SlideShare a Scribd company logo
1 of 13
Download to read offline
Northern Periphery and Arctic Programme 2014-2020
Communication
Strategy
Adopted by the Monitoring Committee on 10th June 2015
2
Contents
1. Introduction........................................................................................................................................... 3
2. Communication Objectives ................................................................................................................... 3
3. Main target audiences........................................................................................................................... 4
4. Strategy.................................................................................................................................................. 5
4.1 Tactics............................................................................................................................................ 5
4.2 Messages ....................................................................................................................................... 6
4.3 Roles .............................................................................................................................................. 7
5. Communication measures..................................................................................................................... 9
6. Annual Communication Plans (Information Action Plans) .................................................................. 11
7. Budget ................................................................................................................................................. 12
8. Monitoring and Evaluation.................................................................................................................. 13
3
1. Introduction
This document outlines the 7-year communication strategy for the Northern Periphery and Arctic
Programme 2014-2020 (NPA 2014-2020), as adopted by the Monitoring Committee on 10th
June 2015.
In line with the Common Provisions Regulation (EU) 1303/2013 Articles 115-117 and Annex XII, and
Implementing Regulation 821/2014 Articles 3-5 and Annex II, the programme is responsible for drawing up
a 7-year communication strategy, which is operationalised into annual communication plans. It is stipulated
that the communication strategy should be adopted by the Monitoring Committee within 6 months after
the approval date of the programme, 16th
December 2014. Reviews of the annual communication plans
should be presented to the Monitoring Committee each year.
This strategy document outlines the main communication objectives of the NPA 2014-2020, the main target
groups identified, the messages that will be communicated to the target groups and the channels that will
be deployed. The document ends with an overview of roles and responsibilities, methods for evaluation of
the strategy and the amounts earmarked for the implementation of the communication strategy in the
Technical Assistance budget.
2. Communication Objectives
Compared with the previous programmes, the NPA needs to put considerably more efforts into achieving
tangible results and measurable changes at programme area level. The Communication Strategy plays a
crucial role in obtaining these results, besides more traditional communication objectives. Thus, the
following aim and objectives have been defined for the communication strategy of the Northern Periphery
and Arctic Programme 2014-2020:
To raise awareness about the Northern Periphery and Arctic Programme 2014-2020, its objectives and its
outputs by engaging with (potential) beneficiaries, relevant stakeholders and the public, thereby
facilitating the achievement of the changes sought by the programme.
Ultimately the purpose of the communication strategy is to support the implementation of the programme
strategy, thereby achieving the results sought by the programme. An effective communication strategy is
expected to contribute to the development of high quality project applications, good governance of the
programme, and an active coordination with other programmes.
This translates into the following communication objectives, linked to the programme objectives:
 Achieving and sustaining results:
o To raise awareness about the added value of cooperation for achieving the specific
objectives and results sought.
o To raise awareness about outputs and impacts of funded projects and programme results,
thereby increasing the dissemination of the results as well as giving accountability for
invested funds.
 High quality applications:
o To raise awareness about the NPA 2014-2020 and its funding opportunities.
4
o To increase the capacity for high quality applications and effective project implementation
and thereby facilitate the development of viable project outputs.
 Good governance:
o To support efficient and effective governance of the programme in cooperation with its
partners.
o To engage with the (potential) stakeholders of the programme in order to build a trust
relationship with beneficiaries.
 Coordination:
o To coordinate with other programmes and funding instruments operating in the NPA area,
by informing them about the NPA-specific profile and supported projects, and to stay
informed about them.
Figure 1 – Link between the communication strategy and the programme strategy
3. Main target audiences
 Potential beneficiaries/applicants: organisations that have an interest or have the capacity to
participate in NPA projects; organisations that participated in previous programme periods, as well
as new organisations. This group includes applicants known to the programme bodies as having the
intention to submit an application.
 Beneficiaries/funded projects: organisations receiving funding from the NPA 2014-2020
 Programme bodies: organisations and groups involved in the governance of the programme. They
include the Joint Secretariat (Denmark), the Managing Authority (Sweden), the Audit Authority
(Sweden), Regional Contact Points (one in each of the 9 countries), national and regional
Effective
Communication
Strategy
Achieving
and
sustaining
results
Good
governance
Coordination
with other
programmes
High quality
applications
5
representatives on different programme committees for all 9 countries. The European Commission
DG Regio also falls in this category.
 External audience:
o End users and the wider public: those making use of or potentially being impacted by
project outputs and programme results.
o Influencers/multipliers: authorities and policy makers, match funding providers, politicians,
third sector organisations, trade and industry, educational and research institutions, EU
info centres, the press, etc.
o Others: this may include organisations acting as observers on the Monitoring Committee,
other programmes and their projects and other national and international organisations,
especially those with overlapping areas in the Arctic, neighbouring regions in Russia and
Canada.
4. Strategy
4.1 Tactics
The NPA 2014-2020 can build on the good reputation of its predecessors (NPP 2007-2013, Interreg IIIB NPP,
Article 10), having a track record of being a well-run and unique programme.
The programme has a long-standing practice of consulting its stakeholders and where relevant involving
them in the decision-making and implementation. This approach of fostering a trust relationship with
programme bodies, regions and (potential) beneficiaries, allows the programme to be proactive and
efficient.
A number of important developments have taken place since the previous communication strategy was
drawn up 7 years ago:
 As a result of an increased focus on the Arctic dimension, the programme’s profile has risen,
attracting interest from a wider audience, national and international institution. This places a
bigger emphasis on the need for coordination with other EU programmes in the same region1
.
 The NPA 2014-2020 has the ambition to build on the results from the previous programme, by
freshening up existing partnerships and tapping into new groups of potential project partners. In
addition, the European Commission has emphasised the importance of private sector involvement.
Two of the NPA priority axes are targeting SMEs, representing approx. 60% of the programme
funds. This requires the programme to utilise new messages and channels tailored to the needs of
new potential applicants, including SMEs2
and intermediary bodies.
 Since the previous communication strategy was drawn up, technological developments and social
media have transformed the way in which people share information and participate in networks.
1
The Northern Periphery Programme 2007-2013 has funded a preparatory project to develop a pilot to test the
concept of coordination around regional development activities and projects in the Arctic and near-Arctic.
2
The MC acknowledged that it would be impossible for the programme to address SMEs in general, but it might be
possible to address specific groups, e.g. SMEs dealing with Blue Growth. In addition, the programme could target
organisations dealing with entrepreneurship, e.g. chambers of commerce and intermediate bodies in the region.
6
The developments described above justify the need for an up-to-date and comprehensive communication
strategy. At the same time, the programme’s communication budget and staff resources are limited
compared to the vast geographical area to cover. For this reason, the communication activities need to be
extremely efficient.
Routines and tools will be set up to allow clustering and targeting of information at programme and project
