SlideShare a Scribd company logo
1 of 30
ENVIRONMENTAL PROTECTION
MEASURES
Group Members: Tutor:
5 February 2024
โ€ข Pradeep Bhattarai
076BCE112
โ€ข Sibesh Pandey 076BCE166
โ€ข Somnath Luitel 076BCE170
Assoc. Prof. Shukra Raj Paudel
Department of Civil
Engineering,
Pulchowk Campus,
IOE, Tribhuwan University
Outline of the Presentation
1.Introduction to Environmental Protection
Measures
2.Objectives of Environmental Protection
Measures
3.Mitigation Hierarchy
4.Types of Mitigation Measures
5.Implementation of EPMs
Objectives of the Presentation
โ€ข To enhance knowledge on Environmental Protection
Measures
โ€ข To know about consideration to be taken during project
alternatives
โ€ข To discuss on importance of alternative analysis and its
legal provision
โ€ข To give concept on different types of mitigation measures
โ€ข To link mitigation measures and project cycle
โ€ข To explain the examples of mitigation measures
Introduction to Mitigation Measures
โ€ข Mitigation measures refer to the techniques to control or
minimize the adverse environmental impact which is
caused due to the establishment of the project
โ€ข It maximizes the project benefits and minimizes the
undesirable impacts.
โ€ข It depends upon the type of project and its location
โ€ข Selection of mitigation measures may depend on the
cost benefit analysis of the project as well
โ€ข Wide range of Environmental Protection Measures
(EPM/EPMs) are proposed for various project
Environmental Protection
Measures
โ€ข Environmental protection
measures means all measures
taken to effect Environmental
Quality, including but not limited
to, assessment and prediction of
impacts, monitoring, measures to
avoid or mitigate impacts, setting
of limits for environmental
degradation, and measures for
construction, operations, closure,
reclamation and abandonment of
the Project.
โ€ข The purpose of EPM is to identify
measures that safeguard the
environment and the community
affected by the proposal.
EPM in Nepal
โ€ข Environmental Protection Act, 2076 and Regulation,
2077 provide guidelines for the detail of BES, IEE
and EIA.
โ€ข Principle of Avoidance of impact, Minimization of
impacts and remedy or compensation for adverse
residual impact are getting practical these days.
(three-step process of mitigation)
โ€ข Supreme Court says no to Nijgadh airport over
environmental concerns
โ€ข The Supreme Court has issued an interim order not
to carry out any of the physical construction projects
along the Sikles Annapurna Conservation in Kaski.
Objectives of Environmental Protection
Measures
โ€ข To protect physical, biological and human environment
โ€ข To manage hazardous compounds and other different
wastes
โ€ข To provide basis for the development of monitoring plans
โ€ข To find better alternatives
โ€ข To enhance environmental and social benefits
โ€ข To minimize undesirable impacts within the acceptable
level or legal boundaries
Mitigation Measures
Hierarchy
Avoidance
Correctio
n
Compensation
Most Preferred
Most Practical
Rare,
Undesirable
Alternatives
Corrective
Measures
Compensation to
People
Fig : Mitigation Measure Hierarchy
3. TYPES OF MITIGATION
MEASURES
I. Selection of Alternatives
II. Preventive Measures
III. Corrective Measures
IV. Compensatory Measures
i. Selection of Alternatives
โ€ข Selection of alternatives
helps to identify the best
option to carry out a
project with minimum
impact on environment.
โ€ข Selection of alternatives
is also known as โ€œ The
Heart of EIAโ€.
โ€ข It is the most preferable
and desired type of
mitigation measure.
contd..
โ€ข The alternativeโ€™s are selected on the basis of following
factors-
a. Scale
b. Economic Consideration
c. Design
d. Time schedule
e. Socio-Economic Factors
f. Raw Materials
Alternative Analysis-Legal Provision
โ€ข The legal provision regarding alternative analysis as per
Environmental Protection Act, 2019 (2076) is shown
below-
Importance of Alternative Analysis
โ€ข It helps to identify the best option with minimum impact
upon environment.
โ€ข Saves time and money
โ€ข Incorporation and utilization of knowledge from every
stakeholders
โ€ข Risk Reduction: Considering a range of alternatives can
bring robustness to the planning and design process and
may reduce the possible risks.
