What Will Be Covered
 Flexible Manufacturing is Defined
 How “you” can use FMS
 Nuts and Bolts
 How FMS works
 A real world example
 Summary
What Is A Flexible
Manufacturing System?
Flexible Manufacturing System:
- “A system that consists of numerous
programmable machine tools connected by an
automated material handling system”
Basic Components of FMS
The Basic components of FMS are:
1. Workstations.
2. Automated material Handling and Storage
system.
3. Computer Control System.
Stand alone
NC machines
Flexible Manufacture
Systems
Transfer Lines
High
Medium
Low
Low Medium High
Production volume
Product
variety
Application Characteristics of FMS
Flexibility in Manufacturing
 Basic Flexibility
Machine flexibility
Material handling flexibility
 System Flexibility
volume flexibility
Routing flexibility
Expansion flexibility
 Aggregate Flexibility
Program flexibility
production flexibility
market flexibility
Different Types of FMS
 Sequential FMS
 Random FMS
 Dedicated FMS
 Engineered FMS
 Modular FMS
 Progressive Layout:
 Best for producing a variety of parts
 Closed Loop Layout:
 Parts can skip stations for flexibility
 Used for large part sizes
 Best for long process times
Types of FMS Layouts
• Robot centered Layout
- Robot centered cell with one or more robots are
Used as the material handling systems.
FMS Layouts Continued
• Ladder Layout:
― Parts can be sent to any machine in any sequence
― Parts not limited to particular part families
• Open Field Layout:
― Most complex FMS layout
― Includes several support stations
Types of FMS Layouts
 Progressive or Line type
 Loop Type
 Ladder Type
 Open Field Type
 Robot centered type
Factors Influencing the FMS
layouts
 Available of raw material
 Proximity to market
 Transport facilities
 Availability of efficient and cheap labor
 Availability of Power ,Water and Fuel
 Atmospheric and climatic condition
 Social and recreation Facilities
Objective of FMS
 Decreased Lead Times
 Increased machine utilization
 Improved Due Date Reliability
 Decreased Store Inventors levels
 Decreased Work in Progress
 Increased Quality
Advantages and disadvantages
of FMS Implementation
Advantages
 Faster, lower-cost changes from one part to
another which will improve capital utilization.
 Lower direct labor cost, due to the reduction in
number of workers.
 Reduced inventory.
 Consistent and better quality.
 Savings from indirect labors, from reduced
errors , rework, repairs and rejects.
Disadvantages
 Limited ability to adapt to changes in product or
product mix .
 Substantial pre-planning activity
 Expensive , costing millions of Dollars.
 Technological problems of exact component
positioning.
 Sophisticated manufacturing systems.
Automated Material Handling
 Automated Guided
Vehicle (AGV)
 Automated Storage and
Retrieval System
(ASRS)
 Conveyors
Components of Flexible
Manufacturing Systems
 NC
 CNC
 DNC
 Robotics
 AGV
 ASRS
 Automated
Inspection
 Cells and Centers
Flexible Automation
 Ability to adapt to
engineering changes in
parts
 Increase in number of
similar parts produced
on the system
 Ability to accommodate
routing changes
 Ability to rapidly change
production set up
FMS Nuts and Bolts
Robots
Robots
Robots: Programmable Manipulators
― Can tolerate hostile environments
― Can work much longer hours than humans
― Can perform redundant jobs more consistently
Common Uses of Robots
 Loading and unloading
 Spray painting
 Welding
 Material handling
 Inspection
 Machine Assembly
Computer Integrated
Manufacturing
 CIM: “The Integration of the total manufacturing
enterprise through the use of integrated systems and
data communications coupled with new managerial
philosophies that improve organizational and personnel
efficiency.”
Components of CIM
 CAD Computer Aided Design
 CAM Computer Aided Manufacturing
 CAE Computer Aided Engineering
Manufacturing Technology
 This part of FMS uses:
 NC Numerically Controlled Machine
 CNC Computer Controlled Machine
 DNC Direct Numerical Controlled
Challenges with FMS
 Determining if FMS the best production system for your
company (economically and socially)
 Possible expansion costs associated with
implementing FMS
 Day to day maintenance of FMS operations
Flexible
Manufacturing
How Does It Work ?
Integration of FMS
FMS
Manufacturing Technology CAM Robotics
Making FMS Work
 By implementing the components of
robotics, manufacturing technology and
computer integrated manufacturing in a
correct order one can achieve a successful
Flexible Manufacturing System
A Real World Example
The
Ford
Motor Company
Ford’s Problem
 At Ford Powertrain they faced the
following challenges
- outdated cell controller
- lack of flexibility because of it
- causing loss of efficiency
Solution
 Implemented a cell control based
on an open architecture,
commonly available tools, and
industry standard hardware,
software, and protocols. (3)
Benefits
 Enabled Ford to mix and match machine
tools from different vendors (3)
 Reduced the number of man-years
required to implement the application (3)
Benefits Continued
 The budget for the fully automatic closed-
loop controller was less than 1/10th the
cost for a system built in language.
 No formal training was required for the
floor shop operators
THANK YOU