level. Through dialogue with its stakeholders, the programme will identify information sources and needs
and develop targeted messages for different target groups. In addition, it is expected that the programme
evaluation strategy will provide necessary input to communicate the programme results.
4.2 Messages
The table below shows and overview of the main programme messages, by target group and
communication objective.
Table 1 - Matrix of main programme messages
Programme
objectives
Communication objectives Target groups Main messages
Achieving and
sustaining
results
To raise awareness about the
added value of cooperation
for achieving the specific
objectives and results sought
Potential applicants,
programme bodies,
regional/national/EU policy
makers, other multipliers such
as sectorial
bodies/associations
NPA cooperation can
bring added value to
regions and communities,
as formulated in specific
objectives and results
sought
To raise awareness about
outputs and impacts of
funded projects and
programme results, thereby
increasing the dissemination
of the results as well as
giving accountability for
invested funds
Programme bodies,
regional/national/EU policy
makers, potential end users,
other multipliers such as
sectorial bodies/associations,
potential applicants
NPA projects develop
tangible outputs that
have positive impacts in
regions and communities.
The investment of public
funding in NPA
cooperation projects is
worthwhile.
High quality
applications
High quality
applications
To raise awareness about the
NPA 2014-2020 and its
funding opportunities
Potential applicants, Regional
Contact Points and other
bodies providing guidance to
applicants, intermediary
bodies working with SMEs
The NPA supports
projects addressing the
specific objectives of the
programme.
Private sector partners
can apply for NPA
funding.
To increase the capacity for
high quality applications and
effective project
implementation and thereby
facilitate the development of
viable project outputs
Potential applicants, Regional
Contact Points and other
bodies providing guidance to
applicants
The NPA offers guidance
and support for
developing high quality
applications and good
project management.
Good
governance
To support efficient and
effective governance of the
programme in cooperation
with its partners
Programme bodies,
national/regional/EU
representatives, MC
observers
The NPA takes a
proactive approach to
programme
management.
To engage with the Potential applicants, The NPA involves its
7
(potential) stakeholders of
the programme in order to
build a trust relationship
with beneficiaries.
beneficiaries, Regional
Advisory Groups, potential
end users
stakeholders in the
decision-making and
implementation in order
to be proactive and
responsive to the needs in
the programme area.
Coordination To coordinate with other
programmes and funding
instruments operating in the
NPA area, by informing them
about the NPA-specific
profile and supported
projects, and to stay
informed about them.
Other programmes and
strategies,
national/regional/EU policy
makers, INTERACT network,
multipliers
The NPA is aware of
neighbouring
programmes and takes a
proactive role in
exchanging information.
4.3 Roles
The NPA 2014-2020 covers a vast geographical area compared to relatively limited resources. For this
reason, the implementation of the communication strategy will be a joint effort.
Main actors in the communication strategy:
 Joint Secretariat: the main body responsible for the development and implementation of the
communication strategy.
o Part of the duties of the Programme Manager for Information and Communication is to
design and implement the overall programme communication strategy, to develop
publications and promotional materials, to develop and manage the programme website
and other online platforms, to organise annual conferences, and to develop
communication trainings and materials for NPA projects and Regional Contact Points.
o The Joint Secretariat also provides other programme bodies and the European Commission
with information relevant for the governance of the programme.
o In addition, the Joint Secretariat acts as a multiplier for disseminating project outputs and
results, news from Regional Contact Points, and news from the European level relevant for
the NPA audience.
 Managing Authority: the main body responsible for communicating formal information to the
European Commission, programme bodies, national authorities, and projects.
 Regional Contact Points: the network of Regional Contact Points (RCPs) acts as an extension of the
Joint Secretariat in each programme partner country. RCPs play an important role in making
(potential) beneficiaries aware of the funding opportunities, providing information and guidance
about the programme to applicants, project partners and other stakeholders. RCPs are often the
first point of call for project idea holders, and in this capacity they play an important role in filtering
ideas, thereby helping to create a pipeline for high quality project applications. RCPs also act as the
secretary for the Regional Advisory Group in each programme partner country, and are for that
reason in contact with a wide range of regional stakeholders. They organise information events
about the programme in their region on a regular basis.
8
 Monitoring Committee members: National and regional members on the Monitoring Committee
have access to national and regional politicians, as well as national and regional decision makers in
European and other international institutions. For this reason, MC members have a role in
translating the added value of the programme to national and regional politicians and decision
makers.
 NPA projects: project partners form a link between the programme and the communities in the
programme area. Projects are primarily responsible for communicating with their main target
groups about the project outputs under development and their results, always acknowledging the
support received from the programme (ERDF). This means that project communications should
mainly focus on communicating their outputs rather than on branding the project as such, which is
only a temporary cooperation aimed at developing the outputs. Secondly, projects are expected to
feed back to the programme level by sharing examples of promotional materials, success stories,
and descriptions of (expected) outputs. For this reason, the programme has stipulated a number of
mandatory communication measures that projects are expected to develop within the first 6
months after approval.
 INTERACT and other programmes:
o Together with other transnational and cross-border programmes, INTERACT has developed
a strategy for harmonised branding of Interreg programmes. The purpose is to join efforts
and increase the visibility of Interreg, in particular towards policy makers and multipliers at
the EU level. The Monitoring Committee has decided that the Interreg branding should not
replace the programme branding, but that it should be used in combination where
relevant.
o Besides the harmonised branding, a number of transnational programmes has identified
opportunities to join forces on communication trainings for projects, joint promotion of
thematic objectives, etc. As a small transnational programme, the NPA will seek to join
such initiatives where it leads to synergies and more efficiency.
9
5. Communication measures
The programme will use a wide range of tools and channels for communicating its messages. The
programme will customise its communication efforts for each target audience identified.
In order to consider the relevant communication measures, an analysis of the information needs has been
carried out (Table 2).
Table 2 - Analysis of information needs
Information needs Applicants Funded
projects
Programme
bodies
External
audience
Basic information about the NPA 2014-2020
(priorities, area, context, contact details)
X X X X
Funding opportunities X X
Guidance and templates for applying X X
Guidance and templates for claiming funding
and promotion
X X
Funded projects X X X
Project outputs and programme results X X X X
Programme news & events X X X X
Social networking X X X X
Meeting documents X
Below is a list of the main communication measures identified.
1) Visual identity: the purpose of the visual identity is to provide visibility and recognisability of the
programme throughout all its communication efforts.
 A programme logo has been developed and will be used in combination with the EU emblem in
accordance with regulatory requirements. Where appropriate, the Interreg logo will be
combined with the programme logo.
 Graphical elements and templates for branding the programme/projects will be developed (e.g.
MS Office templates, posters, giveaways).
 Visual guidelines and templates will be made available for use by beneficiaries and RCPs to
ensure compliance with publicity requirements.
 A press kit will be developed to facilitate media coverage. The main access to regional and
national media will be through Regional Contact Points, national and regional representatives
and NPA projects.
2) Printed/digital publications: the programme will produce different types of publications, which will
be printed in small numbers on demand with sustainability in mind. All documents will also be
made available in electronic format.
a) The Cooperation Programme document will be made available in a reader-friendly format.
b) Factsheets/flyers with basic programme information will be used for wide dissemination.
c) Annual reports or a summary of the main conclusions will be published at least in the years
2017, 2019, 2023.
10
