1© Rödl & Partner 05.06.2013
Successful together
European Geothermal Congress 2013
Comparison of regulatory framawork Germany - Italy
Benjamin Richter & Giorgio Castorina| Pisa | 5 June 2013
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
2© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
Agenda
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
01 Introduction Rödl & Partner
3© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
Introduction Rödl & Partner
We are a one-of-a-kind success story from Germany
Founded in 1977 – international expansion since 1989
Your one-stop shop: audit, legal, management and tax consulting
Most familiar with your culture and language
Tailor-made solutions for internationally active companies
4© Rödl & Partner 05.06.2013
Tailor-made solutions for internationally active companies
Our interdisciplinary and comprehensive services offer
Audit
Legal consulting
Tax consulting
Management and IT consulting
Audit
Consult Develop Operate
In close collaboration with
our clients we develop
information for well-
founded decisions that we
implement together
Introduction Rödl & Partner
Rödl & Partner in Europe (excluding Germany)
Almaty ▪ Barcelona ▪ Belgrade
Birmingham ▪ Bolzano
Bratislava ▪ Brno ▪ Bucharest
Budapest ▪ Chişinău ▪ Cluj
Gdańsk ▪ Gliwice ▪ Istanbul
Kaluga ▪ Kharkov ▪ Kiev
Krakow ▪ Ljubljana ▪ Madrid
Milan ▪ Minsk ▪ Moscow
5© Rödl & Partner 05.06.2013
Milan ▪ Minsk ▪ Moscow
Padova ▪ Paris ▪ Plovdiv
Poznań ▪ Prague ▪ Riga
Rome ▪ Sochi ▪ Sofia
St. Petersburg ▪ Stockholm
Tallinn ▪ Tbilisi ▪ Timişoara
Vienna ▪ Vilnius ▪ Warsaw
Wrocław ▪ Zagreb ▪ Zurich
Worldwide 3.200 colleagues - 89 offices - 39 countries
Our references – main focus geothermal energy
National projects
General information Services
Monitoring of the realization of the
geothermal project Unterhaching
Complete project management
Subsidy procurement
Development of the worlds first geological risk insurance
Creation of price system for district heating
Different municipalities in the field of
geothermal energy
Demonstration and evaluation of possible options of action
Estimation of adoption potential
Economic efficiency control / business plan
6© Rödl & Partner 05.06.2013
Economic efficiency control / business plan
Valuation
Consideration of legal form
Forms of participation
Financing institution Project control and economical calculations concerning the market entry in
geothermal energy
UniCredit Legal, economical and organizational consulting for the creation of a power
plant portfolio and its risk management
Industrial company Site selection concerning economical, operative and geological factors as well
as the preparation of applications for the backup of the approved area
Federal Ministry for the Environment,
Nature Conservation and Nuclear Safety
Development of a concept for the realization of a German wide exploration risk
insurance
Our references – main focus geothermal energy
National projects
General information Services
Federal Ministry for the Environment,
Nature Conservation and Nuclear Safety/
World Bank
Development of a benchmarking-study (Pilot project Hungary)
World Bank Examination of two geothermal projects in Kamchatka, Russia, in economical,
legal and technical terms (Electricity supply and district heating)
GEOFAR Financed by the Intelligent Energy Europe – Program of the EU;
7© Rödl & Partner 05.06.2013
GEOFAR Financed by the Intelligent Energy Europe – Program of the EU;
Joint project with 8 partners from 5 EU-countries;
Topic: Financing system geothermal energy
UNEP – United Nation Environmental
Programme
Identification of risks that affect the realization and financing of world wide
renewable energy projects
Industrial companies Advisory service with regard to market entry
Financing institutions Legal and economical due diligence of projects and portfolios
Agenda
01 Introduction Rödl & Partner
03 Legal security regarding water license
02 Legal security regarding ownership of geothermal resources
8© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
Legal security regarding ownership of geothermal resources
Long term security for an exclusive exploration and exploitation of a
specific geothermal reservoir is highly important due to high
investment costs and project related risk management
Different steps:
Legal security
9© Rödl & Partner 05.06.2013
Different steps:
1. Determination of the exploration field allows preliminary
geological investigations and exploration drillings
2. Based on these results determination of a sufficiently large
exploitation field secures a long-term exclusive right for
exploitation
3. Allocation of the resource ownership for a specific area
regarding
ownership of
geothermal
resources
Legal security regarding ownership of geothermal resources
Comparison Germany vs. Italy
Subsoil owned by the state
Germany
10© Rödl & Partner 05.06.2013
Exploitation permit issued for a period of 50 years
Royalty payments of max. 10% can be imposed
• Currently not implemented in the case of geothermal
resources
Legal security regarding ownership of geothermal resources
Ownership in Germany
Procedure
Requirements for application for ownership
• Being the holder of the exploration and exploitation permit
• Economic exploitation has to be credibly shown
11© Rödl & Partner 05.06.2013
Procedure
for
application
and
advantages
At the moment of awarding the ownership of the resource the
exploitation permit for the respective area expires
Ownership can be entered into the land registry and used to safeguard
a credit
Legal security regarding ownership of geothermal resources
Comparison Germany vs. Italy
Land property extends to the subsoil
Resources in the subsoil are owned and kept by the
state or the region, and their exploration and
exploitation need the issuance of licenses
Italy
12© Rödl & Partner 05.06.2013
Exploitation permit can be issued for a period of 30
years, preferably to the holder of the exploration
permit
Royalties are provided for the issuance of the permits.
Further royalties are provided for power generation,
but limited to plants with nominal power higher than 4
MW
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
13© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
Legal security regarding water license
Exploitation permit according to mining law only allows for the
exploitation of geothermal energyLegal security
14© Rödl & Partner 05.06.2013
exploitation of geothermal energy
Further license necessary for the utilization of water or steam
Legal security
regarding water
license
Legal security regarding water license
Comparison Germany vs. Italy
Legally possible to obtain water licenses for decades
License, generally granted for few years and have to be prolonged
on a regular basis
Period of validity of water license and exploitation permit differ
considerably
Germany
15© Rödl & Partner 05.06.2013
considerably
• Further risk in project realization
• So far all necessary water licenses for geothermal projects have been
issued
Proof of disposal of test water and drilling fluid necessary
In water legislation no legal claim possible
• In some states mining authority entitled to override the interests of water
legislation
Legal security regarding water license
Comparison Germany vs. Italy
License can be granted for up to 30 years
• Same period of validity as for exploitation permit
• Security of the investment, once both licenses are obtained
Italy
16© Rödl & Partner 05.06.2013
• Security of the investment, once both licenses are obtained
Granted by the province or region upon payment of a yearly fee
No specific prescriptions concerning geothermal fluids and its
treatment
Legal claims delegated to the court of public water
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
17© Rödl & Partner 05.06.2013
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
04 Economic feed-in tariffs
Economic feed-in tariffs
In relation to geothermal power plants, the amount and especially the
long-term security of feed-in tariffs play a crucial role, due to the long
project preparation phase
18© Rödl & Partner 05.06.2013
Feed-in tariffs should allow for an adequate risk-award ratio that
rewards the relatively high risks of the drilling exploration
Reference value for the calculation of the feed-in tariff (net vs. gross
capacity of the installation) has major influence on the profitability of a
project
Economic feed-in
tariffs
Economic feed-in tariffs
