FUEL SUPPLY AGREEMENT
-ANKUR KUMAR (17)
-ANKUR SINGH CHAUDHARY (18)
Objective of the presentation
The new coal distribution policy has replaced the linkage system with the Fuel
Supply Agreement. Accordingly the category of consumers and the mode of
purchase of coal by each of these consumers have been redefined.
Coal based generation dominates the total installed capacity of India and hence
a robust FSA is a must to ensure the progress of generation segment.
However in the recent times the supply shock of indigenous coal has led to an
increased dependence on imported coal which in turn has given cost shock to
the developers.
The presentation throws a light on the changed policies on coal distribution,
associated problems of the coal sector and measures to overcome them.
Flow Of Presentation
• Definition
• Characteristics
Fuel Supply Agreement
• Policy of FSA
• Customer category & procedure of purchase
Purchase of coal
• Installed Capacity & generation mix
• Electricity generation & annual growth rate
Indian Power Sector Overview
• Supply & cost shock
Issues with Indian Coal Sector
• Build CIL’s coal import capability
• Increase power tariffs to make imported coal affordable
• Enhance domestic coal production
Measures to overcome the issues
Fuel supply agreement
Definition
• FSA stands for Fuel supply Agreement. As per new Coal
Distribution Policy(NCDP) Coal supplies are governed by
Legally enforceable agreements between the seller (coal
companies) and the consumer under specific terms and
conditions.
• Various model FSAs for different categories of consumer have
been placed in the website
Characteristics of fuel supply
 Criteria:
FSAs will be signed with power plants that have entered long
term power purchase agreements (PPAs) with distribution
companies
 Duration:
The FSAs will be signed for a period of 20 years and will be
reviewed after every five years.
 Commitment and penalties:
The FSAs will be signed with 80 per cent of assured contracted
quantity (ACQ) of the committed coal supply.
In the event of supply falling short of 80 per cent, CIL has to pay
a penalty at 0.01 per cent of the value of the shortfall quantity.
Further, this penalty clause is said to be applicable only after
three years of signing the contract; this means that for the first
three years, CIL will not be obliged to supply the contracted
quantity.
 Coal import:
If CIL cannot meet demand through domestic supplies, it can meet the
shortfall through imported coal.
If the buyer agrees to accept the imported coal, CIL will import coal for
power companies and supply it at the unload port on a cost-plus basis,
including service charges.
Thus, CIL would not be responsible for the transportation of imported
coal from the port to the project site.
Additionally, if a customer does not accept imported coal, CIL would
not be liable to pay any penalties.
Force majeure clause:
The new FSAs - along with existing force majeure events such as
natural calamities, strikes and mine fires - includes additional
force majeure circumstances to cover the risks arising from third
parties.
Additional conditions include the global shortage of imported
coal, lack of response to enquiries, the breakdown of equipment,
delays by contractors, power shortages, and obstruction in the
transportation of coal, from pithead to sidings, by agitations/mob-
violence/riots.
Purchase of coal
Policy of FSA
• As per the ‘New Coal Distribution Policy’ approved on 18th
October, 2007 by the GOI.
• Does away with the existing classification of consumer as Core
& Non-core. Instead it treats each sector/consumers on merit.
• Replaces linkage system:
 Existing consumers under the linkage system during the year 2006-
07 with requirement 4200 tones or more would have to enter FSAs
with coal companies not later than six months from a date to be
notified by CIL.
 Other valid linked consumers will have the option to opt out of FSA
regime and enter into FSA within six months. On opting out, they
may access their coal requirement through various channels like e-
auction, distribution network of state nominated agencies etc.
 Failure to enter into FSA will result in discontinuation of supplies at
fixed prices. All existing FSAs, as prevailing on the date of
introduction of this policy, will continue. However, they would need
to be modified in view of the provisions.
Nature of customer & procedure of purchase
• Supply of coal through legally enforceable Fuel Supply agreements (FSA).
• New consumer will have to approach existing Standing Linkage Committee(LT)
under Ministry of Coal for recommendation for issue of Letter of
Assurances(LOA) by Coal companies as per provision of NCDP (NEW COAL