d) A Programme Manual will be developed with guidance and instructions for applicants and
project managers at each stage of the project implementation. This document also contains the
eligibility and selection criteria, as well as the NPA eligibility rules for expenditure.
e) Evaluation reports about the progress towards the programme results (result indicators) will be
published after each evaluation has taken place.
f) Towards the end of the programme period, a publication about the programme
achievements/results will be published3
.
g) Other (on demand): press releases, thematic publications, targeted articles/publications e.g. for
OPEN DAYS, for Arctic cooperation, etc.
3) Online and social media platforms: online communication will be the main channel for
communicating with target audiences, because it offers the opportunity to reach the widest
audience.
a) Programme website: main information platform to communicate about the funding
opportunities (regulatory requirement), projects funded, project outputs, etc.
i) List of funded projects to be updated at least every 3 months (regulatory requirement)
ii) Project websites: the programme will provide projects with their own mini website as part
of the programme website to ensure compliance with publicity requirements and the
availability of information after project closure.
b) Social media platforms: these platforms will provide news on demand, building an NPA
community. These platforms also allow the programme’s stakeholders to network with each
other.
c) Newsflashes/newsletters: the programme will periodically provide up-to-date information
about the programme to the relevant NPA target audiences.
4) Conferences and seminars:
a) Annual conferences: the programme will organise one major information event per year to
present the visions and achievements of the programme. Each year, the Monitoring Committee
will select a theme, and key actors will be invited. Due to budget limitations, a bigger
conference will be held every other year.
b) Project development events will be organised, such as training events for applicants, project
managers, partner search events.
c) Regional events will be organised by Regional Contact Points on a yearly basis.
d) Communication training for beneficiaries and RCPs will be organised (potentially in cooperation
with other programmes).
5) Monitoring system: reliable and aggregated financial information, project information and
indicators will be gathered in an online monitoring system.
a) The monitoring system will facilitate data exchange and formal communication with (potential)
beneficiaries and authorities, such as the European Commission.
b) The monitoring system will allow internal communication and coordination between
programme bodies.
6) Other communication measures
a) Other exposure is expected, for example through interviews/articles for websites and
magazines, presentations at joint Interreg or third party events, RegioStars Awards, etc.
b) Displaying the EU emblem at the premises of the Managing Authority
Guiding principles for all communication measures will be:
3
At the request of the MC, the Joint Secretariat will endeavour to publish smaller stories on results when they
become available during the programme period.
11
 User-friendliness: the programme has a reputation for being approachable and proactive. It is
essential that the programmes makes an effort to develop user-friendly and easy-to-understand
communication measures, in order to communicate a complex topic such as transnational
cooperation to non-experts, in order to reduce the administrative burden for beneficiaries, and to
increase the capacity for high quality applications.
 The NPA horizontal principles as defined in the Cooperation Programme document are guiding
principles, in particular the principle of inclusion and diversity. This means that the programme will
consider for its communication measures if all can participate or if the measures inadvertently
create barriers for individuals or specific groups. Within the scope of the limited resources,
proportional adaptations for people with disabilities will be considered, e.g. developing the NPA
website with accessibility for the visually impaired in mind.
6. Annual Communication Plans (Information Action Plans)
The communication strategy will adapt to each stage of the programme implementation, in the short,
medium, and long term. The Monitoring Committee has chosen a strategy to front-load the programme,
which means that most of the programme funds will be allocated during the first years of the programme
period. In addition, programme routines and systems will be developed and fine-tuned during this period.
For this reason, the communication strategy will mostly focus on attracting high quality applications and
good governance during the first few years. At the same time, it is important to coordinate with other
programmes, to promote synergies and avoid duplications. When the programme reaches the peak of its
implementation, the communication strategy will promote good project management, project
communication skills and dissemination of the first results. In the final years of the programme
implementation, the communication strategy will shift focus to communicating the project and programme
results and optimising the use of the remaining funds.
The table below provides a simplified overview of the planned measures for the entire programme period.
Detailed information action plans will be presented to the Monitoring Committee once a year. In addition,
a review of the year’s information action plan activities will be presented to the MC.
Communication measures 2014 2015 2016 2017 2018 2019 2020 2021-23
Programme Launch Event X
Major information activity
(annual conference)
X X X X X X X
Visual identity setup X X
Programme website setup X
Publications X X X X X
 Cooperation Programme document X X
 Formatted Annual Report X X X
 Results publication X X
Engagement through online & social media X X X X X X X X
Information exchange monitoring system X X X X X X X
12
7. Budget
Communication measure Description Amount
(EUR)
Visual identity 15.000,00
 Development of complete visual
identity and templates
Visual identity guidelines and press kit, MS Office
templates for Word and PPT, envelopes, post-its,
including printing costs
10.000,00
 Development of communication
toolkits for beneficiaries (and
RCPs)
Guidelines for meeting the publicity requirements,
templates for posters and plaques, other electronic
templates, stickers
5.000,00
Website and other online platforms4
45.000,00
 Technical solution Programming, implementing existing solutions,
including an adaptation to retrieve data from the
monitoring system
25.000,00
 Graphical design for programme
website and other online
platforms
Note: the design of the website may be integrated
in the price of the technical solution.
7.500,00
 Content management Adding/updating content, development plan -
 Maintenance, hosting and
updates
Development and technical updates 12.500,00
Publications 70.000,00
 Programme documents Programme Manual, Cooperation Programme, etc. 15.000,00
 Promotional publications Factsheets, flyers, formatted annual reports, other
reports and publications. Note: it is envisaged that
printing costs will mainly apply to factsheets and
flyers, and only to a limited degree to reports and
publications.
30.000,00
 Promotional materials Banners/roll-ups, posters, giveaways and some
conference materials
25.000,00
Grand total 130.000,00
Please note that the budget for organising events, such as the annual conferences, project development
events and seminars, and programme meetings has been earmarked in a separate budget line in the
Technical Assistance budget, because these events are viewed as more than communication measures
only. The total budget for Seminars & Networking is EUR 335.000.
4
Please note that as a result of the website tender held in December 2014, some amounts have to be moved around
to be able to afford the contract. The basic contract was just approx. 34 500 EUR excluding additional adaptations and
hosting.
13
8. Monitoring and Evaluation
The Monitoring Committee will monitor the progress of the delivery of the communication strategy. A
communication plan will be presented to the Monitoring Committee every year together with the progress
made on the indicators. In addition, progress on the communication plan will be reported to the European
Commission in Annual Reports and the Final Report. If deemed necessary, the Monitoring Committee can
decide on a review of the communication strategy.
In order to measure and evaluate the effectiveness of the communication strategy, the following indicators
will be tracked during the programme implementation.
 Output indicators:
o Website statistics
o Number of news articles (NPA website + articles developed for other media)
o Number of events + participants
o Number of social media posts (Facebook posts + reach, likes, Twitter posts + retweets,
followers)
o Number of publications (if possible how many downloaded)
 Result indicators (baseline is surveys in 2015, repeated in 2017, 2019, 2023):
o Raised awareness about the NPA 2014-2020 and its funding opportunities
o Raised awareness about project outputs and programme results
o Improved knowledge about procedures for applying for/claiming funding
o Increased capacity for effective project implementation (e.g. LP seminars, guidance, RCPs).
o Raised satisfaction with information/guidance provided to applicants and funded projects
 Baseline and measurement methodology: surveys with applicants, projects, RCPs/RAGs, website
survey.