Comparison Germany vs. Italy
Renewable Energy Source Act (EEG) offers in general a stable and
Germany
19© Rödl & Partner 05.06.2013
Renewable Energy Source Act (EEG) offers in general a stable and
secure investment environment
• Gross capacity of the renewable energy technology can be fed into the
distribution network
• Feed-in tariff for hydro-geothermal power: 25 €cent/kWh
• Fixed feed-in tariff secured for 20 years
Economic feed-in tariffs
Comparison Germany vs. Italy
Incentive for the power generated
• Added to the income for the sales to the public entity (GSE)
Italy
20© Rödl & Partner 05.06.2013
• Added to the income for the sales to the public entity (GSE)
• Granted for 20 years
• Sliding Feed-in Premium Value of Feed-in tariff MINUS hourly zonal
energy market price
• Current value: 85 – 135 €cent/kWh, depending on the nominal power of the
plant
• Premium tariffs for innovative technologies provided
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
21© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
05 Priority and guaranteed access to the power grid
Priority and guaranteed access to the power grid
Comparison Germany vs. Italy
Has to be ensured by all EU Member States (Directive 2009/28/EC
on the promotion of the use of energy from renewable sources)
Priority and
guaranteed access
to the power grid
22© Rödl & Partner 05.06.2013
Immediate and priority connection to grid systems shall be
granted by grid system operators (GSOs) to installations
generating electricity from renewable energy sources (RES)
Germany
Priority and guaranteed access to the power grid
Comparison Germany vs. Italy
GSOs are only then entitled to reduce output of RE plants to
prevent a grid overload
Germany
23© Rödl & Partner 05.06.2013
Costs for the connection to the grid are to be borne by the
installation operator
• The GSO bears the additional costs in case of assigning a grid
connection point which is not at the shortest linear distance form the
installation
Costs for optimizing, strengthening and expanding the grid system
have to be borne by the GSOs
Priority and guaranteed access to the power grid
Comparison Germany vs. Italy
Applications aimed at the connection of RE plants must be given
priority by the grid operator
Italy
24© Rödl & Partner 05.06.2013
The Energy Authority shall prioritize the dispatch of power
generated by RE
Only in cases of high risk for the national grid, the grid operator is
entitled to reduce the input of RE plants
Costs for the connection to the grid shall be borne by the
installation operator
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
25© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
07 Drilling and power plant construction licenses
08 Your contact
06 Legal security regarding district heating prices
Legal security regarding district heating prices
Determination of prices in a way that allowsLegal security
26© Rödl & Partner 05.06.2013
Determination of prices in a way that allows
• Achievement of a certain rate of return on the investment
• Passing increasing prices to consumers
Legal security
regarding district
heating prices
Legal security regarding district heating prices
Comparison Germany vs. Italy
Any heat supply contract (except for industrial customers) has to be
based on the “regulation on general conditions for the supply with
district heat”
Germany
27© Rödl & Partner 05.06.2013
The price sliding clause should appropriately include:
• Development of production and supply costs
• Respective circumstances of the heat market
• The price factor associated to the contribution of the costs for fossil
fuels has to be shown separately
Price is not completely free of any regulation but can be oriented
to the present situation of the heat supply costs
Legal security regarding district heating prices
Comparison Germany vs. Italy
Regulatory framework missing. Risks of cartel and monopoly of the
operators
Italy
28© Rödl & Partner 05.06.2013
Investigations have been started up on 2012 by the ”Antitrust
Authority”
Possible creation of an indipendent Authority
Due to the expansion of district heating and to the growing attention
of the institutions, regulation of the sector in the next years
predictable
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
29© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
08 Your contact
07 Drilling and power plant construction licenses
Drilling and power plant construction licenses
Comparison Germany vs. Italy
Drilling regulated by mining legislation
Germany
30© Rödl & Partner 05.06.2013
Construction of the power plant subject to building law
Drilling and power plant construction licenses
Comparison Germany vs. Italy
Issuance of drilling licenses by:
• The respective region
(When geothermal resources of national/local interest)
Italy
31© Rödl & Partner 05.06.2013
(When geothermal resources of national/local interest)
• Ministry for Economic Development
(For geothermal resources found in territorial waters)
Construction license issued by the region, province or municipality
depending on
• Plant’s nominal power
• Source
• D.lgs. 387/2003 created a specific rapid procedure for renewable energies
plant (so-called Autorizzazione uUnica”
Conclusions
Regulatory framework offering legally secure and economic conditions is of utmost
importance for the realization of deep-seated geothermal energy projects
32© Rödl & Partner 05.06.2013
This country comparison illustrates the necessity to gain extensive knowledge on the
regulatory conditions of any specific location before taking an investment decision.
Agenda
01 Introduction Rödl & Partner
02 Legal security regarding ownership of geothermal resources
03 Legal security regarding water license
33© Rödl & Partner 05.06.2013
04 Economic feed-in tariffs
05 Priority and guaranteed access to the power grid
06 Legal security regarding district heating prices
07 Drilling and power plant construction licenses
08 Your contact
Your contact
Benjamin Richter
Rödl & Partner
Denninger Straße 84
D-81925 Munich
Germany
34© Rödl & Partner 05.06.2013
„Each and every person counts“ – to the Castellers and to us.
Human towers symbolise in a unique way the Rödl & Partner corporate culture. They personify our philosophy of solidarity, balance, courage
and team spirit. They stand for the growth that is based on own resources, the growth which has made Rödl & Partner the company we are
today. „Força, Equilibri, Valor i Seny“ (strength, equilibrium, valour and common sense) is the Catalan motto of all Castellers, describing their
fundamental values very accurately. It is to our liking and also reflects our mentality. Therefore Rödl & Partner embarked on a collaborative
journey with the representatives of this long-standing tradition of human towers – Castellers de Barcelona – in May 2011. The association
from Barcelona stands, among many other things, for this intangible cultural heritage.
D-81925 Munich
Phone +49 (89) 928780-350
Fax +49 (89) 928780-300
E-Mail benjamin.richter@roedl.com
Your contact
Italy Svenja Bartels
Rachtsanwaltin/Avv.
Partner
Via Francesco Rismondo 2/E
Giorgio Castorina
Dottore
Via Francesco Rismondo 2/E
35131 Padova
35© Rödl & Partner 05.06.2013
„Each and every person counts“ – to the Castellers and to us.
Human towers symbolise in a unique way the Rödl & Partner corporate culture. They personify our philosophy of solidarity, balance, courage
and team spirit. They stand for the growth that is based on own resources, the growth which has made Rödl & Partner the company we are
today. „Força, Equilibri, Valor i Seny“ (strength, equilibrium, valour and common sense) is the Catalan motto of all Castellers, describing their
fundamental values very accurately. It is to our liking and also reflects our mentality. Therefore Rödl & Partner embarked on a collaborative
journey with the representatives of this long-standing tradition of human towers – Castellers de Barcelona – in May 2011. The association
from Barcelona stands, among many other things, for this intangible cultural heritage.
Via Francesco Rismondo 2/E
35131 Padova
Phone: +39 (049) 80 46 911
Fax: +39 (049) 80 46 920
E-Mail: svenja.bartels@roedl.it
35131 Padova
Phone: +39 (049) 80 46 911
Fax: +39 (049) 80 46 920
E-Mail: giorgio.castorina@roedl.it
We and the Castellers de Barcelona
The human towers are like us:
“every single individual counts”
– when working together and
when supporting our clients.
36© Rödl & Partner 05.06.2013

