PROJECT CASE STUDY:
Heathrow Airport
Application
An airport provides real challenges for any contractor due
to the nature of the building and its safety & security
demands.
Therefore when the health focused fast food operator Leon
looked to open their new Heathrow restaurant they required an
experienced construction and technical team that could deal
with the specific demands of working within an airport
environment.
Lead catering contractor Vision relied on Green Cooling to
deliver a cold room system which would be provided on a
design, specification and installation basis but importantly
would be completed within the tight time constraints of the fast
track project.
Project Manager Scott Pilkington of Green Cooling commented,
“Our project engineers are used to operating within sites that
require real adherence to safety procedures”, continuing, “our
project control systems reflect the demands of sites such as
Heathrow and these systems allow our site procedures to
overlap with those of our client which consequently reduces the
opportunity for delays and importantly increases project
efficiency & safety”.
Equipment & Services
Provided
• Design, Specification, Project management & Installation
• 1 x GC-NEXGEN water cooled packaged refrigeration
system
• 1x GC NEXGEN PIR cold room package (MT)
• Dual glazed argon filled feature viewing glass
PROJECT SUMMARY
Projects of this nature require close control and
planning which reflects the unique demands of an
airport or similar site. The combination of design to
completion project management and adherence to
systems allows Green Cooling to approach a project
of this nature with confidence.
Experience and technical ability enabled this project
to be delivered on time and on budget to the
satisfaction of all involved.
Image courtesy of markhillary
CASE STUDY
For more information call: 01253 685145 email: sales@greencooling.co.uk visit: www.greencooling.co.uk

More Related Content

Similar to GC - Heathrow Airport

Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
Nitin Sethi
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
Austin Antony
 
Autodesk CFD for better building design by ZHU ge
Autodesk CFD for better building design by ZHU geAutodesk CFD for better building design by ZHU ge
Autodesk CFD for better building design by ZHU ge
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
Paul Warrington
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013
ogonzalez1997
 

Similar to GC - Heathrow Airport (20)

amr lashen
amr lashenamr lashen
amr lashen
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
Hatem El-Gohary C.V
Hatem El-Gohary C.VHatem El-Gohary C.V
Hatem El-Gohary C.V
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
PIC Brochure 101615
PIC Brochure 101615PIC Brochure 101615
PIC Brochure 101615
 
Cv ahmad harith.
Cv   ahmad harith.Cv   ahmad harith.
Cv ahmad harith.
 
Inforln.com ERP LN 10.3 & 10.4 Project Peg Audit History Differences
Inforln.com ERP LN 10.3 & 10.4 Project Peg Audit History DifferencesInforln.com ERP LN 10.3 & 10.4 Project Peg Audit History Differences
Inforln.com ERP LN 10.3 & 10.4 Project Peg Audit History Differences
 
Autodesk CFD for better building design by ZHU ge
Autodesk CFD for better building design by ZHU geAutodesk CFD for better building design by ZHU ge
Autodesk CFD for better building design by ZHU ge
 
1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report1-2 Broadgate Final Project Report
1-2 Broadgate Final Project Report
 
Portfolio
PortfolioPortfolio
Portfolio
 
Motion Compensation Brochure
Motion Compensation BrochureMotion Compensation Brochure
Motion Compensation Brochure
 
CURRICULUM
CURRICULUMCURRICULUM
CURRICULUM
 
The Drone Brothers Playbook
The Drone Brothers PlaybookThe Drone Brothers Playbook
The Drone Brothers Playbook
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Infotech oiland gas brochure 13
Infotech oiland gas brochure 13Infotech oiland gas brochure 13
Infotech oiland gas brochure 13
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013
 
An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.An Introduction to Dione Oil Ltd.
An Introduction to Dione Oil Ltd.
 

GC - Heathrow Airport

  • 1. PROJECT CASE STUDY: Heathrow Airport Application An airport provides real challenges for any contractor due to the nature of the building and its safety & security demands. Therefore when the health focused fast food operator Leon looked to open their new Heathrow restaurant they required an experienced construction and technical team that could deal with the specific demands of working within an airport environment. Lead catering contractor Vision relied on Green Cooling to deliver a cold room system which would be provided on a design, specification and installation basis but importantly would be completed within the tight time constraints of the fast track project. Project Manager Scott Pilkington of Green Cooling commented, “Our project engineers are used to operating within sites that require real adherence to safety procedures”, continuing, “our project control systems reflect the demands of sites such as Heathrow and these systems allow our site procedures to overlap with those of our client which consequently reduces the opportunity for delays and importantly increases project efficiency & safety”. Equipment & Services Provided • Design, Specification, Project management & Installation • 1 x GC-NEXGEN water cooled packaged refrigeration system • 1x GC NEXGEN PIR cold room package (MT) • Dual glazed argon filled feature viewing glass PROJECT SUMMARY Projects of this nature require close control and planning which reflects the unique demands of an airport or similar site. The combination of design to completion project management and adherence to systems allows Green Cooling to approach a project of this nature with confidence. Experience and technical ability enabled this project to be delivered on time and on budget to the satisfaction of all involved. Image courtesy of markhillary CASE STUDY For more information call: 01253 685145 email: sales@greencooling.co.uk visit: www.greencooling.co.uk