INFRASTRUCTURE
KEY INDUSTRIAL AREAS
PAKISTAN-ECONOMIC OUTLOOK
 Pakistan received US$ 1.63 Billion of Foreign Direct Investment during 2013-14 with major
inflow from US, Hong Kong, UK, Switzerland and UAE
 Total exports reached US$ 25.196 Billion in 2013-14
 Total imports reached US$ 44.526 Billion in 2013-14
 Industries such as Electronics, Telecom, Automobiles, FMCG, and Retail Segments are
growing faster.
 Cellular Phone subscribers have reached 139.20 Million. Electronics segment is growing at
an
annual rate of 13.3%.
 Retail remains the 3rd largest sector and the 2nd largest employer, employing 16% of the
total
labor force with 2 million retail outlets in Pakistan
 The E-commerce industry is growing rapidly and is around US$ 25-30 million. With the recent
availability of 3G and 4G network in Pakistan, this segment is expected to increase
@ 40% per year in the next few years
About Raaziq Logistics & Supply Chain Management
Established in 1975, 4 decades of foresight and
development has made Raaziq one of the most
portent forces in the National and International
Freight Forwarding.
INTRODUCTION
KEYPERSONNEL
Chairman
Muhammad Nadeem Khan
Vice President Imports
Tariq Mahmood Mian
Vice President Exports
Hasen Mahmoud Capt. Anwar Karim
Director Cold Chain
KEYPERSONNEL
Director Transportation
Muhammad Ammar Khan
Director Warehousing &
Projects
Muhammad Mikail Khan
Director Custom Clearance
Syed Rehan Rizvi
Head of Afghan Operations
Abdul Mateen
OUR NETWORK
LOCAL NETWORK
OUR NETWORK
INTERNATIONAL NETWORK
RANGE OF SERVICES
International Freight Forwarding
Custom Clearance
Transportation
Distribution
Cold Chain Management
Transit Security & Technical Services
Warehousing and Stock Management
Information Technology and Solution Development
Afghan Transit Trade
Project Management
Fairs & Exhibitions
Supply Chain Management
Ocean Freight
> Handling over 11000 (controlled) Teus to Worldwide annually
> LCL/FCL service offering with fixed schedules
> Superior management of vessel space
> Shipment tracking, purchase order management, reporting and documentation
> Expertise in handling refrigerated cargo
> Hazardous cargo management
> Competitive Pricing – Relations with all major carriers
INTERNATIONAL FREIGHT FORWARDING
Air Freight
> Ranked as 2nd by IATA in Pakistan
> Handling over 17000 Tons p/annum
> Time-definite delivery
> Charter/freighter booking
> Consolidation
> Packing and crating services
> Cargo tracking ,reporting and documentation
> Strong carrier relationship
> Clients and global reach
> Projects
> Best rates in the market due to volume commitments
INTERNATIONAL FREIGHT FORWARDING
> Declared as the #1 Custom Clearing Agent by PACCS
(Pakistan Automated Custom Clearance System)
> Export / Import custom clearance facilities at all Ports and ICD’s
> Pre-shipment consultancy, which includes:
- Preparation of documents
- Creation of detailed instructions in the letter of credit
- Evaluation of duty impact
> Time-definite delivery
> Fixed costs
CUSTOM CLEARANCE
TRANSPORTATION
Fleet plus Equipment
> 200 primary vehicles (40ft Trailers)
> More than 100 refrigerated trucks
> Over 200 secondary vehicles (ambient, refrigerated and distribution services)
> All kinds of containerized, non-containerized and cold chain reefer fleets
Services
> Specialized in Dry Transportation and Cold Chain Transportation
> FTL and LTL cargo trucking for B2B services
> Track and trace facility & delivery confirmation on every shipment
> Complete visibility through ERP with Real Time information and customer interfaces
DISTRIBUTION
> Nationwide distribution network
> Fleet tracking software to ensure timely deliveries with 100% tracking &
traceability
> Provide transportation services at all levels from import to end mile,
which include:
- Port to Factory
- Factory to Warehouse
- Warehouse to Distributer
- Distributor to Retailer and End User
> Cold Chain logistics services
> Trucking and Storage Solutions for temperature sensitive cargo
> Specialized Services for deep frozen, frozen, chilled and fresh products
> International, national, within city and inter-city temperature sensitive
shipments
> Software based Cold Chain Management Solutions
> Trip based and dedicated transport service models with dedicated web
based customer portals for tracking and monitoring of shipments
> In-transit temperature graphs and reports and data acquisition from
cold chain applications
COLD CHAIN MANAGEMENT
TRANSIT SECURITY & TECHNICAL SERVICES
> In-transit Soft and Hard security to save cargo from temperature variability
and thefts
 Armed security to escort valuable shipments
> Technological control room equipped with 24/7 tracking, monitoring,
operational support and shipment status updates
> On route incident & breakdown handling plans & back up arrangements
> Customized designs and fabrication of temperature controlled transport
and storage systems
> In-house facilities for service and maintenance of vehicles and refrigeration
systems.