More Related Content

What's hot

Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
  Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios  Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
The Sustainable Energy Planning research group at Aalborg University
 
Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...
Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...
Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...
Roberta De Matteo
 
5th GGT - Barbara Cox - Hydreco
5th GGT - Barbara Cox - Hydreco5th GGT - Barbara Cox - Hydreco
5th GGT - Barbara Cox - Hydreco
Alexandros Daniilidis
 
Economic analysis of wind projects
Economic analysis of wind projectsEconomic analysis of wind projects
Economic analysis of wind projects
Leonardo ENERGY
 
Economics of wind energy
Economics of wind energyEconomics of wind energy
Economics of wind energy
ASHWANI BHARATI
 
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
The Sustainable Energy Planning research group at Aalborg University
 
Wind Power Economics
Wind Power EconomicsWind Power Economics
Wind Power Economics
Steven Avary
 
CCXG Forum, September 2021, Ian Fry
CCXG Forum, September 2021, Ian FryCCXG Forum, September 2021, Ian Fry
CCXG Forum, September 2021, Ian Fry
OECD Environment
 
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
Dr. Oliver Massmann
 
Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES
Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES
Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES
The Sustainable Energy Planning research group at Aalborg University
 
RES auctions and CfDs in Germany
RES auctions and CfDs in GermanyRES auctions and CfDs in Germany
RES auctions and CfDs in Germany
Vitaliy Radchenko
 
Demand side Transition to 4th Generation District Heating and Motivation Tariffs
Demand side Transition to 4th Generation District Heating and Motivation TariffsDemand side Transition to 4th Generation District Heating and Motivation Tariffs
Demand side Transition to 4th Generation District Heating and Motivation Tariffs
The Sustainable Energy Planning research group at Aalborg University
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Dutch Power
 

What's hot (13)

Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
  Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios  Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
Net Zero Emissions in EU? NGO Round Table on Decarbonisation Scenarios
 
Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...
Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...
Italy's new energy startegy raises hopes of fresh tender round quote-cm-5 dic...
 
5th GGT - Barbara Cox - Hydreco
5th GGT - Barbara Cox - Hydreco5th GGT - Barbara Cox - Hydreco
5th GGT - Barbara Cox - Hydreco
 
Economic analysis of wind projects
Economic analysis of wind projectsEconomic analysis of wind projects
Economic analysis of wind projects
 
Economics of wind energy
Economics of wind energyEconomics of wind energy
Economics of wind energy
 
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
Towards a decarbonised heating and cooling sector in Europe – Unlocking the p...
 
Wind Power Economics
Wind Power EconomicsWind Power Economics
Wind Power Economics
 
CCXG Forum, September 2021, Ian Fry
CCXG Forum, September 2021, Ian FryCCXG Forum, September 2021, Ian Fry
CCXG Forum, September 2021, Ian Fry
 
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
VIETNAM – RENEWABLE ENERGY – NEW FEED IN TARIFFS FOR WIND ENERGY - AMAZING DE...
 
Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES
Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES
Keynote: ROADMAP FOR NET ZERO EMISSIONS WITH KNOWN TECHNOLOGIES
 
RES auctions and CfDs in Germany
RES auctions and CfDs in GermanyRES auctions and CfDs in Germany
RES auctions and CfDs in Germany
 
Demand side Transition to 4th Generation District Heating and Motivation Tariffs
Demand side Transition to 4th Generation District Heating and Motivation TariffsDemand side Transition to 4th Generation District Heating and Motivation Tariffs
Demand side Transition to 4th Generation District Heating and Motivation Tariffs
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
 

Viewers also liked

Islam = surrender to allah
Islam = surrender to allahIslam = surrender to allah
Islam = surrender to allah
FAHIM AKTHAR ULLAL
 
Apresentação fatto
Apresentação fattoApresentação fatto
Apresentação fatto
Sandro Andrey Alves
 
Tutor 9 based on pdf
Tutor 9 based on pdfTutor 9 based on pdf
Tutor 9 based on pdf
Drradz Maths
 
Cyberbulling
CyberbullingCyberbulling
Cyberbulling
BrandonXDGarcia
 
Revuepresse 22 nov2011_immac
Revuepresse 22 nov2011_immacRevuepresse 22 nov2011_immac
Revuepresse 22 nov2011_immacClaudie Merlet
 
la calabria
la calabriala calabria
News 2.0 -- Personalized and Customized
News 2.0 -- Personalized and CustomizedNews 2.0 -- Personalized and Customized
News 2.0 -- Personalized and Customized
Cincinnati Social Media
 
Presentacion temporada prensa 201112
Presentacion temporada prensa 201112Presentacion temporada prensa 201112
Presentacion temporada prensa 201112
Guias de Picos de Europa Panes Aventura
 
HOSPITAL DE APARTADÓ (Aviso Definitivo)
HOSPITAL DE APARTADÓ (Aviso Definitivo)HOSPITAL DE APARTADÓ (Aviso Definitivo)
HOSPITAL DE APARTADÓ (Aviso Definitivo)
VIDEOS DE URABÁ
 
Boletim 139
Boletim 139 Boletim 139
Novena de Natal 2015 - diocese de Jundiaí
Novena de Natal 2015 - diocese de JundiaíNovena de Natal 2015 - diocese de Jundiaí
Novena de Natal 2015 - diocese de Jundiaí
Bernadetecebs .
 
