WELL COME TO OUR
PRESENTATION
Our Group Number-04
SL ID Student Name Program
01 13205100 Md. Foyez Ahammad BSEEE
02 13305003 Md.-Sabirul-Islam BSEEE
03 13305019 Tapan Khan BSEEE
04 13305020 Imran Hossain Shehab BSEEE
05 13305024 Md. Shafiqul Islam BSEEE
Our Project Name Feasibility Study
On
Energy Saving BulB
Contents of This
Project
Introduction
Market
Raw Material
Process Technology
Utility
Location
Environment Impact
Investment Cost
Operation Cost
Profitability Analysis
Conclusion and Recommendations
Introduction
Feasibility study and analysis of the ability
 to complete a project successfully
 taking into account legal
 economic
 technological
 scheduling
 And other factors
Background
 In 1878, Thomas Alva Edison began
serious research into developing a
practical incandescent lamp and on
October 14, 1878.
 The spiral Compact Fluorescent
Lamp (CFL) was invented in 1976
by Edward E. Hammer, an engineer
with General Electric, in response to
the 1973 oil crisis.
incandescent lamp
Compact Fluorescent
Lamp
Definition
Energy saving lamps are sources of artificial light that
employ advanced technology to reduce the amount
of electricity used to generate light, relative to traditional
filament-burning light bulbs.
The trend of energy saving light bulbs has been
growing since last several years and people around the
world have managed to cut down on their electricity
bills as much as fifty to sixty taka. The demand of such
energy saving bulbs has been increased and
considering this growing demand various
manufacturing companies have been incepted.
Type Light Bulb
 Classic
 Candles
 Spiral & stick
 Spotlights
 Reflectors
 Tubes
Type Light Bulb
 Classic:
A traditional light bulb shape,
suitable for a variety of fittings.
 Candles:
Flame-shaped bulb, ideal for older-
style light fixtures and chandeliers.
 Spiral & stick:
Practical and energy efficient bulb to
light your home
Type Light Bulb
 Spotlights:
Specially designed bulbs for
bright, targeted spotlights.
 Reflectors:
Ideal for illuminating large areas
with wide beams of light.
 Tubes:
Long cylinder-shaped bulb
(known as fluorescent lighting)
used for functional lighting.
Type Light Bulb
Type of Energy Saving Bulb
Florescent lamps- compact and
regular.
Light emitting diode (LED) bulb
Magnetic induction lamp
Light emitting Electrochemical
cell.
Methodology
The basis of low watt and high watt energy
saving bulb are manufactures like 5W to
65W.
Due to the respect of time energy saving
bulb manufacturing technology has
changed.
Limitations
 The most commonly used energy-saving
light bulb is the Compact Fluorescent
Light (CFL). Light-emitting diodes
(LEDs) are increasing in popularity.
 There are limitation of manpower, land
and also other things.
Market
Situational Analysis
Market Survey
Characterization of Market
Demand Forecasting
Market Planning
Situational Analysis
Situational Analysis
Market Survey
 Total Demand.
 Production of different company.
 Satisfaction with exiting products.
 Unsatisfied needs.
 Attitudes towards various products.
 Socio-economic characteristics of the buyers.
Total Demand
Bangladesh sets a world record – 5 million CFLs
in a day, one bulb at a time. On Saturday, June
19th 2010, at over 1,400 rural and urban
distribution centers spread across 27 districts
about five million high quality CFL bulbs, in
the first round of distribution.
Company
There are varieties brands Energy Saving Lamp
available at the market. Some of the leading
brands are following:
 Nashir energy saving lamp industry.
 Allied power Ltd.
 Shafa electronics.
 Transtec.
 Superstar
Production of different company
No Company Name Production/year
01 Transtec 45,0000
02 NASIR 40,0000
03 Superstar 20,0000
04 Others 30,0000
Total =135,0000
Satisfaction with existing products
Unsatisfied with the existing product
Good quality but high rate
Low rate but not too much good quality
long lasting
Attitudes towards various products
People wants good quality with
reasonable price
Low price but good product
Long lasting
Good Brightness
Socio-economic characteristics of the buyers
 Low price but high quality
 Long time life
 Good brightness
 Energy saving
Characterization of Market
 Effective demand in the past and present
 Breakdown of demand
 Price
 Methods of distribution and sales promotion
 Supply and competition
 Government policy
Raw Material
