What you will learn
- To understand the mechanism of geological disasters
- To understand the events that will occur during a geological disaster
- To understand how to manage yourself safely while facing geological hazards
- To prepare you to perform the roles, responsibilities
and tasks of a shelter manager.
Geological Hazard
and Incident Command System
Drop, Cover, Hold on
Do not use the elevator, because when
the earthquake is often a power outage
INDOOR
If the building is not safe
Go out outside as fast as possible
If the building is safe,
Stay inside until the event is calm
If stuck in the building
Go to the rooftop
Or top floor
Or go outdoor if possible
If driving, park the car , Stay in the car.
Until the seismic passed
If you are outside of the building
Beware and Watch out
for glass, bricks and building
debris dropped on you
Beware of advertising
billboards, electric
poles, big trees
falling down.
Leave the beach Because the earthquake could
cause Tsunami to hit the shore
Along the beach
วงเแหวนแห่งไฟ: แนวภูเขาไฟมีพลังรอบมหาสมุทรแปซิฟิก (พื้นที่สีแดง) - GeoThai.net
What is An earthquake ?
An earthquake (also known as a quake, tremor or
temblor) is the shaking of the surface of the Earth,
resulting from the sudden release of energy in the
Earth's lithosphere that creates seismic waves.
Three types of faults:
A. Strike-slip (horizontal move)
B. Normal (One move down)
C. Thrust (One move up)
Most fault surfaces are a form of stick-slip behavior.
Once the fault has locked, continued relative motion
between the plates leads to increasing stress and
therefore, stored strain energy in the volume around
the fault surface. This continues until the stress has
risen sufficiently to break through the shaking surface,
suddenly allowing sliding over the locked portion of
the fault, releasing the stored energy.
เปรียบเทียบขนาดของแผ่นดินไหวกับพลังงานที่ถูกปลดปล่อย - GeoThai.net
สถิติการเกิดแผ่นดินไหวทั่วโลก - GeoThai.net
1
7
Body Wave
The propagatation of the waves can be divided into 3 phases.
Primary Wave The faster of these body waves is called the
primary or P wave. Its motion is the same as that of a sound wave
in that, as it spreads out, it alternately pushes and pulls the rock.
Secondary Wave The slower wave through the body of rock is called the secondary or S wave.
it shears the rock sideways at right angles to the direction of travel. If a liquid is sheared sideways or
twisted, it will not spring back, hence S waves cannot propagate in the liquid parts of the earth,
Normally, our houses are built to
bear only the vertical gravity. But
when encountering horizontal
movement Building structure might
damage due to the shear strenght
that causes column of house to be
damaged.
The third general type of earthquake
wave is Love wave (surface wave).
Surface waves, it moves the ground from side
to side in a horizontal plane but at right angles
to the direction of propagation. The horizontal
shaking of Love waves is particulary damaging
to the foundations of structures
Do not run outside the high-rise building
zone, be careful of "glass rain" from the
high-rise building window that pour down.
Buildings followed code might not collapse
immediately. Therefore you should wait until
the vibrating calm down then comes out.
Strange shape building Will be more easily damaged
Flat Slab
24
Appilcation
Vibrometer
Place your screenshot here
วัดแรงสั่นสะเทือน
goo.gl/9ZBS1j
App ที่ควรลง / Web ที่ควรเข้า
Place your screenshot here
Website
Thailand Meteorological
http://www.earthquake.tmd.go.th/home.php
สำนักแผ่นดินไหว กรมอุตุฯ
goo.gl/kFmxFp
Earthquakes can be recorded by seismometers
up to great distances, because seismic waves
travel through the whole Earth's interior.
The absolute magnitude of a quake is
conventionally reported by numbers
on the Moment magnitude scale
(formerly Richter scale, magnitude 7
causing serious damage over large
areas), whereas the felt magnitude is
reported using the modified Mercalli
scale (intensity II-XII).
Link goo.gl/B8kJ8D Link goo.gl/vagVng
Bangkok Metropolitan Administration was
simulated that the earthquake 7.3 Mw is the most
severe incident from 4 levels severity. In case of
earthquake, Bangkok operation procedure is
1) Scene size-up (assessment) and report data
2) Manage Damage data And prepare resources
3) District Administration report the situation
assessment
4) Each district administration self-organize by
cooperation with various organizations.
5) Report to Bangkok Metropolitan Administration
Office
Sanamluang was set to be the evacuation
place of Phranakorn district
If Severity is too larger, the district officer must be
approved by higher governor respectively.
Damage to buildings 8-20 floors will occur in the
district; Bang Phlat, Bang Khae, Dusit Rat Burana,