Invention to Venture
Invention to VentureInvention to Venture
Invention to Venture
Rick Paul
 
An Overview of the Ski Industry
An Overview of the Ski IndustryAn Overview of the Ski Industry
An Overview of the Ski Industry
Jess Sloss
 
Velocity Talk: Top 10 Problems Costing You Millions
Velocity Talk: Top 10 Problems Costing You MillionsVelocity Talk: Top 10 Problems Costing You Millions
Velocity Talk: Top 10 Problems Costing You Millions
Jennifer Carlson
 
Clase 17 energia no renovable y renovable y velocidad resumido rev 5-1-10 ...
Clase 17   energia no renovable y renovable y velocidad resumido rev  5-1-10 ...Clase 17   energia no renovable y renovable y velocidad resumido rev  5-1-10 ...
Clase 17 energia no renovable y renovable y velocidad resumido rev 5-1-10 ...
Rafael Caballero
 
Introduce yourself
Introduce yourself Introduce yourself
Introduce yourself
Jeisson Restrepo
 
La Enciclopedia
La EnciclopediaLa Enciclopedia
La Enciclopedia
Pedro
 

Viewers also liked (17)

Islam = surrender to allah
Islam = surrender to allahIslam = surrender to allah
Islam = surrender to allah
 
Apresentação fatto
Apresentação fattoApresentação fatto
Apresentação fatto
 
Tutor 9 based on pdf
Tutor 9 based on pdfTutor 9 based on pdf
Tutor 9 based on pdf
 
Cyberbulling
CyberbullingCyberbulling
Cyberbulling
 
Revuepresse 22 nov2011_immac
Revuepresse 22 nov2011_immacRevuepresse 22 nov2011_immac
Revuepresse 22 nov2011_immac
 
la calabria
la calabriala calabria
la calabria
 
News 2.0 -- Personalized and Customized
News 2.0 -- Personalized and CustomizedNews 2.0 -- Personalized and Customized
News 2.0 -- Personalized and Customized
 
Presentacion temporada prensa 201112
Presentacion temporada prensa 201112Presentacion temporada prensa 201112
Presentacion temporada prensa 201112
 
HOSPITAL DE APARTADÓ (Aviso Definitivo)
HOSPITAL DE APARTADÓ (Aviso Definitivo)HOSPITAL DE APARTADÓ (Aviso Definitivo)
HOSPITAL DE APARTADÓ (Aviso Definitivo)
 
Boletim 139
Boletim 139 Boletim 139
Boletim 139
 
Novena de Natal 2015 - diocese de Jundiaí
Novena de Natal 2015 - diocese de JundiaíNovena de Natal 2015 - diocese de Jundiaí
Novena de Natal 2015 - diocese de Jundiaí
 
Invention to Venture
Invention to VentureInvention to Venture
Invention to Venture
 
An Overview of the Ski Industry
An Overview of the Ski IndustryAn Overview of the Ski Industry
An Overview of the Ski Industry
 
Velocity Talk: Top 10 Problems Costing You Millions
Velocity Talk: Top 10 Problems Costing You MillionsVelocity Talk: Top 10 Problems Costing You Millions
Velocity Talk: Top 10 Problems Costing You Millions
 
Clase 17 energia no renovable y renovable y velocidad resumido rev 5-1-10 ...
Clase 17   energia no renovable y renovable y velocidad resumido rev  5-1-10 ...Clase 17   energia no renovable y renovable y velocidad resumido rev  5-1-10 ...
Clase 17 energia no renovable y renovable y velocidad resumido rev 5-1-10 ...
 
Introduce yourself
Introduce yourself Introduce yourself
Introduce yourself
 
La Enciclopedia
La EnciclopediaLa Enciclopedia
La Enciclopedia
 

Similar to Geothermal energy - Comparison of regulatory framework Germany - Italy

C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
Iceland Geothermal
 
StrategicFit - French unconventionals regulation
StrategicFit - French unconventionals regulationStrategicFit - French unconventionals regulation
StrategicFit - French unconventionals regulation
StrategicFit
 
Arthur cox greenexpo
Arthur cox greenexpoArthur cox greenexpo
Arthur cox greenexpo
Damian Connon
 
Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...
Florence Shool of Regulation
 
Pay for delay deals: selection of practical issues
Pay for delay deals: selection of practical issuesPay for delay deals: selection of practical issues
Pay for delay deals: selection of practical issues
OECD Directorate for Financial and Enterprise Affairs
 
Institutional presentation 1 q12
Institutional presentation 1 q12Institutional presentation 1 q12
Institutional presentation 1 q12
comgasri
 
Corporate Green Energy Sourcing
Corporate Green Energy SourcingCorporate Green Energy Sourcing
Corporate Green Energy Sourcing
Leonardo ENERGY
 
Liability of driverless cars
Liability of driverless carsLiability of driverless cars
Liability of driverless cars
LderKaiser
 
Presentation teush July_2015_update
Presentation teush July_2015_updatePresentation teush July_2015_update
Presentation teush July_2015_update
sveki
 
Institutional presentation 2011
Institutional presentation 2011Institutional presentation 2011
Institutional presentation 2011
comgasri
 
Arcelaor & Mittal, Legal aspects of merger
Arcelaor & Mittal, Legal aspects of mergerArcelaor & Mittal, Legal aspects of merger
Arcelaor & Mittal, Legal aspects of merger
Ankur Jindal
 
SmartPower-March2015-Newsletter
SmartPower-March2015-NewsletterSmartPower-March2015-Newsletter
SmartPower-March2015-Newsletter
Fergus Wheatley
 
RES auctions in Poland: a new opening?
RES auctions in Poland: a new opening?RES auctions in Poland: a new opening?
RES auctions in Poland: a new opening?
Florence Shool of Regulation
 
Renewable energy management
Renewable energy managementRenewable energy management
Renewable energy management
Siddharth Maniyar
 
ADBA Spring Members' Meeting 2018
ADBA Spring Members' Meeting 2018 ADBA Spring Members' Meeting 2018
ADBA Spring Members' Meeting 2018
Anaerobic Digestion & Biogas Association
 
Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
Eversheds Sutherland
 
Energy opportunities in the netherlands
Energy opportunities in the netherlandsEnergy opportunities in the netherlands
Energy opportunities in the netherlands
Weero Koster
 
Nationaal energie forum 28 nov 2012
Nationaal energie forum 28 nov 2012Nationaal energie forum 28 nov 2012
Nationaal energie forum 28 nov 2012
Weero Koster
 
New base 31 may 2019 energy news issue - 1249 by khaled al awadi
New base  31 may  2019  energy news issue - 1249 by khaled al awadiNew base  31 may  2019  energy news issue - 1249 by khaled al awadi
New base 31 may 2019 energy news issue - 1249 by khaled al awadi
Khaled Al Awadi
 
Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...
Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...
Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...
Marko Lehtovaara
 

Similar to Geothermal energy - Comparison of regulatory framework Germany - Italy (20)

C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
 
StrategicFit - French unconventionals regulation
StrategicFit - French unconventionals regulationStrategicFit - French unconventionals regulation
StrategicFit - French unconventionals regulation
 
Arthur cox greenexpo
Arthur cox greenexpoArthur cox greenexpo
Arthur cox greenexpo
 
Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...
 
