How to Assess Your Reliability Program
“How do you know so much about our program?” was a
question the quality manager asked after reading the
assessment report. The assessment took one day with
eight interviews.
The reliability that results is going to happen whether or
not the team designing the product or production line
deliberately use reliability engineering tools or not. The
elements of a product or system will respond to the
environment and either work or fail.
While working at Hewlett-Packard I had the opportunity
to conduct reliability program assessment of about 50
product divisions. One hypothesis related the number of
reliability tasks the team actively used would correlate to
their warranty expenses.
That worked to a point.
The teams that did not understand basic tools and did no
overt or organized reliability engineering had high
warranty expenses (as percent of revenue). The teams
that did a large number of tasks (FMEA, HALT, ALT,
Predictions, etc.) did have lower warranty expenses.
The surprise was the teams that had the lowest warranty
expenses also did very few reliability activities. The
difference was the best performing teams understood
the range of available reliability engineering activities
and only used the tools that would provide value for a
given circumstance.
Less mature organization would attempt to do as many
reliability related activities including a long list of product
tests of which many provided little actual value. It was
the application of the right tool at the right time that made the difference.
Maturity and Activity
Hiring a reliability engineer or running a lot of life tests does not improve your product’s reliability performance. It is
not the organization or activities that you call a reliability program, rather your reliability performance relates to the
culture concerning reliability.
Reliability occurs at the point of decision. Therefore, during interviews the intent is to understand how decisions are
currently accomplished. To what extent does reliability considerations influence decisions and what tools or methods
are used to form decisions.
For example, if we ask, “To what extent do you do HALT?” (HALT being Highly Accelerated Life Testing). In two
circumstance the answer may be, “We rarely use HALT.”
In one case, it may be the engineer doesn’t know what HALT is and isn’t sure if the testing they accomplish is similar
to HALT or not. Or, they don’t do HALT as they are unfamiliar with that type of testing.
In another case, the engineer knows about HALT, how and why it is used. Then says they have rarely used HALT
because they have not had appropriate situations to do HALT. They understand that it is a useful tool for specific
applications and recently have not needed to conduct HALT.
Some respond that they do HALT. Again there are two common responses. In one case the team does HALT all the
time because it is required, independent of whether it may be useful or not. In the other case, they do HALT as it is
the right tool for the current situation.
One team didn’t know what HALT was and the other fully understood and choose to not do HALT. The difference is
the understanding and application, or maturity.
Assessment Process
To understand how an organization’s reliability maturity, use the following assessment process.
1. Select survey topics. This is a list of activities and tools common to reliability practices in your industry. It may
include items rarely used. It should include the breadth of topics related to reliability in your field. See the DFR
Methods Survey for one possible list of topics.
Some topics are broad, such as on ownership/responsibility of product reliability, or reactive or proactive approach of
management. Some topics are very specific, such as specific tools like FMEA or HALT.
2. Establish the interview format. One to one, small group, via phone, invited survey with follow up conversations,
or some other method. I have found the one-to-one discussions the most useful as it permits immediate follow up and
exploration of the rationale or motivation behind specific behaviors or responses.
3. Conduct the interviews (collect information). Arrange to interview or survey a cross section of people in the
organization. Select individuals with experience with the organization and products are typically designed and
manufactured. My recommended list of position titles comprises:
Design & development engineers (electrical, mechanical, software)
Design& development managers (electrical, mechanical, software)
Reliability or Quality engineers and/or managers
Procurement engineering (someone that works with suppliers)
Manufacturing engineering and/or managers (design for manufacturing, sustaining and/or production
engineering)
Select about 8 individuals for interviews, more or less depending on the specific situation, size, complexity, etc of the
program.
In general the interview question is based on the phrase, ’to what extent’. For example, you might ask, “To what
extent do you use HALT?” Depending on the response you may explore the motivations or rationale behind the
decision both to conduct HALT, and how the HALT results are used within the organization.
4. Document the business environment – volume, cost, brand position, revenue, cost of unreliability as percent of
net revenue, etc. Document any regulatory or customer imposed restrictions or requirements. Summarize to convey
the atmosphere around the reliability program.
5. Document the collected information. A summary back to participant asking for additional input or corrections
helps with the acceptance of the assessment results, plus may help avoid a mistake in your understanding.
6. Analyze the data. This is not done during the interviews – let them talk. Review the notes and information
provided and map to the maturity matrix. Look for consistent approaches to making reliability related decisions. Look
for patterns of behavior and underlaying motivations or causes.
7. Report on assessment findings. Document and explain what you heard and how it related to the overall
organization’s maturity. The report my include the interview summary, strengths, weaknesses, and recommendations
for improvement.
Summary
The assessment process should provide a view of the overall organization’s approach to making decisions and to
what extent and how their reliability program influences those decisions. With that basic understanding you can
identify strengths to build upon, weaknesses that need attention, and recommendations to improve the maturity of the
reliability program.