More Related Content

Similar to FINAL_NPA_Communication_Strategy_-_approved_by_MC.pdf

Stakeholder Workshop (Naidoo, Ouchi)
Stakeholder Workshop (Naidoo, Ouchi)Stakeholder Workshop (Naidoo, Ouchi)
Stakeholder Workshop (Naidoo, Ouchi)UNDPhr
 
Governance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water SectorGovernance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water SectorGlobal Water Partnership
 
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augKnowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augGlobal Water Partnership
 
[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination PlanKarel Janečka
 
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...FIDAfrique-IFADAfrica
 
BBC_Communication to make_aid_effective
BBC_Communication to make_aid_effectiveBBC_Communication to make_aid_effective
BBC_Communication to make_aid_effectiveToura Vanh
 
Item 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdfItem 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdfOECD Environment
 
PIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_ReportPIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_ReportTatjana Muhic
 
D5.1 Communication and Dissemination Plan
D5.1 Communication and Dissemination PlanD5.1 Communication and Dissemination Plan
D5.1 Communication and Dissemination PlanMobile Age Project
 
Head general affairs_department_en
Head general affairs_department_enHead general affairs_department_en
Head general affairs_department_enAgus Witono
 
ttopstart - Project management
ttopstart - Project managementttopstart - Project management
ttopstart - Project managementttopstart B.V.
 
Head general affairs_department_en
Head general affairs_department_enHead general affairs_department_en
Head general affairs_department_enAgus Witono
 
DTP-COM-STRATEGIC-PLAN-SL.pptx LGU Mater
DTP-COM-STRATEGIC-PLAN-SL.pptx LGU MaterDTP-COM-STRATEGIC-PLAN-SL.pptx LGU Mater
DTP-COM-STRATEGIC-PLAN-SL.pptx LGU MaterVictoriaJessicaPadol
 
Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Christina Parmionova
 
Playing the Game Toolkit: A guide for sport-for-development practitioners
Playing the Game Toolkit: A guide for sport-for-development practitionersPlaying the Game Toolkit: A guide for sport-for-development practitioners
Playing the Game Toolkit: A guide for sport-for-development practitionersUNICEF Office of Research - Innocenti
 

Similar to FINAL_NPA_Communication_Strategy_-_approved_by_MC.pdf (20)

Stakeholder Workshop (Naidoo, Ouchi)
Stakeholder Workshop (Naidoo, Ouchi)Stakeholder Workshop (Naidoo, Ouchi)
Stakeholder Workshop (Naidoo, Ouchi)
 
Governance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water SectorGovernance and Financing for the Mediterranean Water Sector
Governance and Financing for the Mediterranean Water Sector
 
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augKnowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
 
UN_Careers.pdf
UN_Careers.pdfUN_Careers.pdf
UN_Careers.pdf
 
Handbook of Good Practices
Handbook of Good PracticesHandbook of Good Practices
Handbook of Good Practices
 
[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan[SDI-EDU] WP5 Dissemination Plan
[SDI-EDU] WP5 Dissemination Plan
 
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
 
BBC_Communication to make_aid_effective
BBC_Communication to make_aid_effectiveBBC_Communication to make_aid_effective
BBC_Communication to make_aid_effective
 
Item 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdfItem 5a_GPIP overview_D.Simek_OECD.pdf
Item 5a_GPIP overview_D.Simek_OECD.pdf
 
PIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_ReportPIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_Report
 
OP Infrastruture and Networks 2014/2020 - Communication Plan
OP Infrastruture and Networks 2014/2020 - Communication PlanOP Infrastruture and Networks 2014/2020 - Communication Plan
OP Infrastruture and Networks 2014/2020 - Communication Plan
 
D5.1 Communication and Dissemination Plan
D5.1 Communication and Dissemination PlanD5.1 Communication and Dissemination Plan
D5.1 Communication and Dissemination Plan
 
Head general affairs_department_en
Head general affairs_department_enHead general affairs_department_en
Head general affairs_department_en
 
ttopstart - Project management
ttopstart - Project managementttopstart - Project management
ttopstart - Project management
 
Head general affairs_department_en
Head general affairs_department_enHead general affairs_department_en
Head general affairs_department_en
 
WelDest Dissemination Plan 2012 - 2014
WelDest Dissemination Plan 2012 - 2014WelDest Dissemination Plan 2012 - 2014
WelDest Dissemination Plan 2012 - 2014
 
DTP-COM-STRATEGIC-PLAN-SL.pptx LGU Mater
DTP-COM-STRATEGIC-PLAN-SL.pptx LGU MaterDTP-COM-STRATEGIC-PLAN-SL.pptx LGU Mater
DTP-COM-STRATEGIC-PLAN-SL.pptx LGU Mater
 
Extension.pptx
Extension.pptxExtension.pptx
Extension.pptx
 
Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.Production of the Industrial Development Report 2024.
Production of the Industrial Development Report 2024.
 
Playing the Game Toolkit: A guide for sport-for-development practitioners
Playing the Game Toolkit: A guide for sport-for-development practitionersPlaying the Game Toolkit: A guide for sport-for-development practitioners
Playing the Game Toolkit: A guide for sport-for-development practitioners
 

More from Ermiyas33

active_listening_and_effective_questioning.pdf
active_listening_and_effective_questioning.pdfactive_listening_and_effective_questioning.pdf
active_listening_and_effective_questioning.pdfErmiyas33
 
1Feb17-Gulf of Mexico Peer Listening Manual.pdf
1Feb17-Gulf of Mexico Peer Listening Manual.pdf1Feb17-Gulf of Mexico Peer Listening Manual.pdf
1Feb17-Gulf of Mexico Peer Listening Manual.pdfErmiyas33
 
PersonalSkills_SelfMotivated_AttitudeIsEverything.pptx
PersonalSkills_SelfMotivated_AttitudeIsEverything.pptxPersonalSkills_SelfMotivated_AttitudeIsEverything.pptx
PersonalSkills_SelfMotivated_AttitudeIsEverything.pptxErmiyas33
 
Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...
Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...
Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...Ermiyas33
 
Growth Mindset PowerpointGrowth Mindset Powerpoint_web.pdf
Growth Mindset PowerpointGrowth Mindset Powerpoint_web.pdfGrowth Mindset PowerpointGrowth Mindset Powerpoint_web.pdf
Growth Mindset PowerpointGrowth Mindset Powerpoint_web.pdfErmiyas33
 
Developing Positive AttitudeDeveloping Positive Attitude.pptx
Developing Positive AttitudeDeveloping Positive Attitude.pptxDeveloping Positive AttitudeDeveloping Positive Attitude.pptx
Developing Positive AttitudeDeveloping Positive Attitude.pptxErmiyas33
 