Pay for delay deals: selection of practical issues
Pay for delay deals: selection of practical issuesPay for delay deals: selection of practical issues
Pay for delay deals: selection of practical issues
 
Institutional presentation 1 q12
Institutional presentation 1 q12Institutional presentation 1 q12
Institutional presentation 1 q12
 
Corporate Green Energy Sourcing
Corporate Green Energy SourcingCorporate Green Energy Sourcing
Corporate Green Energy Sourcing
 
Liability of driverless cars
Liability of driverless carsLiability of driverless cars
Liability of driverless cars
 
Presentation teush July_2015_update
Presentation teush July_2015_updatePresentation teush July_2015_update
Presentation teush July_2015_update
 
Institutional presentation 2011
Institutional presentation 2011Institutional presentation 2011
Institutional presentation 2011
 
Arcelaor & Mittal, Legal aspects of merger
Arcelaor & Mittal, Legal aspects of mergerArcelaor & Mittal, Legal aspects of merger
Arcelaor & Mittal, Legal aspects of merger
 
SmartPower-March2015-Newsletter
SmartPower-March2015-NewsletterSmartPower-March2015-Newsletter
SmartPower-March2015-Newsletter
 
RES auctions in Poland: a new opening?
RES auctions in Poland: a new opening?RES auctions in Poland: a new opening?
RES auctions in Poland: a new opening?
 
Renewable energy management
Renewable energy managementRenewable energy management
Renewable energy management
 
ADBA Spring Members' Meeting 2018
ADBA Spring Members' Meeting 2018 ADBA Spring Members' Meeting 2018
ADBA Spring Members' Meeting 2018
 
Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
 
Energy opportunities in the netherlands
Energy opportunities in the netherlandsEnergy opportunities in the netherlands
Energy opportunities in the netherlands
 
Nationaal energie forum 28 nov 2012
Nationaal energie forum 28 nov 2012Nationaal energie forum 28 nov 2012
Nationaal energie forum 28 nov 2012
 
New base 31 may 2019 energy news issue - 1249 by khaled al awadi
New base  31 may  2019  energy news issue - 1249 by khaled al awadiNew base  31 may  2019  energy news issue - 1249 by khaled al awadi
New base 31 may 2019 energy news issue - 1249 by khaled al awadi
 
Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...
Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...
Energy Certification - an Efficient Tool to Achieve Ambitious RES Targets - C...
 

More from Giorgio Castorina

Conergy Academy "FV 2.0 e storage - nuove opportunità di business "
Conergy Academy "FV 2.0 e storage - nuove opportunità di business"Conergy Academy "FV 2.0 e storage - nuove opportunità di business"
Conergy Academy "FV 2.0 e storage - nuove opportunità di business "
Giorgio Castorina
 
Convegno Certificati Bianchi FIRE 2015 - Aspetti legali e criticità del sis...
Convegno Certificati Bianchi FIRE 2015  -  Aspetti legali e criticità del sis...Convegno Certificati Bianchi FIRE 2015  -  Aspetti legali e criticità del sis...
Convegno Certificati Bianchi FIRE 2015 - Aspetti legali e criticità del sis...
Giorgio Castorina
 
I contratti a prestazioni garantite
I contratti a prestazioni garantiteI contratti a prestazioni garantite
I contratti a prestazioni garantite
Giorgio Castorina
 
Convegno FIRE Certificati Bianchi - Roma 12.04.2016
Convegno FIRE Certificati Bianchi - Roma 12.04.2016Convegno FIRE Certificati Bianchi - Roma 12.04.2016
Convegno FIRE Certificati Bianchi - Roma 12.04.2016
Giorgio Castorina
 
Smart Hotel - Padova, giovedì 14 maggio
Smart Hotel - Padova, giovedì 14 maggioSmart Hotel - Padova, giovedì 14 maggio
Smart Hotel - Padova, giovedì 14 maggio
Giorgio Castorina
 
Smart Hotel - Padova 14.05.2015
Smart Hotel - Padova 14.05.2015Smart Hotel - Padova 14.05.2015
Smart Hotel - Padova 14.05.2015Giorgio Castorina
 
Presentazione Solarexpo - Il contratto EPC: i fondamenti
Presentazione Solarexpo - Il contratto EPC: i fondamentiPresentazione Solarexpo - Il contratto EPC: i fondamenti
Presentazione Solarexpo - Il contratto EPC: i fondamenti
Giorgio Castorina
 
Klimaenergy mercato pv dell’esistente in evoluzione - 26.03.2015
Klimaenergy   mercato pv dell’esistente in evoluzione - 26.03.2015Klimaenergy   mercato pv dell’esistente in evoluzione - 26.03.2015
Klimaenergy mercato pv dell’esistente in evoluzione - 26.03.2015
Giorgio Castorina
 

More from Giorgio Castorina (9)

Conergy Academy "FV 2.0 e storage - nuove opportunità di business "
Conergy Academy "FV 2.0 e storage - nuove opportunità di business"Conergy Academy "FV 2.0 e storage - nuove opportunità di business"
Conergy Academy "FV 2.0 e storage - nuove opportunità di business "
 
Convegno Certificati Bianchi FIRE 2015 - Aspetti legali e criticità del sis...
Convegno Certificati Bianchi FIRE 2015  -  Aspetti legali e criticità del sis...Convegno Certificati Bianchi FIRE 2015  -  Aspetti legali e criticità del sis...
Convegno Certificati Bianchi FIRE 2015 - Aspetti legali e criticità del sis...
 