Bangkok Yai, Watthana, Lat Phrao, Lak Si
The area where 31-90 people died as
Laksi, Dusit and Lat Phrao districts, other
areas will have no more than 30 deaths.
ความเสียหายของโรงพยาบาล
Damage to buildings 8-20 floors will occur in the district. Bang Phlat, Bang Khae, Dusit Rat Burana, Bangkok Yai, Watthana, Lat Phrao, Lak Si
Building resist earthquake ministerial regulations 2007
แหล่งข้อมูล http://download.asa.or.th/03media/04law/cba/mr/mr50-62d.pdf
Building resist earthquake ministerial regulations
2007
แหล่งข้อมูล http://download.asa.or.th/03media/04law/cba/mr/mr50-62d.pdf
Building resist earthquake ministerial regulations 2007
แหล่งข้อมูล http://download.asa.or.th/03media/04law/cba/mr/mr50-62d.pdf
More far from the epicenter of
the earthquake. The vibration
that will be weakened.
Except that remote area
has a soft soil Which has
amplify vibration.
Thai gulf
เมืองที่มีชั้นดินเป็นตะกอน เลน เช่น เมืองที่
เป็นปากแม่น้้าที่มาจากการทับถมของดินเดิม
แม้จะอยู่ไกลจากจุดศูนย์กลางของ
แผ่นดินไหว ดินอ่อนซึ่ง Transfer คลื่นของ
แรงสั่นสะเทือนจะยิ่ง Amplified Wave ก่อ
ความเสียหายได้แม้จะอยู่ห่างไกลรอยเลื่อน
Mexico city
gulf
Mexico city and Bangkok are the city on basin that lower ground is clay.
The soft Bangkok clay was deposited during the latest transgression of the sea over the
plain, which began about 10,000 years ago
In 1985, Mexico faced 8.5 magnitude earthquake,
the epicenter far away from Mexico City 350 km
Mexico City's soft have clay layer thickness of 70 m,
Mexico City population 8.55 million
585 building are most serious damage
Bangkok have clay layer thickness of 30 m
Bangkok have population more than 9 million
Bangkok never had a serious incident. (Just feel it)
Bangkok is far away from the Si Sawat fault,
Kanchanaburi 200 km
Mexico met earthquake again in 2017
And Mexico is still repeated last year (2017)
4-9
magnitude
earthquake
Earthquake
risk area
4 levels
Earthquake risk area 4 levels
Earthquake risk area 4 levels
INCIDENT COMMAND SYSTEM (ICS)
Incident Command System is a
standardized approach to the command,
control, and coordination of emergency
response providing a common hierarchy within
which responders from multiple agencies can be
effective with a common goal of scene response,
protecting lives, property and the environment.
Provide a unified, centrally authorized emergency organization.
INCIDENTS ARE DEFINED WITHIN ICS AS UNPLANNED SITUATIONS
NECESSITATING A RESPONSE SUCH AS.
 Emergency medical situations (ambulance service)
 Hazardous material spills, releases to the air (toxic chemicals), releases
to a drinking water supply
 Man-made disasters such as vehicle crashes, industrial accidents, train
derailments, or structure fires
 Natural disasters such as wildfires, flooding, earthquake or tornado
Search and Rescue operations
 Technological crisis
 Terrorist attacks , Hostage crises
 Traffic incidents
PROBLEMS ON CRISIS
Chaos
No decision maker
Lack coordination.
Redundant work are waste time and budget.
Delay, problem solving can not in time
Practitioners come from many agencies. Have
communication problems between each other.
Lack of operation plan within common goal
ICS structure
Command
Planning Operation Logistic Admin/Finance
How to doWhat to do
(the consultant of the
commander)
How to
Support
Decide what to do
How to
coordinate
Example of coordination in disaster
The planning team must holistic view to coordinate.
Coordinate
food
Synchronize
information,
needs and
resources.
Health
Aid
Logistic
Coordinate
transportation
Shelter
safe place , space,
Tent, sleeping bag
Professional
discipline to
Control
Chaos
There are some minor injuries.
But how does this critical patient coordinate
specific help? Operation team
What prompt food to eat right now?
Where is the food
Pls, Sum and
inform me
I will Coordinate
to operation team
Will this building collapse?
Who can evaluate ?
Operation team
Take care of the survivors
who evacuated to the
destination
Operation team
Ok, I will take the
budget to buy and
carry to support
team
Incident
Commander
Operations
Section
Planning
Section
Logistics
Section
Finance/
Admin Section
Liaison Officer
Public Information Officer
Safety Officer
Command Staff
General Staff
Each members of the group must have duties
in charge according ICS structure (5 minutes)
Today, we divide into 2 teams, Each team should be 7-8 personnels.
6.1 magnitude earthquake
At 11:30 am on 19 April 2019
How many Students and staff are in campus ?
- Evacuation route (Design safety Evacuation route of each building,
Calculate flowrate of population traffic to move)
- Assembly point (How many Assembly point should be have in
Thammasart Thapharchan ? What place should be the safety area ?
- Resource Allocation (What is needed supplied, How many, Budget,
How to have supplied, How to have manpower to set up the shelter?)