More Related Content

Similar to FMS-1.ppt .

flexible manufacturing systems
flexible manufacturing systemsflexible manufacturing systems
flexible manufacturing systemsShivam Joshi
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMAnand Khare
 
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURINGMohanumar S
 
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)mathanArumugam
 
Intoduction to mantech 2
Intoduction to mantech 2Intoduction to mantech 2
Intoduction to mantech 2libertychidzuu2
 
Direct numerical control
Direct numerical controlDirect numerical control
Direct numerical controlFarhan Fahim
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsagisanyang dingalo
 
Flexible manufacturing system ppt
Flexible manufacturing system pptFlexible manufacturing system ppt
Flexible manufacturing system pptIrshad Ansari
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemVishal Jadhav
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing SystemDesai Vaishali
 
mekatronik4.pptx
mekatronik4.pptxmekatronik4.pptx
mekatronik4.pptxmerFarukAK3
 

Similar to FMS-1.ppt . (20)

Flexible Manufacturing Systems V2 090310
Flexible Manufacturing Systems V2 090310Flexible Manufacturing Systems V2 090310
Flexible Manufacturing Systems V2 090310
 
flexible manufacturing systems
flexible manufacturing systemsflexible manufacturing systems
flexible manufacturing systems
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEM
 
Flexible Manufacturing System.
Flexible Manufacturing System.Flexible Manufacturing System.
Flexible Manufacturing System.
 
CIM unit-4
CIM  unit-4CIM  unit-4
CIM unit-4
 
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 5 2nd-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
 
Unit 4 cim
Unit 4 cimUnit 4 cim
Unit 4 cim
 
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
 
Intoduction to mantech 2
Intoduction to mantech 2Intoduction to mantech 2
Intoduction to mantech 2
 
Direct numerical control
Direct numerical controlDirect numerical control
Direct numerical control
 
Cim presentation
Cim presentationCim presentation
Cim presentation
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
Flexible manufacturing system ppt
Flexible manufacturing system pptFlexible manufacturing system ppt
Flexible manufacturing system ppt
 
CIM Introduction|Mechanical |Harin Prajapati|GTU
CIM Introduction|Mechanical |Harin Prajapati|GTU  CIM Introduction|Mechanical |Harin Prajapati|GTU
CIM Introduction|Mechanical |Harin Prajapati|GTU
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
Types of manufacturing_systems
Types of manufacturing_systemsTypes of manufacturing_systems
Types of manufacturing_systems
 
Unit3
Unit3Unit3
Unit3
 
Wcm 3
Wcm 3Wcm 3
Wcm 3
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
mekatronik4.pptx
mekatronik4.pptxmekatronik4.pptx
mekatronik4.pptx
 

More from Athar739197

META Finals '22 .pdf .
META Finals '22 .pdf                     .META Finals '22 .pdf                     .
META Finals '22 .pdf .Athar739197
 
2_Working_principles_of_Microsystems_revised.pdf
2_Working_principles_of_Microsystems_revised.pdf2_Working_principles_of_Microsystems_revised.pdf
2_Working_principles_of_Microsystems_revised.pdfAthar739197
 