More Related Content

What's hot

Successful EHR / EMR Implementations
Successful EHR / EMR ImplementationsSuccessful EHR / EMR Implementations
Successful EHR / EMR ImplementationsQualifacts
 
Decisiontechniques Mgt350
Decisiontechniques Mgt350Decisiontechniques Mgt350
Decisiontechniques Mgt350rscalmo
 
Home health software selection guide 2010
Home health software selection guide 2010Home health software selection guide 2010
Home health software selection guide 2010carolrn2
 
Projects on performance appraisal
Projects on performance appraisalProjects on performance appraisal
Projects on performance appraisalcoxdennis362
 
Escape Analysis Paralysis
Escape Analysis ParalysisEscape Analysis Paralysis
Escape Analysis Paralysiscssa
 
How to Measure the Relevance and Accuracy of OHS Information
How to Measure the Relevance and Accuracy of OHS InformationHow to Measure the Relevance and Accuracy of OHS Information
How to Measure the Relevance and Accuracy of OHS Informationdanieljohn810
 
Endoscopy nurse kpi
Endoscopy nurse kpiEndoscopy nurse kpi
Endoscopy nurse kpijomforew
 
Performance appraisal thesis
Performance appraisal thesisPerformance appraisal thesis
Performance appraisal thesisalexbaker881
 
Performance appraisal model
Performance appraisal modelPerformance appraisal model
Performance appraisal modelalexwalker024
 
Advice On IT Implementations
Advice On IT ImplementationsAdvice On IT Implementations
Advice On IT ImplementationsAlan Walsh
 
Nursing performance appraisal examples
Nursing performance appraisal examplesNursing performance appraisal examples
Nursing performance appraisal exampleszulmaweber
 
Performance Management - Herman Augnis
Performance Management - Herman Augnis Performance Management - Herman Augnis
Performance Management - Herman Augnis Preeti Bhaskar
 

What's hot (17)

Successful EHR / EMR Implementations
Successful EHR / EMR ImplementationsSuccessful EHR / EMR Implementations
Successful EHR / EMR Implementations
 
Decisiontechniques Mgt350
Decisiontechniques Mgt350Decisiontechniques Mgt350
Decisiontechniques Mgt350
 
Home health software selection guide 2010
Home health software selection guide 2010Home health software selection guide 2010
Home health software selection guide 2010
 
Dessler 06
Dessler 06Dessler 06
Dessler 06
 
Projects on performance appraisal
Projects on performance appraisalProjects on performance appraisal
Projects on performance appraisal
 
Escape Analysis Paralysis
Escape Analysis ParalysisEscape Analysis Paralysis
Escape Analysis Paralysis
 
Root Cause Analysis (orgz.info)
Root Cause Analysis (orgz.info)Root Cause Analysis (orgz.info)
Root Cause Analysis (orgz.info)
 
