This facility has a 280 foot long by 40 foot wide piping fabrication bay with 32 feet of clearance under cranes including two 15-ton cranes and one 5-ton crane. It has the capability to fabricate piping up to 48 inches in diameter and 40 foot long spools up to 8 tons per month. The facility is equipped with engineering and drafting resources along with computerized tracking systems. It is certified to ASME, B31.1, and B31.3 codes for piping and structural fabrication and has the capacity to fabricate 400 tons of structural steel per month using various CNC machinery.