DISTRIBUTION POLICY) and recommendation of Administrative Ministry .
• LOA is issued on furnishing Commitment Guarantee(CG) followed by execution
of FSA on fulfilment of LOA conditions in the stipulated period of time.
Power Utilities including Independent Power
Producers (IPPs) and Captive Power Plants (
CPPs), cement and sponge iron including Steel,
• Coal will be supplied by coal companies through FSA.
Fertilizer
• As per government order
Defence
• Customers to get coal under FSA through Letter of Assurance (LOA) route as per
laid down procedure.
Customers belonging to sectors other than what has been
mentioned above (requiring coal beyond 4200 MTPA)
• Such consumers may buy coal from the state nominated agencies. Such nominated
agencies get coal through FSA with the coal supplying companies
Customers having requirement of coal less than and up to
4200 MTPA
• Coal can be purchased only through Spot E-Auction- Scheme
Trader
Indian power sector overview
Installed capacity & generation mix
Nuclear
2%
Hydro
17%
RES
12%
Coal
59%
Gas
9%
Diesel
1%
Thermal
69%
Source: CEA
Source Capacity
(GW)
Hydro 40.20
Nuclear 4.78
RES 29.46
Coal 140.72
Gas 21.38
Diesel 1.2
Total 237.74
Clearly coal as a source of fuel dominates and makes it imperative for a robust supply of fuel
Electricity generation & annual growth rate
723.8 771.6 811.1 876.9 912.1 231.5
2.7
6.6
5.6
8.1
4.01
2.84
0
1
2
3
4
5
6
7
8
9
0
100
200
300
400
500
600
700
800
900
1000
(%)
Energy (BU) Growth (%)• The electricity generation target for
the year 2013-2014 was fixed as 975
Billion Unit (BU). i.e. growth of
around 6.9% over actual generation of
912.056 for the previous year (2012-
2013). The generation during April-
June, 2013 was 238.66 BU as
compared to 231.497 BU generated
during April-March 2013, representing
a growth of about 2.84%.
• The electricity generation target for
the year 2012-13 has been fixed at 930
BU comprising of 767.275 BU
thermal; 122.045 BU hydro; 35.200
nuclear; and 5.480 BU import from
Bhutan
Source: MoP
Supply & cost shock
2008
-09
2009
-10
2010
-11
2011
-12
2012
-13
Demand-
Supply gap
17 14 88 93 113
0
20
40
60
80
100
120
MT
Demand-Supply gap
60.88
75.6
70.4
105.21
140.63
0
20
40
60
80
100
120
140
160
Coking Coal
Non-Coking
Coke
Total
Source: Ministry of coal
Measures to overcome the issue
Build CIL’s coal import capability
• CIL is primarily a producer and has little experience in
importing large quantities of coal. Yet, given the growing
dependence on imported coal, CIL need to build its import
capabilities.
• Initially, CIL could import coal with the help of the MMTC and
STC and gradually develop the capability and infrastructure
(logistics) to import large volumes of coal.
• To increase imported coal acceptability, CIL could consider the
price-pooling of imported coal with domestic coal and supply
coal to power companies at an average price. This could help
lower the cost disparity among power producers. However, for
this mechanism to be efficient, the pooled price should be
available to only those power plants that have coal linkages
with CIL and are not based on imported coal.
Increase power tariffs to make imported coal affordable
• There is a need to increase power tariffs for the end consumer
to make imported coal-based power plants economically
viable.
• Further, the government should address the issues of power
plants that are stuck with low price PPAs and their fuel cost
has increased considerably due to regulatory changes in coal
exporting countries such as Indonesia and Australia.
• To protect these developers, the government could allow at
least a partial ‘pass-through' of fuel costs for projects awarded
under tariff-based competitive bidding. This would increase
end-consumer prices but help in avoiding stranded capacities
and is necessary to retain private players’ interest in the power
sector
Enhance domestic coal production
• To increase productivity from existing fields, it is important to
deploy the latest technology and professional assistance.
• Further, there is need to accelerate the process of land
acquisition and environmental clearances, to increase the total
area under exploration.
• Further, the government could adapt the NELP model (used
for oil and gas blocks bidding) and allow global mining majors
to participate instead of limiting the bidding to only end users
(such as steel, cement and power plants).This route, along
with much needed investment, can be expected to bring global
technology and capabilities to the Indian mining sector.
Reference:
• www.coal.nic.in
• www.cea.nic.in
• www.planningcommission.nic.in
• www.powermin.nic.in
• KPMG report: Coal India’s fuel supply agreement