- Emergency Response (How to coordinate with personnel? Who?
How to deal with injured people, lost people, Search and Rescue)
You have 30 Minute to Determine
Incident
Commander
Operations
Section
Planning
Section
Logistics
Section
Finance/
Admin Section
Liaison Officer
Public Information Officer
Safety Officer
General Staff
Decided from the personnel proposals
Make supplied item list
Budget calculation
Approve the items that
must be purchased
Make the holistic
Evacuation and
shelter plan
resources allocation and
transportation
Decided how to provide
the supplied item
Evacuate, search lost
people and take care
of the injured and
Set up the shelter
Note the proposal from internal staff
coordinate help from outside into
Process Information
/ report situation
Assess the vulnerability and exposure
from the building that might break
down when Aftershock occurs
including the potential danger.
Command Staff
Follow ICSWhat you have to do
Incident
Commander
Operations
Section
Planning
Section
Logistics
Section
Finance/
Admin Section
Liaison Officer
Public Information Officer
Safety Officer
เจ้ำหน้ำที่ประชำสัมพันธ์
เจ้ำหน้ำที่ประสำนงำน
ส่วนปฏิบัติกำร
เจ้ำหน้ำที่ควำมปลอดภัย
ส่วนวำงแผน ส่วนขนส่งสนับสนุน
General Staff
อำนวยกำร
ผู้บัญชำกำรเหตุ
ส่วนธุรกำรและกำรเงิน
ตัดสินใจฟันธงข้อเสนอจากเจ้าหน้าที่อ้านวยการ
ลิสต์ของที่ต้องหา
ค้านวณงบประมาณ
อนุมัติของที่ต้องซื้อ
วางแผนการอพยพ
และการตั้งศูนย์พักพิง
เป็นคนน้าเสนอแผนรวม
ขนส่ง จัดหาทรัพยากร
ติดสินใจว่าจะต้องไป
เอาของเหล่านั้นจากไหน
จัดการอพยพ
ค้นหาผู้สูญหาย ผู้พลัดหลง
ดูแลผู้บาดเจ็บ
บันทึกข้อเสนอข้างในจากแต่ละฝ่าย
ประสานความช่วยเหลือจากข้างนอกเข้ามา
ประมวลข้อมูล / รายงานสถานการณ์
ประเมินความล่อแหลมที่อาคาร
จะพังลงมาเมื่อเกิด Aftershock
รวมถึงภัยที่อาจเกิดขึ้นตามมา และรักษาความสงบ
Command Staff
ทีมประสำน
โครงสร้ำงกำรบัญชำกำรสิ่งที่ต้องคิดและทำตำม
First 24 Hours Response :
1) Search and Rescue
2) Evacuate and Traffic
3) Information
4) Shelter
5) Food
6) Drinking and Using Water
7) Public Health
Survey : assess the damage outside the building, property loss that
may cause other damage (exposure), Injury (Vulnerability)
Data processing: linking damage Lost person information - Coordinated with
resources agency / Publicize the situation To control rumors And Chaos)
Calculate people that flow from the various building / Plan the route that
people from each building will go to assembly point before go to shelter.
Where will the equipment be prepared from? How to find raw materials?
How to manage the kitchen? How to find enough raw materials?
How to have tents? Who is the manpower to set up ? How to set up the sanitation
system in the handling of waste products from cooking and excretion of shelters?
How to provide enough clean water to drink and use
in the kitchen shelters?
Do our medical personnel and medical resources enough?
how to coordinate personnel and resources in emergency?
ระยะฉุกเฉินใน 24 ชั่วโมงนี้สิ่งที่ต้องคิดและทำให้ทัน
ประกอบด้วย
1) การค้นหากู้ภัย
2) ฝ่ายจราจรและการอพยพ
3) ระบบข้อมูล
4) ศูนย์พักชั่วคราว
5) อาหาร
6) น้้ากิน น้้าใช้
7) ฝ่ายพยาบาล
ส้ารวจพื้นที่ : ประเมินความเสียหายที่พบภายนอกอาคาร ความเสียหายของทรัพย์สิน
ที่อาจก่อความเสียหายอื่นตามมา (ความล่อแหลม) ผู้บาดเจ็บ (ความเปราะบาง)
ประมวลข้อมูล : เชื่อมโยงความเสียหาย ข้อมูลผู้สูญหาย พลัดหลง - ประสานหน่วยงานที่มีทรัพยากร
ความช่วยเหลือ ประชาสัมพันธ์ถึงสถานการณ์ที่เกิดขึ้น เพื่อควบคุมข่าวลือ และการจัดการความสงบ)
ค้านวณ Flow ของคนที่ลงจากตึก ให้ไปอยู่ ณ จุดต่างๆ /
วางแผนเส้นทางที่คนจากแต่ละตึกจะไปยังจุดรวมพลหรือศูนย์พักชั่วคราว
จะจัดหาอุปกรณ์ปรุงจากไหน หาวัตถุดิบอย่างไร จัดการครัวอย่างไร หาวัตถุดิบที่เพียงพอได้อย่างไร
จะจัดหาเต็นท์จากไหน ใครเป็นก้าลังคนในการตั้ง ใช้เวลาเท่าใด จัดวางผังอย่างไร หาเครื่องนอนจากไหน
มีระบบสุขาภิบาลในการจัดการของใช้ของเสียจากการปรุงอาหารและการขับถ่ายของศูนย์พักพิงอย่างไร
จะจัดหาน้้าสะอาด ให้เพียงพอกับการกินให้แก่ ศูนย์พักพิง โรงครัวอย่างไร จะจัดการ
ของเสีย และน้้าเสียที่เกิดขึ้นตามมาจากโรงครัวและศูนย์พักพิงอย่างไร
บุคลากรด้านการแพทย์ของเรามีหรือไม่ อย่างไร ทรัพยากรทางการแพทย์ของเรามีหรือไม่อย่างไร
เราจะประสานบุคลากรและทรัพยากรจากไหน ต้องจัดหาอะไรบ้าง อย่างไร
Summary of basic needs and the minimum standard
Liaison or Public Information Officer must be reporter
- How much budget should be prepare ?
- What is Emergency management plan in 24 hours?
1) Safety
2) Evacuate and Traffic
3) Information systems
4) Temporary shelters
5) Food
6) Drinking and using water
7) Public health
5 points today consist of :
2 points : Integrity of coordination
2 points : Practically plan, the actual
possible proposal in practice
1 points : Reasonable Budget
Do we ready to deal?
แหล่งข้อมูล http://www.eit.or.th/q_download/1302.pdf
มำตรฐำนกำรออกแบบอำคำรต้ำนทำนกำรสั่นสะเทือนของแผ่นดินไหว
(ฉบับปี 2552) หรือ มยผ. 1302
geo hazard and Incident command systems
geo hazard and Incident command systems

