For the groups Fixperts project worked alongside Royal Mail, as a member of our group had connections with them. As a group we travelled to West
Brompton, to a newly outfitted Royal Mail distribution centre where our fixpartner, Richard Hoile, informed us of their problem; These new distribution
centres are manned by one or two people, who spend the majority of the time out back, rather than sitting behind the main reception desk. This is an
issue as it leaves monitors, PDA’s, keyboards and computer mice unguarded, meaning people could come and take them. The computer monitors are
held down with a Kensington lock which Royal Mail are afraid will give the customers the impression that the do not trust them. Additionally, many of
their customers become very short tempered when problems arise in the collection of their parcels, and have been known to verbally and occasionally
physicallyassaultthestaff,meaningaprotectivescreenwouldalsobeuseful.ThusweweretaskedwithcreatingaproductthatbothhidestoKensington
lock from the customers, as well as providing additional protection to the staff. A problem we encountered with some initial concepts we had on the
day was the fact that the staff would be unable to retrofit a product to the work surface without getting a contractor to fit it, thus we decided to make
a device that doesn’t need to be screwed to the surface and requires no special skill to fit it. The fact our product wouldn’t be permanently fixed in
place would offer the staff the ability to move it, and their desk equipment around the work surface, a feature that wouldn’t be possible with a fixed
screen. The wires and cables coming from behind the monitor are very unsightly and contrast with the rest of the new, tidy distribution centre. Our
product would have to therefore in keep with the sleek modern design of the room to hide all the wires, making the whole thing much neater. We
also decided that as the rest of the room, and Royal Mail in general is attributed with the colours red and white, that we would make our product
these colours too, so that it fitted well in the room. The final issue we faced was the fact that many of these distribution centres have different
thicknesses of their desks vary, therefore we would have to design our product to be adjustable, as we wanted it to be able to clip under the desk.
On this page are the rough
sketches I did for our prod-
uct. As a group we decided to
use the image above as the
concept to make on rig day.
The first thing we had to do was cut the different lengths of wood
to the required sizes and then we planned out how our product
would go together before actually assembling it. Whilst measuring
it we realised it needed to be slightly wider, to fit both the keyboard
and the mouse with enough room to be used comfortably.
When it came to fastening the pieces together, we initially cut
come of the off cuts into 45 degree sections and attempted to
nail these into the corners, where the planks met. However we
were able to find metal brackets which did the job a lot better.
We had to get a few pieces cut from the technicians as we were una-
ble to use the workshop machinery ourselves. This posed as a prob-
lem as it meant not only did we have to wait in line to get work done,
but we also had to explain exactly what we wanted done, where-
as it would have been much easier to have done it ourselves.
Once finished with our rig build, we placed it on a table to view it and as-
sess whether the under table clipping system worked correctly, which it
did, however it was not adjustable as we had previously planned on doing.
We then had a meeting with our fixpartner, Richard, to gain his views on our initial concept. Although ultimately
happy with the system we had devised, we ended up coming to the conclusion that the product needed to
be deeper, as well as being open at one side as to not restrict the staff. To the right is my sketch for the new
design which I drew in a group meeting, this was ultimately the design that we as a group decided to go with.
Before making the final product, I designed a 3D rendering on Google SkethUp, which I felt better portrayed
the design to others than any drawing would do, as it gave a complete 360 degree view. I then designed the
illustrator file that we laser cut. The pieces we laser cut were the two white acrylic screens and the red under
table clip. We then went to the metal workshop and gave our technical drawing to a technician to manufacture.
Once fully assembled we were able to set up our product
on a table and ensure that it worked correctly, which it did.
Unfortunately, due to a delay in the metalwork shop we
were ultimately unsuccessful in bringing our final product
back to our fixpartner for his final opinion, however we still
intent to do this so that we can fully conclude the project.

