SlideShare a Scribd company logo
Our Vision
Leading the industry
to a sustainable future.
Our Mission
Through TEAMwork and
innovation, we are shaping
the infrastructure of offshore
energy.
OUR VALUES
Our TEAM values guide our decisions
and actions in everything we do.
Trust
We value and respect each other and we do
what is right. Every one of us. As true team
players, we are inclusive and resourceful. Our
customers, partners, and colleagues can rely
on our full commitment to transparency,
honesty, and reliability.
Excellence
We put safety first. Always. Everything we do
is shaped by our desire to make a difference
and to find the best solutions. Our unrelenting
determination to set higher standards for
quality and precision allows us to create
lasting results.
Momentum
We bring passion, enthusiasm, and energy to
work. Every day. By always seeing the
opportunity and being intentional, we are
continuously moving forward, embracing change
and learning from our mistakes. Our collective
creativity and vitality keep us progressing.
Who we are
Accountability
We keep our word and deliver on our
promises. No surprises. Acting responsibly,
we create context, follow through, and take
ownership of our actions. Our ambitious
leadership will help to ensure the industry’s
relevance and value, far into the future.
Our Mission
Through TEAMwork and
innovation, we are shaping
the infrastructure of offshore
energy.
~2400
Total workforce
9
Offices
6
Countries
of Operation
38
Vessels
Customers
 One of the world’s largest alternative asset managers
 Long-term, value investors
 Owner-operator mentality
 Focused on Real Assets (Property, Infrastructure,
Renewables & Private Equity)
 Real assets expertise
 Invest on a value basis
 Operations-oriented approach
 Global scale
 Significant access to capital
Strong and Committed Sponsors
PRIVATE EQUITY STRATEGY
4
BROOKFIELD
ASSET MANAGEMENT
The
Stella
Maris
Project
• One stop-shop from collection to storage
• Flexible maritime solution
• Scalable worldwide – design one – build
many
• Cooperate closely with industry and policy
makers nationally and internationally
• Solution deployed for large scale emitters,
clusters and/or nation states in 2027
Stella Maris – Large-Scale CCS
To get CCS costs down, large scale flexible solutions are
required!
10 Mt CO2 / year:
The Stella Maris CCS Project
To get CCS costs down, large scale flexible solutions are required!
Infrastructure planned can handle ≥ 10 mtpa of CO2
Typical CCSO
Moored at jetty/
quay or in protected area
50-80k storage
(size adaptable to need/site)
Annual capacity up to 7 mt/unit
Designed for shore power
Infrastructure
Injection of CO2
Floating Injection Unit
Capturing
Technology
In cooperation with and
specific per emitter
Offshore Storage
Reservoir
Work in progress
Collection
CO2 Terminal
Transportation
CO2-shuttle
carriers
Transport CO2
from Emitter to
CO2 Terminal
In cooperation with
emitter (pipeline, truck,
rail, barge, etc)
Emitter capture,
liquify and store
in own CO2 tanks
Stella Marris can collect
CO2 and transport to CO2
Terminal or directly to
injection location
The Stella Maris CCS Project
CO2 Terminal
High- & low-pressure gas from pipelines
Medium & low-pressure liquid from road, rail, ships or barges
Various qualities with different levels of impurity
Collection
• 50-80k cbm storage
• Annual capacity up to 7
mt/unit
• Designed for shore power
Principal Dimensions (80k cbm design):
Length o.a. 220m
Breath (M) 58m
Depth (M) 24,5m
Design Draft 13m
Designed to receive and process:
Collection, Processing and
Export
The Stella Maris CCS Project
Principal dimensions:
Length o.a: 238m
Breadth (M): 38m
Depth (M): 22m
Design draft: 13m
Cargo cap: 50k cbm
CO2 Shuttle Carriers
• New, state of the art CO2 shuttle carrier
design
• 50,000 cbm - low pressure tanks
• Zero emission capable
Transport
Transport and DP
offloading
Key Innovations:
• Low pressure CO2 tanks
• Dynamically positioned CO2 carrier
• Equipment for offshore offloading of
CO2
• Power Source for injection unit
The Stella Maris CCS Project
Principal dimensions:
Hull Diameter 50m
Bilge Box diameter: 62m
Main Deck diameter 50m
Hull Depth: 22m
Design draft: 13m
Draft loaded 14m
Floating Injection Unit (FIU)
• Allows continuous injection
• Heating and injection modules below
deck
• Power from Shuttle carrier (+ battery
back-up)
• Unmanned and operations from shore,
communication via shuttle carrier
• CO2 heated and injected into reservoir in
dense phase (>5°C & 65 -160 barg)
Injection
Alternatives:
• Injection facilities on an
existing offshore installation
or on new fixed offshore
structure
• Direct injection from shuttle
carrier
Key Innovations
• Power from CO2 Shuttle
Carrier
• Normally Unmanned
• Equipment for offshore
loading of CO2
• Zero emission capable
Offshore Injection and
storage
The
Stella
Maris
Project
Establishing CCS Hubs and Cluster Networks
How we are working in the market
The largest part of the CCS capex requirement is
related to capture technology and land-based
infrastructure
The importance of industrial
CCS hubs and cluster networks
• Reduces costs and risks
• Enables the capture of
small volume sources
• Strong policy support is
needed
• Supportive government is
key
• EU Funding – application
with Portugal/Spain as base
case