 Type of raw material
 Sources
 Demand
 Supply
 Mode of transportation
Type of raw material
 Resistance
 Transistor
 Iron
 PVC wire
 Glass
 Body
Our Product
Sources
 All raw material suppliers found in India.
 Low demand accessory are found in local electrical
company.
Mode of transportation
 Truck transportation
 Train transportation
 River-port using
Process Technology
 Outline of process technology
 Availability and proneness
 Comparative technology
 Level of technology
 Availability of manpower
Utility
 Typically use about 25%-80% less energy than
traditional incandescent and it save money.
 Can last 3-25 times longer.
 Installing five low energy light bulbs will cost
about tk1150 and could save as much as tk2250 a
year.
Location
Proximity to market
Availability of raw material
Availability of utility
Availability of skilled technical
manpower
Location
The location of our project can be in the area of
Kalibazar, Narayanganj.
Proximity to Market
In Bangladesh the main local markets are in
Dhaka, Chittagong and Khulna.
It is very easy to cover the local markets.
Availability of raw material
 In fact the raw materials are not available in our
country.
 This place is close to the river port and easy road
transport system.
 It is very easy to collect raw materials.
 So we have to depend on other developed country.
Availability of utility
 To run this plant we need much more transport,
electricity and gas.
 It is very good area to have the proper utilities.
 Because There are lots of electricity generation plant
in Narayangonj area.
 In this area has river so we can easily collect water if
we need.
 So we can say that this place are sweet able to run our
Project.
Manpower
 Manpower are available but Skilled technical
manpower is not available.
 Have to trained few engineers from abroad.
 Extra cost for the project but give us more benefit
in future.
Environmental Impact
 Electromagnetic
Compatibility
 Radio Frequency
Interference
 Electromagnetic
Disturbance
Electromagnetic Compatibility
 Electromagnetic Compatibility - The
ability of an equipment or system to
function satisfactorily in its electromagnetic
environment without introducing intolerable
electromagnetic disturbances to anything in
that environment.
Radio Frequency Interference
Radio Frequency Interference -CFLs
emit radio frequency radiation at
levels that may interfere with various
types of wireless technology. Any
modification to the reception of sound
or picture signals that make them
unacceptable.
Electromagnetic Disturbance
 Electromagnetic Disturbance - Any
electromagnetic phenomenon (or
transmission) which may degrade the
performance of a device, equipment or
system, or adversely affect living or inert
matter.
Investment Cost
42
No Cost name Local currency
(in %)
Foreign currency
(in %)
Total (tk)
01 Land 100 1,80,00,000/=
02 Building 75 25 1,00,00,000/=
03 Machinery 90 10 5,50,00,000/=
04 Taxes and duties 80 20 40,00,000/=
05 Installation cost 75 25 50,00,000/=
06 Depreciation 80 20 14,00,000/=
07 Interest during construction
(IDLC)
100 10,00,000/=
Total 9,44,00,000/=
Operation Cost
No Cost name Cost(Tk)
01 Raw material 1,85,00,000/=
02 Utility 1,00,00,000/=
03 Manpower 80,00,000/=
04 Maintenance 65,00,000/=
05 Depreciation 12,00,000/=
06 interest 40,00,000/=
Total 4,82,00,000/=
Profitability Analysis
B/C Ratio IRR
Break even
analysis
Cash flow
Type Amount
Investment (9,44,00,000)/=
Benefit in 1st year 90,00,000/=
Benefit in 2nd year 1,40,00,000/=
Benefit in 3rd year 3,02,00,000/=
Benefit in 4th year 4,50,00,000/=
Benefit in 5th year 5,50,00,000/=
Benefit in 6th year 8,50,00,000/=
45
Cash flow
B/C Ratio
We guess that the interest rate is 15%. So the B/C ratio
B/C Ratio = Total discount benefit
Total discount cost
IRR( Internal Rate of Return)
Let, The internal rate of return 23%
Now NPV = Discount benefit – Discount cost
= 96542697 – 94400000
= 2142697
IRR( Internal Rate of Return)
%
%
Break even sales
p
r
o
d
u
c
t
sales
Recommendations
 Risky project
 Govt. help needed
 Peoples awareness for country-made product
 Challenges to importer
 Future field
Conclusion
Our project is profitable and Energy saving bulb is more
economical because day by day its extended user
whole over the world. It has less environmental impact
to comparison other electrical project and it save the
electrical energy.
Thanks For Watching