More Related Content

Viewers also liked

What Is SMART+ Memberships
What Is SMART+ MembershipsWhat Is SMART+ Memberships
What Is SMART+ Memberships
Mark Renkert, MCsl
 
Nadadores
NadadoresNadadores
Nadadores
Guido Rondinoni
 
MM FARMER WHITE PAPER, 060908
MM FARMER WHITE PAPER, 060908MM FARMER WHITE PAPER, 060908
MM FARMER WHITE PAPER, 060908
DC Kuhns
 
Admission Restricted -US Refugee Policy
Admission Restricted -US Refugee PolicyAdmission Restricted -US Refugee Policy
Admission Restricted -US Refugee Policy
Maurice De Heus
 
stARTup Los Angeles-Apply Now
stARTup Los Angeles-Apply NowstARTup Los Angeles-Apply Now
stARTup Los Angeles-Apply Now
Annie Seaton
 
ENCIMERA FRANKE 4 PIN 630
ENCIMERA  FRANKE 4 PIN 630ENCIMERA  FRANKE 4 PIN 630
ENCIMERA FRANKE 4 PIN 630
Alsako Electrodomésticos
 
Media risk assessment for each shoot
Media risk assessment for each shootMedia risk assessment for each shoot
Media risk assessment for each shoot
charliequirk16
 
lesson plan 2
lesson plan 2lesson plan 2
lesson plan 2
Wafa alshehhi
 
Research into twitter
Research into twitterResearch into twitter
Research into twitter
Damita D
 
Invasive Green Sunfish to be Removed from Backwater Slough In Colorado River
Invasive Green Sunfish to be Removed from Backwater Slough In Colorado RiverInvasive Green Sunfish to be Removed from Backwater Slough In Colorado River
Invasive Green Sunfish to be Removed from Backwater Slough In Colorado River
Grand Canyon Visitor Center
 
The future-of-productivity-peterson-institute-for-international-economics-was...
The future-of-productivity-peterson-institute-for-international-economics-was...The future-of-productivity-peterson-institute-for-international-economics-was...
The future-of-productivity-peterson-institute-for-international-economics-was...
Dr. Stefan Laternser
 
Assenstelsel en grafiek
Assenstelsel en grafiekAssenstelsel en grafiek
Assenstelsel en grafiek
0769599lanlan
 
Clark portfolio
Clark portfolioClark portfolio
Clark portfolio
Tiffany Clark
 

Viewers also liked (13)

What Is SMART+ Memberships
What Is SMART+ MembershipsWhat Is SMART+ Memberships
What Is SMART+ Memberships
 
Nadadores
NadadoresNadadores
Nadadores
 
MM FARMER WHITE PAPER, 060908
MM FARMER WHITE PAPER, 060908MM FARMER WHITE PAPER, 060908
MM FARMER WHITE PAPER, 060908
 
Admission Restricted -US Refugee Policy
Admission Restricted -US Refugee PolicyAdmission Restricted -US Refugee Policy
Admission Restricted -US Refugee Policy
 
stARTup Los Angeles-Apply Now
stARTup Los Angeles-Apply NowstARTup Los Angeles-Apply Now
stARTup Los Angeles-Apply Now
 
ENCIMERA FRANKE 4 PIN 630
ENCIMERA  FRANKE 4 PIN 630ENCIMERA  FRANKE 4 PIN 630
ENCIMERA FRANKE 4 PIN 630
 
Media risk assessment for each shoot
Media risk assessment for each shootMedia risk assessment for each shoot
Media risk assessment for each shoot
 
lesson plan 2
lesson plan 2lesson plan 2
lesson plan 2
 
Research into twitter
Research into twitterResearch into twitter
Research into twitter
 
Invasive Green Sunfish to be Removed from Backwater Slough In Colorado River
Invasive Green Sunfish to be Removed from Backwater Slough In Colorado RiverInvasive Green Sunfish to be Removed from Backwater Slough In Colorado River
Invasive Green Sunfish to be Removed from Backwater Slough In Colorado River
 
The future-of-productivity-peterson-institute-for-international-economics-was...
The future-of-productivity-peterson-institute-for-international-economics-was...The future-of-productivity-peterson-institute-for-international-economics-was...
The future-of-productivity-peterson-institute-for-international-economics-was...
 
