The document provides guidelines for preparing total cost estimates for construction works in the public sector, aiming to standardize procedures while allowing for individual discretion based on circumstances. It emphasizes the importance of accurate estimating methods and the need for skilled personnel to ensure that cost estimates are realistic and suitable for procurement purposes. The document outlines various estimating techniques, stages of preparing estimates, and necessary documentation required for accurate cost estimation.