More Related Content

Similar to General Presentation - Stella Maris CCS

Hsb broshure 2019_spreads_web
Hsb broshure 2019_spreads_webHsb broshure 2019_spreads_web
Hsb broshure 2019_spreads_web
HSB MARINE
 
Hsb Marine Presentation 2019
Hsb Marine Presentation 2019Hsb Marine Presentation 2019
Hsb Marine Presentation 2019
HSB MARINE
 
HatchAnnualReview2013
HatchAnnualReview2013HatchAnnualReview2013
HatchAnnualReview2013
Allen Migdal
 
Carbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introductionCarbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introduction
Caroline Joseph
 
ALE Capability Brochure-2016
ALE Capability Brochure-2016ALE Capability Brochure-2016
ALE Capability Brochure-2016
Patrick Ent van der
 
Power Projects
Power ProjectsPower Projects
Power Projects
Per Lyager
 
N c group presentation
N c group presentationN c group presentation
N c group presentation
surajith kanakam
 
CR Middle East
CR Middle EastCR Middle East
CR Middle East
Amir karami
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
raghunathan janarthanan
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
raghunathan janarthanan
 
KSP_comapny_profile_2022_eng.pdf
KSP_comapny_profile_2022_eng.pdfKSP_comapny_profile_2022_eng.pdf
KSP_comapny_profile_2022_eng.pdf
KSP
 
Hydrogen About Us.pdf
Hydrogen About Us.pdfHydrogen About Us.pdf
Hydrogen About Us.pdf
Daniel Donatelli
 
H2O Environmental ORSO (Oil Spill Removal Organization) Presentation
H2O Environmental ORSO (Oil Spill Removal Organization) PresentationH2O Environmental ORSO (Oil Spill Removal Organization) Presentation
H2O Environmental ORSO (Oil Spill Removal Organization) Presentation
H2O Environmental
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
Atkins
 
evrmac01122015
evrmac01122015evrmac01122015
evrmac01122015
Khaled Omar
 
Engineer plus Channel Management
Engineer plus Channel ManagementEngineer plus Channel Management
Engineer plus Channel Management
Indore Colour Organics Ltd.
 
Motive Offshore Group Company Presentation
Motive Offshore Group Company PresentationMotive Offshore Group Company Presentation
Motive Offshore Group Company Presentation
Ryan Thomson
 
HSB Marine | Floating Solutions and Building On Water
HSB Marine | Floating Solutions and Building On WaterHSB Marine | Floating Solutions and Building On Water
HSB Marine | Floating Solutions and Building On Water
HSB Marine
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
Denis Cremin
 
SeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-BrochureSeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-Brochure
surajith kanakam
 

Similar to General Presentation - Stella Maris CCS (20)

Hsb broshure 2019_spreads_web
Hsb broshure 2019_spreads_webHsb broshure 2019_spreads_web
Hsb broshure 2019_spreads_web
 