Assenstelsel en grafiek
Assenstelsel en grafiekAssenstelsel en grafiek
Assenstelsel en grafiek
 
Clark portfolio
Clark portfolioClark portfolio
Clark portfolio
 

Similar to fixperts

Arduino 2 Final Report (final)
Arduino 2 Final Report (final)Arduino 2 Final Report (final)
Arduino 2 Final Report (final)
Mohammad Molani
 
CDC 3D Printing Energy Light
CDC 3D Printing Energy LightCDC 3D Printing Energy Light
CDC 3D Printing Energy Light
Ellen Palmer
 
The 3DVisual Process Exterior
The 3DVisual Process ExteriorThe 3DVisual Process Exterior
The 3DVisual Process Exterior
Elaine Wu
 
abistory
abistoryabistory
abistory
externalidades
 
Presentation notes t forster
Presentation notes   t forsterPresentation notes   t forster
Presentation notes t forster
Bath & Bristol Enterprise Network
 
The SAIL Volume 1 MARCH 2016_spread_IA
The SAIL Volume 1 MARCH 2016_spread_IAThe SAIL Volume 1 MARCH 2016_spread_IA
The SAIL Volume 1 MARCH 2016_spread_IA
Deborah Sill
 
Real Options Agile Tour Brussels 2013
Real Options Agile Tour Brussels 2013Real Options Agile Tour Brussels 2013
Real Options Agile Tour Brussels 2013
AgileCoach.net
 
CASE STUDY Design house partnerships at Concept Design S.docx
CASE STUDY  Design house partnerships at Concept Design S.docxCASE STUDY  Design house partnerships at Concept Design S.docx
CASE STUDY Design house partnerships at Concept Design S.docx
madlynplamondon
 
Printing The Future
Printing The FuturePrinting The Future
Printing The Future
Paulo Carvalho
 
From Prototype to Kickstarter to Production: How blink(1) was made
From Prototype to Kickstarter to Production: How blink(1) was madeFrom Prototype to Kickstarter to Production: How blink(1) was made
From Prototype to Kickstarter to Production: How blink(1) was made
todbotdotcom
 
Big_Magazine_2016
Big_Magazine_2016Big_Magazine_2016
Big_Magazine_2016
Olivia Ekmark
 
CBS Design Process-email
CBS Design Process-emailCBS Design Process-email
CBS Design Process-email
Matthew Adler
 
TANATSWA MAJONI PORTFOLIO
TANATSWA MAJONI PORTFOLIOTANATSWA MAJONI PORTFOLIO
TANATSWA MAJONI PORTFOLIO
TanatswaMajoni1
 
Engineering Portfolio.pptx
Engineering Portfolio.pptxEngineering Portfolio.pptx
Engineering Portfolio.pptx
TanatswaMajoni1
 
M.b.t.s. round 1 week 2 (2018)
M.b.t.s. round 1 week 2 (2018)M.b.t.s. round 1 week 2 (2018)
M.b.t.s. round 1 week 2 (2018)
Moon Bears To Space
 
Aglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAILAglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAIL
Joe Whelan
 
Paco Viñoly, Designing in a Developer World, WarmGun 2013
Paco Viñoly, Designing in a Developer World, WarmGun 2013Paco Viñoly, Designing in a Developer World, WarmGun 2013
Paco Viñoly, Designing in a Developer World, WarmGun 2013
500 Startups
 
Makesmith Accessible Technology Pitch Deck for the Dublin Web Summit
Makesmith Accessible Technology Pitch Deck for the Dublin Web SummitMakesmith Accessible Technology Pitch Deck for the Dublin Web Summit
Makesmith Accessible Technology Pitch Deck for the Dublin Web Summit
Justin Beirold
 
