Auto Sectionlizer
FAS type
15/27/34.5kV
Product brochure
2010/4
Zhejiang Farady Electric Co., Ltd.
ISO9001&ISO14001 certificated enterprise
++++General
The electric sectionalizer has been developed for use on overhead distribution lines to
improve reliability and service continuity. It enhances the protection of the distribution system
in a simple, economical way which is free from maintenance and spares. Statistics indicated
that 70% - 90% of fuse cutout operations are in response to transient faults. The electronic
sectionalizer enables customers to better manage these types of transient faults. It is
designed to substitute a fuse cutout, ensuring effective isolation only in the event of a
sustained fault. It remains unresponsive to transient faults. The sectionalizer is a self-
contained device, designed to be used in a coordinated overcurrent protection scheme with
automatic reclosers.
This sectionalizer uses micro-computer and operating trip mechanism and does not
require external auxiliary supply.And it is designed to withstand the mechanical forces
generated by high fault currents. Its design also caters for the durability needed with repetitive
hook stick closing in harsh outdoor environments.
The electronic sectionalizer incorporates electronic logic and trip circuits which are
controlled and powered by a dual core current transformer mounted on the copper conductive
tube.The current transformer is mounted externally to the conductive tube and encapsulated
in a durable weatherproof epoxy.
The electronic circuit provides the necessary intelligence for counting recloser tripping
operations and provokes the opening of the sectionalizer at the appropriate time. The
electronic circuit is encapsulated with epoxy, within the environmentally sealed conductive
tube. The tube acts as a faraday cage, protecting the electronic circuit from the influence of
magnetic fields.
Tripping is achieved when a solenoid located in the lower half of the conductive tube is
energized and the trip arm is released enabling the hinged trunnion to collapse.
++++Working principle
The current transformer built in the cutout sectionalizer can detect the current of the main
circuit and send the output to the electronic control for digital handling. When a fault occurs,
the upstream recloser (or circuit breaker) opens, the circuit loses voltage and the current is
lower than 300mA, the electronic controller can remember this opening time as a “count”. As
it accumulate the presetting number (1 to 4), the sectionalizer will automatic trips within
1
180ms of fault interruption to isolate fault. Then the upstream recloser (or circuit breaker)
closes to restore power supply to the healthy section of the system to limit outage scope and
protect the main feeder in service. If the fault is temporary and is cleared before the
sectionalizer counter reaches the presetting number, the sectionalizer remains closed and
resets to its original state after its reset time expires.
++++Counts
The number of counts differentiates real faults from transient faults. When the preset
number of counts is registered, the electronic sectionalizer will operate.
The sectionalizer can be set to 1, 2, 3, 4 counts. It registers a count when a current dead
time exceeding 200 milliseconds occurs, immediately after a current pick up. This ensures
the sectionalizer only registers a count when a recloser has tripped due to a fault current.
The count setting should be one count less than the immediate upstreamrecloser.
++++Pick up current
The pick up current is the threshold, which must be exceeded in order to register a count.
The pick up requires a minimum fault pulse that is 10% greater than the pick up current setting
and is longer than 20 milliseconds in duration.
++++Resetting
The electronic sectionalizer will reset itself during the drop out operation. Do not need
remove the unit from its mount using a hook stick and reset it manually.
++++Service conditions
①The ambient air temperature is not above 55℃ or below -40℃.
②The average value of the ambient temperature, measured over a period of 24h,does not exceed 25
℃.
③The altitude does not exceed 1000 m (3300ft).
④The wind speed does not exceed 34 m/s (corresponding to 700 Pa on cylindrical surfaces).
⑤The ice coating does not exceed 1mm.
⑥The sectionalizer should not apply to those flammable, explosive, corrosive and severe
vibration conditions. As to other service conditions not covered in the manual, please
2
contact and consult with the manufacturer for detail information.
++++Technical data
Rated actuating current: 8 to 400A
Reclaim time: 20 ±5%s
Operation counts: 1-4
Sensitivity of pick up current: ±10%
Max. load current prior to operation: 0.3A
Min. recloser dead time: 500ms
Min. duration of fault pulse: 10ms
++++Selection list
Please inform the order before ordering. For example:
Pick up current (A) Count/counts
I1 I2 I3 I4 I5 1,2,3,4
Note: Please view the label to know the section current(I1, I2, I3, I4, I5) .
3
Dimension and Mounting Arrangements
Rating L
15.5KV 379
40.5KV 486
L
76
Note: 1. Installation mode can be designed according
to customer requirements.