How to Measure the Relevance and Accuracy of OHS Information
How to Measure the Relevance and Accuracy of OHS InformationHow to Measure the Relevance and Accuracy of OHS Information
How to Measure the Relevance and Accuracy of OHS Information
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Root cause analysis training
Root cause analysis trainingRoot cause analysis training
Root cause analysis training
 
Endoscopy nurse kpi
Endoscopy nurse kpiEndoscopy nurse kpi
Endoscopy nurse kpi
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Performance appraisal thesis
Performance appraisal thesisPerformance appraisal thesis
Performance appraisal thesis
 
Performance appraisal model
Performance appraisal modelPerformance appraisal model
Performance appraisal model
 
Advice On IT Implementations
Advice On IT ImplementationsAdvice On IT Implementations
Advice On IT Implementations
 
Nursing performance appraisal examples
Nursing performance appraisal examplesNursing performance appraisal examples
Nursing performance appraisal examples
 
Performance Management - Herman Augnis
Performance Management - Herman Augnis Performance Management - Herman Augnis
Performance Management - Herman Augnis
 

Viewers also liked

Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Chad Broussard
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanAccendo Reliability
 
Integrating Reliability Engineering Concepts
Integrating Reliability Engineering ConceptsIntegrating Reliability Engineering Concepts
Integrating Reliability Engineering ConceptsDan DeGrendel
 
2011 RAMS Tutorial Effective Reliability Program Traits and Management
2011 RAMS Tutorial Effective Reliability Program Traits and Management2011 RAMS Tutorial Effective Reliability Program Traits and Management
2011 RAMS Tutorial Effective Reliability Program Traits and ManagementAccendo Reliability
 
Improving Supplier Reliability -15 June 2016 - Report
Improving Supplier Reliability -15 June 2016 - ReportImproving Supplier Reliability -15 June 2016 - Report
Improving Supplier Reliability -15 June 2016 - ReportLora Cecere
 
Investment in reliability program versus return – how to decide
Investment in reliability program versus return – how to decideInvestment in reliability program versus return – how to decide
Investment in reliability program versus return – how to decideAccendo Reliability
 
A Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFA Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFASQ Reliability Division
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)Mudassar Salman
 

Viewers also liked (16)

Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopRashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
 
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silvermanRAMS 2013 Calculating roi when implementing a dfr program by mike silverman
RAMS 2013 Calculating roi when implementing a dfr program by mike silverman
 
Integrating Reliability Engineering Concepts
Integrating Reliability Engineering ConceptsIntegrating Reliability Engineering Concepts
Integrating Reliability Engineering Concepts
 
2011 RAMS Tutorial Effective Reliability Program Traits and Management
2011 RAMS Tutorial Effective Reliability Program Traits and Management2011 RAMS Tutorial Effective Reliability Program Traits and Management
2011 RAMS Tutorial Effective Reliability Program Traits and Management
 
Chinese Suppliers Search & Reliability Analysis
Chinese Suppliers  Search & Reliability AnalysisChinese Suppliers  Search & Reliability Analysis
Chinese Suppliers Search & Reliability Analysis
 
Improving Supplier Reliability -15 June 2016 - Report
Improving Supplier Reliability -15 June 2016 - ReportImproving Supplier Reliability -15 June 2016 - Report
Improving Supplier Reliability -15 June 2016 - Report
 
Investment in reliability program versus return – how to decide
Investment in reliability program versus return – how to decideInvestment in reliability program versus return – how to decide
Investment in reliability program versus return – how to decide
 
Led failure mechanisms
Led failure mechanismsLed failure mechanisms
Led failure mechanisms
 
A Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFA Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTF
 
Thermodynamic Reliability
Thermodynamic  ReliabilityThermodynamic  Reliability
Thermodynamic Reliability
 
An introduction to weibull analysis
An introduction to weibull analysisAn introduction to weibull analysis
An introduction to weibull analysis
 
Apqp process flow
Apqp process flowApqp process flow
Apqp process flow
 
On Duty Cycle Concept in Reliability
On Duty Cycle Concept in ReliabilityOn Duty Cycle Concept in Reliability
On Duty Cycle Concept in Reliability
 