Respectful Workplace PresentationRespectful Workplace Presentation.pptx
Respectful Workplace PresentationRespectful Workplace Presentation.pptxRespectful Workplace PresentationRespectful Workplace Presentation.pptx
Respectful Workplace PresentationRespectful Workplace Presentation.pptxErmiyas33
 
Positive AttitudePositive AttitudePositive Attitude.pptx
Positive AttitudePositive AttitudePositive Attitude.pptxPositive AttitudePositive AttitudePositive Attitude.pptx
Positive AttitudePositive AttitudePositive Attitude.pptxErmiyas33
 
Growth MindsetGrowth MindsetGrowth Mindset.pptx
Growth MindsetGrowth MindsetGrowth Mindset.pptxGrowth MindsetGrowth MindsetGrowth Mindset.pptx
Growth MindsetGrowth MindsetGrowth Mindset.pptxErmiyas33
 
Positive Attitude Positive Attitude.pptx
Positive Attitude Positive Attitude.pptxPositive Attitude Positive Attitude.pptx
Positive Attitude Positive Attitude.pptxErmiyas33
 
training on Soft Skills Induction Program.pptx
training on Soft Skills Induction Program.pptxtraining on Soft Skills Induction Program.pptx
training on Soft Skills Induction Program.pptxErmiyas33
 
Basics of Communication_Soft_Skills.pptx
Basics of Communication_Soft_Skills.pptxBasics of Communication_Soft_Skills.pptx
Basics of Communication_Soft_Skills.pptxErmiyas33
 
20135 4.0 Telephone Training Tips - English 2020 (Low).pdf
20135 4.0 Telephone Training Tips - English 2020 (Low).pdf20135 4.0 Telephone Training Tips - English 2020 (Low).pdf
20135 4.0 Telephone Training Tips - English 2020 (Low).pdfErmiyas33
 
Improving Telephone Skills.pdfImproving Telephone Skills.pdf
Improving Telephone Skills.pdfImproving Telephone Skills.pdfImproving Telephone Skills.pdfImproving Telephone Skills.pdf
Improving Telephone Skills.pdfImproving Telephone Skills.pdfErmiyas33
 
Telephone_communication.pptxTelephone_communication.pptx
Telephone_communication.pptxTelephone_communication.pptxTelephone_communication.pptxTelephone_communication.pptx
Telephone_communication.pptxTelephone_communication.pptxErmiyas33
 
A_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdf
A_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdf
A_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdfErmiyas33
 
Creating a Motivating Workplace.pdfCreating a Motivating Workplace.pdf
Creating a Motivating Workplace.pdfCreating a Motivating Workplace.pdfCreating a Motivating Workplace.pdfCreating a Motivating Workplace.pdf
Creating a Motivating Workplace.pdfCreating a Motivating Workplace.pdfErmiyas33
 
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptxErmiyas33
 
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptxErmiyas33
 
HCSCC_Guide_to_Complaints_Resolution_Web.pdf
HCSCC_Guide_to_Complaints_Resolution_Web.pdfHCSCC_Guide_to_Complaints_Resolution_Web.pdf
HCSCC_Guide_to_Complaints_Resolution_Web.pdfErmiyas33
 

More from Ermiyas33 (20)

active_listening_and_effective_questioning.pdf
active_listening_and_effective_questioning.pdfactive_listening_and_effective_questioning.pdf
active_listening_and_effective_questioning.pdf
 
1Feb17-Gulf of Mexico Peer Listening Manual.pdf
1Feb17-Gulf of Mexico Peer Listening Manual.pdf1Feb17-Gulf of Mexico Peer Listening Manual.pdf
1Feb17-Gulf of Mexico Peer Listening Manual.pdf
 
PersonalSkills_SelfMotivated_AttitudeIsEverything.pptx
PersonalSkills_SelfMotivated_AttitudeIsEverything.pptxPersonalSkills_SelfMotivated_AttitudeIsEverything.pptx
PersonalSkills_SelfMotivated_AttitudeIsEverything.pptx
 
Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...
Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...
Professional-Workplace-CultureProfessional-Workplace-Culture-Employees-2019-r...
 
Growth Mindset PowerpointGrowth Mindset Powerpoint_web.pdf
Growth Mindset PowerpointGrowth Mindset Powerpoint_web.pdfGrowth Mindset PowerpointGrowth Mindset Powerpoint_web.pdf
Growth Mindset PowerpointGrowth Mindset Powerpoint_web.pdf
 
Developing Positive AttitudeDeveloping Positive Attitude.pptx
Developing Positive AttitudeDeveloping Positive Attitude.pptxDeveloping Positive AttitudeDeveloping Positive Attitude.pptx
Developing Positive AttitudeDeveloping Positive Attitude.pptx
 
Respectful Workplace PresentationRespectful Workplace Presentation.pptx
Respectful Workplace PresentationRespectful Workplace Presentation.pptxRespectful Workplace PresentationRespectful Workplace Presentation.pptx
Respectful Workplace PresentationRespectful Workplace Presentation.pptx
 
Positive AttitudePositive AttitudePositive Attitude.pptx
Positive AttitudePositive AttitudePositive Attitude.pptxPositive AttitudePositive AttitudePositive Attitude.pptx
Positive AttitudePositive AttitudePositive Attitude.pptx
 
Growth MindsetGrowth MindsetGrowth Mindset.pptx
Growth MindsetGrowth MindsetGrowth Mindset.pptxGrowth MindsetGrowth MindsetGrowth Mindset.pptx
Growth MindsetGrowth MindsetGrowth Mindset.pptx
 
Positive Attitude Positive Attitude.pptx
Positive Attitude Positive Attitude.pptxPositive Attitude Positive Attitude.pptx
Positive Attitude Positive Attitude.pptx
 
training on Soft Skills Induction Program.pptx
training on Soft Skills Induction Program.pptxtraining on Soft Skills Induction Program.pptx
training on Soft Skills Induction Program.pptx
 
Basics of Communication_Soft_Skills.pptx
Basics of Communication_Soft_Skills.pptxBasics of Communication_Soft_Skills.pptx
Basics of Communication_Soft_Skills.pptx
 
20135 4.0 Telephone Training Tips - English 2020 (Low).pdf
20135 4.0 Telephone Training Tips - English 2020 (Low).pdf20135 4.0 Telephone Training Tips - English 2020 (Low).pdf
20135 4.0 Telephone Training Tips - English 2020 (Low).pdf
 
Improving Telephone Skills.pdfImproving Telephone Skills.pdf
Improving Telephone Skills.pdfImproving Telephone Skills.pdfImproving Telephone Skills.pdfImproving Telephone Skills.pdf
Improving Telephone Skills.pdfImproving Telephone Skills.pdf
 
Telephone_communication.pptxTelephone_communication.pptx
Telephone_communication.pptxTelephone_communication.pptxTelephone_communication.pptxTelephone_communication.pptx
Telephone_communication.pptxTelephone_communication.pptx
 
A_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdf
A_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdf
A_STUDY_ON_EMPLOYEE_MOTIVATION.pdfA_STUDY_ON_EMPLOYEE_MOTIVATION.pdf
 