2. Link must be balanced when installed.
Unit:mm
4
Sectionalizer setting guide
①Current setting
The sectionalizer current setting must be selected at 20% below the minimum associated
recloser or circuit breaker trip current.
②Number of count setting
Generally the number of count settings should be ‘one’ less than the number of trips to
lockout of the recloser or circuit breaker.
5
6
The following table is a description of how to choose the pick up current and
the counts.
Curre
nt
Counts
I1 I2 I3 I4 I5
1
2
3
4
Application
Normally, the sectionalizer is applied in conjunction with an upstream
recloser or circuit breaker.For Example:
The recloser applied in the substation is set (1 fast and 3 slow) 4 shots to
lockout and 6 units cutout sectionalizers (F1, F2, F3, F4, F5, F6) are applied in
the four branch line to separate 7 section ( L1, L2, L3, L4, L5, L6, L7). The
counts of F1 is set to 3 time, F2, F3, F5 are set to 2 times and F4, F6 are set
to 1 time. As shown in the following figure:
7
If there is a fault E1 in section L5, a fault current flow the recloser and
sectionalizer F1, F3, F4, The recloser trip and all the line lost voltage, The
sectionalizer F4 trip after it reach to the presetting “count” number 1 and isolate
the fault section L5, the rescloser reclose and restore the healthy section L1,
L2, L3, L4, L6, L7 to service.
If a fault E2 in section L6, a fault current flow the recloser and sectionalizer
F1, F5, the recloser trip, if the fault is temporary, the recloser reclose to restore
the line in service, then the sectionalizer F1, F5 remains closed and resets to
its original state after a presetting time since it does not reach the presetting
8
count number,. if the fault is permanent, the recloser fail to reclose successfully
and trip again, all the line lost voltage and the sectionalizer F5 trip to isolate
fault section L6 after it reaches the presetting count number 2, the sectionalizer
F1 remain closes state since it does not reach the presetting count number.
The recloser reclose again and restore the healthy section L1, L2, L3, L4, L5 to
service.
If a fault E3 in section L2, a fault current flow the recloser and sectionalizer
F1, the recloser trip. If the fault is temporary the recloser reclose to restore the
line in service, then the sectionalizer F1 remains closed and resets to its orginal
state after a presetting time since it does not reach the presetting count number.
If the fault is permanent , the recloser fail to reclose successfully and trip again
all the line lost voltage and the sectionalizer F1 trip to isolate fault section L2
after it reach the presetting count number 3, The recloser reclose again and
restore the healthy section L1 to service.
9
The count number of sectionalizer is set 1 time normally as it applied in the
end of substation because almost fault occurring at the end of substation is
permanent and is set 2 or 3 times applied on the overhead line because almost
fault applied on the overhead line is temporary.
In this co-ordination, the sectionalizer can easily and optimized co-ordinate.
User notes
++++Maintenance instruction
1. Periodic test for correct operation 1 to 3 years. We recommend that
Sectionalizers are tested when the Associated Reclosers are maintained.
Sectionalizers should be tested in a suitable test set or laboratory.
2. If the Sectionalizers cannot be tested during routine maintenance, check de-
latching mechanism.
 This can be done by rotating the Reset Lever until the Lever is
released. The sectionalizer should dropout freely and the trunnion
should then collapse freely.
 The trunnion hinge has plated surfaces to prevent corrosion and provide
electrical contact. Clean and lubricate hinge using an electrical grade
silicon spray.
 Wipe contact surfaces clean. When reinstalling into an old EDO base,
a light smear of contact grease on both top and bottom of contact
10
surfaces may be beneficial.
3. Setting Changes
When setting changes are made to sectionalizers which have had
field service;
 After removing top cap check that no moisture ingress has occurred.
Check condition of O-ring needs replacing, a thin film of O-ring grease is
recommended.
Note: Setting changes should be carried out in a dry environment
and switch housing should be dry before replacing cap.
 Before making setting change, we recommend an operational test be
carried out using a suitable sectionalizer test set or laboratory.
++++Storage
The sectionalizer should be stored in a room with good ventilation. If
the sectionalizer were stored for a long time, it should be tested annually
and before using.
++++Inspection Checklist
 Open the Sectionalizer packaging and inspect the unit for physical
damage.
 View the nameplate and verify that the correct model has been
ordered.
 Ensure the following items are included: Operation manual , Inspection
report and tools.
++++Before order pls clarify of your requirement with our tech
Copyright 2014 Farady Electric
Zhejiang Farady Electric Co.,Ltd
TEL:0086-577-61722510/61777258
Fax:0086-577-61777257
Http://www.farady-electric.com
Email:info@farady.cn
Add:Su’ao,Liushi,Yueqing,Zhejiang,P.R.China, 325604