More Related Content

More from freelance

Ch 3 disaster risk assessment
Ch 3 disaster risk assessmentCh 3 disaster risk assessment
Ch 3 disaster risk assessmentfreelance
 
Ch 2 disaster informatics
Ch 2 disaster informaticsCh 2 disaster informatics
Ch 2 disaster informaticsfreelance
 
Ch 1 disaster education
Ch 1 disaster educationCh 1 disaster education
Ch 1 disaster educationfreelance
 
Ch 7 damange and need assessment
Ch 7 damange and need assessmentCh 7 damange and need assessment
Ch 7 damange and need assessmentfreelance
 
Ch 6 geological hazard
Ch 6  geological hazardCh 6  geological hazard
Ch 6 geological hazardfreelance
 
Ch 5 fire hazard
Ch 5 fire hazardCh 5 fire hazard
Ch 5 fire hazardfreelance
 
Ch 4 disaster risk reduction
Ch 4 disaster risk reductionCh 4 disaster risk reduction
Ch 4 disaster risk reductionfreelance
 
Week 8 survival
Week 8 survivalWeek 8 survival
Week 8 survivalfreelance
 
Week 9 emergency medical
Week 9 emergency medicalWeek 9 emergency medical
Week 9 emergency medicalfreelance
 
Week 7 geo hazard and damage and need assessment (DANA)
Week 7 geo hazard and damage and need assessment (DANA)Week 7 geo hazard and damage and need assessment (DANA)
Week 7 geo hazard and damage and need assessment (DANA)freelance
 
Week 6 geo hazard and Incident command systems
Week 6 geo hazard and Incident command systemsWeek 6 geo hazard and Incident command systems
Week 6 geo hazard and Incident command systemsfreelance
 
Week 4 disaster risk reduction
Week 4  disaster risk reductionWeek 4  disaster risk reduction
Week 4 disaster risk reductionfreelance
 
Week 2 disaster informatics
Week 2 disaster informaticsWeek 2 disaster informatics
Week 2 disaster informaticsfreelance
 
Week 3 meteorological hazard and risk assessment
Week 3 meteorological hazard and risk assessmentWeek 3 meteorological hazard and risk assessment
Week 3 meteorological hazard and risk assessmentfreelance
 
Week 1 intro to disaster
Week 1 intro to disasterWeek 1 intro to disaster
Week 1 intro to disasterfreelance
 
กลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขป
กลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขปกลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขป
กลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขปfreelance
 
กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2
กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2
กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2freelance
 
ผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยง
ผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยงผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยง
ผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยงfreelance
 
กลุ่มMixer --เสรีนิยมใหม่
กลุ่มMixer --เสรีนิยมใหม่กลุ่มMixer --เสรีนิยมใหม่
กลุ่มMixer --เสรีนิยมใหม่freelance
 
กลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคง
กลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคงกลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคง
กลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคงfreelance
 

More from freelance (20)

Ch 3 disaster risk assessment
Ch 3 disaster risk assessmentCh 3 disaster risk assessment
Ch 3 disaster risk assessment
 
Ch 2 disaster informatics
Ch 2 disaster informaticsCh 2 disaster informatics
Ch 2 disaster informatics
 
Ch 1 disaster education
Ch 1 disaster educationCh 1 disaster education
Ch 1 disaster education
 
Ch 7 damange and need assessment
Ch 7 damange and need assessmentCh 7 damange and need assessment
Ch 7 damange and need assessment
 
Ch 6 geological hazard
Ch 6  geological hazardCh 6  geological hazard
Ch 6 geological hazard
 
Ch 5 fire hazard
Ch 5 fire hazardCh 5 fire hazard
Ch 5 fire hazard
 
Ch 4 disaster risk reduction
Ch 4 disaster risk reductionCh 4 disaster risk reduction
Ch 4 disaster risk reduction
 
Week 8 survival
Week 8 survivalWeek 8 survival
Week 8 survival
 
Week 9 emergency medical
Week 9 emergency medicalWeek 9 emergency medical
Week 9 emergency medical
 
Week 7 geo hazard and damage and need assessment (DANA)
Week 7 geo hazard and damage and need assessment (DANA)Week 7 geo hazard and damage and need assessment (DANA)
Week 7 geo hazard and damage and need assessment (DANA)
 
Week 6 geo hazard and Incident command systems
Week 6 geo hazard and Incident command systemsWeek 6 geo hazard and Incident command systems
Week 6 geo hazard and Incident command systems
 
Week 4 disaster risk reduction
Week 4  disaster risk reductionWeek 4  disaster risk reduction
Week 4 disaster risk reduction
 
Week 2 disaster informatics
Week 2 disaster informaticsWeek 2 disaster informatics
Week 2 disaster informatics
 
Week 3 meteorological hazard and risk assessment
Week 3 meteorological hazard and risk assessmentWeek 3 meteorological hazard and risk assessment
Week 3 meteorological hazard and risk assessment
 
Week 1 intro to disaster
Week 1 intro to disasterWeek 1 intro to disaster
Week 1 intro to disaster
 
กลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขป
กลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขปกลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขป
กลุ่มรียากระดาษแอนเดอะแก๊งค์ --สรุปหนังสือปราชญาวิทยาศาสตร์โดยสังเขป
 
กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2
กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2
กลุ่มRobot มนุษย์ต้องเปลี่ยนแปลงตนเอง...ด่วน-2
 
ผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยง
ผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยงผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยง
ผู้ใหญ่ปอย --ประวัติศาสตร์ฉบับย่อของลัทธิเสรีนิยมใหม่ เชื่อมโยง
 
กลุ่มMixer --เสรีนิยมใหม่
กลุ่มMixer --เสรีนิยมใหม่กลุ่มMixer --เสรีนิยมใหม่
กลุ่มMixer --เสรีนิยมใหม่
 
กลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคง
กลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคงกลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคง
กลุ่มไหน -- สิ่งแวดล้อมกับความมั่นคง
 