Creating a Motivating Workplace.pdfCreating a Motivating Workplace.pdf
Creating a Motivating Workplace.pdfCreating a Motivating Workplace.pdfCreating a Motivating Workplace.pdfCreating a Motivating Workplace.pdf
Creating a Motivating Workplace.pdfCreating a Motivating Workplace.pdf
 
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
 
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
Sample-MotivatingPeople.pptxSample-MotivatingPeople.pptx
 
HCSCC_Guide_to_Complaints_Resolution_Web.pdf
HCSCC_Guide_to_Complaints_Resolution_Web.pdfHCSCC_Guide_to_Complaints_Resolution_Web.pdf
HCSCC_Guide_to_Complaints_Resolution_Web.pdf
 

Recently uploaded

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 

Recently uploaded (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 

FINAL_NPA_Communication_Strategy_-_approved_by_MC.pdf

  • 1. Northern Periphery and Arctic Programme 2014-2020 Communication Strategy Adopted by the Monitoring Committee on 10th June 2015
  • 2. 2 Contents 1. Introduction........................................................................................................................................... 3 2. Communication Objectives ................................................................................................................... 3 3. Main target audiences........................................................................................................................... 4 4. Strategy.................................................................................................................................................. 5 4.1 Tactics............................................................................................................................................ 5 4.2 Messages ....................................................................................................................................... 6 4.3 Roles .............................................................................................................................................. 7 5. Communication measures..................................................................................................................... 9 6. Annual Communication Plans (Information Action Plans) .................................................................. 11 7. Budget ................................................................................................................................................. 12 8. Monitoring and Evaluation.................................................................................................................. 13
  • 3. 3 1. Introduction This document outlines the 7-year communication strategy for the Northern Periphery and Arctic Programme 2014-2020 (NPA 2014-2020), as adopted by the Monitoring Committee on 10th June 2015. In line with the Common Provisions Regulation (EU) 1303/2013 Articles 115-117 and Annex XII, and Implementing Regulation 821/2014 Articles 3-5 and Annex II, the programme is responsible for drawing up a 7-year communication strategy, which is operationalised into annual communication plans. It is stipulated that the communication strategy should be adopted by the Monitoring Committee within 6 months after the approval date of the programme, 16th December 2014. Reviews of the annual communication plans should be presented to the Monitoring Committee each year. This strategy document outlines the main communication objectives of the NPA 2014-2020, the main target groups identified, the messages that will be communicated to the target groups and the channels that will be deployed. The document ends with an overview of roles and responsibilities, methods for evaluation of the strategy and the amounts earmarked for the implementation of the communication strategy in the Technical Assistance budget. 2. Communication Objectives Compared with the previous programmes, the NPA needs to put considerably more efforts into achieving tangible results and measurable changes at programme area level. The Communication Strategy plays a crucial role in obtaining these results, besides more traditional communication objectives. Thus, the following aim and objectives have been defined for the communication strategy of the Northern Periphery and Arctic Programme 2014-2020: To raise awareness about the Northern Periphery and Arctic Programme 2014-2020, its objectives and its outputs by engaging with (potential) beneficiaries, relevant stakeholders and the public, thereby facilitating the achievement of the changes sought by the programme. Ultimately the purpose of the communication strategy is to support the implementation of the programme strategy, thereby achieving the results sought by the programme. An effective communication strategy is expected to contribute to the development of high quality project applications, good governance of the programme, and an active coordination with other programmes. This translates into the following communication objectives, linked to the programme objectives:  Achieving and sustaining results: o To raise awareness about the added value of cooperation for achieving the specific objectives and results sought. o To raise awareness about outputs and impacts of funded projects and programme results, thereby increasing the dissemination of the results as well as giving accountability for invested funds.  High quality applications: o To raise awareness about the NPA 2014-2020 and its funding opportunities.
  • 4. 4 o To increase the capacity for high quality applications and effective project implementation and thereby facilitate the development of viable project outputs.  Good governance: o To support efficient and effective governance of the programme in cooperation with its partners. o To engage with the (potential) stakeholders of the programme in order to build a trust relationship with beneficiaries.  Coordination: o To coordinate with other programmes and funding instruments operating in the NPA area, by informing them about the NPA-specific profile and supported projects, and to stay informed about them. Figure 1 – Link between the communication strategy and the programme strategy 3. Main target audiences  Potential beneficiaries/applicants: organisations that have an interest or have the capacity to participate in NPA projects; organisations that participated in previous programme periods, as well as new organisations. This group includes applicants known to the programme bodies as having the intention to submit an application.  Beneficiaries/funded projects: organisations receiving funding from the NPA 2014-2020  Programme bodies: organisations and groups involved in the governance of the programme. They include the Joint Secretariat (Denmark), the Managing Authority (Sweden), the Audit Authority (Sweden), Regional Contact Points (one in each of the 9 countries), national and regional Effective Communication Strategy Achieving and sustaining results Good governance Coordination with other programmes High quality applications
  • 5. 5 representatives on different programme committees for all 9 countries. The European Commission DG Regio also falls in this category.  External audience: o End users and the wider public: those making use of or potentially being impacted by project outputs and programme results. o Influencers/multipliers: authorities and policy makers, match funding providers, politicians, third sector organisations, trade and industry, educational and research institutions, EU info centres, the press, etc. o Others: this may include organisations acting as observers on the Monitoring Committee, other programmes and their projects and other national and international organisations, especially those with overlapping areas in the Arctic, neighbouring regions in Russia and Canada. 4. Strategy 4.1 Tactics The NPA 2014-2020 can build on the good reputation of its predecessors (NPP 2007-2013, Interreg IIIB NPP, Article 10), having a track record of being a well-run and unique programme. The programme has a long-standing practice of consulting its stakeholders and where relevant involving them in the decision-making and implementation. This approach of fostering a trust relationship with programme bodies, regions and (potential) beneficiaries, allows the programme to be proactive and efficient. A number of important developments have taken place since the previous communication strategy was drawn up 7 years ago:  As a result of an increased focus on the Arctic dimension, the programme’s profile has risen, attracting interest from a wider audience, national and international institution. This places a bigger emphasis on the need for coordination with other EU programmes in the same region1 .  The NPA 2014-2020 has the ambition to build on the results from the previous programme, by freshening up existing partnerships and tapping into new groups of potential project partners. In addition, the European Commission has emphasised the importance of private sector involvement. Two of the NPA priority axes are targeting SMEs, representing approx. 60% of the programme funds. This requires the programme to utilise new messages and channels tailored to the needs of new potential applicants, including SMEs2 and intermediary bodies.  Since the previous communication strategy was drawn up, technological developments and social media have transformed the way in which people share information and participate in networks. 1 The Northern Periphery Programme 2007-2013 has funded a preparatory project to develop a pilot to test the concept of coordination around regional development activities and projects in the Arctic and near-Arctic. 2 The MC acknowledged that it would be impossible for the programme to address SMEs in general, but it might be possible to address specific groups, e.g. SMEs dealing with Blue Growth. In addition, the programme could target organisations dealing with entrepreneurship, e.g. chambers of commerce and intermediate bodies in the region.