More Related Content

What's hot

Advanced motion controls 120a10b 24
Advanced motion controls 120a10b 24Advanced motion controls 120a10b 24
Advanced motion controls 120a10b 24
Electromate
 
Advanced motion controls 120a10b
Advanced motion controls 120a10bAdvanced motion controls 120a10b
Advanced motion controls 120a10b
Electromate
 
Rv1 a2aj instruction manual.bfp-a8052e
Rv1 a2aj instruction manual.bfp-a8052eRv1 a2aj instruction manual.bfp-a8052e
Rv1 a2aj instruction manual.bfp-a8052e
Abe Paih
 
Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101
tedjurca
 

What's hot (16)

Be siemens price list 03 02-2012
Be siemens price list 03 02-2012Be siemens price list 03 02-2012
Be siemens price list 03 02-2012
 
Advanced motion controls 120a10b 24
Advanced motion controls 120a10b 24Advanced motion controls 120a10b 24
Advanced motion controls 120a10b 24
 
Advanced motion controls 120a10b
Advanced motion controls 120a10bAdvanced motion controls 120a10b
Advanced motion controls 120a10b
 
AC Servo Driver SD Series Taiwan Tech
AC Servo Driver SD Series Taiwan TechAC Servo Driver SD Series Taiwan Tech
AC Servo Driver SD Series Taiwan Tech
 
Catalog ls mc dienhathe.vn
Catalog ls mc dienhathe.vnCatalog ls mc dienhathe.vn
Catalog ls mc dienhathe.vn
 
Chapter 4 electrical-auxiliary_systems
Chapter 4 electrical-auxiliary_systemsChapter 4 electrical-auxiliary_systems
Chapter 4 electrical-auxiliary_systems
 
Dienhathe.com monitoring devices
Dienhathe.com monitoring devicesDienhathe.com monitoring devices
Dienhathe.com monitoring devices
 
4188 855 mac
4188 855 mac4188 855 mac
4188 855 mac
 
Advanced motion controls 30a8
Advanced motion controls 30a8Advanced motion controls 30a8
Advanced motion controls 30a8
 
Catalog Inverter FR-D700 safety stop function instruction manual-Beeteco.com
Catalog Inverter FR-D700 safety stop function instruction manual-Beeteco.comCatalog Inverter FR-D700 safety stop function instruction manual-Beeteco.com
Catalog Inverter FR-D700 safety stop function instruction manual-Beeteco.com
 
Gr 105 auto valve user manual
Gr 105 auto valve user manualGr 105 auto valve user manual
Gr 105 auto valve user manual
 
Delta ch2000 m_en_20120625
Delta ch2000 m_en_20120625Delta ch2000 m_en_20120625
Delta ch2000 m_en_20120625
 
Rv1 a2aj instruction manual.bfp-a8052e
Rv1 a2aj instruction manual.bfp-a8052eRv1 a2aj instruction manual.bfp-a8052e
Rv1 a2aj instruction manual.bfp-a8052e
 