Stephanie Tomasetta: 2014 Portfolio
Stephanie Tomasetta: 2014 PortfolioStephanie Tomasetta: 2014 Portfolio
Stephanie Tomasetta: 2014 Portfolio
stephanieltomas
 
Shikhar profile
Shikhar profileShikhar profile
Shikhar profile
SHIKHAR COMMUNICATIONS
 

Similar to fixperts (20)

Arduino 2 Final Report (final)
Arduino 2 Final Report (final)Arduino 2 Final Report (final)
Arduino 2 Final Report (final)
 
CDC 3D Printing Energy Light
CDC 3D Printing Energy LightCDC 3D Printing Energy Light
CDC 3D Printing Energy Light
 
The 3DVisual Process Exterior
The 3DVisual Process ExteriorThe 3DVisual Process Exterior
The 3DVisual Process Exterior
 
abistory
abistoryabistory
abistory
 
Presentation notes t forster
Presentation notes   t forsterPresentation notes   t forster
Presentation notes t forster
 
The SAIL Volume 1 MARCH 2016_spread_IA
The SAIL Volume 1 MARCH 2016_spread_IAThe SAIL Volume 1 MARCH 2016_spread_IA
The SAIL Volume 1 MARCH 2016_spread_IA
 
Real Options Agile Tour Brussels 2013
Real Options Agile Tour Brussels 2013Real Options Agile Tour Brussels 2013
Real Options Agile Tour Brussels 2013
 
CASE STUDY Design house partnerships at Concept Design S.docx
CASE STUDY  Design house partnerships at Concept Design S.docxCASE STUDY  Design house partnerships at Concept Design S.docx
CASE STUDY Design house partnerships at Concept Design S.docx
 
Printing The Future
Printing The FuturePrinting The Future
Printing The Future
 
From Prototype to Kickstarter to Production: How blink(1) was made
From Prototype to Kickstarter to Production: How blink(1) was madeFrom Prototype to Kickstarter to Production: How blink(1) was made
From Prototype to Kickstarter to Production: How blink(1) was made
 
Big_Magazine_2016
Big_Magazine_2016Big_Magazine_2016
Big_Magazine_2016
 
CBS Design Process-email
CBS Design Process-emailCBS Design Process-email
CBS Design Process-email
 
TANATSWA MAJONI PORTFOLIO
TANATSWA MAJONI PORTFOLIOTANATSWA MAJONI PORTFOLIO
TANATSWA MAJONI PORTFOLIO
 
Engineering Portfolio.pptx
Engineering Portfolio.pptxEngineering Portfolio.pptx
Engineering Portfolio.pptx
 
M.b.t.s. round 1 week 2 (2018)
M.b.t.s. round 1 week 2 (2018)M.b.t.s. round 1 week 2 (2018)
M.b.t.s. round 1 week 2 (2018)
 
Aglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAILAglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAIL
 
Paco Viñoly, Designing in a Developer World, WarmGun 2013
Paco Viñoly, Designing in a Developer World, WarmGun 2013Paco Viñoly, Designing in a Developer World, WarmGun 2013
Paco Viñoly, Designing in a Developer World, WarmGun 2013
 
Makesmith Accessible Technology Pitch Deck for the Dublin Web Summit
Makesmith Accessible Technology Pitch Deck for the Dublin Web SummitMakesmith Accessible Technology Pitch Deck for the Dublin Web Summit
Makesmith Accessible Technology Pitch Deck for the Dublin Web Summit
 
Stephanie Tomasetta: 2014 Portfolio
Stephanie Tomasetta: 2014 PortfolioStephanie Tomasetta: 2014 Portfolio
Stephanie Tomasetta: 2014 Portfolio
 
