www.fixxus.com/movie
THE PROBLEM
        • Many facilities built in in the
        60s and 70s.

        • Insulated Metal panels –
        aging oven baked polyester
        finish wears, peels, flakes

        • Concrete – Porous; cracks
        and spalls

        • Damage and corrosion
        painted over, or covered up
        with FRP or SS panels

        • Severe deterioration requires
        replacement and the cycle
        begins again.
THE PROBLEM

                                   As finishes deteriorate, cleaning
                                   and maintenance efforts increase

                                                             Finish dulls and
                                      Harsher chemicals     scratches, making
                                      and more abrasion        the surface
                                      in turn deteriorate   rougher and more
                                       the surface faster         porous




                                        Sanitation crews
                                         work longer and       Rougher
                                        harder scrubbing,      surfaces
                                           with more         collect more
 Eventually, USDA will require          chemicals, more     dirt and grime
                                           water, etc.
the plant to hang plastic on the
walls to prevent contamination
THE PROBLEM


                                                 Facilities ask
                                               Paint Vendors to
                                                   provide
              Finishes
                                               solutions, which
             deteriorate
                                                they do to the
                                                 best of their
                                                     ability
                                                                              After numerous
                                                                              repetitions, plants
                                                                              decide to replace the
                                                                              panels, or cover
                                                                              them up and cycle
   Food Safety
risks increase to
                                                             Ineffective
                                                                              begins again.
  the point that
                                                          painting (which
   USDA / FDA
                                                         results in peeling
    inspectors
      require
                                                          or flaking paint)   With pre-stressed
   corrections                                                                concrete, there are
                                                                              few options, if any.
                           Touch up paint or hang
                           plastic over production
                                    areas
THE PROBLEM
SOME SOLUTIONS



1)   Painting (Industrial Enamel, epoxy, urethanes, Reinforcing linings)

2)   Cover with FRP

3)   Cover with Stainless Steel

4)   Replace panels

* All options either create problems or restart the cycle
SOME SOLUTIONS

           The Painting Cycle
           – Just A Temporary Fix
THE REAL SOLUTION
THE REAL SOLUTION
SOME SOLUTIONS




  - More Temporary Measures
SOME SOLUTIONS


      Just Cover Up Problems…
SOME SOLUTIONS


      Just Cover Up Problems…
THE BEST SOLUTION

                                Engineered Sanitation for
                                Interior Walls and Ceilings


Twelve (12) Year Case History          69 Projects in 35 Sites for 19 Clients

Reduces Risk                           Best Long-Term Alternative

Installed Quickly                      Cost Effective

Reduces Sanitation Costs               Seamless and Safe
THE SYSTEMS
                      FIXXUS Sanitary Systems

                                   NO product contamination from
                                     deteriorating construction
                                             materials



       REDUCE Liability

• Seal joints between
  construction materials
• Eliminate caulking
• Stop water or air infiltration
• Eliminate pockets or ledges
  where water gathers
• Fill gaps where bacteria
  and insects hide


                These issues are THE regulatory focus in the Food Processing Industry.
THE SYSTEMS
BEFORE FIXXUS




                Typical conditions
 Small Freezer Structure, Poultry processing in GA
Sister
Panels       AFTER FIXXUS
remove
 dents




  Duct
Penetratio
n Sealed        Floor
             Terminatio                    Concrete   Concrete
                          Gloss     Door
              n Sealed                       Curb     Column
                          Finish   Rehab
                                            Sealed     Sealed
THE SYSTEMS

•FIXXUS Panel Rehabilitation
   -FIXXUS Sister Panel System
•FIXXUS Concrete Solutions
  -FIXXUS Double Tee Ceiling
Rehab
  -FIXXUS Sanitary Curbing
THE SYSTEMS
                  INSULATED METAL PANELS




•Transitions Panel / Curb Joint
•Flexible
•Stops Corrosion
•Eliminates Harborage Site
THE SYSTEMS
              SISTER PANEL SYSTEM




When Good Panels Go Bad…


                           FIXXUS Installs New Skins Prior to Finishes..
THE SYSTEMS
SISTER PANEL SYSTEM


              •Alternative to Panel
               Replacement
              •No Vapor Space for Bacteria
               Mold or Algae
              •Waterproof & Monolithic
THE SYSTEMS
                  CONCRETE SOLUTIONS




Is This Growing Behind Your FRP?
THE SYSTEMS
CONCRETE SOLUTIONS

              •Seamless Hygienic
              Surface
              •Flexible / Crack
              Bridging
              •Eliminates Vapor
              Space
              •Installed Over a
              Weekend
THE SYSTEMS
              DOUBLE TEE CEILINGS




Risk of Adulteration
Overhead
THE SYSTEMS
                 DOUBLE TEE CEILINGS




•Cost Effective
•Structural Repair
•Low Risk Solution
•Cleanable
THE SYSTEMS
                SANITARY CURBING




•Seamless Barrier Between
 Curb and Processing
•Stops Water Penetration
•Flexible and Ultra Strong
HOW TOUGH IS IT?
FIXXUS SOLUTIONS

  "We don’t have the
  hard numbers, but
  how could it not be
  more efficient than
  what we had? Just
  look at it!"

