapter focuses on strategic planning for service. It is divided into three parts:
■ Introduction to Service Strategy
■ Analyzing Position and Market
■ Integration: Implementing a Service Strategy
In the fi rst section, the premise of strategy is introduced as it relates to hospitality
management and a foundation is established. Th e second section discusses the internal
and external evaluations of the SWOT analysis in an eff ort to analyze the position and
the market environment. Th e fi nal section covers writing objectives and implementation
of the strategy.
Introduction to Service Strategy
STRATEGY DEFINED
Th e science of strategy can be quite complex. Numerous books, courses, and even
college majors are devoted to this subject. Consultants and professionals devote
entire careers to the study of the topic. As complex as it may be, it is also a very basic
concept at its roots. Simply put, a strategy is a calculated plan to achieve a common,
chosen objective. Th is defi nition sounds simple. However, each word and phrase has
distinct meaning. Let’s dig more deeply into the three main facets of strategy.
CALCULATED PLAN
We aim to develop a strategy through methodical means, to structure a well-thoughtout
plan with direction. Th is is anything but ad hoc. It involves self-analysis and external
input to make the best possible plan with the information available. Any and all
progress will be monitored and revised as needed.
COMMON, CHOSEN
Th e framework is agreed upon and supported at all levels of the business. Everyone
is made aware of the plan, the direction, and the commitment involved to get to the
objective. Upper-level management supports low-level management and line staff in
all of their eff orts. Everyone is working together.
OBJECTIVE
Th e desired outcome may vary greatly in nature and scope based on the organization
and the goals, but it is always present. Objectives ultimately help to achieve goals.
Most objectives involve a plan for improvement. Some examples of aggressive objectives
include being known as having the absolute best service or gaining market share.
Strategy
A calculated plan to
achieve a common,
chosen object.
Similar to How to deploy PPM methodologies with an agile approach (20)
ITM Platformé o software online para a gerenciamento de projetos, programas e portfólio mais simples e completo do mercado. Gerencie projetos preditivos ou ágeis, prioriza o mais importante para a sua organização, controla economicamente os projetos e avalia o seu estado com informação em tempo real.
ITM Platform is the most simple and complete online software for project, program and portfolio management in the market.
Manage predictive or agile projects, prioritize the most important work for your organization, control your project financials and report their status with real time information.
Brochure ITM Platform
ITM Platform is a projects, programs and portfolio management software that guarantees alignment with business objectives, in addition to facilitating communication and collaboration among team members in a secure, simple and intuitive manner.
ITM Platform manage:
• Projects
• Portfolios
• Costs
• Budgets
• Tasks
• Revenues
• Dashboards
• Clients
• Suppliers
• Resources
• Documents
• Etc.
try ITM Platform FOR FREE here: http://bit.ly/1QFNlxL
Software Adoption - How to get your employees to use your SaaS solutionITM Platform
How to get your employees to use your SaaS solutions. We also discuss our new integration with the team collaboration tool Slack, making user on-boarding easier for your organization.
Webinar Gratuito: Implementação da gestão de projetos em sua organização (PPM).ITM Platform
Neste webinar falaremos sobre as chaves para que a implementação da gestão de projetos em sua organização tenha éxito.
O conteúdo:
1. Estrutura de uma organização orientada a projetos.
2. Gestão da mudança em organizações..
3. Configuração básica do ITM Platform PPM.
4. Template de projeto Kanban para implementação de uma PMO.
Clients and Project Management- Webinar ITM PlatformITM Platform
Deploy your fully functional cloud-based PPM solution in 2 days instead of 6 months, get your users onboarded and, most importantly, happy. ITM Platform offers the most practical and powerful project management solution available * Portfolio management and strategic planning integrate naturally with the daily operations of project management * Manage Agile + Classic projects in one single integrated portfolio with ITM Platform * Integrated team based social communications. Try the FREE TRIAL.
Is your business following a more traditional, predictive methodology or maybe seeking an alternative through the agile movement? There’s no reason to choose between the two because today’s the day you’ll learn how both methodologies can exist together.