More Related Content

What's hot

USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects
M. Arkam C. Munaaim Adj. Prof, PhD, PEPC, IntPE.
 
LED PRESENTATION
LED PRESENTATIONLED PRESENTATION
LED PRESENTATION
Karimah Ali
 
Solar PV manufacturing
Solar PV manufacturingSolar PV manufacturing
Solar PV manufacturing
EAI
 
Desgin and development of solar powered air conditioning sysytem
Desgin and development of solar powered air conditioning sysytemDesgin and development of solar powered air conditioning sysytem
Desgin and development of solar powered air conditioning sysytem
Akshay Saraf
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
Gensol Engineering Limited
 
Led ppt
Led ppt Led ppt
Led ppt
Prabhu Kiran
 
Capital cost estimating – owner’s costs in an EPC project delivery method
Capital cost estimating – owner’s costs in an EPC project delivery methodCapital cost estimating – owner’s costs in an EPC project delivery method
Capital cost estimating – owner’s costs in an EPC project delivery method
Doina Dobre, P.Eng, GSC
 
Solar Photovoltaic Power Plant
Solar Photovoltaic Power PlantSolar Photovoltaic Power Plant
Solar Photovoltaic Power Plant
Pratish Rawat
 
Introduction plc
Introduction plcIntroduction plc
Introduction plc
Prasanta Roy
 
Kazeta
KazetaKazeta
Hazardous Area Classification
Hazardous Area ClassificationHazardous Area Classification
Hazardous Area Classification
guest81e1c7
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Syed Hashimi
 
LED Lighting Presentation
LED Lighting PresentationLED Lighting Presentation
LED Lighting Presentation
robcohen
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M Presentation
Roofsol Energy
 
Top 8 singapore airlines pilot interview questions answers
Top 8 singapore airlines pilot interview questions answersTop 8 singapore airlines pilot interview questions answers
Top 8 singapore airlines pilot interview questions answers
Toppilotinterview
 
LG Commercial Washing Machine User Manual
LG Commercial Washing Machine User ManualLG Commercial Washing Machine User Manual
LG Commercial Washing Machine User Manual
Equipe Solutions
 
Solar energy business opportunity
Solar energy business opportunitySolar energy business opportunity
Solar energy business opportunity
Lokender Yadav
 
TÜV SÜD Webinar - Important changes in the luminary standards
TÜV SÜD Webinar - Important changes in the luminary standardsTÜV SÜD Webinar - Important changes in the luminary standards
TÜV SÜD Webinar - Important changes in the luminary standards
TÜV SÜD
 
User manual of nk105 g2 handle controller ricocnc
User manual of nk105 g2 handle controller ricocncUser manual of nk105 g2 handle controller ricocnc
User manual of nk105 g2 handle controller ricocnc
Salce Smith CNC machines and woodworking spare parts
 

What's hot (19)

USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects
 
LED PRESENTATION
LED PRESENTATIONLED PRESENTATION
LED PRESENTATION
 
Solar PV manufacturing
Solar PV manufacturingSolar PV manufacturing
Solar PV manufacturing
 