โ€ข Selected project will be economically feasible, technically
viable, socially acceptable and environment friendly.
โ€ข Donor agencies such as Asian Development Bank
(ADB), World Bank (WB) are focusing more on
alternative analysis for the financialization of least
damage option avoiding impact upon environment and
Types of Mitigation Measures
Mitigation
Measures
1. Preventive
Measures
3.Compensatory
Measures
2. Corrective
Measures
Mitigation is an integral regulatory procedure in all
international interpretations of environmental impact
assessment (EIA).
*If preventive or corrective measures fail,
then compensatory measures are applied.
*The potential impact is prevented
or reduced before it occurs.
*Reducing the impact to a level
which is acceptable
Measure to eliminate workplace risks at source, through
technical or organisational means or by providing protection.
๏‚ง Change location/site to avoid impacts, such as re-route from
forests to degraded areas;
๏‚ง Avoid environmentally sensitive areas
๏‚ง Integrate education, and include additional social service
facilities;
๏‚ง Organize public awareness programs etc.
1. Preventive Measures
Few illustrations of Preventive Measures
Image:- Military Area Image:- Wildlife reserve
Image: Environmentally sensitive area
Image: Landslide prone area
๏‚ง If impacts canโ€™t be avoided, reduce impacts to an
acceptable level through.
๏‚ง Use of technologies, practices, inclusion of facilitative
measures.
๏‚ง Construct fish ladder to ensure movement of migratory fish
species.
๏‚ง Use bio-engineering measures to stabilise slopes etc.
2. Corrective
Measures
Few Illustrations of Corrective
Measures
Image:- Gabion mesh to protect from rockfall Image:- Fish ladder
Image:- Retrofitting Image:- Gabion mesh for landslide
Few Illustrations of Corrective Measures(contd..)
Image:- Wastewater Treatment
Image:- Foundation retrofitting
Image:- Air pollution control devices
Corrective Measures
Water sprinkling, water fogging, broom sweeping is carried out in
dust prone locations @ Pokhara-Mugling Highway
Nature-based Solution (NbS) to prevent/mitigate soil erosion
and slope instability at Chaku-Marming Road, Bhotekoshi.
Corrective Measures
๏‚ง Compensatory measures are the actions that address
adverse impacts which are unavoidable.
๏‚ง Compensatory plantation
๏‚ง Compensation for land and property etc.
Image:- Monetary compensation Image:- Compensatory Plantation
3. Compensatory Measures
๏‚ง It is the least preferred mitigation measure.
๏‚ง It includes restoration of damaged natural resources.
๏‚ง Rehabilitation of displaced settlements.
๏‚ง Creation of similar resources or habitats elsewhere to
replace a loss .
Compensatory Measures(contd..)
๏‚ง Compensation is provided in accordance with the
โ€œCompensation Act, 2019 (1963).โ€
๏‚ง Compensation Determination Committee (CDC) will be
established with the consultation of local stakeholders and local
government body. Rehabilitation of displaced settlements.
๏‚ง Loss of land and property of the affected people will be
addressed either through cash compensation or through cash
and equity share compensation.
Compensatory Measures(contd..)
Budhigandaki Hydropower Project
- Project Affected Families (PAF) and Seriously Project
Affected Family (SPAF) has been identified and categorized as
per guidelines.
- SPAF is defined as a family who loses over 25% of its total land
holdings or whose land is reduced to an uneconomic holding or
who is being displaced.
- Resettlement and Rehabilitation Plan has been prepared to
clarify the entitlements for resettlement and for compulsory
purchase of land and other matters for compensation.
-Alternatively land will be given together with sufficient
compensation to enable families to build & move to new houses
as preferred such that the AFs will have better living standard or
are no worse off than if they were not affected.
Budhigandaki Hydropower Project
- Some of the cultural sites, temples and major local importance
existed within the RoW of the proposed alignment will be
relocated at the appropriate places as requested by locals during
the time of compensation distribution in the Construction Phase.
Compensation for structures, plants and fruits
Corrective Measures Vs Preventive Measures
Thank you for listening

