Bahgwan Mahavir College of Management

                              MBA Programme (year 2012-13)
Outline of Project Report to be submitted:

1.0                          Introduction
1.1                          About Subject and Topic in brief
1.2                          About the Organization in brief
1.3                          Importance of Topic in Project Context
2.0                          Pedagogical tool of Methodology
2.1                          Method of Study
3.0                          Conceptual framework (summery of theoretical aspects of module/topic)
3.1                          Information gathered from the Organization
3.2                          Comparison between theory and study done in Organization
3.3                          Any recommendation or suggestion/Conclusion
Appendix - I                 List of People you have met/interacted with contact details like phone
                             num and/or Email Ids
Appendix - II                Reference of books, websites you have used in your assignments


Task: Make PPT and an Executive summery to presentation give in the class.

Format of project report

  • 1.
    Bahgwan Mahavir Collegeof Management MBA Programme (year 2012-13) Outline of Project Report to be submitted: 1.0 Introduction 1.1 About Subject and Topic in brief 1.2 About the Organization in brief 1.3 Importance of Topic in Project Context 2.0 Pedagogical tool of Methodology 2.1 Method of Study 3.0 Conceptual framework (summery of theoretical aspects of module/topic) 3.1 Information gathered from the Organization 3.2 Comparison between theory and study done in Organization 3.3 Any recommendation or suggestion/Conclusion Appendix - I List of People you have met/interacted with contact details like phone num and/or Email Ids Appendix - II Reference of books, websites you have used in your assignments Task: Make PPT and an Executive summery to presentation give in the class.