Desgin and development of solar powered air conditioning sysytem
Desgin and development of solar powered air conditioning sysytemDesgin and development of solar powered air conditioning sysytem
Desgin and development of solar powered air conditioning sysytem
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
Led ppt
Led ppt Led ppt
Led ppt
 
Capital cost estimating – owner’s costs in an EPC project delivery method
Capital cost estimating – owner’s costs in an EPC project delivery methodCapital cost estimating – owner’s costs in an EPC project delivery method
Capital cost estimating – owner’s costs in an EPC project delivery method
 
Solar Photovoltaic Power Plant
Solar Photovoltaic Power PlantSolar Photovoltaic Power Plant
Solar Photovoltaic Power Plant
 
Introduction plc
Introduction plcIntroduction plc
Introduction plc
 
Kazeta
KazetaKazeta
Kazeta
 
Hazardous Area Classification
Hazardous Area ClassificationHazardous Area Classification
Hazardous Area Classification
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
 
LED Lighting Presentation
LED Lighting PresentationLED Lighting Presentation
LED Lighting Presentation
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M Presentation
 
Top 8 singapore airlines pilot interview questions answers
Top 8 singapore airlines pilot interview questions answersTop 8 singapore airlines pilot interview questions answers
Top 8 singapore airlines pilot interview questions answers
 
LG Commercial Washing Machine User Manual
LG Commercial Washing Machine User ManualLG Commercial Washing Machine User Manual
LG Commercial Washing Machine User Manual
 
Solar energy business opportunity
Solar energy business opportunitySolar energy business opportunity
Solar energy business opportunity
 
TÜV SÜD Webinar - Important changes in the luminary standards
TÜV SÜD Webinar - Important changes in the luminary standardsTÜV SÜD Webinar - Important changes in the luminary standards
TÜV SÜD Webinar - Important changes in the luminary standards
 
User manual of nk105 g2 handle controller ricocnc
User manual of nk105 g2 handle controller ricocncUser manual of nk105 g2 handle controller ricocnc
User manual of nk105 g2 handle controller ricocnc
 

Viewers also liked

Feasibility study on Mobile phone Manufacturing Plant.
Feasibility study on  Mobile phone Manufacturing Plant.Feasibility study on  Mobile phone Manufacturing Plant.
Feasibility study on Mobile phone Manufacturing Plant.
Md Ali
 
Feasibility study on Electric switch Manufacturing Plant.
Feasibility study on  Electric switch Manufacturing Plant.Feasibility study on  Electric switch Manufacturing Plant.
Feasibility study on Electric switch Manufacturing Plant.
Md Ali
 
China high voltage switch industry report, 2010-2011
China high voltage switch industry report, 2010-2011China high voltage switch industry report, 2010-2011
China high voltage switch industry report, 2010-2011
ResearchInChina
 
Feasibility study on PVC PIPE Manufacturing Plant.
Feasibility study on PVC PIPE Manufacturing Plant.Feasibility study on PVC PIPE Manufacturing Plant.
Feasibility study on PVC PIPE Manufacturing Plant.
Md Ali
 
Feasibility study on Ceiling fan Manufacturing Plant.
Feasibility study on  Ceiling fan Manufacturing Plant.Feasibility study on  Ceiling fan Manufacturing Plant.
Feasibility study on Ceiling fan Manufacturing Plant.
Md Ali
 
Feasibility study on Cable manufacturing plant.
Feasibility study on  Cable manufacturing plant. Feasibility study on  Cable manufacturing plant.
Feasibility study on Cable manufacturing plant.
Md Ali
 

Viewers also liked (6)

Feasibility study on Mobile phone Manufacturing Plant.
Feasibility study on  Mobile phone Manufacturing Plant.Feasibility study on  Mobile phone Manufacturing Plant.
Feasibility study on Mobile phone Manufacturing Plant.
 