Shikhar profile
Shikhar profileShikhar profile
Shikhar profile
 

fixperts

  • 1. DM1315 Design Process 1 FIXPERTS PROJECT
  • 3. For the groups Fixperts project worked alongside Royal Mail, as a member of our group had connections with them. As a group we travelled to West Brompton, to a newly outfitted Royal Mail distribution centre where our fixpartner, Richard Hoile, informed us of their problem; These new distribution centres are manned by one or two people, who spend the majority of the time out back, rather than sitting behind the main reception desk. This is an issue as it leaves monitors, PDA’s, keyboards and computer mice unguarded, meaning people could come and take them. The computer monitors are held down with a Kensington lock which Royal Mail are afraid will give the customers the impression that the do not trust them. Additionally, many of their customers become very short tempered when problems arise in the collection of their parcels, and have been known to verbally and occasionally physicallyassaultthestaff,meaningaprotectivescreenwouldalsobeuseful.ThusweweretaskedwithcreatingaproductthatbothhidestoKensington lock from the customers, as well as providing additional protection to the staff. A problem we encountered with some initial concepts we had on the day was the fact that the staff would be unable to retrofit a product to the work surface without getting a contractor to fit it, thus we decided to make a device that doesn’t need to be screwed to the surface and requires no special skill to fit it. The fact our product wouldn’t be permanently fixed in place would offer the staff the ability to move it, and their desk equipment around the work surface, a feature that wouldn’t be possible with a fixed screen. The wires and cables coming from behind the monitor are very unsightly and contrast with the rest of the new, tidy distribution centre. Our product would have to therefore in keep with the sleek modern design of the room to hide all the wires, making the whole thing much neater. We also decided that as the rest of the room, and Royal Mail in general is attributed with the colours red and white, that we would make our product these colours too, so that it fitted well in the room. The final issue we faced was the fact that many of these distribution centres have different thicknesses of their desks vary, therefore we would have to design our product to be adjustable, as we wanted it to be able to clip under the desk.
  • 4. On this page are the rough sketches I did for our prod- uct. As a group we decided to use the image above as the concept to make on rig day.
  • 5. The first thing we had to do was cut the different lengths of wood to the required sizes and then we planned out how our product would go together before actually assembling it. Whilst measuring it we realised it needed to be slightly wider, to fit both the keyboard and the mouse with enough room to be used comfortably.
  • 6. When it came to fastening the pieces together, we initially cut come of the off cuts into 45 degree sections and attempted to nail these into the corners, where the planks met. However we were able to find metal brackets which did the job a lot better.
  • 7. We had to get a few pieces cut from the technicians as we were una- ble to use the workshop machinery ourselves. This posed as a prob- lem as it meant not only did we have to wait in line to get work done, but we also had to explain exactly what we wanted done, where- as it would have been much easier to have done it ourselves.
  • 8. Once finished with our rig build, we placed it on a table to view it and as- sess whether the under table clipping system worked correctly, which it did, however it was not adjustable as we had previously planned on doing.
  • 9. We then had a meeting with our fixpartner, Richard, to gain his views on our initial concept. Although ultimately happy with the system we had devised, we ended up coming to the conclusion that the product needed to be deeper, as well as being open at one side as to not restrict the staff. To the right is my sketch for the new design which I drew in a group meeting, this was ultimately the design that we as a group decided to go with.
  • 10. Before making the final product, I designed a 3D rendering on Google SkethUp, which I felt better portrayed the design to others than any drawing would do, as it gave a complete 360 degree view. I then designed the illustrator file that we laser cut. The pieces we laser cut were the two white acrylic screens and the red under table clip. We then went to the metal workshop and gave our technical drawing to a technician to manufacture.
  • 11. Once fully assembled we were able to set up our product on a table and ensure that it worked correctly, which it did. Unfortunately, due to a delay in the metalwork shop we were ultimately unsuccessful in bringing our final product back to our fixpartner for his final opinion, however we still intent to do this so that we can fully conclude the project.