SlideShare a Scribd company logo
This is to certify that Mr.JAYAKUMAR.R S/o Mr. RAJENDIRAN
organization as Instrument Engineer
absorbed as Instrument Engineer
We confirmed his services as Instrument Engineer on
and relived from the service on 1
He has fully involved in Erection,Testing,
Instrumentation work in our project sites at
1. ISMT 2 x 40 MW ISMT Ltd, (Kur
Operational Energy Group India Private Limited Chennai.
2. 1 x 12 MW Captive Power Plant
Operational Energy Group India Private Limited Chennai.
During his tenure the performed all his assignments with integrity.
We wish him all success in his future endea
EXPERIENCE CERTIFICATE
is to certify that Mr.JAYAKUMAR.R S/o Mr. RAJENDIRAN.R has worked in our
Instrument Engineer from 17th
December 2010 to 10th
absorbed as Instrument Engineer.
We confirmed his services as Instrument Engineer on 17th
December 2010
and relived from the service on 17th
January 2013.
Erection,Testing, Operational & Maintenance activities of Control and
Instrumentation work in our project sites at
1. ISMT 2 x 40 MW ISMT Ltd, (Kurla, Maharashtra) Power Project through M/s. OEG
Operational Energy Group India Private Limited Chennai.
2 MW Captive Power Plant Surendra Mining Pvt Ltd Bonai through M/s. OEG
Operational Energy Group India Private Limited Chennai.
During his tenure the performed all his assignments with integrity.
We wish him all success in his future endeavors
.R has worked in our
th
January 2013 and
2010 to 10th
January 2013
Maintenance activities of Control and
hrough M/s. OEG
hrough M/s. OEG

More Related Content

What's hot

Introduction to green building.
Introduction to green building.Introduction to green building.
Introduction to green building.Abdallah Yousef
 
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker HannifinImproving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker HannifinParker Hannifin Corporation
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminarOsama Khadra
 
Business Responsibility Reporting
Business Responsibility ReportingBusiness Responsibility Reporting
Business Responsibility ReportingRSM GC
 
Green buildings
Green buildingsGreen buildings
Green buildingsFiroz GSK
 
Reactor Modeling Tools - STANJAN
Reactor Modeling Tools - STANJANReactor Modeling Tools - STANJAN
Reactor Modeling Tools - STANJANGerard B. Hawkins
 
Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...
Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...
Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...Frida85y
 
Sustainable Design Part Four: Sustainable Materials
Sustainable Design Part Four: Sustainable MaterialsSustainable Design Part Four: Sustainable Materials
Sustainable Design Part Four: Sustainable MaterialsTerri Meyer Boake
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignGerard B. Hawkins
 
Ethylene Plant Design Considerations
Ethylene Plant Design ConsiderationsEthylene Plant Design Considerations
Ethylene Plant Design ConsiderationsGerard B. Hawkins
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsTerri Meyer Boake
 
Voorbeeld werkstuk Jaguars
Voorbeeld werkstuk JaguarsVoorbeeld werkstuk Jaguars
Voorbeeld werkstuk Jaguarsprojectweb2.0
 

What's hot (20)

Introduction to green building.
Introduction to green building.Introduction to green building.
Introduction to green building.
 
LEED & Green Materials
LEED & Green MaterialsLEED & Green Materials
LEED & Green Materials
 
ESG
ESGESG
ESG
 
ESG
ESGESG
ESG
 
LEED Certification
LEED CertificationLEED Certification
LEED Certification
 
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker HannifinImproving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
Improving Power Plant Gas Turbine Performance - Case Study | Parker Hannifin
 
Green building rating system seminar
Green building rating system seminarGreen building rating system seminar
Green building rating system seminar
 
Business Responsibility Reporting
Business Responsibility ReportingBusiness Responsibility Reporting
Business Responsibility Reporting
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
Reactor Modeling Tools - STANJAN
Reactor Modeling Tools - STANJANReactor Modeling Tools - STANJAN
Reactor Modeling Tools - STANJAN
 
Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...
Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...
Urban Landscape Plantings: A Selection of Plant Species Suitable for the Melb...
 