Feasibility study on Electric switch Manufacturing Plant.
Feasibility study on  Electric switch Manufacturing Plant.Feasibility study on  Electric switch Manufacturing Plant.
Feasibility study on Electric switch Manufacturing Plant.
 
China high voltage switch industry report, 2010-2011
China high voltage switch industry report, 2010-2011China high voltage switch industry report, 2010-2011
China high voltage switch industry report, 2010-2011
 
Feasibility study on PVC PIPE Manufacturing Plant.
Feasibility study on PVC PIPE Manufacturing Plant.Feasibility study on PVC PIPE Manufacturing Plant.
Feasibility study on PVC PIPE Manufacturing Plant.
 
Feasibility study on Ceiling fan Manufacturing Plant.
Feasibility study on  Ceiling fan Manufacturing Plant.Feasibility study on  Ceiling fan Manufacturing Plant.
Feasibility study on Ceiling fan Manufacturing Plant.
 
Feasibility study on Cable manufacturing plant.
Feasibility study on  Cable manufacturing plant. Feasibility study on  Cable manufacturing plant.
Feasibility study on Cable manufacturing plant.
 

Similar to Feasibility study on Energy saving bulb Manufacturing Plant.

Feasibility Study on Energy Saving Bulb.
Feasibility Studyon Energy Saving Bulb.Feasibility Studyon Energy Saving Bulb.
Feasibility Study on Energy Saving Bulb.
md muzahidul haque
 
Feasibility Study on Electric Switches
Feasibility Studyon Electric SwitchesFeasibility Studyon Electric Switches
Feasibility Study on Electric Switches
md muzahidul haque
 
Energy Production For Finance (1)
Energy Production For Finance (1)Energy Production For Finance (1)
Energy Production For Finance (1)
AHMAD MUJTABA MALIK
 
The LED Revolution
The LED RevolutionThe LED Revolution
The LED Revolution
Kevin Willmorth
 
NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...
NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...
NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...
W G Kumar
 
OHMS ENERGY SOLAR
OHMS ENERGY SOLAROHMS ENERGY SOLAR
OHMS ENERGY SOLAR
OHMS Energy Pvt Ltd
 
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
Leonardo ENERGY
 
New Product Development
New Product DevelopmentNew Product Development
New Product Development
arunan
 
English final
English finalEnglish final
English final
Thomas Ting
 
New generation LED Lights.
New generation LED Lights.New generation LED Lights.
New generation LED Lights.
Arnab Roy
 
LVD EMI Lighting
LVD EMI LightingLVD EMI Lighting
LVD EMI Lighting
ADHenderson
 
ADA power high effeciency presentataion summary 02.05.2019
ADA  power high effeciency  presentataion summary  02.05.2019ADA  power high effeciency  presentataion summary  02.05.2019
ADA power high effeciency presentataion summary 02.05.2019
Avanindra Yadav
 
Bernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy EfficiencyBernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy Efficiency
Contract Cities
 
Italian Green Public Procurement for public lighting systems (and beyond)
Italian Green Public Procurement for public lighting systems (and beyond)Italian Green Public Procurement for public lighting systems (and beyond)
Italian Green Public Procurement for public lighting systems (and beyond)
Matteo Seraceni
 
Arch Led2008 Ssl Energy Legislative2
Arch Led2008 Ssl Energy Legislative2Arch Led2008 Ssl Energy Legislative2
Arch Led2008 Ssl Energy Legislative2
sodhi
 
English 2 final report
English 2 final reportEnglish 2 final report
English 2 final report
Carol Tang
 
English final print
English final printEnglish final print
English final print
Charles Teh
 
LED Technology Earthcare
LED Technology EarthcareLED Technology Earthcare
LED Technology Earthcare
Andy Choi
 
H1102014748
H1102014748H1102014748
H1102014748
IOSR Journals
 
Foecke - How? Strategies for Greening the Supply Chain
Foecke - How? Strategies for Greening the Supply ChainFoecke - How? Strategies for Greening the Supply Chain
Foecke - How? Strategies for Greening the Supply Chain
Environmental Initiative
 

Similar to Feasibility study on Energy saving bulb Manufacturing Plant. (20)

Feasibility Study on Energy Saving Bulb.
Feasibility Studyon Energy Saving Bulb.Feasibility Studyon Energy Saving Bulb.
Feasibility Study on Energy Saving Bulb.
 