More Related Content

Similar to environment_pollution_control_slides.pptx

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxSubhajitNandi15
ย 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
ย 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
ย 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfDr. Subramanyam Revanuru
ย 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfJagriti Agarwal
ย 
DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...
DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...
DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...ssuser879abc
ย 
Prosesamdal0415 160604023817
Prosesamdal0415 160604023817Prosesamdal0415 160604023817
Prosesamdal0415 160604023817agusrifkhi
ย 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
ย 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
ย 
Environmental Offset Presentation, QELA - 29052014
Environmental Offset Presentation, QELA - 29052014Environmental Offset Presentation, QELA - 29052014
Environmental Offset Presentation, QELA - 29052014Aaron Organ
ย 
EIA presentation.pptx
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptxNikhilGautam68
ย 
Provision in the project formulation for Environment for Road projects
Provision in the project formulation for Environment for Road projectsProvision in the project formulation for Environment for Road projects
Provision in the project formulation for Environment for Road projectsDr Deepak Kumar Tripathi
ย 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptxMonirulIslamEstiak
ย 
Eia e top1_body
Eia e top1_bodyEia e top1_body
Eia e top1_bodyJitender Kumar
ย 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
ย 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxMarskyUbia
ย 
Green Building and Technology Unit 3
Green Building and Technology Unit 3Green Building and Technology Unit 3
Green Building and Technology Unit 3Chaitanya Nagare
ย 
CEE-401-Economics-of-Environment-Module-5-AB-Das.pdf
CEE-401-Economics-of-Environment-Module-5-AB-Das.pdfCEE-401-Economics-of-Environment-Module-5-AB-Das.pdf
CEE-401-Economics-of-Environment-Module-5-AB-Das.pdfdeepakanand4567
ย 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAikinsOsei1
ย 
Environment biotechnology
Environment biotechnologyEnvironment biotechnology
Environment biotechnologyarushe143
ย 

Similar to environment_pollution_control_slides.pptx (20)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ย 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
ย 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
ย 
Environmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdfEnvironmental Impact Assessment (EIA).pdf
Environmental Impact Assessment (EIA).pdf
ย 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdf
ย 
DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...
DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...
DBCP-36-ppt-Breakout Session-3 Environmental Stewardship breakout session_DBC...
ย 
Prosesamdal0415 160604023817
Prosesamdal0415 160604023817Prosesamdal0415 160604023817
Prosesamdal0415 160604023817
ย 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
ย 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
ย 
Environmental Offset Presentation, QELA - 29052014
Environmental Offset Presentation, QELA - 29052014Environmental Offset Presentation, QELA - 29052014
Environmental Offset Presentation, QELA - 29052014
ย 
EIA presentation.pptx
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptx
ย 
Provision in the project formulation for Environment for Road projects
Provision in the project formulation for Environment for Road projectsProvision in the project formulation for Environment for Road projects
Provision in the project formulation for Environment for Road projects
ย 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptx
ย 
Eia e top1_body
Eia e top1_bodyEia e top1_body
Eia e top1_body
ย 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
ย 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ย 
Green Building and Technology Unit 3
Green Building and Technology Unit 3Green Building and Technology Unit 3
Green Building and Technology Unit 3
ย 
CEE-401-Economics-of-Environment-Module-5-AB-Das.pdf
CEE-401-Economics-of-Environment-Module-5-AB-Das.pdfCEE-401-Economics-of-Environment-Module-5-AB-Das.pdf
CEE-401-Economics-of-Environment-Module-5-AB-Das.pdf
ย 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
ย 
Environment biotechnology
Environment biotechnologyEnvironment biotechnology
Environment biotechnology
ย 