1_Introduction_MEMS_&_Microsystems.pdf .
1_Introduction_MEMS_&_Microsystems.pdf  .1_Introduction_MEMS_&_Microsystems.pdf  .
1_Introduction_MEMS_&_Microsystems.pdf .Athar739197
 
CI_SIModule_QGIS.pptx .
CI_SIModule_QGIS.pptx                         .CI_SIModule_QGIS.pptx                         .
CI_SIModule_QGIS.pptx .Athar739197
 
CI_module1.pptx .
CI_module1.pptx                                   .CI_module1.pptx                                   .
CI_module1.pptx .Athar739197
 
CI_GA_module2_ABC_updatedG.ppt .
CI_GA_module2_ABC_updatedG.ppt           .CI_GA_module2_ABC_updatedG.ppt           .
CI_GA_module2_ABC_updatedG.ppt .Athar739197
 
LECTURE 9 ROPE DRIVES THEORY.pdf .
LECTURE 9 ROPE DRIVES THEORY.pdf         .LECTURE 9 ROPE DRIVES THEORY.pdf         .
LECTURE 9 ROPE DRIVES THEORY.pdf .Athar739197
 
2021 6th SEM EOM Online Class Introduction.pdf
2021 6th SEM EOM Online Class Introduction.pdf2021 6th SEM EOM Online Class Introduction.pdf
2021 6th SEM EOM Online Class Introduction.pdfAthar739197
 
LECTURE 4 BELTS DRIVES.pdf .
LECTURE 4 BELTS DRIVES.pdf                      .LECTURE 4 BELTS DRIVES.pdf                      .
LECTURE 4 BELTS DRIVES.pdf .Athar739197
 
Sliding contact Problem 2.pdf .
Sliding contact Problem 2.pdf                 .Sliding contact Problem 2.pdf                 .
Sliding contact Problem 2.pdf .Athar739197
 
1 - Introduction to Management-merged.pdf
1 - Introduction to Management-merged.pdf1 - Introduction to Management-merged.pdf
1 - Introduction to Management-merged.pdfAthar739197
 
ENTREPRENEURSHIP EOM.pdf .
ENTREPRENEURSHIP EOM.pdf                 .ENTREPRENEURSHIP EOM.pdf                 .
ENTREPRENEURSHIP EOM.pdf .Athar739197
 
Theory z and US Japan management Onlline classes 2020.pdf
Theory z and US Japan management Onlline classes 2020.pdfTheory z and US Japan management Onlline classes 2020.pdf
Theory z and US Japan management Onlline classes 2020.pdfAthar739197
 
market analysis eom.pdf .
market analysis eom.pdf                    .market analysis eom.pdf                    .
market analysis eom.pdf .Athar739197
 
BusinessPlan eom.pdf ..
BusinessPlan eom.pdf                  ..BusinessPlan eom.pdf                  ..
BusinessPlan eom.pdf ..Athar739197
 
4. Market strategy 5C, 4P, STP.pdf .
4. Market strategy 5C, 4P, STP.pdf         .4. Market strategy 5C, 4P, STP.pdf         .
4. Market strategy 5C, 4P, STP.pdf .Athar739197
 
Controlling.pdf .
Controlling.pdf                            .Controlling.pdf                            .
Controlling.pdf .Athar739197
 
Controlling detailed.pdf .
Controlling detailed.pdf                  .Controlling detailed.pdf                  .
Controlling detailed.pdf .Athar739197
 

More from Athar739197 (20)

META Finals '22 .pdf .
META Finals '22 .pdf                     .META Finals '22 .pdf                     .
META Finals '22 .pdf .
 
2_Working_principles_of_Microsystems_revised.pdf
2_Working_principles_of_Microsystems_revised.pdf2_Working_principles_of_Microsystems_revised.pdf
2_Working_principles_of_Microsystems_revised.pdf
 
1_Introduction_MEMS_&_Microsystems.pdf .
1_Introduction_MEMS_&_Microsystems.pdf  .1_Introduction_MEMS_&_Microsystems.pdf  .
1_Introduction_MEMS_&_Microsystems.pdf .
 
