SlideShare a Scribd company logo
1 of 21
FITZGERALD ARCHITECTURE STUDIO
Residential & Commercial Architecture
Fitzgerald Architecture Studio (FAS) was established in response to
client requests for service-oriented approach to architectural services
within Pennsylvania, New Jersey, and New York, particularly in the
areas of residential and commercial rehabilitations, insurance industry
clients, space planning for complex buildings, and the integration of
advanced technologies into the design process.
FITZGERALD ARCHITECTURE
DISASTER RESTORATION SERVICES
WaterCollision FireStorm Damage
The moment a disaster is declared under control, Fitzgerald Disaster
Restoration Services will be there to begin the process of restoring your
clients dream...and their lives. From surveying the damaged site to the finest
finishing details, we’re experts, streamlining the process and getting people
back into their homes and businesses thirty to sixty days faster than other
providers. Fitzgerald Disaster Restoration Services are undisputed leaders in
the field with more experience than any other firm in the tri-state area.
Number of Days To Building Permit Issuance Overview
Current
Claim
Process
120-150 Days
FAS-DRS
Claim
Process
57-70 Days Reduction
Insurance
Company
Benefits
Insurance Company
Time • Cost • Quality Solutions Overview
• Shorten the Insurance Claim Process and Sign off on Proof of
Loss Time Frame by Up To 50%
• Minimize Additional Living Expenses (ALE)
• Reduced Building Code Upgrades and Public Adjustor Issues
o Detailed assessment of necessary code upgrades
o Impact on Proof of Loss, Additional Living Expenses, and
architectural issues
• Provide the Insurance Company with a Dedicated Professional
Architecture Representative
• Boost Insurance Company Consumer Rating
Time • Cost • Quality Solutions Tools
• Insurance Claims Experience
• Insurance Claim Process
and Timeline
• Insurance Claim Deliverables
• Insurance Company Benefits
Time • Cost • Quality Solutions Tools
Insurance Claims Experience
• Hoffman Residence Lebanon, NJ Fire
• Kavanagh Residence Keansburg, NJ Collapsed Floor
• Tower Residence Cliffside Park, NJ Fire
• Hisco Company Somerset, NJ Collision
• Emer Residence Mtn. Lakes, NJ Fire
• Matteo Residence Paramus, NJ Fire
• Liquid Cargo Commercial Kearny, NJ Exterior Blast
• Beatch Residence North Caldwell, NJ Collapsed Floor
• Kmec Residence Hopatcong, NJ Water Damage
Time • Cost • Quality Solutions Tools
Insurance Claims Experience: Example Hoffman - Fire
Time • Cost • Quality Solutions Tools
Insurance Claims Experience: Hisco - Collision
Time • Cost • Quality Solutions Tools
Insurance Claims Experience: Matteo - Fire
Time • Cost • Quality Solutions Tools
General Claim Process and Timeline
1.) Insured contacts agent and/or insurance company following loss.
2.) Property Supervisor assigns Insurance Adjustor.
3.) Insurance Adjustor contacts Insured and schedules site visit.
4.) Insurance Adjustor visits claim site to assess claim needs.
5.) Insurance Adjustor assembles vendor team on-site. ( estimator/builder, emergency cleaning, housing services, etc. )
6.) Insurance Adjustor settles claim and Proof of Loss sign off.
7.) Insured retains builder to perform repair / reconstruction.
8.) Builder determines that formal drawings are required and retains an Architect.
9.) Architect and builder visit site.
10.) Architect provides builder with proposal for services.
11.) Builder notifies insured of architectural fees.
12.) Insured notifies Insurance Adjustor or public adjustor of architectural fees.
13.) Insurance Adjustor processes claim for architectural fees.
14.) Architect performs review of uniform construction code to identify code upgrades and begins construction documents.
15.) Architect notifies builder of code upgrades.
16.) Builder notifies insured of code upgrades.
17.) Insured notifies Insurance Adjustor or public adjuster of code upgrades.
18.) Insurance Adjustor processes claim for code upgrades.
19.) Architect generates necessary construction documents and provides to builders.
20.) Builder applies for building permits.
21.) Builder receives building permits and begins construction (Additional Living Expenses maybe necessary).
22.) As with any claim unexpected or hidden conditions may warrant additional vendor team services.
Begin
1-3 Days
20-60 Days
40-80 Days
120-150 Days
Complete
Time • Cost • Quality Solutions Tools
FAS-DRS Proposed Claim Process and Timeline
1.) Insured contacts agent and/or insurance company following loss.
2.) Property Supervisor assigns Insurance Adjustor.
3.) Insurance Adjustor contacts Insured and schedules site visit.
4.) Insurance Adjustor visits claim site with ARCHITECT to assess claim needs and performs code upgrades reviews.
5.) Insurance Adjustor assembles vendor team on-site. ( estimator/builder, emergency cleaning, housing services, etc. )
6.) Architect performs review of building code upgrades, begins construction documents, and notifies Insurance Adjustor.
7.) Architect generates necessary Construction Documents and provides deliverables to Insurance Adjustor.
8.) Insurance Adjustor settles claim and Proof of Loss sign off by providing insured with Contract Documents and building
estimates.
9.) Builder or Insured applies for building permits.
10.) Builder receives building permits and begins construction ( Additional Living Expenses minimized by 1/3 of the time ).
11.) As with any claim unexpected or hidden conditions may warrant additional vendor team services.
Begin
1-3 Days
30-50 Days
57-70 Days
Complete
Time • Cost • Quality Solutions Tools
Insurance Claim Deliverables (Insurance Claim Services Handbook)
• Preliminary code upgrade listing and letter of introduction and
reconstruction process
Time • Cost • Quality Solutions Tools
Insurance Claim Deliverables (Insurance Claim Services Handbook)
Time • Cost • Quality Solutions Tools
Insurance Claim Deliverables (Insurance Claim Services Handbook)
• Preliminary code upgrade listing and letter of introduction and
reconstruction process
• Notice to adjustor of zoning concerns and final code upgrade
listing.
Time • Cost • Quality Solutions Tools
Insurance Claim Deliverables (Insurance Claim Services Handbook)
Time • Cost • Quality Solutions Tools
Insurance Claim Deliverables (Insurance Claim Services Handbook)
• Preliminary code upgrade listing and letter of introduction and
reconstruction process
• Notice to adjustor of zoning concerns and final code upgrade
listing.
• Construction documents: (see section 3 of Insurance Claim
Services Handbook)
• Construction drawings; 3 sealed sets, 3 copies for permit
application of demolition plans, floor plans, elevations,
construction details, and finish schedules.
• Partially completed permit forms. (see section 3 of Insurance
Claim Services Handbook)
• Letter to insured explaining permit process and providing a
repair/reconstruction event sequence listing.
Time • Cost • Quality Solutions Tools
Insurance Claim Deliverables (Insurance Claim Services Handbook)
Time • Cost • Quality Solutions Overview
Insurance Company Benefits
• Shorten the Insurance Claim Process/Sign off on Proof of
Loss Time Frame
• Minimize Additional Living Expenses (ALE)
• Reduced Building Code Upgrades and Public Adjustor Issues
• Provide a Dedicated Professional Architecture Representative
• Boost Insurance Company Consumer Rating
Begin
1-3 Days
30-50 Days
57-70 Days
Complete
Additional Insurance Services
• Forensic Investigation – (see additional Insurance Services Handbook)
• Construction Phase Services – (see additional Insurance Services Handbook)
• Permits Applications – (see section 3 Insurance Claim Services Handbook)
Thank you for your attention.