  • 6. 6 The developments described above justify the need for an up-to-date and comprehensive communication strategy. At the same time, the programme’s communication budget and staff resources are limited compared to the vast geographical area to cover. For this reason, the communication activities need to be extremely efficient. Routines and tools will be set up to allow clustering and targeting of information at programme and project level. Through dialogue with its stakeholders, the programme will identify information sources and needs and develop targeted messages for different target groups. In addition, it is expected that the programme evaluation strategy will provide necessary input to communicate the programme results. 4.2 Messages The table below shows and overview of the main programme messages, by target group and communication objective. Table 1 - Matrix of main programme messages Programme objectives Communication objectives Target groups Main messages Achieving and sustaining results To raise awareness about the added value of cooperation for achieving the specific objectives and results sought Potential applicants, programme bodies, regional/national/EU policy makers, other multipliers such as sectorial bodies/associations NPA cooperation can bring added value to regions and communities, as formulated in specific objectives and results sought To raise awareness about outputs and impacts of funded projects and programme results, thereby increasing the dissemination of the results as well as giving accountability for invested funds Programme bodies, regional/national/EU policy makers, potential end users, other multipliers such as sectorial bodies/associations, potential applicants NPA projects develop tangible outputs that have positive impacts in regions and communities. The investment of public funding in NPA cooperation projects is worthwhile. High quality applications High quality applications To raise awareness about the NPA 2014-2020 and its funding opportunities Potential applicants, Regional Contact Points and other bodies providing guidance to applicants, intermediary bodies working with SMEs The NPA supports projects addressing the specific objectives of the programme. Private sector partners can apply for NPA funding. To increase the capacity for high quality applications and effective project implementation and thereby facilitate the development of viable project outputs Potential applicants, Regional Contact Points and other bodies providing guidance to applicants The NPA offers guidance and support for developing high quality applications and good project management. Good governance To support efficient and effective governance of the programme in cooperation with its partners Programme bodies, national/regional/EU representatives, MC observers The NPA takes a proactive approach to programme management. To engage with the Potential applicants, The NPA involves its
  • 7. 7 (potential) stakeholders of the programme in order to build a trust relationship with beneficiaries. beneficiaries, Regional Advisory Groups, potential end users stakeholders in the decision-making and implementation in order to be proactive and responsive to the needs in the programme area. Coordination To coordinate with other programmes and funding instruments operating in the NPA area, by informing them about the NPA-specific profile and supported projects, and to stay informed about them. Other programmes and strategies, national/regional/EU policy makers, INTERACT network, multipliers The NPA is aware of neighbouring programmes and takes a proactive role in exchanging information. 4.3 Roles The NPA 2014-2020 covers a vast geographical area compared to relatively limited resources. For this reason, the implementation of the communication strategy will be a joint effort. Main actors in the communication strategy:  Joint Secretariat: the main body responsible for the development and implementation of the communication strategy. o Part of the duties of the Programme Manager for Information and Communication is to design and implement the overall programme communication strategy, to develop publications and promotional materials, to develop and manage the programme website and other online platforms, to organise annual conferences, and to develop communication trainings and materials for NPA projects and Regional Contact Points. o The Joint Secretariat also provides other programme bodies and the European Commission with information relevant for the governance of the programme. o In addition, the Joint Secretariat acts as a multiplier for disseminating project outputs and results, news from Regional Contact Points, and news from the European level relevant for the NPA audience.  Managing Authority: the main body responsible for communicating formal information to the European Commission, programme bodies, national authorities, and projects.  Regional Contact Points: the network of Regional Contact Points (RCPs) acts as an extension of the Joint Secretariat in each programme partner country. RCPs play an important role in making (potential) beneficiaries aware of the funding opportunities, providing information and guidance about the programme to applicants, project partners and other stakeholders. RCPs are often the first point of call for project idea holders, and in this capacity they play an important role in filtering ideas, thereby helping to create a pipeline for high quality project applications. RCPs also act as the secretary for the Regional Advisory Group in each programme partner country, and are for that reason in contact with a wide range of regional stakeholders. They organise information events about the programme in their region on a regular basis.
  • 8. 8  Monitoring Committee members: National and regional members on the Monitoring Committee have access to national and regional politicians, as well as national and regional decision makers in European and other international institutions. For this reason, MC members have a role in translating the added value of the programme to national and regional politicians and decision makers.  NPA projects: project partners form a link between the programme and the communities in the programme area. Projects are primarily responsible for communicating with their main target groups about the project outputs under development and their results, always acknowledging the support received from the programme (ERDF). This means that project communications should mainly focus on communicating their outputs rather than on branding the project as such, which is only a temporary cooperation aimed at developing the outputs. Secondly, projects are expected to feed back to the programme level by sharing examples of promotional materials, success stories, and descriptions of (expected) outputs. For this reason, the programme has stipulated a number of mandatory communication measures that projects are expected to develop within the first 6 months after approval.  INTERACT and other programmes: o Together with other transnational and cross-border programmes, INTERACT has developed a strategy for harmonised branding of Interreg programmes. The purpose is to join efforts and increase the visibility of Interreg, in particular towards policy makers and multipliers at the EU level. The Monitoring Committee has decided that the Interreg branding should not replace the programme branding, but that it should be used in combination where relevant. o Besides the harmonised branding, a number of transnational programmes has identified opportunities to join forces on communication trainings for projects, joint promotion of thematic objectives, etc. As a small transnational programme, the NPA will seek to join such initiatives where it leads to synergies and more efficiency.
  • 9. 9 5. Communication measures The programme will use a wide range of tools and channels for communicating its messages. The programme will customise its communication efforts for each target audience identified. In order to consider the relevant communication measures, an analysis of the information needs has been carried out (Table 2). Table 2 - Analysis of information needs Information needs Applicants Funded projects Programme bodies External audience Basic information about the NPA 2014-2020 (priorities, area, context, contact details) X X X X Funding opportunities X X Guidance and templates for applying X X Guidance and templates for claiming funding and promotion X X Funded projects X X X Project outputs and programme results X X X X Programme news & events X X X X Social networking X X X X Meeting documents X Below is a list of the main communication measures identified. 1) Visual identity: the purpose of the visual identity is to provide visibility and recognisability of the programme throughout all its communication efforts.  A programme logo has been developed and will be used in combination with the EU emblem in accordance with regulatory requirements. Where appropriate, the Interreg logo will be combined with the programme logo.  Graphical elements and templates for branding the programme/projects will be developed (e.g. MS Office templates, posters, giveaways).  Visual guidelines and templates will be made available for use by beneficiaries and RCPs to ensure compliance with publicity requirements.  A press kit will be developed to facilitate media coverage. The main access to regional and national media will be through Regional Contact Points, national and regional representatives and NPA projects. 2) Printed/digital publications: the programme will produce different types of publications, which will be printed in small numbers on demand with sustainability in mind. All documents will also be made available in electronic format. a) The Cooperation Programme document will be made available in a reader-friendly format. b) Factsheets/flyers with basic programme information will be used for wide dissemination. c) Annual reports or a summary of the main conclusions will be published at least in the years 2017, 2019, 2023.