I contratti a prestazioni garantite
I contratti a prestazioni garantiteI contratti a prestazioni garantite
I contratti a prestazioni garantite
 
Convegno FIRE Certificati Bianchi - Roma 12.04.2016
Convegno FIRE Certificati Bianchi - Roma 12.04.2016Convegno FIRE Certificati Bianchi - Roma 12.04.2016
Convegno FIRE Certificati Bianchi - Roma 12.04.2016
 
Smart Hotel - Padova, giovedì 14 maggio
Smart Hotel - Padova, giovedì 14 maggioSmart Hotel - Padova, giovedì 14 maggio
Smart Hotel - Padova, giovedì 14 maggio
 
Smart Hotel - Padova 14.05.2015
Smart Hotel - Padova 14.05.2015Smart Hotel - Padova 14.05.2015
Smart Hotel - Padova 14.05.2015
 
Leaflet a4
Leaflet a4Leaflet a4
Leaflet a4
 
Presentazione Solarexpo - Il contratto EPC: i fondamenti
Presentazione Solarexpo - Il contratto EPC: i fondamentiPresentazione Solarexpo - Il contratto EPC: i fondamenti
Presentazione Solarexpo - Il contratto EPC: i fondamenti
 
Klimaenergy mercato pv dell’esistente in evoluzione - 26.03.2015
Klimaenergy   mercato pv dell’esistente in evoluzione - 26.03.2015Klimaenergy   mercato pv dell’esistente in evoluzione - 26.03.2015
Klimaenergy mercato pv dell’esistente in evoluzione - 26.03.2015
 

Recently uploaded

一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理
fexbqa
 
Pedal to the Court Understanding Your Rights after a Cycling Collision.pdf
Pedal to the Court Understanding Your Rights after a Cycling Collision.pdfPedal to the Court Understanding Your Rights after a Cycling Collision.pdf
Pedal to the Court Understanding Your Rights after a Cycling Collision.pdf
SunsetWestLegalGroup
 
Capital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptxCapital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptx
OmGod1
 
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
woywevt
 
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
gedsuu
 
suture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgicalsuture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgical
AlanSudhan
 
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
onduyv
 
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理
gjsma0ep
 
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdfV.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
bhavenpr
 
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
cadyzeo
 
一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理
一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理
一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理
duxss
 
San Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at SeaSan Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at Sea
Justin Ordoyo
 
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
qevye
 
Integrating Advocacy and Legal Tactics to Tackle Online Consumer Complaints
Integrating Advocacy and Legal Tactics to Tackle Online Consumer ComplaintsIntegrating Advocacy and Legal Tactics to Tackle Online Consumer Complaints
Integrating Advocacy and Legal Tactics to Tackle Online Consumer Complaints
seoglobal20
 
It's the Law: Recent Court and Administrative Decisions of Interest
It's the Law: Recent Court and Administrative Decisions of InterestIt's the Law: Recent Court and Administrative Decisions of Interest
It's the Law: Recent Court and Administrative Decisions of Interest
Parsons Behle & Latimer
 
一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理
一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理
一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理
ymefneb
 
Genocide in International Criminal Law.pptx
Genocide in International Criminal Law.pptxGenocide in International Criminal Law.pptx
Genocide in International Criminal Law.pptx
MasoudZamani13
 
一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理
一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理
一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理
uhsox
 
原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样
原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样
原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样
abondo3
 
Corporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal FrameworkCorporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal Framework
devaki57
 

Recently uploaded (20)

一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理一比一原版林肯大学毕业证(lincoln毕业证)如何办理
一比一原版林肯大学毕业证(lincoln毕业证)如何办理
 
Pedal to the Court Understanding Your Rights after a Cycling Collision.pdf
Pedal to the Court Understanding Your Rights after a Cycling Collision.pdfPedal to the Court Understanding Your Rights after a Cycling Collision.pdf
Pedal to the Court Understanding Your Rights after a Cycling Collision.pdf
 
Capital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptxCapital Punishment by Saif Javed (LLM)ppt.pptx
Capital Punishment by Saif Javed (LLM)ppt.pptx
 
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
一比一原版多伦多都会大学毕业证(TMU毕业证书)学历如何办理
 
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
一比一原版英国伦敦商学院毕业证(lbs毕业证书)如何办理
 
suture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgicalsuture removal ppt.pptx medical surgical
suture removal ppt.pptx medical surgical
 
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
一比一原版朴次茅斯大学毕业证(uop毕业证)如何办理
 
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理
一比一原版(Lincoln毕业证)新西兰林肯大学毕业证如何办理
 
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdfV.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
V.-SENTHIL-BALAJI-SLP-C-8939-8940-2023-SC-Judgment-07-August-2023.pdf
 
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
一比一原版加拿大达尔豪斯大学毕业证(dalhousie毕业证书)如何办理
 
一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理
一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理
一比一原版英国伦敦大学亚非学院毕业证(soas毕业证书)如何办理
 
San Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at SeaSan Remo Manual on International Law Applicable to Armed Conflict at Sea
San Remo Manual on International Law Applicable to Armed Conflict at Sea
 
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
一比一原版(uwlc毕业证书)美国威斯康星大学拉克罗斯分校毕业证如何办理
 
Integrating Advocacy and Legal Tactics to Tackle Online Consumer Complaints
Integrating Advocacy and Legal Tactics to Tackle Online Consumer ComplaintsIntegrating Advocacy and Legal Tactics to Tackle Online Consumer Complaints
Integrating Advocacy and Legal Tactics to Tackle Online Consumer Complaints
 
It's the Law: Recent Court and Administrative Decisions of Interest
It's the Law: Recent Court and Administrative Decisions of InterestIt's the Law: Recent Court and Administrative Decisions of Interest
It's the Law: Recent Court and Administrative Decisions of Interest
 
一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理
一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理
一比一原版伯恩茅斯大学毕业证(bu毕业证)如何办理
 
Genocide in International Criminal Law.pptx
Genocide in International Criminal Law.pptxGenocide in International Criminal Law.pptx
Genocide in International Criminal Law.pptx
 
一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理
一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理
一比一原版(uottawa毕业证书)加拿大渥太华大学毕业证如何办理
 
原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样
原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样
原版定做(sheffield学位证书)英国谢菲尔德大学毕业证文凭证书原版一模一样
 
Corporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal FrameworkCorporate Governance : Scope and Legal Framework
Corporate Governance : Scope and Legal Framework
 