WAREHOUSING & STOCK MANAGEMENT
> ISO-9001 certified
> Having more than 1,000,000 square feet area Nationwide, which consists of
Racked, Non-racked and Open areas to facilitate our valued customer
requirements as per their needs
> In-house designed & customized Warehouse Management System which is
capable to link with any other platform i.e. Electronic Data Interchange (EDI)
> All Warehouses are CCTV covered with live access to the customers
> MHE’s are available to handle all kinds of cargoes
INFORMATION TECHNOLOGY & SOLUTION DEVELOPMENT
> Creating, Integrating and Implementing the best cutting edge technology
into every aspect of the Supply Chain operations
> Capability to develop customized and integrated software solutions that
gives us a huge competitive edge over others
> Developed Raaziq Warehouse Management System adopted by many
multinationals including Johnsons & Johnsons (USA), Huawei (China),
L’OREAL (France)
Key Modules & Features of ERP
AFGHAN TRANSIT TRADE
> Pioneers in services to/from Afghanistan with experience of handling
over 90,000 TEUs just in the last 5 years
> Services of Import/ Export by Air/Sea/ Rail via Pakistan, Iran and CIS countries
> Successfully handled cargo for NATO/ISAF/ Dip. Mission/ Aid Agencies and
various Commercial clients
> Also providing services of Warehousing, Survey-Inspections, Packing,
Tracking-Tracing and Documentation
> Heavy lift and out of gauge moves for various segments including
Electronics, Automotive, Oil & Gas, Telecom
> Complete Consultancy Services
> Complete Door to Door Logistics Support System
> Facilitation on International Trade Documentation
> Inspection & Expediting Tasks in Co-operation with Associated Bodies
PROJECT MANAGEMENT
Some of the Key Projects undertaken
> Packaging of valuable trade fair shipments
> Transport services for any type of goods – by road, rail, air or sea
> Handling transit formalities
> Temporary import clearance and re-export process handling
> On-site handling and delivery of cargo
> Status up-dates during transportation
FAIRS & EXHIBITIONS
SUPPLY CHAIN MANAGEMENT
> Customized Supply Chain Solutions for specific business needs from
Consultancy and Design of services to the final delivery process at the door
 Utilization of logistical expertise to create best in class industry specific solutions
> Broad set of services drawing on our very own resources in the areas of
Transport, CHA, Warehousing, Software Development & Customization to
deliver value across the entire Supply Chain
> End to end visibility, transparency and cost-efficiency
Key Industries/ Customers
Automotive Telecom/ Electronics FMCG
Key Industries/ Customers
Defence Health Care/Pharma International Aid Agencies
AWARDS&ACHIEVEMENTS
AWARDS&ACHIEVEMENTS
Corporate Head Office. Lahore
Lahore Warehouse
Flagship Office. Karachi
Karachi Warehouse
Material Handling Equipment
Barcode Scanning MHE
Value Addition
Karachi Workshop
Our Fleet
Cold Chain Equipment
Recommendation Letters
Recommendation Letters
PROJECTS
Oil and Gas
OUR CUSTOMERS
Pride Forasol
PDIL
Ghani Gas
GENERAL SCOPE OF WORK
> Project Planning and liaison with relevant
Government Agencies
> Clearance, Preparation and Submission of
Vessel and Cargo Manifest
> Arranging Berthing, Tug Vessel and Port
Operations
> Garbage cleaning, supplies management and
permissions
> Flight Management (Planning, Permission and execution)
> Fuel supply and spare Management
> 24x7 Medical Evacuation standby arrangements
> Planning
> Bookings with carriers
> Engaging Sub contractors
> Special trucks arrangements
> Loading from Shipper premises
> Unloading and polarization at origin Airport
> Special handling of the cargo
> Confirm connections with freighter operators
> Pre shipment information
> Supply chain management reports
> Pre-advise of the shipment
> Delivery order in 24 – 48 hours
> Preparation of necessary documents & loading of cargo
> Completion of custom formalities before arrival of the vessel
> Taking direct delivery from the vessel
> Transportation up to site
> Cargo offloading at site
> Special trucks arrangements
> Customs Clearance
Crew Matters
Sign-off & Sign-on Crew, Meet and Greet Services, Transportation to and
from Hotels, Delivery Matters, Licensing issues, Extension of Crew Stay –
Landing Pass, Attending to Consular matters / extensions etc, Hotel's
arrangements, Meeting and cessions and Travel arrangements and liaison
with airlines etc.