ERGO 2.pptx .
ERGO 2.pptx                                              .ERGO 2.pptx                                              .
ERGO 2.pptx .
 
CI_SIModule_QGIS.pptx .
CI_SIModule_QGIS.pptx                         .CI_SIModule_QGIS.pptx                         .
CI_SIModule_QGIS.pptx .
 
CI_module1.pptx .
CI_module1.pptx                                   .CI_module1.pptx                                   .
CI_module1.pptx .
 
CI_GA_module2_ABC_updatedG.ppt .
CI_GA_module2_ABC_updatedG.ppt           .CI_GA_module2_ABC_updatedG.ppt           .
CI_GA_module2_ABC_updatedG.ppt .
 
Brakes.pdf .
Brakes.pdf                                  .Brakes.pdf                                  .
Brakes.pdf .
 
LECTURE 9 ROPE DRIVES THEORY.pdf .
LECTURE 9 ROPE DRIVES THEORY.pdf         .LECTURE 9 ROPE DRIVES THEORY.pdf         .
LECTURE 9 ROPE DRIVES THEORY.pdf .
 
2021 6th SEM EOM Online Class Introduction.pdf
2021 6th SEM EOM Online Class Introduction.pdf2021 6th SEM EOM Online Class Introduction.pdf
2021 6th SEM EOM Online Class Introduction.pdf
 
LECTURE 4 BELTS DRIVES.pdf .
LECTURE 4 BELTS DRIVES.pdf                      .LECTURE 4 BELTS DRIVES.pdf                      .
LECTURE 4 BELTS DRIVES.pdf .
 
Sliding contact Problem 2.pdf .
Sliding contact Problem 2.pdf                 .Sliding contact Problem 2.pdf                 .
Sliding contact Problem 2.pdf .
 
1 - Introduction to Management-merged.pdf
1 - Introduction to Management-merged.pdf1 - Introduction to Management-merged.pdf
1 - Introduction to Management-merged.pdf
 
ENTREPRENEURSHIP EOM.pdf .
ENTREPRENEURSHIP EOM.pdf                 .ENTREPRENEURSHIP EOM.pdf                 .
ENTREPRENEURSHIP EOM.pdf .
 
Theory z and US Japan management Onlline classes 2020.pdf
Theory z and US Japan management Onlline classes 2020.pdfTheory z and US Japan management Onlline classes 2020.pdf
Theory z and US Japan management Onlline classes 2020.pdf
 
market analysis eom.pdf .
market analysis eom.pdf                    .market analysis eom.pdf                    .
market analysis eom.pdf .
 
BusinessPlan eom.pdf ..
BusinessPlan eom.pdf                  ..BusinessPlan eom.pdf                  ..
BusinessPlan eom.pdf ..
 
4. Market strategy 5C, 4P, STP.pdf .
4. Market strategy 5C, 4P, STP.pdf         .4. Market strategy 5C, 4P, STP.pdf         .
4. Market strategy 5C, 4P, STP.pdf .
 
Controlling.pdf .
Controlling.pdf                            .Controlling.pdf                            .
Controlling.pdf .
 
Controlling detailed.pdf .
Controlling detailed.pdf                  .Controlling detailed.pdf                  .
Controlling detailed.pdf .
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 

FMS-1.ppt .