Impulse valve
Impulse valveImpulse valve
Impulse valve
 
KW-Trio Electric Paper Guillotines/Cutters Machines - Printfinish.com
KW-Trio Electric Paper Guillotines/Cutters Machines - Printfinish.comKW-Trio Electric Paper Guillotines/Cutters Machines - Printfinish.com
KW-Trio Electric Paper Guillotines/Cutters Machines - Printfinish.com
 
Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101Ed3 & ed4 sm installation & calibration v101
Ed3 & ed4 sm installation & calibration v101
 

More from JoeChueng

Neutral grounding resistors ngr
Neutral grounding resistors  ngrNeutral grounding resistors  ngr
Neutral grounding resistors ngr
JoeChueng
 
Power factor corrector
Power factor correctorPower factor corrector
Power factor corrector
JoeChueng
 

More from JoeChueng (20)

Automatic reactive voltage regulator
Automatic reactive voltage regulatorAutomatic reactive voltage regulator
Automatic reactive voltage regulator
 
Ys10 pad mounted transformer
Ys10 pad mounted transformerYs10 pad mounted transformer
Ys10 pad mounted transformer
 
Padmounted transformer
Padmounted transformerPadmounted transformer
Padmounted transformer
 
Prefabricated compact transformer
Prefabricated compact transformerPrefabricated compact transformer
Prefabricated compact transformer
 
VR-8 step voltage regulator
VR-8 step voltage regulatorVR-8 step voltage regulator
VR-8 step voltage regulator
 
Automatic voltage regulator(avr)
Automatic voltage regulator(avr)Automatic voltage regulator(avr)
Automatic voltage regulator(avr)
 
Dry type autotransformer
Dry type autotransformerDry type autotransformer
Dry type autotransformer
 
Cast resin dry type transformer
Cast resin dry type transformerCast resin dry type transformer
Cast resin dry type transformer
 
Oil immersed transformer
Oil immersed transformerOil immersed transformer
Oil immersed transformer
 
Neutral grounding resistors ngr
Neutral grounding resistors  ngrNeutral grounding resistors  ngr
Neutral grounding resistors ngr
 
Ltvr overhead line lt voltage regulator
Ltvr overhead line lt voltage regulatorLtvr overhead line lt voltage regulator
Ltvr overhead line lt voltage regulator
 
Lsvr lt step voltage regulator
Lsvr lt step voltage regulatorLsvr lt step voltage regulator
Lsvr lt step voltage regulator
 
Single phase pole mounted transformer
Single phase pole mounted transformerSingle phase pole mounted transformer
Single phase pole mounted transformer
 
D11 single phase overhead distribution transformer
D11 single phase overhead distribution transformerD11 single phase overhead distribution transformer
D11 single phase overhead distribution transformer
 
Fgw1 air break switch
Fgw1 air break switchFgw1 air break switch
Fgw1 air break switch
 
Hxgn17 vacuum type ring main unit
Hxgn17 vacuum type ring main unitHxgn17 vacuum type ring main unit
Hxgn17 vacuum type ring main unit
 
Jxf distribution box
Jxf distribution boxJxf distribution box
Jxf distribution box
 
Xl21 distribution box
Xl21 distribution boxXl21 distribution box
Xl21 distribution box
 
Power factor corrector
Power factor correctorPower factor corrector
Power factor corrector
 
