EWRT 30 CLASS 16
AGENDA
Terms 1-9
Writers' Workshop:
Fiction Project #2
TERMS 1-9
1. Drama
2. Playwright
3. Script
4. Act
5. Scene
6. Prologue
7. Antihero
8. Guerilla theater:
9. Subject
1. Drama: a literary art form that recreates human life
and emotions (uses dialogue)
2. Playwright: the author of the drama.
3. Script: The play in written form.
4. Act: A division of a play.
5. Scene: A division of an act (change of location).
6. Prologue: an introduction
7. Antihero: a protagonist or central character who
lacks the qualities typically associated with heroism—
for example, bravery, morality, or good looks—but
still manages to earn sympathy from the spectator.
8. Guerilla theater: a form of theater popularized in the
United States during the 1960s that sought to confront
spectators with brief, unscheduled, and often provocative
performances in public spaces. Performers were interested
in breaking traditional social barriers in order to convey
their political messages.
9. Subject: What a story or play is about. To be
distinguished from plot and theme. Faulkner's "A Rose for
Emily" is about the decline of a particular way of life
endemic to the American south before the civil war. Its
plot concerns how Faulkner describes and organizes the
actions of the story's characters. Its theme is the overall
meaning Faulkner conveys.
WRITERS’ WORKSHOP
WRITER’S WORKSHOP #3
Get into your groups and share your fiction so everyone has access to
your paper. Include me at kimpalmore01@gmail.com
Take turns reading a brief sample of your work aloud; note obvious
errors (typos, spelling) as the reader reads.
Let everyone read before making comments about content, style, and
conventions. Make sure each participant gets at least one thorough review
of his or her work.
Use the handout as a guide for your comments. Ask yourself the
questions about each piece. Where should the writer focus his or her efforts
in revision?
Use the comment feature on Google Docs. Avoid editing!
DO NOT write on the fiction revision workshop handout
STEPS TO REVISION: AT HOME
1. Carefully and thoughtfully review the suggestions your readers have
given you.
2. Make the changes that will improve your story.
3. Put aside the work for several hours or longer. This kind of literal
space/time distance will allow you to gain some objectivity.
4. Revisit your story and the revision suggestions.
5. Make further changes.
6. Read your revised story aloud.
7. Revise again.
HOMEWORK
 Post # 16: The best two or three paragraphs of
your fiction project.
 Reading: Drama: 10 minute plays: "Gray
Matter"
 Submit Project #3 before noon, Friday, week 9
 Study: Terms

Ewrt 30 class 16

  • 1.
  • 2.
  • 3.
    TERMS 1-9 1. Drama 2.Playwright 3. Script 4. Act 5. Scene 6. Prologue 7. Antihero 8. Guerilla theater: 9. Subject
  • 4.
    1. Drama: aliterary art form that recreates human life and emotions (uses dialogue) 2. Playwright: the author of the drama. 3. Script: The play in written form. 4. Act: A division of a play. 5. Scene: A division of an act (change of location). 6. Prologue: an introduction 7. Antihero: a protagonist or central character who lacks the qualities typically associated with heroism— for example, bravery, morality, or good looks—but still manages to earn sympathy from the spectator.
  • 5.
    8. Guerilla theater:a form of theater popularized in the United States during the 1960s that sought to confront spectators with brief, unscheduled, and often provocative performances in public spaces. Performers were interested in breaking traditional social barriers in order to convey their political messages. 9. Subject: What a story or play is about. To be distinguished from plot and theme. Faulkner's "A Rose for Emily" is about the decline of a particular way of life endemic to the American south before the civil war. Its plot concerns how Faulkner describes and organizes the actions of the story's characters. Its theme is the overall meaning Faulkner conveys.
  • 6.
  • 7.
    WRITER’S WORKSHOP #3 Getinto your groups and share your fiction so everyone has access to your paper. Include me at kimpalmore01@gmail.com Take turns reading a brief sample of your work aloud; note obvious errors (typos, spelling) as the reader reads. Let everyone read before making comments about content, style, and conventions. Make sure each participant gets at least one thorough review of his or her work. Use the handout as a guide for your comments. Ask yourself the questions about each piece. Where should the writer focus his or her efforts in revision? Use the comment feature on Google Docs. Avoid editing! DO NOT write on the fiction revision workshop handout
  • 8.
    STEPS TO REVISION:AT HOME 1. Carefully and thoughtfully review the suggestions your readers have given you. 2. Make the changes that will improve your story. 3. Put aside the work for several hours or longer. This kind of literal space/time distance will allow you to gain some objectivity. 4. Revisit your story and the revision suggestions. 5. Make further changes. 6. Read your revised story aloud. 7. Revise again.
  • 9.
    HOMEWORK  Post #16: The best two or three paragraphs of your fiction project.  Reading: Drama: 10 minute plays: "Gray Matter"  Submit Project #3 before noon, Friday, week 9  Study: Terms