geo hazard and Incident command systems

  • 1. What you will learn - To understand the mechanism of geological disasters - To understand the events that will occur during a geological disaster - To understand how to manage yourself safely while facing geological hazards - To prepare you to perform the roles, responsibilities and tasks of a shelter manager. Geological Hazard and Incident Command System
  • 3. Do not use the elevator, because when the earthquake is often a power outage INDOOR If the building is not safe Go out outside as fast as possible If the building is safe, Stay inside until the event is calm If stuck in the building Go to the rooftop Or top floor Or go outdoor if possible
  • 4. If driving, park the car , Stay in the car. Until the seismic passed If you are outside of the building Beware and Watch out for glass, bricks and building debris dropped on you Beware of advertising billboards, electric poles, big trees falling down.
  • 5. Leave the beach Because the earthquake could cause Tsunami to hit the shore Along the beach
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 12. What is An earthquake ? An earthquake (also known as a quake, tremor or temblor) is the shaking of the surface of the Earth, resulting from the sudden release of energy in the Earth's lithosphere that creates seismic waves.
  • 13. Three types of faults: A. Strike-slip (horizontal move) B. Normal (One move down) C. Thrust (One move up) Most fault surfaces are a form of stick-slip behavior. Once the fault has locked, continued relative motion between the plates leads to increasing stress and therefore, stored strain energy in the volume around the fault surface. This continues until the stress has risen sufficiently to break through the shaking surface, suddenly allowing sliding over the locked portion of the fault, releasing the stored energy.
  • 14.
  • 17. 1 7
  • 18.
  • 19. Body Wave The propagatation of the waves can be divided into 3 phases. Primary Wave The faster of these body waves is called the primary or P wave. Its motion is the same as that of a sound wave in that, as it spreads out, it alternately pushes and pulls the rock. Secondary Wave The slower wave through the body of rock is called the secondary or S wave. it shears the rock sideways at right angles to the direction of travel. If a liquid is sheared sideways or twisted, it will not spring back, hence S waves cannot propagate in the liquid parts of the earth,
  • 20. Normally, our houses are built to bear only the vertical gravity. But when encountering horizontal movement Building structure might damage due to the shear strenght that causes column of house to be damaged. The third general type of earthquake wave is Love wave (surface wave). Surface waves, it moves the ground from side to side in a horizontal plane but at right angles to the direction of propagation. The horizontal shaking of Love waves is particulary damaging to the foundations of structures
  • 21.
  • 22. Do not run outside the high-rise building zone, be careful of "glass rain" from the high-rise building window that pour down. Buildings followed code might not collapse immediately. Therefore you should wait until the vibrating calm down then comes out.
  • 23. Strange shape building Will be more easily damaged Flat Slab
  • 24. 24
  • 25. Appilcation Vibrometer Place your screenshot here วัดแรงสั่นสะเทือน goo.gl/9ZBS1j App ที่ควรลง / Web ที่ควรเข้า Place your screenshot here Website Thailand Meteorological http://www.earthquake.tmd.go.th/home.php สำนักแผ่นดินไหว กรมอุตุฯ goo.gl/kFmxFp
  • 26. Earthquakes can be recorded by seismometers up to great distances, because seismic waves travel through the whole Earth's interior. The absolute magnitude of a quake is conventionally reported by numbers on the Moment magnitude scale (formerly Richter scale, magnitude 7 causing serious damage over large areas), whereas the felt magnitude is reported using the modified Mercalli scale (intensity II-XII).
  • 27.
  • 28. Link goo.gl/B8kJ8D Link goo.gl/vagVng Bangkok Metropolitan Administration was simulated that the earthquake 7.3 Mw is the most severe incident from 4 levels severity. In case of earthquake, Bangkok operation procedure is 1) Scene size-up (assessment) and report data 2) Manage Damage data And prepare resources 3) District Administration report the situation assessment 4) Each district administration self-organize by cooperation with various organizations. 5) Report to Bangkok Metropolitan Administration Office Sanamluang was set to be the evacuation place of Phranakorn district If Severity is too larger, the district officer must be approved by higher governor respectively.