Feasibility Study on Electric Switches
Feasibility Studyon Electric SwitchesFeasibility Studyon Electric Switches
Feasibility Study on Electric Switches
 
Energy Production For Finance (1)
Energy Production For Finance (1)Energy Production For Finance (1)
Energy Production For Finance (1)
 
The LED Revolution
The LED RevolutionThe LED Revolution
The LED Revolution
 
NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...
NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...
NATIONAL GREEN CORPS, NATIONAL SERVICE SCHEME, CLIMATE EDUCATION AND ENERGY C...
 
OHMS ENERGY SOLAR
OHMS ENERGY SOLAROHMS ENERGY SOLAR
OHMS ENERGY SOLAR
 
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009Presentation Solar Technologies   Leonardo Energy   - ICREPQ Congress 2009
Presentation Solar Technologies Leonardo Energy - ICREPQ Congress 2009
 
New Product Development
New Product DevelopmentNew Product Development
New Product Development
 
English final
English finalEnglish final
English final
 
New generation LED Lights.
New generation LED Lights.New generation LED Lights.
New generation LED Lights.
 
LVD EMI Lighting
LVD EMI LightingLVD EMI Lighting
LVD EMI Lighting
 
ADA power high effeciency presentataion summary 02.05.2019
ADA  power high effeciency  presentataion summary  02.05.2019ADA  power high effeciency  presentataion summary  02.05.2019
ADA power high effeciency presentataion summary 02.05.2019
 
Bernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy EfficiencyBernie Kotlier - Energy Efficiency
Bernie Kotlier - Energy Efficiency
 
Italian Green Public Procurement for public lighting systems (and beyond)
Italian Green Public Procurement for public lighting systems (and beyond)Italian Green Public Procurement for public lighting systems (and beyond)
Italian Green Public Procurement for public lighting systems (and beyond)
 
Arch Led2008 Ssl Energy Legislative2
Arch Led2008 Ssl Energy Legislative2Arch Led2008 Ssl Energy Legislative2
Arch Led2008 Ssl Energy Legislative2
 
English 2 final report
English 2 final reportEnglish 2 final report
English 2 final report
 
English final print
English final printEnglish final print
English final print
 
LED Technology Earthcare
LED Technology EarthcareLED Technology Earthcare
LED Technology Earthcare
 
H1102014748
H1102014748H1102014748
H1102014748
 
Foecke - How? Strategies for Greening the Supply Chain
Foecke - How? Strategies for Greening the Supply ChainFoecke - How? Strategies for Greening the Supply Chain
Foecke - How? Strategies for Greening the Supply Chain
 

Recently uploaded

Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...
Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...
Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...
Diana Rendina
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 

Recently uploaded (20)

Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...
Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...
Reimagining Your Library Space: How to Increase the Vibes in Your Library No ...
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 

Feasibility study on Energy saving bulb Manufacturing Plant.