More Related Content

What's hot

Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGCCordell Parvin
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...César del Riego y Fuentes
 
Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating Doina Dobre, P.Eng, GSC
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practiceAditya Sanyal
 
M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3Project Controls Expo
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contractsDr K M SONI
 
Think you don’t need an engineer for your office fitout?
 Think you don’t need an engineer for your office fitout? Think you don’t need an engineer for your office fitout?
Think you don’t need an engineer for your office fitout?Norman Disney & Young
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)mohamed Ismail
 
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...Moustafa Ismail Abu Dief
 
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5Moustafa Ismail Abu Dief
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silverWeero Koster
 
Fidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesFidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesCNC
 
Prolongation cost calculation
Prolongation cost  calculation Prolongation cost  calculation
Prolongation cost calculation R.R.G.S Bandara
 

What's hot (20)

Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
 
Tender
TenderTender
Tender
 
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
Arbitration Dispute Cross Arguments: Asia NGPipeline -Substance of EPC contra...
 
Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating Composite Crews in Construction Cost Estimating
Composite Crews in Construction Cost Estimating
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Construction contract
Construction contract Construction contract
Construction contract
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3M4 - Making Target Cost Contracts Work, under NEC3
M4 - Making Target Cost Contracts Work, under NEC3
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
Think you don’t need an engineer for your office fitout?
 Think you don’t need an engineer for your office fitout? Think you don’t need an engineer for your office fitout?
Think you don’t need an engineer for your office fitout?
 
Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)Time management in fidic red book 2017(prmg080 project)
Time management in fidic red book 2017(prmg080 project)
 
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...Ss 10   cost engineering management  training-   moustafa sec 5 part iii ch 2...
Ss 10 cost engineering management training- moustafa sec 5 part iii ch 2...
 
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5Ss 5 training fidic Dr. Moustafa Ismail  2017 _ lec 5
Ss 5 training fidic Dr. Moustafa Ismail 2017 _ lec 5
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silver
 
Fidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable ChangesFidic contracts 2017 - Notable Changes
Fidic contracts 2017 - Notable Changes
 
Public Meeting - Contract Close-Out - Ground Rules
Public Meeting - Contract Close-Out - Ground RulesPublic Meeting - Contract Close-Out - Ground Rules
Public Meeting - Contract Close-Out - Ground Rules
 
Prolongation cost calculation
Prolongation cost  calculation Prolongation cost  calculation
Prolongation cost calculation
 

Viewers also liked

OCRFeeder (FOSDEM 2010)
OCRFeeder (FOSDEM 2010)OCRFeeder (FOSDEM 2010)
OCRFeeder (FOSDEM 2010)Igalia
 
24h.com.vn - Tai Lieu KH
24h.com.vn - Tai Lieu KH24h.com.vn - Tai Lieu KH
24h.com.vn - Tai Lieu KHPhi Jack
 
Políticas Libro Blanco
Políticas Libro BlancoPolíticas Libro Blanco
Políticas Libro BlancoMelki Carpio
 
Releasing the People's Data
Releasing the People's DataReleasing the People's Data
Releasing the People's DataOpen Data @ CTIC
 
Почта ukr.net
 Почта ukr.net Почта ukr.net
Почта ukr.netNataKvasha
 
系统邮件实战技巧
系统邮件实战技巧系统邮件实战技巧
系统邮件实战技巧thinkinlamp
 
Sit 1 day workshop- www.hoangtien.net
Sit 1 day workshop- www.hoangtien.netSit 1 day workshop- www.hoangtien.net
Sit 1 day workshop- www.hoangtien.netTien Hoang
 
New Forests for New People
New Forests for New PeopleNew Forests for New People
New Forests for New PeopleSIANI
 
Regional Newsletter (Winter 2014/15)
Regional Newsletter (Winter 2014/15)Regional Newsletter (Winter 2014/15)
Regional Newsletter (Winter 2014/15)ENPI FLEG
 
InnovAction Lab 2015 - New Editions
InnovAction Lab 2015 - New EditionsInnovAction Lab 2015 - New Editions
InnovAction Lab 2015 - New EditionsCodemotion
 
From Sage 500 to 1000 ... Performance Testing myths exposed
From Sage 500 to 1000 ... Performance Testing myths exposedFrom Sage 500 to 1000 ... Performance Testing myths exposed
From Sage 500 to 1000 ... Performance Testing myths exposedTrust IV Ltd
 
Spac tombstones
Spac tombstonesSpac tombstones
Spac tombstonesegsllp
 
What is Wrong with Copyright Law and How CC Can Help
What is Wrong with Copyright Law and How CC Can HelpWhat is Wrong with Copyright Law and How CC Can Help
What is Wrong with Copyright Law and How CC Can HelpSarah Hinchliff Pearson
 

Viewers also liked (20)

OCRFeeder (FOSDEM 2010)
OCRFeeder (FOSDEM 2010)OCRFeeder (FOSDEM 2010)
OCRFeeder (FOSDEM 2010)
 
Plastic Mulches & Row Covers on Growth & Production of Summer Squash; Gardeni...
Plastic Mulches & Row Covers on Growth & Production of Summer Squash; Gardeni...Plastic Mulches & Row Covers on Growth & Production of Summer Squash; Gardeni...
Plastic Mulches & Row Covers on Growth & Production of Summer Squash; Gardeni...
 