Sustainable Design Part Four: Sustainable Materials
Sustainable Design Part Four: Sustainable MaterialsSustainable Design Part Four: Sustainable Materials
Sustainable Design Part Four: Sustainable Materials
 
ESG Environmental, Social & Governance
ESG Environmental, Social & GovernanceESG Environmental, Social & Governance
ESG Environmental, Social & Governance
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer Design
 
Green architecture
Green architectureGreen architecture
Green architecture
 
Cracking the Ethane Cracker
Cracking the Ethane CrackerCracking the Ethane Cracker
Cracking the Ethane Cracker
 
green building report
green building reportgreen building report
green building report
 
Ethylene Plant Design Considerations
Ethylene Plant Design ConsiderationsEthylene Plant Design Considerations
Ethylene Plant Design Considerations
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment Systems
 
Voorbeeld werkstuk Jaguars
Voorbeeld werkstuk JaguarsVoorbeeld werkstuk Jaguars
Voorbeeld werkstuk Jaguars
 

Similar to EXP NEW OEG.1

Similar to EXP NEW OEG.1 (7)

EXP ENMAS
EXP  ENMASEXP  ENMAS
EXP ENMAS
 
Ramu Resume
Ramu ResumeRamu Resume
Ramu Resume
 
Company Profile
Company ProfileCompany Profile
Company Profile
 
Pinnacle Company Profile Aug15
Pinnacle Company Profile Aug15Pinnacle Company Profile Aug15
Pinnacle Company Profile Aug15
 
c v2016 (1)
c v2016 (1)c v2016 (1)
c v2016 (1)
 
New Microsoft Office Word Document (4) - Copy
New Microsoft Office Word Document (4) - CopyNew Microsoft Office Word Document (4) - Copy
New Microsoft Office Word Document (4) - Copy
 
Yogesh_Amrale_new_resume.doc-Apr-2015
Yogesh_Amrale_new_resume.doc-Apr-2015Yogesh_Amrale_new_resume.doc-Apr-2015
Yogesh_Amrale_new_resume.doc-Apr-2015
 

EXP NEW OEG.1

  • 1. This is to certify that Mr.JAYAKUMAR.R S/o Mr. RAJENDIRAN organization as Instrument Engineer absorbed as Instrument Engineer We confirmed his services as Instrument Engineer on and relived from the service on 1 He has fully involved in Erection,Testing, Instrumentation work in our project sites at 1. ISMT 2 x 40 MW ISMT Ltd, (Kur Operational Energy Group India Private Limited Chennai. 2. 1 x 12 MW Captive Power Plant Operational Energy Group India Private Limited Chennai. During his tenure the performed all his assignments with integrity. We wish him all success in his future endea EXPERIENCE CERTIFICATE is to certify that Mr.JAYAKUMAR.R S/o Mr. RAJENDIRAN.R has worked in our Instrument Engineer from 17th December 2010 to 10th absorbed as Instrument Engineer. We confirmed his services as Instrument Engineer on 17th December 2010 and relived from the service on 17th January 2013. Erection,Testing, Operational & Maintenance activities of Control and Instrumentation work in our project sites at 1. ISMT 2 x 40 MW ISMT Ltd, (Kurla, Maharashtra) Power Project through M/s. OEG Operational Energy Group India Private Limited Chennai. 2 MW Captive Power Plant Surendra Mining Pvt Ltd Bonai through M/s. OEG Operational Energy Group India Private Limited Chennai. During his tenure the performed all his assignments with integrity. We wish him all success in his future endeavors .R has worked in our th January 2013 and 2010 to 10th January 2013 Maintenance activities of Control and hrough M/s. OEG hrough M/s. OEG