A ITM Platform implementou seu software de gerenciamento de projetos em mais de 300 empresas. Neste caminho, aprendemos muitas e interessantes lições que queremos compartilhar com vocês e que podem ajudá-los a implementar ou a melhorar o gerenciamento de projetos em vossa organização.
Neste webinar falaremos de todas estas chaves e de como colocá-las em prática, especialmente sobre:
• Quais são os pontos mais importantes para ter êxito na implementação de uma PMO?
• Realmente, é necessário ter uma PMO, um departamento de gestão de projetos?
• Quais são os agentes envolvidos no processo de mudança cultural?
Webinario: Despliegue agil de gestion de proyectos (PPM)ITM Platform
En ITM Platform hemos implementado nuestra solución de gestión de proyectos en más de 300 organizaciones. En el camino, hemos aprendido muchas e interesantes lecciones que te pueden ayudar a desarrollar o a mejorar tu organización orientada a proyectos.
En este webinario "Despliegue ágil de gestión de proyectos (PPM)" hablaremos de todas estas claves y de cómo ponerlas en práctica.
El esquema de contenido será:
1. Diseño de la organización orientada a proyectos.
2. Gestión del cambio.
3. Configuración básica de ITM Platform PPM.
4. Plantilla de proyecto de implantación con metodología Kanban.
Micromanagement, ese gran enemigo de las PMOITM Platform
En ocasiones pensamos en las oficinas de proyectos como centros de control de tareas, de horas y de personas. ITM Platform propone una PMO más abierta, distribuida y de generación de valor.
ITM Platform es la solución adecuada para los directores de programa durante el ciclo de vida del programa en su conjunto, desde el inicio hasta el cierre. ITM Platform enfoque de Gestión de Programas.
Conceptos básicos de la gestión de riesgosITM Platform
¿Qué es el riesgo? ¿Qué es la gestión de riesgos? Veamos cuales son los conceptos básicos de la gestión de riesgos.
Más información en:
http://itmplatform.com/es/blog/2012/07/09/conceptos-basicos-de-la-gestion-de-riesgos
ITM Platform - Company and Product Overview v jun2012 en 1.0ITM Platform
ITM Platform is the core concept holding four products (and others to come)
1) Project Management: Advanced, collaborative and easy-to-use
2) Program Management: Strategic planning and business alignment
3) Global IT Management: the solution covering 80% of IT processes
4) Corporate Portfolio: Business analysis on multiple instances
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
In the Adani-Hindenburg case, what is SEBI investigating.pptxAdani case
Adani SEBI investigation revealed that the latter had sought information from five foreign jurisdictions concerning the holdings of the firm’s foreign portfolio investors (FPIs) in relation to the alleged violations of the MPS Regulations. Nevertheless, the economic interest of the twelve FPIs based in tax haven jurisdictions still needs to be determined. The Adani Group firms classed these FPIs as public shareholders. According to Hindenburg, FPIs were used to get around regulatory standards.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Top mailing list providers in the USA.pptxJeremyPeirce1
Discover the top mailing list providers in the USA, offering targeted lists, segmentation, and analytics to optimize your marketing campaigns and drive engagement.
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
2. ▪ facilitate user adoption
▪ allow you to start working ASAP (ideally same day/week)
▪ require no consultants
▪ have all the relevant features of a PPM software
▪ be affordable
Ideal software characteristics
It should:
3. ▪ facilitate user adoption
▪ allow you to start working ASAP (ideally same day/week)
▪ require no consultants
▪ have all the relevant features of a PPM software
▪ be affordable
Ideal software characteristics
It should:
However...
4. ▪ facilitate user adoption
▪ allow you to start working ASAP (ideally same day/week)
▪ require no consultants
▪ have all the relevant features of a PPM software
▪ be affordable
Ideal software characteristics
It should:
However...
The tool is necessary, not sufficient
6. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
7. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Define what is what and unify the meaning
of terms across the whole organization.
8. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
What KPIs are you going to record? what do
they mean / measure precisely? How are
they calculated?