  • 1. WELL COME TO OUR PRESENTATION
  • 2. Our Group Number-04 SL ID Student Name Program 01 13205100 Md. Foyez Ahammad BSEEE 02 13305003 Md.-Sabirul-Islam BSEEE 03 13305019 Tapan Khan BSEEE 04 13305020 Imran Hossain Shehab BSEEE 05 13305024 Md. Shafiqul Islam BSEEE
  • 3. Our Project Name Feasibility Study On Energy Saving BulB
  • 4. Contents of This Project Introduction Market Raw Material Process Technology Utility Location Environment Impact Investment Cost Operation Cost Profitability Analysis Conclusion and Recommendations
  • 5. Introduction Feasibility study and analysis of the ability  to complete a project successfully  taking into account legal  economic  technological  scheduling  And other factors
  • 6. Background  In 1878, Thomas Alva Edison began serious research into developing a practical incandescent lamp and on October 14, 1878.  The spiral Compact Fluorescent Lamp (CFL) was invented in 1976 by Edward E. Hammer, an engineer with General Electric, in response to the 1973 oil crisis. incandescent lamp Compact Fluorescent Lamp
  • 7. Definition Energy saving lamps are sources of artificial light that employ advanced technology to reduce the amount of electricity used to generate light, relative to traditional filament-burning light bulbs. The trend of energy saving light bulbs has been growing since last several years and people around the world have managed to cut down on their electricity bills as much as fifty to sixty taka. The demand of such energy saving bulbs has been increased and considering this growing demand various manufacturing companies have been incepted.
  • 8. Type Light Bulb  Classic  Candles  Spiral & stick  Spotlights  Reflectors  Tubes
  • 9. Type Light Bulb  Classic: A traditional light bulb shape, suitable for a variety of fittings.  Candles: Flame-shaped bulb, ideal for older- style light fixtures and chandeliers.  Spiral & stick: Practical and energy efficient bulb to light your home
  • 10. Type Light Bulb  Spotlights: Specially designed bulbs for bright, targeted spotlights.  Reflectors: Ideal for illuminating large areas with wide beams of light.  Tubes: Long cylinder-shaped bulb (known as fluorescent lighting) used for functional lighting. Type Light Bulb
  • 11. Type of Energy Saving Bulb Florescent lamps- compact and regular. Light emitting diode (LED) bulb Magnetic induction lamp Light emitting Electrochemical cell.
  • 12. Methodology The basis of low watt and high watt energy saving bulb are manufactures like 5W to 65W. Due to the respect of time energy saving bulb manufacturing technology has changed.
  • 13. Limitations  The most commonly used energy-saving light bulb is the Compact Fluorescent Light (CFL). Light-emitting diodes (LEDs) are increasing in popularity.  There are limitation of manpower, land and also other things.
  • 14. Market Situational Analysis Market Survey Characterization of Market Demand Forecasting Market Planning
  • 17. Market Survey  Total Demand.  Production of different company.  Satisfaction with exiting products.  Unsatisfied needs.  Attitudes towards various products.  Socio-economic characteristics of the buyers.
  • 18. Total Demand Bangladesh sets a world record – 5 million CFLs in a day, one bulb at a time. On Saturday, June 19th 2010, at over 1,400 rural and urban distribution centers spread across 27 districts about five million high quality CFL bulbs, in the first round of distribution.
  • 19. Company There are varieties brands Energy Saving Lamp available at the market. Some of the leading brands are following:  Nashir energy saving lamp industry.  Allied power Ltd.  Shafa electronics.  Transtec.  Superstar
  • 20. Production of different company No Company Name Production/year 01 Transtec 45,0000 02 NASIR 40,0000 03 Superstar 20,0000 04 Others 30,0000 Total =135,0000
  • 21. Satisfaction with existing products Unsatisfied with the existing product Good quality but high rate Low rate but not too much good quality long lasting
  • 22. Attitudes towards various products People wants good quality with reasonable price Low price but good product Long lasting Good Brightness
  • 23. Socio-economic characteristics of the buyers  Low price but high quality  Long time life  Good brightness  Energy saving
  • 24. Characterization of Market  Effective demand in the past and present  Breakdown of demand  Price  Methods of distribution and sales promotion  Supply and competition  Government policy