APQP
APQPAPQP
APQP
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 

Similar to How to Assess Your Reliability Program

Benchmarking Basic.pdf
Benchmarking Basic.pdfBenchmarking Basic.pdf
Benchmarking Basic.pdfR Borres
 
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docxalinainglis
 
OverviewConduct a health information technology needs assessment.docx
OverviewConduct a health information technology needs assessment.docxOverviewConduct a health information technology needs assessment.docx
OverviewConduct a health information technology needs assessment.docxjacksnathalie
 
John K Moore Org Alignment Article
John K Moore Org Alignment ArticleJohn K Moore Org Alignment Article
John K Moore Org Alignment ArticleJohn K. Moore
 
Running head IMPROVEMENT OPPORTUNITY .docx
Running head IMPROVEMENT OPPORTUNITY                             .docxRunning head IMPROVEMENT OPPORTUNITY                             .docx
Running head IMPROVEMENT OPPORTUNITY .docxwlynn1
 
360 degree performance evaluations
360 degree performance evaluations360 degree performance evaluations
360 degree performance evaluationsbalotelli456
 
ISE Webinar - 'Squaring the circle'
ISE Webinar - 'Squaring the circle'ISE Webinar - 'Squaring the circle'
ISE Webinar - 'Squaring the circle'Anima & Atman
 
Chapter 7 Management Concultancy by Cabrera
Chapter 7 Management Concultancy by CabreraChapter 7 Management Concultancy by Cabrera
Chapter 7 Management Concultancy by CabreraKriza Matro
 
Basic Guide to Program Evaluation (Including Outcomes Evaluation).docx
Basic Guide to Program Evaluation (Including Outcomes Evaluation).docxBasic Guide to Program Evaluation (Including Outcomes Evaluation).docx
Basic Guide to Program Evaluation (Including Outcomes Evaluation).docxJASS44
 
Change Management 2004
Change Management 2004Change Management 2004
Change Management 2004jim
 
Case StudyIn March 1994, Randal Schwartz was indicted on three f.docx
Case StudyIn March 1994, Randal Schwartz was indicted on three f.docxCase StudyIn March 1994, Randal Schwartz was indicted on three f.docx
Case StudyIn March 1994, Randal Schwartz was indicted on three f.docxwendolynhalbert
 
Chapter 11 Measurement Tools and Strategies© 2016 C
Chapter 11 Measurement Tools and Strategies© 2016 CChapter 11 Measurement Tools and Strategies© 2016 C
Chapter 11 Measurement Tools and Strategies© 2016 CEstelaJeffery653
 
Nadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteNadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteAdrien Boespflug
 
Rapid Software Testing: Strategy
Rapid Software Testing: StrategyRapid Software Testing: Strategy
Rapid Software Testing: StrategyTechWell
 
Performance appraisal words
Performance appraisal wordsPerformance appraisal words
Performance appraisal wordsbushmiller440
 
Write a 4 page report for a senior leader that communicates your e.docx
Write a 4 page report for a senior leader that communicates your e.docxWrite a 4 page report for a senior leader that communicates your e.docx
Write a 4 page report for a senior leader that communicates your e.docxtroutmanboris
 

Similar to How to Assess Your Reliability Program (20)

tqm-col-mba-5575
tqm-col-mba-5575tqm-col-mba-5575
tqm-col-mba-5575
 
Benchmarking Basic.pdf
Benchmarking Basic.pdfBenchmarking Basic.pdf
Benchmarking Basic.pdf
 
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
40 JANUARYFEBRUARY 2010 INFORMATIONMANAGEMENTSelecting .docx
 
OverviewConduct a health information technology needs assessment.docx
OverviewConduct a health information technology needs assessment.docxOverviewConduct a health information technology needs assessment.docx
OverviewConduct a health information technology needs assessment.docx
 