9. General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Hey John, How is your project
going?
Decide what is unified and centralized
What KPIs are you going to record? what do
they mean / measure precisely? How are
they calculated?
10. General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Hey John, How is your project
going?
Very well actually, it is at 50%!
Decide what is unified and centralized
What KPIs are you going to record? what do
they mean / measure precisely? How are
they calculated?
11. General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Hey John, How is your project
going?
Very well actually, it is at 50%!
50% of what?? Cost, time... ?
Decide what is unified and centralized
What KPIs are you going to record? what do
they mean / measure precisely? How are
they calculated?
12. General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Hey John, How is your project
going?
Very well actually, it is at 50%!
50% of what?? Cost, time... ?
Decide what is unified and centralized
What KPIs are you going to record? what do
they mean / measure precisely? How are
they calculated?
13. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
What resources are going to be shared
across the organization? What will be
centralized?
14. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
All reports should follow the same format to
help the communication across departments
/ Stakeholders
15. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Other elements that could be centralized:
✓ Approval criteria
✓ Supplier rates / Standard costs
✓ Document formats
16. Decide what is unified and centralized
General
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Level of maturity
✓ Terminology
✓ Tracking criteria
✓ Resource management
✓ Reports
Other elements that could be centralized:
✓ Approval criteria
✓ Supplier rates / Standard costs
✓ Document formats
First the “what” and then the “how”
17. ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturityMethodologies: Agile, Predictive (Gantt)... or both?
Uncertainty
High Low
18. Effective in
in situationswith HIGH
uncertainty
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturityMethodologies: Agile, Predictive (Gantt)... or both?
Agile
Uncertainty
High Low
19. Effective in
in situationswith HIGH
uncertainty
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturityMethodologies: Agile, Predictive (Gantt)... or both?
Agile
Effective in
in situationswith LOW
uncertainty
Predictive
Uncertainty
High Low
20. Effective in
in situationswith HIGH
uncertainty
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturityMethodologies: Agile, Predictive (Gantt)... or both?
Agile
Effective in
in situationswith LOW
uncertainty
Predictive
Uncertainty
High Low
✓ Both should be used and measured equally
21. Effective in
in situationswith HIGH
uncertainty
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturityMethodologies: Agile, Predictive (Gantt)... or both?
Agile
Effective in
in situationswith LOW
uncertainty
Predictive
Uncertainty
High Low
✓ Both should be used and measured equally
✓ Both have very different dynamics, project managers need to know how to adapt
22. Effective in
in situationswith HIGH
uncertainty
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturityMethodologies: Agile, Predictive (Gantt)... or both?
Agile
Effective in
in situationswith LOW
uncertainty
Predictive
Uncertainty
High Low
✓ Both should be used and measured equally
✓ Both have very different dynamics, project managers need to know how to adapt
✓ Both can (and should) coexist within the same portfolio
23. What skills should a Project Manager have?
✓ Track progress
✓ Economic management
✓ Manage Procurement / revenue
✓ Manage risks
✓ Communicate his project (Formal and Informal
communication)
✓ Manage resources
Average
Level of maturity
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
The project manager should know about the technical content of
the project.
Also he should be able to:
24. Is a Project Management Office (PMO) necessary?
The answer is different for each company, you should consider the following elements:
✓ Level of Project Management maturity
✓ Chaos and disarray in the company
✓ Organizational complexity
✓ Type of business
✓ Project co-dependence
✓ Project leaders
✓ Strategic alignment
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
High
Level of maturity
25. Is a Project Management Office (PMO) necessary?
The answer is different for each company, you should consider the following elements:
✓ Level of Project Management maturity
✓ Chaos and disarray in the company
✓ Organizational complexity
✓ Type of business
✓ Project co-dependence
✓ Project leaders
✓ Strategic alignment
A PMO allows levels of coordination that are difficult to reach with an
ordinary organizational structure.
A PMO provides strategic focus.
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
High
Level of maturity
26. Methods and Method Frameworks
They provide:
✓ Process standardization
✓ Existing models High
Level of maturity
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
27. Methods and Method Frameworks
They provide:
✓ Process standardization
✓ Existing models
But, are these best practices or standard practices?