More Related Content

What's hot

Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in India
Indian Energy Sector
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
IPPAI
 
Sugar industry in india
Sugar industry in indiaSugar industry in india
Sugar industry in indiaRajendran K
 
Indian Energy Sector
Indian Energy SectorIndian Energy Sector
Indian Energy Sector
Pinaki Bhadury
 
Indian oil industry
Indian oil industryIndian oil industry
Indian oil industry
B M CHANDRA SHEKAR
 
Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...
Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...
Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...
Saurabh Tripathi
 
COAL INDIA
COAL INDIA COAL INDIA
COAL INDIA
Akash Gupta
 
Electricity Trading in India
Electricity Trading in IndiaElectricity Trading in India
Electricity Trading in India
Nitin Virmani
 
coal reserves
coal reservescoal reserves
Oil & gas industry in india
Oil & gas industry in indiaOil & gas industry in india
Oil & gas industry in india
suyash gunjal
 
Review of Indian coal sector
Review of Indian coal sectorReview of Indian coal sector
Review of Indian coal sector
Manoj Jhawar
 
Logistics and supply chain of IOC & ONGC
Logistics and supply chain of IOC & ONGCLogistics and supply chain of IOC & ONGC
Logistics and supply chain of IOC & ONGC
Tony Sebastian
 
Foreign Trade Policy 2009 14
Foreign Trade Policy 2009 14Foreign Trade Policy 2009 14
Foreign Trade Policy 2009 14
Jagmohan Dobal
 
Energy (Coal Reserves of Pakistan)
Energy (Coal Reserves of Pakistan)Energy (Coal Reserves of Pakistan)
Energy (Coal Reserves of Pakistan)
sehrish628
 
Coal (black diamond)
Coal (black diamond)Coal (black diamond)
Coal (black diamond)
srq09
 

What's hot (20)

Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in India
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
 
Inflation in india
Inflation in indiaInflation in india
Inflation in india
 
Sugar industry in india
Sugar industry in indiaSugar industry in india
Sugar industry in india
 
Coal sector presentation
Coal sector presentationCoal sector presentation
Coal sector presentation
 
Indian Energy Sector
Indian Energy SectorIndian Energy Sector
Indian Energy Sector
 
Coal industry
Coal industryCoal industry
Coal industry
 
Indian oil industry
Indian oil industryIndian oil industry
Indian oil industry
 
Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...
Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...
Northern Coalfields Limited Training report on Heavy Earth Moving And Mining ...
 
COAL INDIA
COAL INDIA COAL INDIA
COAL INDIA
 
Electricity Trading in India
Electricity Trading in IndiaElectricity Trading in India
Electricity Trading in India
 
coal reserves
coal reservescoal reserves
coal reserves
 
Oil & gas industry in india
Oil & gas industry in indiaOil & gas industry in india
Oil & gas industry in india
 
Review of Indian coal sector
Review of Indian coal sectorReview of Indian coal sector
Review of Indian coal sector
 
Coal Sector Evolution in India
Coal Sector Evolution in IndiaCoal Sector Evolution in India
Coal Sector Evolution in India
 
Logistics and supply chain of IOC & ONGC
Logistics and supply chain of IOC & ONGCLogistics and supply chain of IOC & ONGC
Logistics and supply chain of IOC & ONGC
 
Foreign Trade Policy 2009 14
Foreign Trade Policy 2009 14Foreign Trade Policy 2009 14
Foreign Trade Policy 2009 14
 
Energy (Coal Reserves of Pakistan)
Energy (Coal Reserves of Pakistan)Energy (Coal Reserves of Pakistan)
Energy (Coal Reserves of Pakistan)
 
Coal (black diamond)
Coal (black diamond)Coal (black diamond)
Coal (black diamond)
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 

Similar to Fuel supply agreement

Managing fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaManaging fuel supply & uncertainty in India
Managing fuel supply & uncertainty in India
IPPAI
 
Day2: Fuel supply issues ppt sunil wadhwa
Day2: Fuel supply issues ppt   sunil wadhwaDay2: Fuel supply issues ppt   sunil wadhwa
Day2: Fuel supply issues ppt sunil wadhwa
IPPAI
 
Gas Distribution Reccomendations Pakistan
Gas Distribution Reccomendations PakistanGas Distribution Reccomendations Pakistan
Gas Distribution Reccomendations Pakistan
ssusere8e6a3
 
UK Energy Review 2013
UK Energy Review 2013UK Energy Review 2013
UK Energy Review 2013
Latif Faiyaz
 