PROJECTS
Telecom
GENERAL SCOPE OF WORK
> Computerised inventory management through state of the art WMS
> On line tracking/access of cargo within Warehouse by the customer through CCTV
Cameras
> On line dispatch orders by customers through WMS
> Distribution to Designated Locations across Pakistan
> Value Additions including repacking, sorting, labelling
> Secure Handling of cargo through state of the art MHE including battery operated
Forklifts, Hand Pallets, Reach Stackers etc
OUR CUSTOMERS
Huawei
Wateen
Alcatel
PTCL
PROJECTS
Power
GENERAL SCOP OF WORK
> Planning
> Engaging Sub contractors
> Pre shipment information
> Pre-advise of the shipment
> Customs Clearance
> International Freight Forwarding
> Import Customs Clearance at Airports / Sea Ports
> Transport Handling from Sea Port / Air Port
> Automated Inventory Management with State of the Art WMS
> Distribution to the various delivery sites across Pakistan
> Value Additions including repacking, sorting, labelling
> Bookings with carriers
> Unloading
> Special handling
OUR CUSTOMERS
Liberty Power
Foundation Power
Atlas Power
Attock Gen.
Hubco- Narowal
Siemens- Pakistan
International Resource Group. C/O USAID
PROJECTS
FMCG
GENERAL SCOPE OF WORK
> Computerised inventory management through state of the art WMS
> On line tracking/access of cargo within Warehouse by the customer through CCTV
Cameras
> On line dispatch orders by customers through WMS
> Distribution to Designated Locations across Pakistan
> Value Additions including repacking, sorting, labelling
> Secure Handling of cargo through state of the art MHE including battery operated Forklifts,
Hand Pallets, Reach Stackers etc
> Temperature Control -18 Degrees
> Frozen Food
> Reefer Trucking
> Air Freight Envirotainer
> Pre-Custom Arrangement
> Delivery Till Rack
OUR CUSTOMERS
JIT Deliveries
Johnsons & Johnsons
L’OREAL
Unilever
AkzoNobel
Bata
Metro Cash & Carry
Makro Habib
Engro Food
Nestlé
Servis
PROJECTS
Defence
OUR CUSTOMERS
Ministry of Defence, UK
Ministry of Defence, Netherlands
Ministry of Defence, Spain
Ministry of Defence, Canada
Ministry of Defence, USA
GENERAL SCOPE OF WORK
>Transit Clearance at Karachi
>Transporting Cargo at Raaziq yard at Port Qasim for Cross Stuffing
>Unloading.
>Special handling
>Arrangement of all transit documentary formalities to cross Pak Afghan Border
>Transportation to Kabul with 24/7 on line tracking
>Special trucks arrangements
>Customs Clearance Pak-Afghan Border
>Delivery in Kabul.
>Refrigerated Transport
PROJECTS
Automotive
GENERAL SCOPE OF ENGAGEMENT
> Document Preparation
> Consultancy Services in Opening L/C.
> Complete Clearance of Car MFG Plant.