  • 25. Raw Material  Type of raw material  Sources  Demand  Supply  Mode of transportation
  • 26. Type of raw material  Resistance  Transistor  Iron  PVC wire  Glass  Body
  • 28. Sources  All raw material suppliers found in India.  Low demand accessory are found in local electrical company.
  • 29. Mode of transportation  Truck transportation  Train transportation  River-port using
  • 30. Process Technology  Outline of process technology  Availability and proneness  Comparative technology  Level of technology  Availability of manpower
  • 31. Utility  Typically use about 25%-80% less energy than traditional incandescent and it save money.  Can last 3-25 times longer.  Installing five low energy light bulbs will cost about tk1150 and could save as much as tk2250 a year.
  • 32. Location Proximity to market Availability of raw material Availability of utility Availability of skilled technical manpower
  • 33. Location The location of our project can be in the area of Kalibazar, Narayanganj.
  • 34. Proximity to Market In Bangladesh the main local markets are in Dhaka, Chittagong and Khulna. It is very easy to cover the local markets.
  • 35. Availability of raw material  In fact the raw materials are not available in our country.  This place is close to the river port and easy road transport system.  It is very easy to collect raw materials.  So we have to depend on other developed country.
  • 36. Availability of utility  To run this plant we need much more transport, electricity and gas.  It is very good area to have the proper utilities.  Because There are lots of electricity generation plant in Narayangonj area.  In this area has river so we can easily collect water if we need.  So we can say that this place are sweet able to run our Project.
  • 37. Manpower  Manpower are available but Skilled technical manpower is not available.  Have to trained few engineers from abroad.  Extra cost for the project but give us more benefit in future.
  • 38. Environmental Impact  Electromagnetic Compatibility  Radio Frequency Interference  Electromagnetic Disturbance
  • 39. Electromagnetic Compatibility  Electromagnetic Compatibility - The ability of an equipment or system to function satisfactorily in its electromagnetic environment without introducing intolerable electromagnetic disturbances to anything in that environment.
  • 40. Radio Frequency Interference Radio Frequency Interference -CFLs emit radio frequency radiation at levels that may interfere with various types of wireless technology. Any modification to the reception of sound or picture signals that make them unacceptable.
  • 41. Electromagnetic Disturbance  Electromagnetic Disturbance - Any electromagnetic phenomenon (or transmission) which may degrade the performance of a device, equipment or system, or adversely affect living or inert matter.
  • 42. Investment Cost 42 No Cost name Local currency (in %) Foreign currency (in %) Total (tk) 01 Land 100 1,80,00,000/= 02 Building 75 25 1,00,00,000/= 03 Machinery 90 10 5,50,00,000/= 04 Taxes and duties 80 20 40,00,000/= 05 Installation cost 75 25 50,00,000/= 06 Depreciation 80 20 14,00,000/= 07 Interest during construction (IDLC) 100 10,00,000/= Total 9,44,00,000/=
  • 43. Operation Cost No Cost name Cost(Tk) 01 Raw material 1,85,00,000/= 02 Utility 1,00,00,000/= 03 Manpower 80,00,000/= 04 Maintenance 65,00,000/= 05 Depreciation 12,00,000/= 06 interest 40,00,000/= Total 4,82,00,000/=
  • 44. Profitability Analysis B/C Ratio IRR Break even analysis Cash flow
  • 45. Type Amount Investment (9,44,00,000)/= Benefit in 1st year 90,00,000/= Benefit in 2nd year 1,40,00,000/= Benefit in 3rd year 3,02,00,000/= Benefit in 4th year 4,50,00,000/= Benefit in 5th year 5,50,00,000/= Benefit in 6th year 8,50,00,000/= 45 Cash flow
  • 46. B/C Ratio We guess that the interest rate is 15%. So the B/C ratio B/C Ratio = Total discount benefit Total discount cost
  • 47. IRR( Internal Rate of Return) Let, The internal rate of return 23% Now NPV = Discount benefit – Discount cost = 96542697 – 94400000 = 2142697
  • 48. IRR( Internal Rate of Return) % %
  • 50. Recommendations  Risky project  Govt. help needed  Peoples awareness for country-made product  Challenges to importer  Future field
  • 51. Conclusion Our project is profitable and Energy saving bulb is more economical because day by day its extended user whole over the world. It has less environmental impact to comparison other electrical project and it save the electrical energy.