  • 29. Damage to buildings 8-20 floors will occur in the district; Bang Phlat, Bang Khae, Dusit Rat Burana, Bangkok Yai, Watthana, Lat Phrao, Lak Si The area where 31-90 people died as Laksi, Dusit and Lat Phrao districts, other areas will have no more than 30 deaths. ความเสียหายของโรงพยาบาล Damage to buildings 8-20 floors will occur in the district. Bang Phlat, Bang Khae, Dusit Rat Burana, Bangkok Yai, Watthana, Lat Phrao, Lak Si
  • 30. Building resist earthquake ministerial regulations 2007 แหล่งข้อมูล http://download.asa.or.th/03media/04law/cba/mr/mr50-62d.pdf
  • 31. Building resist earthquake ministerial regulations 2007 แหล่งข้อมูล http://download.asa.or.th/03media/04law/cba/mr/mr50-62d.pdf
  • 32. Building resist earthquake ministerial regulations 2007 แหล่งข้อมูล http://download.asa.or.th/03media/04law/cba/mr/mr50-62d.pdf
  • 33. More far from the epicenter of the earthquake. The vibration that will be weakened. Except that remote area has a soft soil Which has amplify vibration.
  • 34. Thai gulf เมืองที่มีชั้นดินเป็นตะกอน เลน เช่น เมืองที่ เป็นปากแม่น้้าที่มาจากการทับถมของดินเดิม แม้จะอยู่ไกลจากจุดศูนย์กลางของ แผ่นดินไหว ดินอ่อนซึ่ง Transfer คลื่นของ แรงสั่นสะเทือนจะยิ่ง Amplified Wave ก่อ ความเสียหายได้แม้จะอยู่ห่างไกลรอยเลื่อน Mexico city gulf Mexico city and Bangkok are the city on basin that lower ground is clay. The soft Bangkok clay was deposited during the latest transgression of the sea over the plain, which began about 10,000 years ago
  • 35. In 1985, Mexico faced 8.5 magnitude earthquake, the epicenter far away from Mexico City 350 km Mexico City's soft have clay layer thickness of 70 m, Mexico City population 8.55 million 585 building are most serious damage Bangkok have clay layer thickness of 30 m Bangkok have population more than 9 million Bangkok never had a serious incident. (Just feel it) Bangkok is far away from the Si Sawat fault, Kanchanaburi 200 km Mexico met earthquake again in 2017 And Mexico is still repeated last year (2017)
  • 36. 4-9 magnitude earthquake Earthquake risk area 4 levels Earthquake risk area 4 levels Earthquake risk area 4 levels
  • 37.
  • 38. INCIDENT COMMAND SYSTEM (ICS) Incident Command System is a standardized approach to the command, control, and coordination of emergency response providing a common hierarchy within which responders from multiple agencies can be effective with a common goal of scene response, protecting lives, property and the environment. Provide a unified, centrally authorized emergency organization.
  • 39. INCIDENTS ARE DEFINED WITHIN ICS AS UNPLANNED SITUATIONS NECESSITATING A RESPONSE SUCH AS.  Emergency medical situations (ambulance service)  Hazardous material spills, releases to the air (toxic chemicals), releases to a drinking water supply  Man-made disasters such as vehicle crashes, industrial accidents, train derailments, or structure fires  Natural disasters such as wildfires, flooding, earthquake or tornado Search and Rescue operations  Technological crisis  Terrorist attacks , Hostage crises  Traffic incidents
  • 40. PROBLEMS ON CRISIS Chaos No decision maker Lack coordination. Redundant work are waste time and budget. Delay, problem solving can not in time Practitioners come from many agencies. Have communication problems between each other. Lack of operation plan within common goal
  • 41. ICS structure Command Planning Operation Logistic Admin/Finance How to doWhat to do (the consultant of the commander) How to Support Decide what to do How to coordinate
  • 42. Example of coordination in disaster The planning team must holistic view to coordinate. Coordinate food Synchronize information, needs and resources. Health Aid Logistic Coordinate transportation Shelter safe place , space, Tent, sleeping bag Professional discipline to Control Chaos There are some minor injuries. But how does this critical patient coordinate specific help? Operation team What prompt food to eat right now? Where is the food Pls, Sum and inform me I will Coordinate to operation team Will this building collapse? Who can evaluate ? Operation team Take care of the survivors who evacuated to the destination Operation team Ok, I will take the budget to buy and carry to support team
  • 43. Incident Commander Operations Section Planning Section Logistics Section Finance/ Admin Section Liaison Officer Public Information Officer Safety Officer Command Staff General Staff Each members of the group must have duties in charge according ICS structure (5 minutes) Today, we divide into 2 teams, Each team should be 7-8 personnels.
  • 44. 6.1 magnitude earthquake At 11:30 am on 19 April 2019 How many Students and staff are in campus ?