24h.com.vn - Tai Lieu KH
24h.com.vn - Tai Lieu KH24h.com.vn - Tai Lieu KH
24h.com.vn - Tai Lieu KH
 
Políticas Libro Blanco
Políticas Libro BlancoPolíticas Libro Blanco
Políticas Libro Blanco
 
Releasing the People's Data
Releasing the People's DataReleasing the People's Data
Releasing the People's Data
 
Почта ukr.net
 Почта ukr.net Почта ukr.net
Почта ukr.net
 
SemáNtico PragmáTico
SemáNtico PragmáTicoSemáNtico PragmáTico
SemáNtico PragmáTico
 
系统邮件实战技巧
系统邮件实战技巧系统邮件实战技巧
系统邮件实战技巧
 
Presentatie handicap en studie
Presentatie handicap en studiePresentatie handicap en studie
Presentatie handicap en studie
 
Sit 1 day workshop- www.hoangtien.net
Sit 1 day workshop- www.hoangtien.netSit 1 day workshop- www.hoangtien.net
Sit 1 day workshop- www.hoangtien.net
 
New Forests for New People
New Forests for New PeopleNew Forests for New People
New Forests for New People
 
Regional Newsletter (Winter 2014/15)
Regional Newsletter (Winter 2014/15)Regional Newsletter (Winter 2014/15)
Regional Newsletter (Winter 2014/15)
 
InnovAction Lab 2015 - New Editions
InnovAction Lab 2015 - New EditionsInnovAction Lab 2015 - New Editions
InnovAction Lab 2015 - New Editions
 
From Sage 500 to 1000 ... Performance Testing myths exposed
From Sage 500 to 1000 ... Performance Testing myths exposedFrom Sage 500 to 1000 ... Performance Testing myths exposed
From Sage 500 to 1000 ... Performance Testing myths exposed
 
Euskal Valley v9
Euskal Valley v9Euskal Valley v9
Euskal Valley v9
 
Spac tombstones
Spac tombstonesSpac tombstones
Spac tombstones
 
Rendezvény Navigátor Magazin Május
Rendezvény Navigátor Magazin MájusRendezvény Navigátor Magazin Május
Rendezvény Navigátor Magazin Május
 
9. Il Web semantico
9. Il Web semantico9. Il Web semantico
9. Il Web semantico
 
SAPIENS2009 - Module 4B
SAPIENS2009 - Module 4BSAPIENS2009 - Module 4B
SAPIENS2009 - Module 4B
 
What is Wrong with Copyright Law and How CC Can Help
What is Wrong with Copyright Law and How CC Can HelpWhat is Wrong with Copyright Law and How CC Can Help
What is Wrong with Copyright Law and How CC Can Help
 

Similar to Fas drs power_point_2003

OSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIA
OSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIAOSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIA
OSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIAEmily Sweillam
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINALBrandon Hummel
 
Builders risk wrap up insurance webinar april 12
Builders risk  wrap up insurance webinar april 12 Builders risk  wrap up insurance webinar april 12
Builders risk wrap up insurance webinar april 12 MarkNBFC
 
Blyth Group Drying Corporate Presentation
Blyth Group Drying Corporate PresentationBlyth Group Drying Corporate Presentation
Blyth Group Drying Corporate PresentationGary Woodcock
 
An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копияLAZOVOY
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorLAZOVOY
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Kipcon Inc.
 
Johnson controls case study consultancy
Johnson controls case study   consultancyJohnson controls case study   consultancy
Johnson controls case study consultancygrahamelanders
 
How Rising Construction Costs Can Affect Your Insurance
How Rising Construction Costs Can Affect Your InsuranceHow Rising Construction Costs Can Affect Your Insurance
How Rising Construction Costs Can Affect Your InsuranceCBIZ, Inc.
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studiesgrahamelanders
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionSarbesh Mishra
 
Permit Place Asset Advantage
Permit Place Asset AdvantagePermit Place Asset Advantage
Permit Place Asset AdvantagePermit Place
 
Mall management Process Overview
Mall management Process OverviewMall management Process Overview
Mall management Process OverviewJaladhi Bhatt
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Browne Jacobson LLP
 
In Whose Court? Understanding Build-Out Provisions in Commercial Leases
In Whose Court? Understanding Build-Out Provisions in Commercial LeasesIn Whose Court? Understanding Build-Out Provisions in Commercial Leases
In Whose Court? Understanding Build-Out Provisions in Commercial LeasesBrewer Offord & Pedersen LLP
 

Similar to Fas drs power_point_2003 (20)

OSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIA
OSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIAOSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIA
OSHA A Strategic Partner for Residential & Commercial PA's | UDR | TAPIA
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
 
Builders risk wrap up insurance webinar april 12
Builders risk  wrap up insurance webinar april 12 Builders risk  wrap up insurance webinar april 12
Builders risk wrap up insurance webinar april 12
 
Construction Risk Management ABC's
Construction Risk Management ABC'sConstruction Risk Management ABC's
Construction Risk Management ABC's
 
Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
 
Blyth Group Drying Corporate Presentation
Blyth Group Drying Corporate PresentationBlyth Group Drying Corporate Presentation
Blyth Group Drying Corporate Presentation
 
An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копия
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sector
 
C4_Booklet
C4_BookletC4_Booklet
C4_Booklet
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
Johnson controls case study consultancy
Johnson controls case study   consultancyJohnson controls case study   consultancy
Johnson controls case study consultancy
 
How Rising Construction Costs Can Affect Your Insurance
How Rising Construction Costs Can Affect Your InsuranceHow Rising Construction Costs Can Affect Your Insurance
How Rising Construction Costs Can Affect Your Insurance
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studies
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in Construction
 
Permit Place Asset Advantage
Permit Place Asset AdvantagePermit Place Asset Advantage
Permit Place Asset Advantage
 
Mall management Process Overview
Mall management Process OverviewMall management Process Overview
Mall management Process Overview
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...
 
Resume_Dipanker
Resume_DipankerResume_Dipanker
Resume_Dipanker
 
In Whose Court? Understanding Build-Out Provisions in Commercial Leases
In Whose Court? Understanding Build-Out Provisions in Commercial LeasesIn Whose Court? Understanding Build-Out Provisions in Commercial Leases
In Whose Court? Understanding Build-Out Provisions in Commercial Leases
 