Hsb Marine Presentation 2019
Hsb Marine Presentation 2019Hsb Marine Presentation 2019
Hsb Marine Presentation 2019
 
HatchAnnualReview2013
HatchAnnualReview2013HatchAnnualReview2013
HatchAnnualReview2013
 
Carbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introductionCarbon Catalysts Consultancy introduction
Carbon Catalysts Consultancy introduction
 
ALE Capability Brochure-2016
ALE Capability Brochure-2016ALE Capability Brochure-2016
ALE Capability Brochure-2016
 
Power Projects
Power ProjectsPower Projects
Power Projects
 
N c group presentation
N c group presentationN c group presentation
N c group presentation
 
CR Middle East
CR Middle EastCR Middle East
CR Middle East
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
KSP_comapny_profile_2022_eng.pdf
KSP_comapny_profile_2022_eng.pdfKSP_comapny_profile_2022_eng.pdf
KSP_comapny_profile_2022_eng.pdf
 
Hydrogen About Us.pdf
Hydrogen About Us.pdfHydrogen About Us.pdf
Hydrogen About Us.pdf
 
H2O Environmental ORSO (Oil Spill Removal Organization) Presentation
H2O Environmental ORSO (Oil Spill Removal Organization) PresentationH2O Environmental ORSO (Oil Spill Removal Organization) Presentation
H2O Environmental ORSO (Oil Spill Removal Organization) Presentation
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
evrmac01122015
evrmac01122015evrmac01122015
evrmac01122015
 
Engineer plus Channel Management
Engineer plus Channel ManagementEngineer plus Channel Management
Engineer plus Channel Management
 
Motive Offshore Group Company Presentation
Motive Offshore Group Company PresentationMotive Offshore Group Company Presentation
Motive Offshore Group Company Presentation
 
HSB Marine | Floating Solutions and Building On Water
HSB Marine | Floating Solutions and Building On WaterHSB Marine | Floating Solutions and Building On Water
HSB Marine | Floating Solutions and Building On Water
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
SeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-BrochureSeaTech-Solutions-Corporate-Brochure
SeaTech-Solutions-Corporate-Brochure
 

Recently uploaded

Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
Zilliz
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 

Recently uploaded (20)

Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 

General Presentation - Stella Maris CCS

  • 1.
  • 2. Our Vision Leading the industry to a sustainable future. Our Mission Through TEAMwork and innovation, we are shaping the infrastructure of offshore energy. OUR VALUES Our TEAM values guide our decisions and actions in everything we do. Trust We value and respect each other and we do what is right. Every one of us. As true team players, we are inclusive and resourceful. Our customers, partners, and colleagues can rely on our full commitment to transparency, honesty, and reliability. Excellence We put safety first. Always. Everything we do is shaped by our desire to make a difference and to find the best solutions. Our unrelenting determination to set higher standards for quality and precision allows us to create lasting results. Momentum We bring passion, enthusiasm, and energy to work. Every day. By always seeing the opportunity and being intentional, we are continuously moving forward, embracing change and learning from our mistakes. Our collective creativity and vitality keep us progressing. Who we are Accountability We keep our word and deliver on our promises. No surprises. Acting responsibly, we create context, follow through, and take ownership of our actions. Our ambitious leadership will help to ensure the industry’s relevance and value, far into the future. Our Mission Through TEAMwork and innovation, we are shaping the infrastructure of offshore energy.
  • 4.  One of the world’s largest alternative asset managers  Long-term, value investors  Owner-operator mentality  Focused on Real Assets (Property, Infrastructure, Renewables & Private Equity)  Real assets expertise  Invest on a value basis  Operations-oriented approach  Global scale  Significant access to capital Strong and Committed Sponsors PRIVATE EQUITY STRATEGY 4 BROOKFIELD ASSET MANAGEMENT
  • 5. The Stella Maris Project • One stop-shop from collection to storage • Flexible maritime solution • Scalable worldwide – design one – build many • Cooperate closely with industry and policy makers nationally and internationally • Solution deployed for large scale emitters, clusters and/or nation states in 2027 Stella Maris – Large-Scale CCS To get CCS costs down, large scale flexible solutions are required! 10 Mt CO2 / year:
  • 6. The Stella Maris CCS Project To get CCS costs down, large scale flexible solutions are required! Infrastructure planned can handle ≥ 10 mtpa of CO2 Typical CCSO Moored at jetty/ quay or in protected area 50-80k storage (size adaptable to need/site) Annual capacity up to 7 mt/unit Designed for shore power Infrastructure Injection of CO2 Floating Injection Unit Capturing Technology In cooperation with and specific per emitter Offshore Storage Reservoir Work in progress Collection CO2 Terminal Transportation CO2-shuttle carriers Transport CO2 from Emitter to CO2 Terminal In cooperation with emitter (pipeline, truck, rail, barge, etc) Emitter capture, liquify and store in own CO2 tanks Stella Marris can collect CO2 and transport to CO2 Terminal or directly to injection location
  • 7. The Stella Maris CCS Project CO2 Terminal High- & low-pressure gas from pipelines Medium & low-pressure liquid from road, rail, ships or barges Various qualities with different levels of impurity Collection • 50-80k cbm storage • Annual capacity up to 7 mt/unit • Designed for shore power Principal Dimensions (80k cbm design): Length o.a. 220m Breath (M) 58m Depth (M) 24,5m Design Draft 13m Designed to receive and process: Collection, Processing and Export
  • 8. The Stella Maris CCS Project Principal dimensions: Length o.a: 238m Breadth (M): 38m Depth (M): 22m Design draft: 13m Cargo cap: 50k cbm CO2 Shuttle Carriers • New, state of the art CO2 shuttle carrier design • 50,000 cbm - low pressure tanks • Zero emission capable Transport Transport and DP offloading Key Innovations: • Low pressure CO2 tanks • Dynamically positioned CO2 carrier • Equipment for offshore offloading of CO2 • Power Source for injection unit
  • 9. The Stella Maris CCS Project Principal dimensions: Hull Diameter 50m Bilge Box diameter: 62m Main Deck diameter 50m Hull Depth: 22m Design draft: 13m Draft loaded 14m Floating Injection Unit (FIU) • Allows continuous injection • Heating and injection modules below deck • Power from Shuttle carrier (+ battery back-up) • Unmanned and operations from shore, communication via shuttle carrier • CO2 heated and injected into reservoir in dense phase (>5°C & 65 -160 barg) Injection Alternatives: • Injection facilities on an existing offshore installation or on new fixed offshore structure • Direct injection from shuttle carrier Key Innovations • Power from CO2 Shuttle Carrier • Normally Unmanned • Equipment for offshore loading of CO2 • Zero emission capable Offshore Injection and storage
  • 10. The Stella Maris Project Establishing CCS Hubs and Cluster Networks How we are working in the market The largest part of the CCS capex requirement is related to capture technology and land-based infrastructure The importance of industrial CCS hubs and cluster networks • Reduces costs and risks • Enables the capture of small volume sources • Strong policy support is needed • Supportive government is key • EU Funding – application with Portugal/Spain as base case

Editor's Notes

  1. Christian: Initially we actually looked at a very large offshore Floating Storage and Injection Unit. However during the Concept Select stage of the project, this was ruled out due to costs, and we rather landed on a solution whereby each shuttle carrier acts as the intermediate storage which is needed to achieve continuous injection from a small floating injection unit into the reservoir. This means that one shuttle carrier must at all times be connected, and swich-over can be done once a new laden shuttle carrier arrives at the second offloading buoy. The heating and injection modules are place below deck on the FIU so that it is completely protected from green sea. The power of the FIU is received from the moored shuttle carrier (+ battery back-up for redundancy) The unit is normally unmanned, and controlled from shore. The CO2 will be heated and injected into reservoir in dense phase (>5°C & 65 -160 barg) Instead of a floating unit, if the location allows, the FIU functionality can be on an existing offshore installation, or on a new fixed structure such as a jacket. Also, we plan to standardize the heating and injection modules for the FIU so that it potentially can be put directly on the shuttle tankers if the specific business case would allow for it. The key Innovation of the FIU is the ability to use power from the CO2 shuttle carrier, its ability to be normally unmanned, and the equipment required for offshore loading of CO2.