Best Practices
Best Practices Best Practices
Best Practices
 
John K Moore Org Alignment Article
John K Moore Org Alignment ArticleJohn K Moore Org Alignment Article
John K Moore Org Alignment Article
 
Running head IMPROVEMENT OPPORTUNITY .docx
Running head IMPROVEMENT OPPORTUNITY                             .docxRunning head IMPROVEMENT OPPORTUNITY                             .docx
Running head IMPROVEMENT OPPORTUNITY .docx
 
360 degree performance evaluations
360 degree performance evaluations360 degree performance evaluations
360 degree performance evaluations
 
ISE Webinar - 'Squaring the circle'
ISE Webinar - 'Squaring the circle'ISE Webinar - 'Squaring the circle'
ISE Webinar - 'Squaring the circle'
 
7Tips
7Tips7Tips
7Tips
 
Chapter 7 Management Concultancy by Cabrera
Chapter 7 Management Concultancy by CabreraChapter 7 Management Concultancy by Cabrera
Chapter 7 Management Concultancy by Cabrera
 
Basic Guide to Program Evaluation (Including Outcomes Evaluation).docx
Basic Guide to Program Evaluation (Including Outcomes Evaluation).docxBasic Guide to Program Evaluation (Including Outcomes Evaluation).docx
Basic Guide to Program Evaluation (Including Outcomes Evaluation).docx
 
Change Management 2004
Change Management 2004Change Management 2004
Change Management 2004
 
Example_Whitepaper
Example_WhitepaperExample_Whitepaper
Example_Whitepaper
 
Case StudyIn March 1994, Randal Schwartz was indicted on three f.docx
Case StudyIn March 1994, Randal Schwartz was indicted on three f.docxCase StudyIn March 1994, Randal Schwartz was indicted on three f.docx
Case StudyIn March 1994, Randal Schwartz was indicted on three f.docx
 
Chapter 11 Measurement Tools and Strategies© 2016 C
Chapter 11 Measurement Tools and Strategies© 2016 CChapter 11 Measurement Tools and Strategies© 2016 C
Chapter 11 Measurement Tools and Strategies© 2016 C
 
Nadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for websiteNadcap newsletter 1607-12 for website
Nadcap newsletter 1607-12 for website
 
Rapid Software Testing: Strategy
Rapid Software Testing: StrategyRapid Software Testing: Strategy
Rapid Software Testing: Strategy
 
Performance appraisal words
Performance appraisal wordsPerformance appraisal words
Performance appraisal words
 
Write a 4 page report for a senior leader that communicates your e.docx
Write a 4 page report for a senior leader that communicates your e.docxWrite a 4 page report for a senior leader that communicates your e.docx
Write a 4 page report for a senior leader that communicates your e.docx
 

More from Accendo Reliability

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfAccendo Reliability
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdfAccendo Reliability
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdfAccendo Reliability
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdfAccendo Reliability
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 

More from Accendo Reliability (20)

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdf
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 