> Regular Clearance of CKD Kits at NLC Dry Port Lahore
> Bookings with carriers
> Unloading
> Special handling
> Customs Clearance
OUR CUSTOMERS
Honda Atlas Cars
Pakistan Railways
Toyota
Avencion

Final Raaziq Presentation SITTAM.PDF

  • 2.
    Table of Contents 03-Our Mission 05- Our Network 04- Key Personnel 06- Range of services 01- About Pakistan ( Please click on links to navigate) 09- Additional information 02- About Raaziq 07- Key Industries/ Customers 08- Awards and Achievements
  • 6.
  • 7.
  • 8.
    PAKISTAN-ECONOMIC OUTLOOK  Pakistanreceived US$ 1.63 Billion of Foreign Direct Investment during 2013-14 with major inflow from US, Hong Kong, UK, Switzerland and UAE  Total exports reached US$ 25.196 Billion in 2013-14  Total imports reached US$ 44.526 Billion in 2013-14  Industries such as Electronics, Telecom, Automobiles, FMCG, and Retail Segments are growing faster.  Cellular Phone subscribers have reached 139.20 Million. Electronics segment is growing at an annual rate of 13.3%.  Retail remains the 3rd largest sector and the 2nd largest employer, employing 16% of the total labor force with 2 million retail outlets in Pakistan  The E-commerce industry is growing rapidly and is around US$ 25-30 million. With the recent availability of 3G and 4G network in Pakistan, this segment is expected to increase @ 40% per year in the next few years
  • 9.
    About Raaziq Logistics& Supply Chain Management
  • 10.
    Established in 1975,4 decades of foresight and development has made Raaziq one of the most portent forces in the National and International Freight Forwarding. INTRODUCTION
  • 12.
    KEYPERSONNEL Chairman Muhammad Nadeem Khan VicePresident Imports Tariq Mahmood Mian Vice President Exports Hasen Mahmoud Capt. Anwar Karim Director Cold Chain
  • 13.
    KEYPERSONNEL Director Transportation Muhammad AmmarKhan Director Warehousing & Projects Muhammad Mikail Khan Director Custom Clearance Syed Rehan Rizvi Head of Afghan Operations Abdul Mateen
  • 14.
  • 15.
  • 16.
    RANGE OF SERVICES InternationalFreight Forwarding Custom Clearance Transportation Distribution Cold Chain Management Transit Security & Technical Services Warehousing and Stock Management Information Technology and Solution Development Afghan Transit Trade Project Management Fairs & Exhibitions Supply Chain Management
  • 17.
    Ocean Freight > Handlingover 11000 (controlled) Teus to Worldwide annually > LCL/FCL service offering with fixed schedules > Superior management of vessel space > Shipment tracking, purchase order management, reporting and documentation > Expertise in handling refrigerated cargo > Hazardous cargo management > Competitive Pricing – Relations with all major carriers INTERNATIONAL FREIGHT FORWARDING
  • 18.
    Air Freight > Rankedas 2nd by IATA in Pakistan > Handling over 17000 Tons p/annum > Time-definite delivery > Charter/freighter booking > Consolidation > Packing and crating services > Cargo tracking ,reporting and documentation > Strong carrier relationship > Clients and global reach > Projects > Best rates in the market due to volume commitments INTERNATIONAL FREIGHT FORWARDING
  • 19.
    > Declared asthe #1 Custom Clearing Agent by PACCS (Pakistan Automated Custom Clearance System) > Export / Import custom clearance facilities at all Ports and ICD’s > Pre-shipment consultancy, which includes: - Preparation of documents - Creation of detailed instructions in the letter of credit - Evaluation of duty impact > Time-definite delivery > Fixed costs CUSTOM CLEARANCE
  • 20.
    TRANSPORTATION Fleet plus Equipment >200 primary vehicles (40ft Trailers) > More than 100 refrigerated trucks > Over 200 secondary vehicles (ambient, refrigerated and distribution services) > All kinds of containerized, non-containerized and cold chain reefer fleets Services > Specialized in Dry Transportation and Cold Chain Transportation > FTL and LTL cargo trucking for B2B services > Track and trace facility & delivery confirmation on every shipment > Complete visibility through ERP with Real Time information and customer interfaces
  • 21.