Mns lv switchgear
Mns lv switchgearMns lv switchgear
Mns lv switchgear
 

Recently uploaded

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Fas auto sectionlizer

  • 1. Auto Sectionlizer FAS type 15/27/34.5kV Product brochure 2010/4 Zhejiang Farady Electric Co., Ltd. ISO9001&ISO14001 certificated enterprise
  • 2. ++++General The electric sectionalizer has been developed for use on overhead distribution lines to improve reliability and service continuity. It enhances the protection of the distribution system in a simple, economical way which is free from maintenance and spares. Statistics indicated that 70% - 90% of fuse cutout operations are in response to transient faults. The electronic sectionalizer enables customers to better manage these types of transient faults. It is designed to substitute a fuse cutout, ensuring effective isolation only in the event of a sustained fault. It remains unresponsive to transient faults. The sectionalizer is a self- contained device, designed to be used in a coordinated overcurrent protection scheme with automatic reclosers. This sectionalizer uses micro-computer and operating trip mechanism and does not require external auxiliary supply.And it is designed to withstand the mechanical forces generated by high fault currents. Its design also caters for the durability needed with repetitive hook stick closing in harsh outdoor environments. The electronic sectionalizer incorporates electronic logic and trip circuits which are controlled and powered by a dual core current transformer mounted on the copper conductive tube.The current transformer is mounted externally to the conductive tube and encapsulated in a durable weatherproof epoxy. The electronic circuit provides the necessary intelligence for counting recloser tripping operations and provokes the opening of the sectionalizer at the appropriate time. The electronic circuit is encapsulated with epoxy, within the environmentally sealed conductive tube. The tube acts as a faraday cage, protecting the electronic circuit from the influence of magnetic fields. Tripping is achieved when a solenoid located in the lower half of the conductive tube is energized and the trip arm is released enabling the hinged trunnion to collapse. ++++Working principle The current transformer built in the cutout sectionalizer can detect the current of the main circuit and send the output to the electronic control for digital handling. When a fault occurs, the upstream recloser (or circuit breaker) opens, the circuit loses voltage and the current is lower than 300mA, the electronic controller can remember this opening time as a “count”. As it accumulate the presetting number (1 to 4), the sectionalizer will automatic trips within
  • 3. 1 180ms of fault interruption to isolate fault. Then the upstream recloser (or circuit breaker) closes to restore power supply to the healthy section of the system to limit outage scope and protect the main feeder in service. If the fault is temporary and is cleared before the sectionalizer counter reaches the presetting number, the sectionalizer remains closed and resets to its original state after its reset time expires. ++++Counts The number of counts differentiates real faults from transient faults. When the preset number of counts is registered, the electronic sectionalizer will operate. The sectionalizer can be set to 1, 2, 3, 4 counts. It registers a count when a current dead time exceeding 200 milliseconds occurs, immediately after a current pick up. This ensures the sectionalizer only registers a count when a recloser has tripped due to a fault current. The count setting should be one count less than the immediate upstreamrecloser. ++++Pick up current The pick up current is the threshold, which must be exceeded in order to register a count. The pick up requires a minimum fault pulse that is 10% greater than the pick up current setting and is longer than 20 milliseconds in duration. ++++Resetting The electronic sectionalizer will reset itself during the drop out operation. Do not need remove the unit from its mount using a hook stick and reset it manually. ++++Service conditions ①The ambient air temperature is not above 55℃ or below -40℃. ②The average value of the ambient temperature, measured over a period of 24h,does not exceed 25 ℃. ③The altitude does not exceed 1000 m (3300ft). ④The wind speed does not exceed 34 m/s (corresponding to 700 Pa on cylindrical surfaces). ⑤The ice coating does not exceed 1mm. ⑥The sectionalizer should not apply to those flammable, explosive, corrosive and severe vibration conditions. As to other service conditions not covered in the manual, please
  • 4. 2 contact and consult with the manufacturer for detail information. ++++Technical data Rated actuating current: 8 to 400A Reclaim time: 20 ±5%s Operation counts: 1-4 Sensitivity of pick up current: ±10% Max. load current prior to operation: 0.3A Min. recloser dead time: 500ms Min. duration of fault pulse: 10ms ++++Selection list Please inform the order before ordering. For example: Pick up current (A) Count/counts I1 I2 I3 I4 I5 1,2,3,4 Note: Please view the label to know the section current(I1, I2, I3, I4, I5) .