High
Level of maturity
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
29. Prerequisites for a successful transition
1. Top management should support project-based management
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
30. Prerequisites for a successful transition
1. Top management should support project-based management
2. Deployment must have a leader.
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
31. Prerequisites for a successful transition
1. Top management should support project-based management
2. Deployment must have a leader.
3. If you lack the above, don’t even try: resistance from the organization will prevent you
from achieving success.
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
32. Prerequisites for a successful transition
1. Top management should support project-based management
2. Deployment must have a leader.
3. If you lack the above, don’t even try: resistance from the organization will prevent you
from achieving success.
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
Obtain support from company management before
taking any action!
34. Bottom-up approachTop-down approach
Approaches - “pincer” effect
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
✓ Compulsory (from top mgmt)
✓ Presence of control models
✓ Report-based Tracking
✓ Risks
✓ Documents
✓ Budgets
✓ Progress...
35. Bottom-up approachTop-down approach
Approaches - “pincer” effect
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
✓ Compulsory (from top mgmt)
✓ Presence of control models
✓ Report-based Tracking
✓ Risks
✓ Documents
✓ Budgets
✓ Progress...
✓ Evangelization
✓ Training
✓ Active listening
✓ Reality
36. Bottom-up approachTop-down approach
Approaches - “pincer” effect
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
Both should be used jointly
General
Level of maturity
✓ Compulsory (from top mgmt)
✓ Presence of control models
✓ Report-based Tracking
✓ Risks
✓ Documents
✓ Budgets
✓ Progress...
✓ Evangelization
✓ Training
✓ Active listening
✓ Reality
37. Take a Running Start
1. Choose your first move wisely
2. Involve well-trained, aligned people
3. Choose sensitive projects as test-candidates
4. Enable comparison with reliable metrics
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
General
Level of maturity
38. Give back part of what you receive
✓ To Management Portfolio view
✓ To Project Managers Planning, control, resources
✓ To Team Members Collaboration, visibility
✓ To Stakeholders Information
General
Level of maturity
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
39. Give back part of what you receive
✓ To Management Portfolio view
✓ To Project Managers Planning, control, resources
✓ To Team Members Collaboration, visibility
✓ To Stakeholders Information
Everyone in the organization has to see the benefits of PPM
General
Level of maturity
ORGANIZATION | CHANGE MANAGEMENT| ONGOING IMPROVEMENT
41. Alone or with help?
ORGANIZATION | CHANGE MANAGEMENT| CONFIGURATION| ONGOING IMPROVEMENT
42. Alone or with help?
If you get on it every day, the
tool will work: you will get in
shape.
ORGANIZATION | CHANGE MANAGEMENT| CONFIGURATION| ONGOING IMPROVEMENT
43. Alone or with help?
If you get on it every day, the
tool will work: you will get in
shape.
If you lack the time, energy,
resources or ability to convince
others, you need help.
ORGANIZATION | CHANGE MANAGEMENT| CONFIGURATION| ONGOING IMPROVEMENT
44. Alone or with help?
ITM Platform's Implementation Service – delivered online or
through partners - can get you started in seven days
If you get on it every day, the
tool will work: you will get in
shape.
If you lack the time, energy,
resources or ability to convince
others, you need help.
ORGANIZATION | CHANGE MANAGEMENT| CONFIGURATION| ONGOING IMPROVEMENT
45. Conclusions
1. Decide and define what is centralized / standardized
2. Adopt an organizational model
3. Embark on simple processes
4. Ensure you have support from company management
5. Offer training, convince others and add value.
6. Consider whether you need help
7. Use the Kanban template available in ITM Platform
Start a free trial of ITM Platform
46. Ask for your deployment Kanban template*!
Already using ITM Platform?
*Available under request in trial version
47. Find the latest news and articles on ITM Platform’s blog:
itmplatform.com/en/blog/
Follow us on socialmedia for moreupdates
…or visit our website at: itmplatform.com/en