    DISTRIBUTION > Nationwide distributionnetwork > Fleet tracking software to ensure timely deliveries with 100% tracking & traceability > Provide transportation services at all levels from import to end mile, which include: - Port to Factory - Factory to Warehouse - Warehouse to Distributer - Distributor to Retailer and End User
  • 22.
    > Cold Chainlogistics services > Trucking and Storage Solutions for temperature sensitive cargo > Specialized Services for deep frozen, frozen, chilled and fresh products > International, national, within city and inter-city temperature sensitive shipments > Software based Cold Chain Management Solutions > Trip based and dedicated transport service models with dedicated web based customer portals for tracking and monitoring of shipments > In-transit temperature graphs and reports and data acquisition from cold chain applications COLD CHAIN MANAGEMENT
  • 23.
    TRANSIT SECURITY &TECHNICAL SERVICES > In-transit Soft and Hard security to save cargo from temperature variability and thefts  Armed security to escort valuable shipments > Technological control room equipped with 24/7 tracking, monitoring, operational support and shipment status updates > On route incident & breakdown handling plans & back up arrangements > Customized designs and fabrication of temperature controlled transport and storage systems > In-house facilities for service and maintenance of vehicles and refrigeration systems.
  • 24.
    WAREHOUSING & STOCKMANAGEMENT > ISO-9001 certified > Having more than 1,000,000 square feet area Nationwide, which consists of Racked, Non-racked and Open areas to facilitate our valued customer requirements as per their needs > In-house designed & customized Warehouse Management System which is capable to link with any other platform i.e. Electronic Data Interchange (EDI) > All Warehouses are CCTV covered with live access to the customers > MHE’s are available to handle all kinds of cargoes
  • 25.
    INFORMATION TECHNOLOGY &SOLUTION DEVELOPMENT > Creating, Integrating and Implementing the best cutting edge technology into every aspect of the Supply Chain operations > Capability to develop customized and integrated software solutions that gives us a huge competitive edge over others > Developed Raaziq Warehouse Management System adopted by many multinationals including Johnsons & Johnsons (USA), Huawei (China), L’OREAL (France) Key Modules & Features of ERP
  • 26.
    AFGHAN TRANSIT TRADE >Pioneers in services to/from Afghanistan with experience of handling over 90,000 TEUs just in the last 5 years > Services of Import/ Export by Air/Sea/ Rail via Pakistan, Iran and CIS countries > Successfully handled cargo for NATO/ISAF/ Dip. Mission/ Aid Agencies and various Commercial clients > Also providing services of Warehousing, Survey-Inspections, Packing, Tracking-Tracing and Documentation
  • 27.
    > Heavy liftand out of gauge moves for various segments including Electronics, Automotive, Oil & Gas, Telecom > Complete Consultancy Services > Complete Door to Door Logistics Support System > Facilitation on International Trade Documentation > Inspection & Expediting Tasks in Co-operation with Associated Bodies PROJECT MANAGEMENT Some of the Key Projects undertaken
  • 28.
    > Packaging ofvaluable trade fair shipments > Transport services for any type of goods – by road, rail, air or sea > Handling transit formalities > Temporary import clearance and re-export process handling > On-site handling and delivery of cargo > Status up-dates during transportation FAIRS & EXHIBITIONS
  • 29.
    SUPPLY CHAIN MANAGEMENT >Customized Supply Chain Solutions for specific business needs from Consultancy and Design of services to the final delivery process at the door  Utilization of logistical expertise to create best in class industry specific solutions > Broad set of services drawing on our very own resources in the areas of Transport, CHA, Warehousing, Software Development & Customization to deliver value across the entire Supply Chain > End to end visibility, transparency and cost-efficiency
  • 30.
    Key Industries/ Customers AutomotiveTelecom/ Electronics FMCG
  • 31.