  • 5. 3 Dimension and Mounting Arrangements Rating L 15.5KV 379 40.5KV 486 L 76 Note: 1. Installation mode can be designed according to customer requirements. 2. Link must be balanced when installed. Unit:mm
  • 6. 4 Sectionalizer setting guide ①Current setting The sectionalizer current setting must be selected at 20% below the minimum associated recloser or circuit breaker trip current. ②Number of count setting Generally the number of count settings should be ‘one’ less than the number of trips to lockout of the recloser or circuit breaker.
  • 7. 5
  • 8. 6 The following table is a description of how to choose the pick up current and the counts. Curre nt Counts I1 I2 I3 I4 I5 1 2 3 4 Application Normally, the sectionalizer is applied in conjunction with an upstream recloser or circuit breaker.For Example: The recloser applied in the substation is set (1 fast and 3 slow) 4 shots to lockout and 6 units cutout sectionalizers (F1, F2, F3, F4, F5, F6) are applied in the four branch line to separate 7 section ( L1, L2, L3, L4, L5, L6, L7). The counts of F1 is set to 3 time, F2, F3, F5 are set to 2 times and F4, F6 are set to 1 time. As shown in the following figure:
  • 9. 7 If there is a fault E1 in section L5, a fault current flow the recloser and sectionalizer F1, F3, F4, The recloser trip and all the line lost voltage, The sectionalizer F4 trip after it reach to the presetting “count” number 1 and isolate the fault section L5, the rescloser reclose and restore the healthy section L1, L2, L3, L4, L6, L7 to service. If a fault E2 in section L6, a fault current flow the recloser and sectionalizer F1, F5, the recloser trip, if the fault is temporary, the recloser reclose to restore the line in service, then the sectionalizer F1, F5 remains closed and resets to its original state after a presetting time since it does not reach the presetting
  • 10. 8 count number,. if the fault is permanent, the recloser fail to reclose successfully and trip again, all the line lost voltage and the sectionalizer F5 trip to isolate fault section L6 after it reaches the presetting count number 2, the sectionalizer F1 remain closes state since it does not reach the presetting count number. The recloser reclose again and restore the healthy section L1, L2, L3, L4, L5 to service. If a fault E3 in section L2, a fault current flow the recloser and sectionalizer F1, the recloser trip. If the fault is temporary the recloser reclose to restore the line in service, then the sectionalizer F1 remains closed and resets to its orginal state after a presetting time since it does not reach the presetting count number. If the fault is permanent , the recloser fail to reclose successfully and trip again all the line lost voltage and the sectionalizer F1 trip to isolate fault section L2 after it reach the presetting count number 3, The recloser reclose again and restore the healthy section L1 to service.
  • 11. 9 The count number of sectionalizer is set 1 time normally as it applied in the end of substation because almost fault occurring at the end of substation is permanent and is set 2 or 3 times applied on the overhead line because almost fault applied on the overhead line is temporary. In this co-ordination, the sectionalizer can easily and optimized co-ordinate. User notes ++++Maintenance instruction 1. Periodic test for correct operation 1 to 3 years. We recommend that Sectionalizers are tested when the Associated Reclosers are maintained. Sectionalizers should be tested in a suitable test set or laboratory. 2. If the Sectionalizers cannot be tested during routine maintenance, check de- latching mechanism.  This can be done by rotating the Reset Lever until the Lever is released. The sectionalizer should dropout freely and the trunnion should then collapse freely.  The trunnion hinge has plated surfaces to prevent corrosion and provide electrical contact. Clean and lubricate hinge using an electrical grade silicon spray.  Wipe contact surfaces clean. When reinstalling into an old EDO base, a light smear of contact grease on both top and bottom of contact
  • 12. 10 surfaces may be beneficial. 3. Setting Changes When setting changes are made to sectionalizers which have had field service;  After removing top cap check that no moisture ingress has occurred. Check condition of O-ring needs replacing, a thin film of O-ring grease is recommended. Note: Setting changes should be carried out in a dry environment and switch housing should be dry before replacing cap.  Before making setting change, we recommend an operational test be carried out using a suitable sectionalizer test set or laboratory. ++++Storage The sectionalizer should be stored in a room with good ventilation. If the sectionalizer were stored for a long time, it should be tested annually and before using. ++++Inspection Checklist  Open the Sectionalizer packaging and inspect the unit for physical damage.  View the nameplate and verify that the correct model has been ordered.  Ensure the following items are included: Operation manual , Inspection report and tools. ++++Before order pls clarify of your requirement with our tech Copyright 2014 Farady Electric Zhejiang Farady Electric Co.,Ltd TEL:0086-577-61722510/61777258 Fax:0086-577-61777257 Http://www.farady-electric.com Email:info@farady.cn Add:Su’ao,Liushi,Yueqing,Zhejiang,P.R.China, 325604