he Bengaluru–Chennai Expressway, or National Expressway 7 (NE-7), is an under construction 258 km (160 mi) long, 4-lane wide access-controlled expressway between the cities of Bengaluru, the capital of Karnataka and Chennai, the capital of Tamil Nadu.
he Bengaluru–Chennai Expressway, or National Expressway 7 (NE-7), is an under construction 258 km (160 mi) long, 4-lane wide access-controlled expressway between the cities of Bengaluru, the capital of Karnataka and Chennai, the capital of Tamil Nadu.
1. Paris &
Nice
DATES OF TRAVEL – 1ST APRIL 2024 TO
10TH APRIL 2024
DURATION OF TRAVEL – 7 NIGHTS 8 DAYS
2. 1st April 2024 – Departure from
Bengaluru
1st April 2024 – Bengaluru – Dubai
2nd April 2024 – Dubai - Paris
3. HOTEL AT PARIS
- double/Single occupancy
- Continental Buffet/ Set Menu
breakfast at the hotel
4. 2nd April 2024 –
Arrival in Paris.
Lunch at a local
restaurant
5. 2nd April 2024 –
Evening
tour of the Eiffel Tour.
Dinner at a local restaurant
6. 3rd April 2024 –
Paris School of
Architecture for a full day
workshop.