    Key Industries/ Customers DefenceHealth Care/Pharma International Aid Agencies
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
    PROJECTS Oil and Gas OURCUSTOMERS Pride Forasol PDIL Ghani Gas GENERAL SCOPE OF WORK > Project Planning and liaison with relevant Government Agencies > Clearance, Preparation and Submission of Vessel and Cargo Manifest > Arranging Berthing, Tug Vessel and Port Operations > Garbage cleaning, supplies management and permissions > Flight Management (Planning, Permission and execution) > Fuel supply and spare Management > 24x7 Medical Evacuation standby arrangements > Planning > Bookings with carriers > Engaging Sub contractors > Special trucks arrangements > Loading from Shipper premises > Unloading and polarization at origin Airport > Special handling of the cargo > Confirm connections with freighter operators > Pre shipment information > Supply chain management reports > Pre-advise of the shipment > Delivery order in 24 – 48 hours > Preparation of necessary documents & loading of cargo > Completion of custom formalities before arrival of the vessel > Taking direct delivery from the vessel > Transportation up to site > Cargo offloading at site > Special trucks arrangements > Customs Clearance Crew Matters Sign-off & Sign-on Crew, Meet and Greet Services, Transportation to and from Hotels, Delivery Matters, Licensing issues, Extension of Crew Stay – Landing Pass, Attending to Consular matters / extensions etc, Hotel's arrangements, Meeting and cessions and Travel arrangements and liaison with airlines etc.
  • 47.
    PROJECTS Telecom GENERAL SCOPE OFWORK > Computerised inventory management through state of the art WMS > On line tracking/access of cargo within Warehouse by the customer through CCTV Cameras > On line dispatch orders by customers through WMS > Distribution to Designated Locations across Pakistan > Value Additions including repacking, sorting, labelling > Secure Handling of cargo through state of the art MHE including battery operated Forklifts, Hand Pallets, Reach Stackers etc OUR CUSTOMERS Huawei Wateen Alcatel PTCL
  • 48.
    PROJECTS Power GENERAL SCOP OFWORK > Planning > Engaging Sub contractors > Pre shipment information > Pre-advise of the shipment > Customs Clearance > International Freight Forwarding > Import Customs Clearance at Airports / Sea Ports > Transport Handling from Sea Port / Air Port > Automated Inventory Management with State of the Art WMS > Distribution to the various delivery sites across Pakistan > Value Additions including repacking, sorting, labelling > Bookings with carriers > Unloading > Special handling OUR CUSTOMERS Liberty Power Foundation Power Atlas Power Attock Gen. Hubco- Narowal Siemens- Pakistan International Resource Group. C/O USAID
  • 49.
    PROJECTS FMCG GENERAL SCOPE OFWORK > Computerised inventory management through state of the art WMS > On line tracking/access of cargo within Warehouse by the customer through CCTV Cameras > On line dispatch orders by customers through WMS > Distribution to Designated Locations across Pakistan > Value Additions including repacking, sorting, labelling > Secure Handling of cargo through state of the art MHE including battery operated Forklifts, Hand Pallets, Reach Stackers etc > Temperature Control -18 Degrees > Frozen Food > Reefer Trucking > Air Freight Envirotainer > Pre-Custom Arrangement > Delivery Till Rack OUR CUSTOMERS JIT Deliveries Johnsons & Johnsons L’OREAL Unilever AkzoNobel Bata Metro Cash & Carry Makro Habib Engro Food Nestlé Servis
  • 50.
    PROJECTS Defence OUR CUSTOMERS Ministry ofDefence, UK Ministry of Defence, Netherlands Ministry of Defence, Spain Ministry of Defence, Canada Ministry of Defence, USA GENERAL SCOPE OF WORK >Transit Clearance at Karachi >Transporting Cargo at Raaziq yard at Port Qasim for Cross Stuffing >Unloading. >Special handling >Arrangement of all transit documentary formalities to cross Pak Afghan Border >Transportation to Kabul with 24/7 on line tracking >Special trucks arrangements >Customs Clearance Pak-Afghan Border >Delivery in Kabul. >Refrigerated Transport
  • 51.
    PROJECTS Automotive GENERAL SCOPE OFENGAGEMENT > Document Preparation > Consultancy Services in Opening L/C. > Complete Clearance of Car MFG Plant. > Regular Clearance of CKD Kits at NLC Dry Port Lahore > Bookings with carriers > Unloading > Special handling > Customs Clearance OUR CUSTOMERS Honda Atlas Cars Pakistan Railways Toyota Avencion