Recently uploaded

Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas๐Ÿ’ฅVictoria K. Colangelo
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...rajputriyana310
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Anamikakaur10
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...tanu pandey
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
ย 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
ย 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...Escorts Call Girls
ย 

Recently uploaded (20)

Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 โ˜Ž 9990224454 High Class Delhi NCR 24 Hour...
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
ย 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
ย 

environment_pollution_control_slides.pptx

  • 1. ENVIRONMENTAL PROTECTION MEASURES Group Members: Tutor: 5 February 2024 โ€ข Pradeep Bhattarai 076BCE112 โ€ข Sibesh Pandey 076BCE166 โ€ข Somnath Luitel 076BCE170 Assoc. Prof. Shukra Raj Paudel Department of Civil Engineering, Pulchowk Campus, IOE, Tribhuwan University
  • 2. Outline of the Presentation 1.Introduction to Environmental Protection Measures 2.Objectives of Environmental Protection Measures 3.Mitigation Hierarchy 4.Types of Mitigation Measures 5.Implementation of EPMs
  • 3. Objectives of the Presentation โ€ข To enhance knowledge on Environmental Protection Measures โ€ข To know about consideration to be taken during project alternatives โ€ข To discuss on importance of alternative analysis and its legal provision โ€ข To give concept on different types of mitigation measures โ€ข To link mitigation measures and project cycle โ€ข To explain the examples of mitigation measures
  • 4. Introduction to Mitigation Measures โ€ข Mitigation measures refer to the techniques to control or minimize the adverse environmental impact which is caused due to the establishment of the project โ€ข It maximizes the project benefits and minimizes the undesirable impacts. โ€ข It depends upon the type of project and its location โ€ข Selection of mitigation measures may depend on the cost benefit analysis of the project as well โ€ข Wide range of Environmental Protection Measures (EPM/EPMs) are proposed for various project
  • 5. Environmental Protection Measures โ€ข Environmental protection measures means all measures taken to effect Environmental Quality, including but not limited to, assessment and prediction of impacts, monitoring, measures to avoid or mitigate impacts, setting of limits for environmental degradation, and measures for construction, operations, closure, reclamation and abandonment of the Project. โ€ข The purpose of EPM is to identify measures that safeguard the environment and the community affected by the proposal.
  • 6. EPM in Nepal โ€ข Environmental Protection Act, 2076 and Regulation, 2077 provide guidelines for the detail of BES, IEE and EIA. โ€ข Principle of Avoidance of impact, Minimization of impacts and remedy or compensation for adverse residual impact are getting practical these days. (three-step process of mitigation) โ€ข Supreme Court says no to Nijgadh airport over environmental concerns โ€ข The Supreme Court has issued an interim order not to carry out any of the physical construction projects along the Sikles Annapurna Conservation in Kaski.
  • 7. Objectives of Environmental Protection Measures โ€ข To protect physical, biological and human environment โ€ข To manage hazardous compounds and other different wastes โ€ข To provide basis for the development of monitoring plans โ€ข To find better alternatives โ€ข To enhance environmental and social benefits โ€ข To minimize undesirable impacts within the acceptable level or legal boundaries
  • 8.
  • 9. Mitigation Measures Hierarchy Avoidance Correctio n Compensation Most Preferred Most Practical Rare, Undesirable Alternatives Corrective Measures Compensation to People Fig : Mitigation Measure Hierarchy
  • 10. 3. TYPES OF MITIGATION MEASURES I. Selection of Alternatives II. Preventive Measures III. Corrective Measures IV. Compensatory Measures
  • 11. i. Selection of Alternatives โ€ข Selection of alternatives helps to identify the best option to carry out a project with minimum impact on environment. โ€ข Selection of alternatives is also known as โ€œ The Heart of EIAโ€. โ€ข It is the most preferable and desired type of mitigation measure.