Fas drs power_point_2003

  • 1.
  • 2. FITZGERALD ARCHITECTURE STUDIO Residential & Commercial Architecture Fitzgerald Architecture Studio (FAS) was established in response to client requests for service-oriented approach to architectural services within Pennsylvania, New Jersey, and New York, particularly in the areas of residential and commercial rehabilitations, insurance industry clients, space planning for complex buildings, and the integration of advanced technologies into the design process.
  • 3. FITZGERALD ARCHITECTURE DISASTER RESTORATION SERVICES WaterCollision FireStorm Damage The moment a disaster is declared under control, Fitzgerald Disaster Restoration Services will be there to begin the process of restoring your clients dream...and their lives. From surveying the damaged site to the finest finishing details, we’re experts, streamlining the process and getting people back into their homes and businesses thirty to sixty days faster than other providers. Fitzgerald Disaster Restoration Services are undisputed leaders in the field with more experience than any other firm in the tri-state area.
  • 4. Number of Days To Building Permit Issuance Overview Current Claim Process 120-150 Days FAS-DRS Claim Process 57-70 Days Reduction Insurance Company Benefits
  • 5. Insurance Company Time • Cost • Quality Solutions Overview • Shorten the Insurance Claim Process and Sign off on Proof of Loss Time Frame by Up To 50% • Minimize Additional Living Expenses (ALE) • Reduced Building Code Upgrades and Public Adjustor Issues o Detailed assessment of necessary code upgrades o Impact on Proof of Loss, Additional Living Expenses, and architectural issues • Provide the Insurance Company with a Dedicated Professional Architecture Representative • Boost Insurance Company Consumer Rating
  • 6. Time • Cost • Quality Solutions Tools • Insurance Claims Experience • Insurance Claim Process and Timeline • Insurance Claim Deliverables • Insurance Company Benefits
  • 7. Time • Cost • Quality Solutions Tools Insurance Claims Experience • Hoffman Residence Lebanon, NJ Fire • Kavanagh Residence Keansburg, NJ Collapsed Floor • Tower Residence Cliffside Park, NJ Fire • Hisco Company Somerset, NJ Collision • Emer Residence Mtn. Lakes, NJ Fire • Matteo Residence Paramus, NJ Fire • Liquid Cargo Commercial Kearny, NJ Exterior Blast • Beatch Residence North Caldwell, NJ Collapsed Floor • Kmec Residence Hopatcong, NJ Water Damage
  • 8. Time • Cost • Quality Solutions Tools Insurance Claims Experience: Example Hoffman - Fire
  • 9. Time • Cost • Quality Solutions Tools Insurance Claims Experience: Hisco - Collision
  • 10. Time • Cost • Quality Solutions Tools Insurance Claims Experience: Matteo - Fire
  • 11. Time • Cost • Quality Solutions Tools General Claim Process and Timeline 1.) Insured contacts agent and/or insurance company following loss. 2.) Property Supervisor assigns Insurance Adjustor. 3.) Insurance Adjustor contacts Insured and schedules site visit. 4.) Insurance Adjustor visits claim site to assess claim needs. 5.) Insurance Adjustor assembles vendor team on-site. ( estimator/builder, emergency cleaning, housing services, etc. ) 6.) Insurance Adjustor settles claim and Proof of Loss sign off. 7.) Insured retains builder to perform repair / reconstruction. 8.) Builder determines that formal drawings are required and retains an Architect. 9.) Architect and builder visit site. 10.) Architect provides builder with proposal for services. 11.) Builder notifies insured of architectural fees. 12.) Insured notifies Insurance Adjustor or public adjustor of architectural fees. 13.) Insurance Adjustor processes claim for architectural fees. 14.) Architect performs review of uniform construction code to identify code upgrades and begins construction documents. 15.) Architect notifies builder of code upgrades. 16.) Builder notifies insured of code upgrades. 17.) Insured notifies Insurance Adjustor or public adjuster of code upgrades. 18.) Insurance Adjustor processes claim for code upgrades. 19.) Architect generates necessary construction documents and provides to builders. 20.) Builder applies for building permits. 21.) Builder receives building permits and begins construction (Additional Living Expenses maybe necessary). 22.) As with any claim unexpected or hidden conditions may warrant additional vendor team services. Begin 1-3 Days 20-60 Days 40-80 Days 120-150 Days Complete
  • 12. Time • Cost • Quality Solutions Tools FAS-DRS Proposed Claim Process and Timeline 1.) Insured contacts agent and/or insurance company following loss. 2.) Property Supervisor assigns Insurance Adjustor. 3.) Insurance Adjustor contacts Insured and schedules site visit. 4.) Insurance Adjustor visits claim site with ARCHITECT to assess claim needs and performs code upgrades reviews. 5.) Insurance Adjustor assembles vendor team on-site. ( estimator/builder, emergency cleaning, housing services, etc. ) 6.) Architect performs review of building code upgrades, begins construction documents, and notifies Insurance Adjustor. 7.) Architect generates necessary Construction Documents and provides deliverables to Insurance Adjustor. 8.) Insurance Adjustor settles claim and Proof of Loss sign off by providing insured with Contract Documents and building estimates. 9.) Builder or Insured applies for building permits. 10.) Builder receives building permits and begins construction ( Additional Living Expenses minimized by 1/3 of the time ). 11.) As with any claim unexpected or hidden conditions may warrant additional vendor team services. Begin 1-3 Days 30-50 Days 57-70 Days Complete
  • 13. Time • Cost • Quality Solutions Tools Insurance Claim Deliverables (Insurance Claim Services Handbook) • Preliminary code upgrade listing and letter of introduction and reconstruction process
  • 14. Time • Cost • Quality Solutions Tools Insurance Claim Deliverables (Insurance Claim Services Handbook)
  • 15. Time • Cost • Quality Solutions Tools Insurance Claim Deliverables (Insurance Claim Services Handbook) • Preliminary code upgrade listing and letter of introduction and reconstruction process • Notice to adjustor of zoning concerns and final code upgrade listing.
  • 16. Time • Cost • Quality Solutions Tools Insurance Claim Deliverables (Insurance Claim Services Handbook)
  • 17. Time • Cost • Quality Solutions Tools Insurance Claim Deliverables (Insurance Claim Services Handbook) • Preliminary code upgrade listing and letter of introduction and reconstruction process • Notice to adjustor of zoning concerns and final code upgrade listing. • Construction documents: (see section 3 of Insurance Claim Services Handbook) • Construction drawings; 3 sealed sets, 3 copies for permit application of demolition plans, floor plans, elevations, construction details, and finish schedules. • Partially completed permit forms. (see section 3 of Insurance Claim Services Handbook) • Letter to insured explaining permit process and providing a repair/reconstruction event sequence listing.
  • 18. Time • Cost • Quality Solutions Tools Insurance Claim Deliverables (Insurance Claim Services Handbook)
  • 19. Time • Cost • Quality Solutions Overview Insurance Company Benefits • Shorten the Insurance Claim Process/Sign off on Proof of Loss Time Frame • Minimize Additional Living Expenses (ALE) • Reduced Building Code Upgrades and Public Adjustor Issues • Provide a Dedicated Professional Architecture Representative • Boost Insurance Company Consumer Rating Begin 1-3 Days 30-50 Days 57-70 Days Complete
  • 20. Additional Insurance Services • Forensic Investigation – (see additional Insurance Services Handbook) • Construction Phase Services – (see additional Insurance Services Handbook) • Permits Applications – (see section 3 Insurance Claim Services Handbook)
  • 21. Thank you for your attention.