Gas Pooling & New Urea Policy 2015 - June 2015
Gas Pooling & New Urea Policy 2015 - June 2015Gas Pooling & New Urea Policy 2015 - June 2015
Gas Pooling & New Urea Policy 2015 - June 2015Pranav Awasthi, CFA
 
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Resurgent India
 
Business Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year OnBusiness Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year On
EMEX
 
pmicg-jp.pdf
pmicg-jp.pdfpmicg-jp.pdf
pmicg-jp.pdf
ssuserda3dcb1
 
National energy policy ppt
National energy policy pptNational energy policy ppt
National energy policy ppt
ghildiyal8811
 
Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...
Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...
Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...
UK Energy Research Centre (UKERC)
 
Captive Power Plants
Captive Power PlantsCaptive Power Plants
Captive Power Plants
Koos Smit
 
Coal Block Auction- A Boon for Consumer or Just a Boom
Coal Block Auction- A Boon for Consumer or Just a BoomCoal Block Auction- A Boon for Consumer or Just a Boom
Coal Block Auction- A Boon for Consumer or Just a BoomSoumya Ranjan Parida
 
brief policies.pptx
brief policies.pptxbrief policies.pptx
brief policies.pptx
ssuser9f2ad7
 
Rpcon s105 the carbon tax impact on the retail industry - peter ramsay.ppt
Rpcon s105   the carbon tax impact on the retail industry - peter ramsay.pptRpcon s105   the carbon tax impact on the retail industry - peter ramsay.ppt
Rpcon s105 the carbon tax impact on the retail industry - peter ramsay.pptpcmrevents
 
Satyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfSatyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdf
BhawnaRighteous
 
SVCE Initiation of Coverage
SVCE Initiation of CoverageSVCE Initiation of Coverage
SVCE Initiation of Coverage
Mohab Yamany, CMA
 
Coal in india 2015
Coal in india 2015Coal in india 2015
Coal in india 2015
Angel Dass
 
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Ashish Singla
 
4 city-gas-distribution
4 city-gas-distribution4 city-gas-distribution
4 city-gas-distribution
Hiren Patel
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyank
PRIYANK JAIN
 

Similar to Fuel supply agreement (20)

Managing fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaManaging fuel supply & uncertainty in India
Managing fuel supply & uncertainty in India
 
Day2: Fuel supply issues ppt sunil wadhwa
Day2: Fuel supply issues ppt   sunil wadhwaDay2: Fuel supply issues ppt   sunil wadhwa
Day2: Fuel supply issues ppt sunil wadhwa
 
Gas Distribution Reccomendations Pakistan
Gas Distribution Reccomendations PakistanGas Distribution Reccomendations Pakistan
Gas Distribution Reccomendations Pakistan
 
UK Energy Review 2013
UK Energy Review 2013UK Energy Review 2013
UK Energy Review 2013
 
Gas Pooling & New Urea Policy 2015 - June 2015
Gas Pooling & New Urea Policy 2015 - June 2015Gas Pooling & New Urea Policy 2015 - June 2015
Gas Pooling & New Urea Policy 2015 - June 2015
 
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
Affordable 24x7 Power To All @2019 - Key Strategies for Achieving Programme O...
 
Business Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year OnBusiness Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year On
 
pmicg-jp.pdf
pmicg-jp.pdfpmicg-jp.pdf
pmicg-jp.pdf
 
National energy policy ppt
National energy policy pptNational energy policy ppt
National energy policy ppt
 
Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...
Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...
Bringing new energy to Britain: Policies, pathways and challenges - Steven Fr...
 
Captive Power Plants
Captive Power PlantsCaptive Power Plants
Captive Power Plants
 
Coal Block Auction- A Boon for Consumer or Just a Boom
Coal Block Auction- A Boon for Consumer or Just a BoomCoal Block Auction- A Boon for Consumer or Just a Boom
Coal Block Auction- A Boon for Consumer or Just a Boom
 
brief policies.pptx
brief policies.pptxbrief policies.pptx
brief policies.pptx
 
Rpcon s105 the carbon tax impact on the retail industry - peter ramsay.ppt
Rpcon s105   the carbon tax impact on the retail industry - peter ramsay.pptRpcon s105   the carbon tax impact on the retail industry - peter ramsay.ppt
Rpcon s105 the carbon tax impact on the retail industry - peter ramsay.ppt
 
Satyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfSatyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdf
 