Geothermal energy - Comparison of regulatory framework Germany - Italy

  • 1. 1© Rödl & Partner 05.06.2013 Successful together European Geothermal Congress 2013 Comparison of regulatory framawork Germany - Italy Benjamin Richter & Giorgio Castorina| Pisa | 5 June 2013
  • 2. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 2© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact
  • 3. Agenda 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 01 Introduction Rödl & Partner 3© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact
  • 4. Introduction Rödl & Partner We are a one-of-a-kind success story from Germany Founded in 1977 – international expansion since 1989 Your one-stop shop: audit, legal, management and tax consulting Most familiar with your culture and language Tailor-made solutions for internationally active companies 4© Rödl & Partner 05.06.2013 Tailor-made solutions for internationally active companies Our interdisciplinary and comprehensive services offer Audit Legal consulting Tax consulting Management and IT consulting Audit Consult Develop Operate In close collaboration with our clients we develop information for well- founded decisions that we implement together
  • 5. Introduction Rödl & Partner Rödl & Partner in Europe (excluding Germany) Almaty ▪ Barcelona ▪ Belgrade Birmingham ▪ Bolzano Bratislava ▪ Brno ▪ Bucharest Budapest ▪ Chişinău ▪ Cluj Gdańsk ▪ Gliwice ▪ Istanbul Kaluga ▪ Kharkov ▪ Kiev Krakow ▪ Ljubljana ▪ Madrid Milan ▪ Minsk ▪ Moscow 5© Rödl & Partner 05.06.2013 Milan ▪ Minsk ▪ Moscow Padova ▪ Paris ▪ Plovdiv Poznań ▪ Prague ▪ Riga Rome ▪ Sochi ▪ Sofia St. Petersburg ▪ Stockholm Tallinn ▪ Tbilisi ▪ Timişoara Vienna ▪ Vilnius ▪ Warsaw Wrocław ▪ Zagreb ▪ Zurich Worldwide 3.200 colleagues - 89 offices - 39 countries
  • 6. Our references – main focus geothermal energy National projects General information Services Monitoring of the realization of the geothermal project Unterhaching Complete project management Subsidy procurement Development of the worlds first geological risk insurance Creation of price system for district heating Different municipalities in the field of geothermal energy Demonstration and evaluation of possible options of action Estimation of adoption potential Economic efficiency control / business plan 6© Rödl & Partner 05.06.2013 Economic efficiency control / business plan Valuation Consideration of legal form Forms of participation Financing institution Project control and economical calculations concerning the market entry in geothermal energy UniCredit Legal, economical and organizational consulting for the creation of a power plant portfolio and its risk management Industrial company Site selection concerning economical, operative and geological factors as well as the preparation of applications for the backup of the approved area Federal Ministry for the Environment, Nature Conservation and Nuclear Safety Development of a concept for the realization of a German wide exploration risk insurance
  • 7. Our references – main focus geothermal energy National projects General information Services Federal Ministry for the Environment, Nature Conservation and Nuclear Safety/ World Bank Development of a benchmarking-study (Pilot project Hungary) World Bank Examination of two geothermal projects in Kamchatka, Russia, in economical, legal and technical terms (Electricity supply and district heating) GEOFAR Financed by the Intelligent Energy Europe – Program of the EU; 7© Rödl & Partner 05.06.2013 GEOFAR Financed by the Intelligent Energy Europe – Program of the EU; Joint project with 8 partners from 5 EU-countries; Topic: Financing system geothermal energy UNEP – United Nation Environmental Programme Identification of risks that affect the realization and financing of world wide renewable energy projects Industrial companies Advisory service with regard to market entry Financing institutions Legal and economical due diligence of projects and portfolios
  • 8. Agenda 01 Introduction Rödl & Partner 03 Legal security regarding water license 02 Legal security regarding ownership of geothermal resources 8© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact
  • 9. Legal security regarding ownership of geothermal resources Long term security for an exclusive exploration and exploitation of a specific geothermal reservoir is highly important due to high investment costs and project related risk management Different steps: Legal security 9© Rödl & Partner 05.06.2013 Different steps: 1. Determination of the exploration field allows preliminary geological investigations and exploration drillings 2. Based on these results determination of a sufficiently large exploitation field secures a long-term exclusive right for exploitation 3. Allocation of the resource ownership for a specific area regarding ownership of geothermal resources
  • 10. Legal security regarding ownership of geothermal resources Comparison Germany vs. Italy Subsoil owned by the state Germany 10© Rödl & Partner 05.06.2013 Exploitation permit issued for a period of 50 years Royalty payments of max. 10% can be imposed • Currently not implemented in the case of geothermal resources
  • 11. Legal security regarding ownership of geothermal resources Ownership in Germany Procedure Requirements for application for ownership • Being the holder of the exploration and exploitation permit • Economic exploitation has to be credibly shown 11© Rödl & Partner 05.06.2013 Procedure for application and advantages At the moment of awarding the ownership of the resource the exploitation permit for the respective area expires Ownership can be entered into the land registry and used to safeguard a credit
  • 12. Legal security regarding ownership of geothermal resources Comparison Germany vs. Italy Land property extends to the subsoil Resources in the subsoil are owned and kept by the state or the region, and their exploration and exploitation need the issuance of licenses Italy 12© Rödl & Partner 05.06.2013 Exploitation permit can be issued for a period of 30 years, preferably to the holder of the exploration permit Royalties are provided for the issuance of the permits. Further royalties are provided for power generation, but limited to plants with nominal power higher than 4 MW
  • 13. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 13© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact
  • 14. Legal security regarding water license Exploitation permit according to mining law only allows for the exploitation of geothermal energyLegal security 14© Rödl & Partner 05.06.2013 exploitation of geothermal energy Further license necessary for the utilization of water or steam Legal security regarding water license
  • 15. Legal security regarding water license Comparison Germany vs. Italy Legally possible to obtain water licenses for decades License, generally granted for few years and have to be prolonged on a regular basis Period of validity of water license and exploitation permit differ considerably Germany 15© Rödl & Partner 05.06.2013 considerably • Further risk in project realization • So far all necessary water licenses for geothermal projects have been issued Proof of disposal of test water and drilling fluid necessary In water legislation no legal claim possible • In some states mining authority entitled to override the interests of water legislation
  • 16. Legal security regarding water license Comparison Germany vs. Italy License can be granted for up to 30 years • Same period of validity as for exploitation permit • Security of the investment, once both licenses are obtained Italy 16© Rödl & Partner 05.06.2013 • Security of the investment, once both licenses are obtained Granted by the province or region upon payment of a yearly fee No specific prescriptions concerning geothermal fluids and its treatment Legal claims delegated to the court of public water
  • 17. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 17© Rödl & Partner 05.06.2013 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact 04 Economic feed-in tariffs
  • 18. Economic feed-in tariffs In relation to geothermal power plants, the amount and especially the long-term security of feed-in tariffs play a crucial role, due to the long project preparation phase 18© Rödl & Partner 05.06.2013 Feed-in tariffs should allow for an adequate risk-award ratio that rewards the relatively high risks of the drilling exploration Reference value for the calculation of the feed-in tariff (net vs. gross capacity of the installation) has major influence on the profitability of a project Economic feed-in tariffs
