The soil investigation report found that the soil conditions at the construction site were suitable for building foundations. Test pits dug on the property revealed soil consisting of silty clay and gravel down to a depth of 5 meters, with the water table located 6 meters below ground surface. No issues were identified that would prevent standard foundation designs from being used at the planned building locations.