  • 2. What Will Be Covered  Flexible Manufacturing is Defined  How “you” can use FMS  Nuts and Bolts  How FMS works  A real world example  Summary
  • 3. What Is A Flexible Manufacturing System? Flexible Manufacturing System: - “A system that consists of numerous programmable machine tools connected by an automated material handling system”
  • 4. Basic Components of FMS The Basic components of FMS are: 1. Workstations. 2. Automated material Handling and Storage system. 3. Computer Control System.
  • 5. Stand alone NC machines Flexible Manufacture Systems Transfer Lines High Medium Low Low Medium High Production volume Product variety Application Characteristics of FMS
  • 6. Flexibility in Manufacturing  Basic Flexibility Machine flexibility Material handling flexibility  System Flexibility volume flexibility Routing flexibility Expansion flexibility  Aggregate Flexibility Program flexibility production flexibility market flexibility
  • 7. Different Types of FMS  Sequential FMS  Random FMS  Dedicated FMS  Engineered FMS  Modular FMS
  • 8.  Progressive Layout:  Best for producing a variety of parts  Closed Loop Layout:  Parts can skip stations for flexibility  Used for large part sizes  Best for long process times Types of FMS Layouts • Robot centered Layout - Robot centered cell with one or more robots are Used as the material handling systems.
  • 9. FMS Layouts Continued • Ladder Layout: ― Parts can be sent to any machine in any sequence ― Parts not limited to particular part families • Open Field Layout: ― Most complex FMS layout ― Includes several support stations
  • 10. Types of FMS Layouts  Progressive or Line type  Loop Type  Ladder Type  Open Field Type  Robot centered type
  • 11. Factors Influencing the FMS layouts  Available of raw material  Proximity to market  Transport facilities  Availability of efficient and cheap labor  Availability of Power ,Water and Fuel  Atmospheric and climatic condition  Social and recreation Facilities
  • 12. Objective of FMS  Decreased Lead Times  Increased machine utilization  Improved Due Date Reliability  Decreased Store Inventors levels  Decreased Work in Progress  Increased Quality
  • 13. Advantages and disadvantages of FMS Implementation Advantages  Faster, lower-cost changes from one part to another which will improve capital utilization.  Lower direct labor cost, due to the reduction in number of workers.  Reduced inventory.  Consistent and better quality.  Savings from indirect labors, from reduced errors , rework, repairs and rejects.
  • 14. Disadvantages  Limited ability to adapt to changes in product or product mix .  Substantial pre-planning activity  Expensive , costing millions of Dollars.  Technological problems of exact component positioning.  Sophisticated manufacturing systems.
  • 15. Automated Material Handling  Automated Guided Vehicle (AGV)  Automated Storage and Retrieval System (ASRS)  Conveyors
  • 16. Components of Flexible Manufacturing Systems  NC  CNC  DNC  Robotics  AGV  ASRS  Automated Inspection  Cells and Centers
  • 17. Flexible Automation  Ability to adapt to engineering changes in parts  Increase in number of similar parts produced on the system  Ability to accommodate routing changes  Ability to rapidly change production set up
  • 18. FMS Nuts and Bolts Robots
  • 19. Robots Robots: Programmable Manipulators ― Can tolerate hostile environments ― Can work much longer hours than humans ― Can perform redundant jobs more consistently
  • 20. Common Uses of Robots  Loading and unloading  Spray painting  Welding  Material handling  Inspection  Machine Assembly
  • 21. Computer Integrated Manufacturing  CIM: “The Integration of the total manufacturing enterprise through the use of integrated systems and data communications coupled with new managerial philosophies that improve organizational and personnel efficiency.”
  • 22. Components of CIM  CAD Computer Aided Design  CAM Computer Aided Manufacturing  CAE Computer Aided Engineering
  • 23. Manufacturing Technology  This part of FMS uses:  NC Numerically Controlled Machine  CNC Computer Controlled Machine  DNC Direct Numerical Controlled
  • 24. Challenges with FMS  Determining if FMS the best production system for your company (economically and socially)  Possible expansion costs associated with implementing FMS  Day to day maintenance of FMS operations
  • 26. Integration of FMS FMS Manufacturing Technology CAM Robotics
  • 27. Making FMS Work  By implementing the components of robotics, manufacturing technology and computer integrated manufacturing in a correct order one can achieve a successful Flexible Manufacturing System
  • 28. A Real World Example The Ford Motor Company
  • 29. Ford’s Problem  At Ford Powertrain they faced the following challenges - outdated cell controller - lack of flexibility because of it - causing loss of efficiency
  • 30. Solution  Implemented a cell control based on an open architecture, commonly available tools, and industry standard hardware, software, and protocols. (3)
  • 31. Benefits  Enabled Ford to mix and match machine tools from different vendors (3)  Reduced the number of man-years required to implement the application (3)
  • 32. Benefits Continued  The budget for the fully automatic closed- loop controller was less than 1/10th the cost for a system built in language.  No formal training was required for the floor shop operators