  • 10. 10 d) A Programme Manual will be developed with guidance and instructions for applicants and project managers at each stage of the project implementation. This document also contains the eligibility and selection criteria, as well as the NPA eligibility rules for expenditure. e) Evaluation reports about the progress towards the programme results (result indicators) will be published after each evaluation has taken place. f) Towards the end of the programme period, a publication about the programme achievements/results will be published3 . g) Other (on demand): press releases, thematic publications, targeted articles/publications e.g. for OPEN DAYS, for Arctic cooperation, etc. 3) Online and social media platforms: online communication will be the main channel for communicating with target audiences, because it offers the opportunity to reach the widest audience. a) Programme website: main information platform to communicate about the funding opportunities (regulatory requirement), projects funded, project outputs, etc. i) List of funded projects to be updated at least every 3 months (regulatory requirement) ii) Project websites: the programme will provide projects with their own mini website as part of the programme website to ensure compliance with publicity requirements and the availability of information after project closure. b) Social media platforms: these platforms will provide news on demand, building an NPA community. These platforms also allow the programme’s stakeholders to network with each other. c) Newsflashes/newsletters: the programme will periodically provide up-to-date information about the programme to the relevant NPA target audiences. 4) Conferences and seminars: a) Annual conferences: the programme will organise one major information event per year to present the visions and achievements of the programme. Each year, the Monitoring Committee will select a theme, and key actors will be invited. Due to budget limitations, a bigger conference will be held every other year. b) Project development events will be organised, such as training events for applicants, project managers, partner search events. c) Regional events will be organised by Regional Contact Points on a yearly basis. d) Communication training for beneficiaries and RCPs will be organised (potentially in cooperation with other programmes). 5) Monitoring system: reliable and aggregated financial information, project information and indicators will be gathered in an online monitoring system. a) The monitoring system will facilitate data exchange and formal communication with (potential) beneficiaries and authorities, such as the European Commission. b) The monitoring system will allow internal communication and coordination between programme bodies. 6) Other communication measures a) Other exposure is expected, for example through interviews/articles for websites and magazines, presentations at joint Interreg or third party events, RegioStars Awards, etc. b) Displaying the EU emblem at the premises of the Managing Authority Guiding principles for all communication measures will be: 3 At the request of the MC, the Joint Secretariat will endeavour to publish smaller stories on results when they become available during the programme period.
  • 11. 11  User-friendliness: the programme has a reputation for being approachable and proactive. It is essential that the programmes makes an effort to develop user-friendly and easy-to-understand communication measures, in order to communicate a complex topic such as transnational cooperation to non-experts, in order to reduce the administrative burden for beneficiaries, and to increase the capacity for high quality applications.  The NPA horizontal principles as defined in the Cooperation Programme document are guiding principles, in particular the principle of inclusion and diversity. This means that the programme will consider for its communication measures if all can participate or if the measures inadvertently create barriers for individuals or specific groups. Within the scope of the limited resources, proportional adaptations for people with disabilities will be considered, e.g. developing the NPA website with accessibility for the visually impaired in mind. 6. Annual Communication Plans (Information Action Plans) The communication strategy will adapt to each stage of the programme implementation, in the short, medium, and long term. The Monitoring Committee has chosen a strategy to front-load the programme, which means that most of the programme funds will be allocated during the first years of the programme period. In addition, programme routines and systems will be developed and fine-tuned during this period. For this reason, the communication strategy will mostly focus on attracting high quality applications and good governance during the first few years. At the same time, it is important to coordinate with other programmes, to promote synergies and avoid duplications. When the programme reaches the peak of its implementation, the communication strategy will promote good project management, project communication skills and dissemination of the first results. In the final years of the programme implementation, the communication strategy will shift focus to communicating the project and programme results and optimising the use of the remaining funds. The table below provides a simplified overview of the planned measures for the entire programme period. Detailed information action plans will be presented to the Monitoring Committee once a year. In addition, a review of the year’s information action plan activities will be presented to the MC. Communication measures 2014 2015 2016 2017 2018 2019 2020 2021-23 Programme Launch Event X Major information activity (annual conference) X X X X X X X Visual identity setup X X Programme website setup X Publications X X X X X  Cooperation Programme document X X  Formatted Annual Report X X X  Results publication X X Engagement through online & social media X X X X X X X X Information exchange monitoring system X X X X X X X
  • 12. 12 7. Budget Communication measure Description Amount (EUR) Visual identity 15.000,00  Development of complete visual identity and templates Visual identity guidelines and press kit, MS Office templates for Word and PPT, envelopes, post-its, including printing costs 10.000,00  Development of communication toolkits for beneficiaries (and RCPs) Guidelines for meeting the publicity requirements, templates for posters and plaques, other electronic templates, stickers 5.000,00 Website and other online platforms4 45.000,00  Technical solution Programming, implementing existing solutions, including an adaptation to retrieve data from the monitoring system 25.000,00  Graphical design for programme website and other online platforms Note: the design of the website may be integrated in the price of the technical solution. 7.500,00  Content management Adding/updating content, development plan -  Maintenance, hosting and updates Development and technical updates 12.500,00 Publications 70.000,00  Programme documents Programme Manual, Cooperation Programme, etc. 15.000,00  Promotional publications Factsheets, flyers, formatted annual reports, other reports and publications. Note: it is envisaged that printing costs will mainly apply to factsheets and flyers, and only to a limited degree to reports and publications. 30.000,00  Promotional materials Banners/roll-ups, posters, giveaways and some conference materials 25.000,00 Grand total 130.000,00 Please note that the budget for organising events, such as the annual conferences, project development events and seminars, and programme meetings has been earmarked in a separate budget line in the Technical Assistance budget, because these events are viewed as more than communication measures only. The total budget for Seminars & Networking is EUR 335.000. 4 Please note that as a result of the website tender held in December 2014, some amounts have to be moved around to be able to afford the contract. The basic contract was just approx. 34 500 EUR excluding additional adaptations and hosting.
  • 13. 13 8. Monitoring and Evaluation The Monitoring Committee will monitor the progress of the delivery of the communication strategy. A communication plan will be presented to the Monitoring Committee every year together with the progress made on the indicators. In addition, progress on the communication plan will be reported to the European Commission in Annual Reports and the Final Report. If deemed necessary, the Monitoring Committee can decide on a review of the communication strategy. In order to measure and evaluate the effectiveness of the communication strategy, the following indicators will be tracked during the programme implementation.  Output indicators: o Website statistics o Number of news articles (NPA website + articles developed for other media) o Number of events + participants o Number of social media posts (Facebook posts + reach, likes, Twitter posts + retweets, followers) o Number of publications (if possible how many downloaded)  Result indicators (baseline is surveys in 2015, repeated in 2017, 2019, 2023): o Raised awareness about the NPA 2014-2020 and its funding opportunities o Raised awareness about project outputs and programme results o Improved knowledge about procedures for applying for/claiming funding o Increased capacity for effective project implementation (e.g. LP seminars, guidance, RCPs). o Raised satisfaction with information/guidance provided to applicants and funded projects  Baseline and measurement methodology: surveys with applicants, projects, RCPs/RAGs, website survey.