SVCE Initiation of Coverage
SVCE Initiation of CoverageSVCE Initiation of Coverage
SVCE Initiation of Coverage
 
Coal in india 2015
Coal in india 2015Coal in india 2015
Coal in india 2015
 
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
 
4 city-gas-distribution
4 city-gas-distribution4 city-gas-distribution
4 city-gas-distribution
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyank
 

Recently uploaded

Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 

Recently uploaded (20)

Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 

Fuel supply agreement

  • 1. FUEL SUPPLY AGREEMENT -ANKUR KUMAR (17) -ANKUR SINGH CHAUDHARY (18)
  • 2. Objective of the presentation The new coal distribution policy has replaced the linkage system with the Fuel Supply Agreement. Accordingly the category of consumers and the mode of purchase of coal by each of these consumers have been redefined. Coal based generation dominates the total installed capacity of India and hence a robust FSA is a must to ensure the progress of generation segment. However in the recent times the supply shock of indigenous coal has led to an increased dependence on imported coal which in turn has given cost shock to the developers. The presentation throws a light on the changed policies on coal distribution, associated problems of the coal sector and measures to overcome them.
  • 3. Flow Of Presentation • Definition • Characteristics Fuel Supply Agreement • Policy of FSA • Customer category & procedure of purchase Purchase of coal • Installed Capacity & generation mix • Electricity generation & annual growth rate Indian Power Sector Overview • Supply & cost shock Issues with Indian Coal Sector • Build CIL’s coal import capability • Increase power tariffs to make imported coal affordable • Enhance domestic coal production Measures to overcome the issues
  • 5. Definition • FSA stands for Fuel supply Agreement. As per new Coal Distribution Policy(NCDP) Coal supplies are governed by Legally enforceable agreements between the seller (coal companies) and the consumer under specific terms and conditions. • Various model FSAs for different categories of consumer have been placed in the website
  • 6. Characteristics of fuel supply  Criteria: FSAs will be signed with power plants that have entered long term power purchase agreements (PPAs) with distribution companies  Duration: The FSAs will be signed for a period of 20 years and will be reviewed after every five years.
  • 7.  Commitment and penalties: The FSAs will be signed with 80 per cent of assured contracted quantity (ACQ) of the committed coal supply. In the event of supply falling short of 80 per cent, CIL has to pay a penalty at 0.01 per cent of the value of the shortfall quantity. Further, this penalty clause is said to be applicable only after three years of signing the contract; this means that for the first three years, CIL will not be obliged to supply the contracted quantity.
  • 8.  Coal import: If CIL cannot meet demand through domestic supplies, it can meet the shortfall through imported coal. If the buyer agrees to accept the imported coal, CIL will import coal for power companies and supply it at the unload port on a cost-plus basis, including service charges. Thus, CIL would not be responsible for the transportation of imported coal from the port to the project site. Additionally, if a customer does not accept imported coal, CIL would not be liable to pay any penalties.
  • 9. Force majeure clause: The new FSAs - along with existing force majeure events such as natural calamities, strikes and mine fires - includes additional force majeure circumstances to cover the risks arising from third parties. Additional conditions include the global shortage of imported coal, lack of response to enquiries, the breakdown of equipment, delays by contractors, power shortages, and obstruction in the transportation of coal, from pithead to sidings, by agitations/mob- violence/riots.
  • 11. Policy of FSA • As per the ‘New Coal Distribution Policy’ approved on 18th October, 2007 by the GOI. • Does away with the existing classification of consumer as Core & Non-core. Instead it treats each sector/consumers on merit.
  • 12. • Replaces linkage system:  Existing consumers under the linkage system during the year 2006- 07 with requirement 4200 tones or more would have to enter FSAs with coal companies not later than six months from a date to be notified by CIL.  Other valid linked consumers will have the option to opt out of FSA regime and enter into FSA within six months. On opting out, they may access their coal requirement through various channels like e- auction, distribution network of state nominated agencies etc.  Failure to enter into FSA will result in discontinuation of supplies at fixed prices. All existing FSAs, as prevailing on the date of introduction of this policy, will continue. However, they would need to be modified in view of the provisions.