  • 19. Economic feed-in tariffs Comparison Germany vs. Italy Renewable Energy Source Act (EEG) offers in general a stable and Germany 19© Rödl & Partner 05.06.2013 Renewable Energy Source Act (EEG) offers in general a stable and secure investment environment • Gross capacity of the renewable energy technology can be fed into the distribution network • Feed-in tariff for hydro-geothermal power: 25 €cent/kWh • Fixed feed-in tariff secured for 20 years
  • 20. Economic feed-in tariffs Comparison Germany vs. Italy Incentive for the power generated • Added to the income for the sales to the public entity (GSE) Italy 20© Rödl & Partner 05.06.2013 • Added to the income for the sales to the public entity (GSE) • Granted for 20 years • Sliding Feed-in Premium Value of Feed-in tariff MINUS hourly zonal energy market price • Current value: 85 – 135 €cent/kWh, depending on the nominal power of the plant • Premium tariffs for innovative technologies provided
  • 21. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 21© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact 05 Priority and guaranteed access to the power grid
  • 22. Priority and guaranteed access to the power grid Comparison Germany vs. Italy Has to be ensured by all EU Member States (Directive 2009/28/EC on the promotion of the use of energy from renewable sources) Priority and guaranteed access to the power grid 22© Rödl & Partner 05.06.2013 Immediate and priority connection to grid systems shall be granted by grid system operators (GSOs) to installations generating electricity from renewable energy sources (RES) Germany
  • 23. Priority and guaranteed access to the power grid Comparison Germany vs. Italy GSOs are only then entitled to reduce output of RE plants to prevent a grid overload Germany 23© Rödl & Partner 05.06.2013 Costs for the connection to the grid are to be borne by the installation operator • The GSO bears the additional costs in case of assigning a grid connection point which is not at the shortest linear distance form the installation Costs for optimizing, strengthening and expanding the grid system have to be borne by the GSOs
  • 24. Priority and guaranteed access to the power grid Comparison Germany vs. Italy Applications aimed at the connection of RE plants must be given priority by the grid operator Italy 24© Rödl & Partner 05.06.2013 The Energy Authority shall prioritize the dispatch of power generated by RE Only in cases of high risk for the national grid, the grid operator is entitled to reduce the input of RE plants Costs for the connection to the grid shall be borne by the installation operator
  • 25. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 25© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 07 Drilling and power plant construction licenses 08 Your contact 06 Legal security regarding district heating prices
  • 26. Legal security regarding district heating prices Determination of prices in a way that allowsLegal security 26© Rödl & Partner 05.06.2013 Determination of prices in a way that allows • Achievement of a certain rate of return on the investment • Passing increasing prices to consumers Legal security regarding district heating prices
  • 27. Legal security regarding district heating prices Comparison Germany vs. Italy Any heat supply contract (except for industrial customers) has to be based on the “regulation on general conditions for the supply with district heat” Germany 27© Rödl & Partner 05.06.2013 The price sliding clause should appropriately include: • Development of production and supply costs • Respective circumstances of the heat market • The price factor associated to the contribution of the costs for fossil fuels has to be shown separately Price is not completely free of any regulation but can be oriented to the present situation of the heat supply costs
  • 28. Legal security regarding district heating prices Comparison Germany vs. Italy Regulatory framework missing. Risks of cartel and monopoly of the operators Italy 28© Rödl & Partner 05.06.2013 Investigations have been started up on 2012 by the ”Antitrust Authority” Possible creation of an indipendent Authority Due to the expansion of district heating and to the growing attention of the institutions, regulation of the sector in the next years predictable
  • 29. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 29© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 08 Your contact 07 Drilling and power plant construction licenses
  • 30. Drilling and power plant construction licenses Comparison Germany vs. Italy Drilling regulated by mining legislation Germany 30© Rödl & Partner 05.06.2013 Construction of the power plant subject to building law
  • 31. Drilling and power plant construction licenses Comparison Germany vs. Italy Issuance of drilling licenses by: • The respective region (When geothermal resources of national/local interest) Italy 31© Rödl & Partner 05.06.2013 (When geothermal resources of national/local interest) • Ministry for Economic Development (For geothermal resources found in territorial waters) Construction license issued by the region, province or municipality depending on • Plant’s nominal power • Source • D.lgs. 387/2003 created a specific rapid procedure for renewable energies plant (so-called Autorizzazione uUnica”
  • 32. Conclusions Regulatory framework offering legally secure and economic conditions is of utmost importance for the realization of deep-seated geothermal energy projects 32© Rödl & Partner 05.06.2013 This country comparison illustrates the necessity to gain extensive knowledge on the regulatory conditions of any specific location before taking an investment decision.
  • 33. Agenda 01 Introduction Rödl & Partner 02 Legal security regarding ownership of geothermal resources 03 Legal security regarding water license 33© Rödl & Partner 05.06.2013 04 Economic feed-in tariffs 05 Priority and guaranteed access to the power grid 06 Legal security regarding district heating prices 07 Drilling and power plant construction licenses 08 Your contact
  • 34. Your contact Benjamin Richter Rödl & Partner Denninger Straße 84 D-81925 Munich Germany 34© Rödl & Partner 05.06.2013 „Each and every person counts“ – to the Castellers and to us. Human towers symbolise in a unique way the Rödl & Partner corporate culture. They personify our philosophy of solidarity, balance, courage and team spirit. They stand for the growth that is based on own resources, the growth which has made Rödl & Partner the company we are today. „Força, Equilibri, Valor i Seny“ (strength, equilibrium, valour and common sense) is the Catalan motto of all Castellers, describing their fundamental values very accurately. It is to our liking and also reflects our mentality. Therefore Rödl & Partner embarked on a collaborative journey with the representatives of this long-standing tradition of human towers – Castellers de Barcelona – in May 2011. The association from Barcelona stands, among many other things, for this intangible cultural heritage. D-81925 Munich Phone +49 (89) 928780-350 Fax +49 (89) 928780-300 E-Mail benjamin.richter@roedl.com
  • 35. Your contact Italy Svenja Bartels Rachtsanwaltin/Avv. Partner Via Francesco Rismondo 2/E Giorgio Castorina Dottore Via Francesco Rismondo 2/E 35131 Padova 35© Rödl & Partner 05.06.2013 „Each and every person counts“ – to the Castellers and to us. Human towers symbolise in a unique way the Rödl & Partner corporate culture. They personify our philosophy of solidarity, balance, courage and team spirit. They stand for the growth that is based on own resources, the growth which has made Rödl & Partner the company we are today. „Força, Equilibri, Valor i Seny“ (strength, equilibrium, valour and common sense) is the Catalan motto of all Castellers, describing their fundamental values very accurately. It is to our liking and also reflects our mentality. Therefore Rödl & Partner embarked on a collaborative journey with the representatives of this long-standing tradition of human towers – Castellers de Barcelona – in May 2011. The association from Barcelona stands, among many other things, for this intangible cultural heritage. Via Francesco Rismondo 2/E 35131 Padova Phone: +39 (049) 80 46 911 Fax: +39 (049) 80 46 920 E-Mail: svenja.bartels@roedl.it 35131 Padova Phone: +39 (049) 80 46 911 Fax: +39 (049) 80 46 920 E-Mail: giorgio.castorina@roedl.it