Recently uploaded

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 

Recently uploaded (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 

How to Assess Your Reliability Program

  • 1. fmsreliability.com http://www.fmsreliability.com/education/assess-reliability-program/ Fred How to Assess Your Reliability Program “How do you know so much about our program?” was a question the quality manager asked after reading the assessment report. The assessment took one day with eight interviews. The reliability that results is going to happen whether or not the team designing the product or production line deliberately use reliability engineering tools or not. The elements of a product or system will respond to the environment and either work or fail. While working at Hewlett-Packard I had the opportunity to conduct reliability program assessment of about 50 product divisions. One hypothesis related the number of reliability tasks the team actively used would correlate to their warranty expenses. That worked to a point. The teams that did not understand basic tools and did no overt or organized reliability engineering had high warranty expenses (as percent of revenue). The teams that did a large number of tasks (FMEA, HALT, ALT, Predictions, etc.) did have lower warranty expenses. The surprise was the teams that had the lowest warranty expenses also did very few reliability activities. The difference was the best performing teams understood the range of available reliability engineering activities and only used the tools that would provide value for a given circumstance. Less mature organization would attempt to do as many reliability related activities including a long list of product tests of which many provided little actual value. It was the application of the right tool at the right time that made the difference. Maturity and Activity Hiring a reliability engineer or running a lot of life tests does not improve your product’s reliability performance. It is not the organization or activities that you call a reliability program, rather your reliability performance relates to the culture concerning reliability. Reliability occurs at the point of decision. Therefore, during interviews the intent is to understand how decisions are currently accomplished. To what extent does reliability considerations influence decisions and what tools or methods are used to form decisions.
  • 2. For example, if we ask, “To what extent do you do HALT?” (HALT being Highly Accelerated Life Testing). In two circumstance the answer may be, “We rarely use HALT.” In one case, it may be the engineer doesn’t know what HALT is and isn’t sure if the testing they accomplish is similar to HALT or not. Or, they don’t do HALT as they are unfamiliar with that type of testing. In another case, the engineer knows about HALT, how and why it is used. Then says they have rarely used HALT because they have not had appropriate situations to do HALT. They understand that it is a useful tool for specific applications and recently have not needed to conduct HALT. Some respond that they do HALT. Again there are two common responses. In one case the team does HALT all the time because it is required, independent of whether it may be useful or not. In the other case, they do HALT as it is the right tool for the current situation. One team didn’t know what HALT was and the other fully understood and choose to not do HALT. The difference is the understanding and application, or maturity. Assessment Process To understand how an organization’s reliability maturity, use the following assessment process. 1. Select survey topics. This is a list of activities and tools common to reliability practices in your industry. It may include items rarely used. It should include the breadth of topics related to reliability in your field. See the DFR Methods Survey for one possible list of topics. Some topics are broad, such as on ownership/responsibility of product reliability, or reactive or proactive approach of management. Some topics are very specific, such as specific tools like FMEA or HALT. 2. Establish the interview format. One to one, small group, via phone, invited survey with follow up conversations, or some other method. I have found the one-to-one discussions the most useful as it permits immediate follow up and exploration of the rationale or motivation behind specific behaviors or responses. 3. Conduct the interviews (collect information). Arrange to interview or survey a cross section of people in the organization. Select individuals with experience with the organization and products are typically designed and manufactured. My recommended list of position titles comprises: Design & development engineers (electrical, mechanical, software) Design& development managers (electrical, mechanical, software) Reliability or Quality engineers and/or managers Procurement engineering (someone that works with suppliers) Manufacturing engineering and/or managers (design for manufacturing, sustaining and/or production engineering) Select about 8 individuals for interviews, more or less depending on the specific situation, size, complexity, etc of the program. In general the interview question is based on the phrase, ’to what extent’. For example, you might ask, “To what extent do you use HALT?” Depending on the response you may explore the motivations or rationale behind the decision both to conduct HALT, and how the HALT results are used within the organization. 4. Document the business environment – volume, cost, brand position, revenue, cost of unreliability as percent of net revenue, etc. Document any regulatory or customer imposed restrictions or requirements. Summarize to convey
  • 3. the atmosphere around the reliability program. 5. Document the collected information. A summary back to participant asking for additional input or corrections helps with the acceptance of the assessment results, plus may help avoid a mistake in your understanding. 6. Analyze the data. This is not done during the interviews – let them talk. Review the notes and information provided and map to the maturity matrix. Look for consistent approaches to making reliability related decisions. Look for patterns of behavior and underlaying motivations or causes. 7. Report on assessment findings. Document and explain what you heard and how it related to the overall organization’s maturity. The report my include the interview summary, strengths, weaknesses, and recommendations for improvement. Summary The assessment process should provide a view of the overall organization’s approach to making decisions and to what extent and how their reliability program influences those decisions. With that basic understanding you can identify strengths to build upon, weaknesses that need attention, and recommendations to improve the maturity of the reliability program.