The document outlines the daily activities for July 15, 2015 for the Hoang Long Joint Operating Company's engineering, procurement, construction and installation project for the H05 topside and pipelines. The activities include bringing the topside barge alongside the LTS 3000, lifting and moving the topside to the H05 jacket, setting the topside onto the H05 jacket, and continuing the laying of 6-inch pipes.