  • 13. Nature of customer & procedure of purchase • Supply of coal through legally enforceable Fuel Supply agreements (FSA). • New consumer will have to approach existing Standing Linkage Committee(LT) under Ministry of Coal for recommendation for issue of Letter of Assurances(LOA) by Coal companies as per provision of NCDP (NEW COAL DISTRIBUTION POLICY) and recommendation of Administrative Ministry . • LOA is issued on furnishing Commitment Guarantee(CG) followed by execution of FSA on fulfilment of LOA conditions in the stipulated period of time. Power Utilities including Independent Power Producers (IPPs) and Captive Power Plants ( CPPs), cement and sponge iron including Steel, • Coal will be supplied by coal companies through FSA. Fertilizer
  • 14. • As per government order Defence • Customers to get coal under FSA through Letter of Assurance (LOA) route as per laid down procedure. Customers belonging to sectors other than what has been mentioned above (requiring coal beyond 4200 MTPA) • Such consumers may buy coal from the state nominated agencies. Such nominated agencies get coal through FSA with the coal supplying companies Customers having requirement of coal less than and up to 4200 MTPA • Coal can be purchased only through Spot E-Auction- Scheme Trader
  • 16. Installed capacity & generation mix Nuclear 2% Hydro 17% RES 12% Coal 59% Gas 9% Diesel 1% Thermal 69% Source: CEA Source Capacity (GW) Hydro 40.20 Nuclear 4.78 RES 29.46 Coal 140.72 Gas 21.38 Diesel 1.2 Total 237.74 Clearly coal as a source of fuel dominates and makes it imperative for a robust supply of fuel
  • 17. Electricity generation & annual growth rate 723.8 771.6 811.1 876.9 912.1 231.5 2.7 6.6 5.6 8.1 4.01 2.84 0 1 2 3 4 5 6 7 8 9 0 100 200 300 400 500 600 700 800 900 1000 (%) Energy (BU) Growth (%)• The electricity generation target for the year 2013-2014 was fixed as 975 Billion Unit (BU). i.e. growth of around 6.9% over actual generation of 912.056 for the previous year (2012- 2013). The generation during April- June, 2013 was 238.66 BU as compared to 231.497 BU generated during April-March 2013, representing a growth of about 2.84%. • The electricity generation target for the year 2012-13 has been fixed at 930 BU comprising of 767.275 BU thermal; 122.045 BU hydro; 35.200 nuclear; and 5.480 BU import from Bhutan Source: MoP
  • 18. Supply & cost shock 2008 -09 2009 -10 2010 -11 2011 -12 2012 -13 Demand- Supply gap 17 14 88 93 113 0 20 40 60 80 100 120 MT Demand-Supply gap 60.88 75.6 70.4 105.21 140.63 0 20 40 60 80 100 120 140 160 Coking Coal Non-Coking Coke Total Source: Ministry of coal
  • 19. Measures to overcome the issue
  • 20. Build CIL’s coal import capability • CIL is primarily a producer and has little experience in importing large quantities of coal. Yet, given the growing dependence on imported coal, CIL need to build its import capabilities. • Initially, CIL could import coal with the help of the MMTC and STC and gradually develop the capability and infrastructure (logistics) to import large volumes of coal. • To increase imported coal acceptability, CIL could consider the price-pooling of imported coal with domestic coal and supply coal to power companies at an average price. This could help lower the cost disparity among power producers. However, for this mechanism to be efficient, the pooled price should be available to only those power plants that have coal linkages with CIL and are not based on imported coal.
  • 21. Increase power tariffs to make imported coal affordable • There is a need to increase power tariffs for the end consumer to make imported coal-based power plants economically viable. • Further, the government should address the issues of power plants that are stuck with low price PPAs and their fuel cost has increased considerably due to regulatory changes in coal exporting countries such as Indonesia and Australia. • To protect these developers, the government could allow at least a partial ‘pass-through' of fuel costs for projects awarded under tariff-based competitive bidding. This would increase end-consumer prices but help in avoiding stranded capacities and is necessary to retain private players’ interest in the power sector
  • 22. Enhance domestic coal production • To increase productivity from existing fields, it is important to deploy the latest technology and professional assistance. • Further, there is need to accelerate the process of land acquisition and environmental clearances, to increase the total area under exploration. • Further, the government could adapt the NELP model (used for oil and gas blocks bidding) and allow global mining majors to participate instead of limiting the bidding to only end users (such as steel, cement and power plants).This route, along with much needed investment, can be expected to bring global technology and capabilities to the Indian mining sector.
  • 23. Reference: • www.coal.nic.in • www.cea.nic.in • www.planningcommission.nic.in • www.powermin.nic.in • KPMG report: Coal India’s fuel supply agreement