Rhema House provides shelter and care for 21 children ages 5 to 17. It was established in 1996 and is located in Seremban, Negeri Sembilan. The home requires renovations and additions such as painting the fence, adding shoe racks and storage, and fixing drainage issues. A proposal was made to address these needs through donations of materials, volunteer labor, and fundraising.