  – Plant Engineer


FIXXUS Panel Rehabilitation
FIXXUS Concrete Solutions
FIXXUS Fluid Applied Roofing
FIXXUS Flexible Flooring
FIXXUS Freezer Rehab
FIXXUS Consulting
FIXXUS Worldwide Services
Kevin Gooding
                                kgooding@fixxus.com
                                336-669-3247



Twelve (12) Year Case History         69 Projects in 35 Sites for 19 Clients

Reduces Risk                          Best Long-Term Alternative

Installed Quickly                     Cost Effective

Reduces Sanitation Costs              Seamless and Safe

FIXXUS Presentation

  • 1.
  • 2.
    THE PROBLEM • Many facilities built in in the 60s and 70s. • Insulated Metal panels – aging oven baked polyester finish wears, peels, flakes • Concrete – Porous; cracks and spalls • Damage and corrosion painted over, or covered up with FRP or SS panels • Severe deterioration requires replacement and the cycle begins again.
  • 3.
    THE PROBLEM As finishes deteriorate, cleaning and maintenance efforts increase Finish dulls and Harsher chemicals scratches, making and more abrasion the surface in turn deteriorate rougher and more the surface faster porous Sanitation crews work longer and Rougher harder scrubbing, surfaces with more collect more Eventually, USDA will require chemicals, more dirt and grime water, etc. the plant to hang plastic on the walls to prevent contamination
  • 4.
    THE PROBLEM Facilities ask Paint Vendors to provide Finishes solutions, which deteriorate they do to the best of their ability After numerous repetitions, plants decide to replace the panels, or cover them up and cycle Food Safety risks increase to Ineffective begins again. the point that painting (which USDA / FDA results in peeling inspectors require or flaking paint) With pre-stressed corrections concrete, there are few options, if any. Touch up paint or hang plastic over production areas
  • 5.
  • 6.
    SOME SOLUTIONS 1) Painting (Industrial Enamel, epoxy, urethanes, Reinforcing linings) 2) Cover with FRP 3) Cover with Stainless Steel 4) Replace panels * All options either create problems or restart the cycle
  • 7.
    SOME SOLUTIONS The Painting Cycle – Just A Temporary Fix
  • 8.
  • 9.
  • 10.
    SOME SOLUTIONS - More Temporary Measures
  • 11.
    SOME SOLUTIONS Just Cover Up Problems…
  • 12.
    SOME SOLUTIONS Just Cover Up Problems…
  • 13.
    THE BEST SOLUTION Engineered Sanitation for Interior Walls and Ceilings Twelve (12) Year Case History 69 Projects in 35 Sites for 19 Clients Reduces Risk Best Long-Term Alternative Installed Quickly Cost Effective Reduces Sanitation Costs Seamless and Safe
  • 14.
    THE SYSTEMS FIXXUS Sanitary Systems NO product contamination from deteriorating construction materials REDUCE Liability • Seal joints between construction materials • Eliminate caulking • Stop water or air infiltration • Eliminate pockets or ledges where water gathers • Fill gaps where bacteria and insects hide These issues are THE regulatory focus in the Food Processing Industry.
  • 15.
    THE SYSTEMS BEFORE FIXXUS Typical conditions Small Freezer Structure, Poultry processing in GA
  • 16.
    Sister Panels AFTER FIXXUS remove dents Duct Penetratio n Sealed Floor Terminatio Concrete Concrete Gloss Door n Sealed Curb Column Finish Rehab Sealed Sealed
  • 17.
    THE SYSTEMS •FIXXUS PanelRehabilitation -FIXXUS Sister Panel System •FIXXUS Concrete Solutions -FIXXUS Double Tee Ceiling Rehab -FIXXUS Sanitary Curbing
  • 18.
    THE SYSTEMS INSULATED METAL PANELS •Transitions Panel / Curb Joint •Flexible •Stops Corrosion •Eliminates Harborage Site
  • 19.
    THE SYSTEMS SISTER PANEL SYSTEM When Good Panels Go Bad… FIXXUS Installs New Skins Prior to Finishes..
  • 20.
    THE SYSTEMS SISTER PANELSYSTEM •Alternative to Panel Replacement •No Vapor Space for Bacteria Mold or Algae •Waterproof & Monolithic
  • 21.
    THE SYSTEMS CONCRETE SOLUTIONS Is This Growing Behind Your FRP?
  • 22.
    THE SYSTEMS CONCRETE SOLUTIONS •Seamless Hygienic Surface •Flexible / Crack Bridging •Eliminates Vapor Space •Installed Over a Weekend
  • 23.
    THE SYSTEMS DOUBLE TEE CEILINGS Risk of Adulteration Overhead
  • 24.
    THE SYSTEMS DOUBLE TEE CEILINGS •Cost Effective •Structural Repair •Low Risk Solution •Cleanable
  • 25.
    THE SYSTEMS SANITARY CURBING •Seamless Barrier Between Curb and Processing •Stops Water Penetration •Flexible and Ultra Strong
  • 26.
  • 27.
    FIXXUS SOLUTIONS "We don’t have the hard numbers, but how could it not be more efficient than what we had? Just look at it!" – Plant Engineer FIXXUS Panel Rehabilitation FIXXUS Concrete Solutions FIXXUS Fluid Applied Roofing FIXXUS Flexible Flooring FIXXUS Freezer Rehab FIXXUS Consulting FIXXUS Worldwide Services
  • 28.
    Kevin Gooding kgooding@fixxus.com 336-669-3247 Twelve (12) Year Case History 69 Projects in 35 Sites for 19 Clients Reduces Risk Best Long-Term Alternative Installed Quickly Cost Effective Reduces Sanitation Costs Seamless and Safe