  • 45. - Evacuation route (Design safety Evacuation route of each building, Calculate flowrate of population traffic to move) - Assembly point (How many Assembly point should be have in Thammasart Thapharchan ? What place should be the safety area ? - Resource Allocation (What is needed supplied, How many, Budget, How to have supplied, How to have manpower to set up the shelter?) - Emergency Response (How to coordinate with personnel? Who? How to deal with injured people, lost people, Search and Rescue) You have 30 Minute to Determine
  • 46. Incident Commander Operations Section Planning Section Logistics Section Finance/ Admin Section Liaison Officer Public Information Officer Safety Officer General Staff Decided from the personnel proposals Make supplied item list Budget calculation Approve the items that must be purchased Make the holistic Evacuation and shelter plan resources allocation and transportation Decided how to provide the supplied item Evacuate, search lost people and take care of the injured and Set up the shelter Note the proposal from internal staff coordinate help from outside into Process Information / report situation Assess the vulnerability and exposure from the building that might break down when Aftershock occurs including the potential danger. Command Staff Follow ICSWhat you have to do
  • 47. Incident Commander Operations Section Planning Section Logistics Section Finance/ Admin Section Liaison Officer Public Information Officer Safety Officer เจ้ำหน้ำที่ประชำสัมพันธ์ เจ้ำหน้ำที่ประสำนงำน ส่วนปฏิบัติกำร เจ้ำหน้ำที่ควำมปลอดภัย ส่วนวำงแผน ส่วนขนส่งสนับสนุน General Staff อำนวยกำร ผู้บัญชำกำรเหตุ ส่วนธุรกำรและกำรเงิน ตัดสินใจฟันธงข้อเสนอจากเจ้าหน้าที่อ้านวยการ ลิสต์ของที่ต้องหา ค้านวณงบประมาณ อนุมัติของที่ต้องซื้อ วางแผนการอพยพ และการตั้งศูนย์พักพิง เป็นคนน้าเสนอแผนรวม ขนส่ง จัดหาทรัพยากร ติดสินใจว่าจะต้องไป เอาของเหล่านั้นจากไหน จัดการอพยพ ค้นหาผู้สูญหาย ผู้พลัดหลง ดูแลผู้บาดเจ็บ บันทึกข้อเสนอข้างในจากแต่ละฝ่าย ประสานความช่วยเหลือจากข้างนอกเข้ามา ประมวลข้อมูล / รายงานสถานการณ์ ประเมินความล่อแหลมที่อาคาร จะพังลงมาเมื่อเกิด Aftershock รวมถึงภัยที่อาจเกิดขึ้นตามมา และรักษาความสงบ Command Staff ทีมประสำน โครงสร้ำงกำรบัญชำกำรสิ่งที่ต้องคิดและทำตำม
  • 48. First 24 Hours Response : 1) Search and Rescue 2) Evacuate and Traffic 3) Information 4) Shelter 5) Food 6) Drinking and Using Water 7) Public Health Survey : assess the damage outside the building, property loss that may cause other damage (exposure), Injury (Vulnerability) Data processing: linking damage Lost person information - Coordinated with resources agency / Publicize the situation To control rumors And Chaos) Calculate people that flow from the various building / Plan the route that people from each building will go to assembly point before go to shelter. Where will the equipment be prepared from? How to find raw materials? How to manage the kitchen? How to find enough raw materials? How to have tents? Who is the manpower to set up ? How to set up the sanitation system in the handling of waste products from cooking and excretion of shelters? How to provide enough clean water to drink and use in the kitchen shelters? Do our medical personnel and medical resources enough? how to coordinate personnel and resources in emergency?
  • 49. ระยะฉุกเฉินใน 24 ชั่วโมงนี้สิ่งที่ต้องคิดและทำให้ทัน ประกอบด้วย 1) การค้นหากู้ภัย 2) ฝ่ายจราจรและการอพยพ 3) ระบบข้อมูล 4) ศูนย์พักชั่วคราว 5) อาหาร 6) น้้ากิน น้้าใช้ 7) ฝ่ายพยาบาล ส้ารวจพื้นที่ : ประเมินความเสียหายที่พบภายนอกอาคาร ความเสียหายของทรัพย์สิน ที่อาจก่อความเสียหายอื่นตามมา (ความล่อแหลม) ผู้บาดเจ็บ (ความเปราะบาง) ประมวลข้อมูล : เชื่อมโยงความเสียหาย ข้อมูลผู้สูญหาย พลัดหลง - ประสานหน่วยงานที่มีทรัพยากร ความช่วยเหลือ ประชาสัมพันธ์ถึงสถานการณ์ที่เกิดขึ้น เพื่อควบคุมข่าวลือ และการจัดการความสงบ) ค้านวณ Flow ของคนที่ลงจากตึก ให้ไปอยู่ ณ จุดต่างๆ / วางแผนเส้นทางที่คนจากแต่ละตึกจะไปยังจุดรวมพลหรือศูนย์พักชั่วคราว จะจัดหาอุปกรณ์ปรุงจากไหน หาวัตถุดิบอย่างไร จัดการครัวอย่างไร หาวัตถุดิบที่เพียงพอได้อย่างไร จะจัดหาเต็นท์จากไหน ใครเป็นก้าลังคนในการตั้ง ใช้เวลาเท่าใด จัดวางผังอย่างไร หาเครื่องนอนจากไหน มีระบบสุขาภิบาลในการจัดการของใช้ของเสียจากการปรุงอาหารและการขับถ่ายของศูนย์พักพิงอย่างไร จะจัดหาน้้าสะอาด ให้เพียงพอกับการกินให้แก่ ศูนย์พักพิง โรงครัวอย่างไร จะจัดการ ของเสีย และน้้าเสียที่เกิดขึ้นตามมาจากโรงครัวและศูนย์พักพิงอย่างไร บุคลากรด้านการแพทย์ของเรามีหรือไม่ อย่างไร ทรัพยากรทางการแพทย์ของเรามีหรือไม่อย่างไร เราจะประสานบุคลากรและทรัพยากรจากไหน ต้องจัดหาอะไรบ้าง อย่างไร
  • 50.
  • 51. Summary of basic needs and the minimum standard
  • 52. Liaison or Public Information Officer must be reporter - How much budget should be prepare ? - What is Emergency management plan in 24 hours? 1) Safety 2) Evacuate and Traffic 3) Information systems 4) Temporary shelters 5) Food 6) Drinking and using water 7) Public health 5 points today consist of : 2 points : Integrity of coordination 2 points : Practically plan, the actual possible proposal in practice 1 points : Reasonable Budget
  • 53. Do we ready to deal?
  • 54.