HEAVY VEHICLE
CLASSIFICATION SYSTEM
1
INTRODUCTION
• Kuala Lumpur is faced with traffic congestion daily
• Among the reasons?
– Heavy Vehicles entering city center during peak hours
– DBKL needs a system to monitor and identify heavy
vehicles entering, and to take action without causing
any additional congestion
2
WHAT IS HVCS?
• To detect heavy vehicles 5 tons & above
entering city center and take action.
• Fully Automated system
• 1st such project in Malaysia
3
Operation
4
ACCESSIBLE THROUGH WEB UI
Violation Trending
Date Number of Violation
Vehicles
14/3/2016 73
15/3/2016 64
16/3/2016 46
17/3/2016 40
18/3/2016 59
19/3/2016 80
• In general, heavy vehicle traffic is lower during
the middle of the week.
0
10
20
30
40
50
60
70
80
90
14/3/2016
15/3/2016
16/3/2016
17/3/2016
18/3/2016
19/3/2016
Number of Violation Vehicles
Number of
Violation
Vehicles
THANK YOU
6

Heavy vehicle classification system slide 3

  • 1.
  • 2.
    INTRODUCTION • Kuala Lumpuris faced with traffic congestion daily • Among the reasons? – Heavy Vehicles entering city center during peak hours – DBKL needs a system to monitor and identify heavy vehicles entering, and to take action without causing any additional congestion 2
  • 3.
    WHAT IS HVCS? •To detect heavy vehicles 5 tons & above entering city center and take action. • Fully Automated system • 1st such project in Malaysia 3
  • 4.
  • 5.
    Violation Trending Date Numberof Violation Vehicles 14/3/2016 73 15/3/2016 64 16/3/2016 46 17/3/2016 40 18/3/2016 59 19/3/2016 80 • In general, heavy vehicle traffic is lower during the middle of the week. 0 10 20 30 40 50 60 70 80 90 14/3/2016 15/3/2016 16/3/2016 17/3/2016 18/3/2016 19/3/2016 Number of Violation Vehicles Number of Violation Vehicles
  • 6.

Editor's Notes

  • #3 What is HVCS project? Why is it needed? When are the operating hours? How is the system implemented? Who are the beneficiaries?
  • #4 What is HVCS project? Why is it needed? When are the operating hours? How is the system implemented? Who are the beneficiaries?
  • #5 What is HVCS project? Why is it needed? When are the operating hours? How is the system implemented? Who are the beneficiaries?
  • #6  Working drawing = 13/4 Material submission = 6/4 Procurement = start 25/3 - dateline 20/5 Gantry fab = 25/3
  • #7 What is HVCS project? Why is it needed? When are the operating hours? How is the system implemented? Who are the beneficiaries?