  • 12. contd.. โ€ข The alternativeโ€™s are selected on the basis of following factors- a. Scale b. Economic Consideration c. Design d. Time schedule e. Socio-Economic Factors f. Raw Materials
  • 13. Alternative Analysis-Legal Provision โ€ข The legal provision regarding alternative analysis as per Environmental Protection Act, 2019 (2076) is shown below-
  • 14. Importance of Alternative Analysis โ€ข It helps to identify the best option with minimum impact upon environment. โ€ข Saves time and money โ€ข Incorporation and utilization of knowledge from every stakeholders โ€ข Risk Reduction: Considering a range of alternatives can bring robustness to the planning and design process and may reduce the possible risks. โ€ข Selected project will be economically feasible, technically viable, socially acceptable and environment friendly. โ€ข Donor agencies such as Asian Development Bank (ADB), World Bank (WB) are focusing more on alternative analysis for the financialization of least damage option avoiding impact upon environment and
  • 15. Types of Mitigation Measures Mitigation Measures 1. Preventive Measures 3.Compensatory Measures 2. Corrective Measures Mitigation is an integral regulatory procedure in all international interpretations of environmental impact assessment (EIA). *If preventive or corrective measures fail, then compensatory measures are applied. *The potential impact is prevented or reduced before it occurs. *Reducing the impact to a level which is acceptable
  • 16. Measure to eliminate workplace risks at source, through technical or organisational means or by providing protection. ๏‚ง Change location/site to avoid impacts, such as re-route from forests to degraded areas; ๏‚ง Avoid environmentally sensitive areas ๏‚ง Integrate education, and include additional social service facilities; ๏‚ง Organize public awareness programs etc. 1. Preventive Measures
  • 17. Few illustrations of Preventive Measures Image:- Military Area Image:- Wildlife reserve Image: Environmentally sensitive area Image: Landslide prone area
  • 18. ๏‚ง If impacts canโ€™t be avoided, reduce impacts to an acceptable level through. ๏‚ง Use of technologies, practices, inclusion of facilitative measures. ๏‚ง Construct fish ladder to ensure movement of migratory fish species. ๏‚ง Use bio-engineering measures to stabilise slopes etc. 2. Corrective Measures
  • 19. Few Illustrations of Corrective Measures Image:- Gabion mesh to protect from rockfall Image:- Fish ladder Image:- Retrofitting Image:- Gabion mesh for landslide
  • 20. Few Illustrations of Corrective Measures(contd..) Image:- Wastewater Treatment Image:- Foundation retrofitting Image:- Air pollution control devices
  • 21. Corrective Measures Water sprinkling, water fogging, broom sweeping is carried out in dust prone locations @ Pokhara-Mugling Highway
  • 22. Nature-based Solution (NbS) to prevent/mitigate soil erosion and slope instability at Chaku-Marming Road, Bhotekoshi. Corrective Measures
  • 23. ๏‚ง Compensatory measures are the actions that address adverse impacts which are unavoidable. ๏‚ง Compensatory plantation ๏‚ง Compensation for land and property etc. Image:- Monetary compensation Image:- Compensatory Plantation 3. Compensatory Measures
  • 24. ๏‚ง It is the least preferred mitigation measure. ๏‚ง It includes restoration of damaged natural resources. ๏‚ง Rehabilitation of displaced settlements. ๏‚ง Creation of similar resources or habitats elsewhere to replace a loss . Compensatory Measures(contd..)
  • 25. ๏‚ง Compensation is provided in accordance with the โ€œCompensation Act, 2019 (1963).โ€ ๏‚ง Compensation Determination Committee (CDC) will be established with the consultation of local stakeholders and local government body. Rehabilitation of displaced settlements. ๏‚ง Loss of land and property of the affected people will be addressed either through cash compensation or through cash and equity share compensation. Compensatory Measures(contd..)
  • 26. Budhigandaki Hydropower Project - Project Affected Families (PAF) and Seriously Project Affected Family (SPAF) has been identified and categorized as per guidelines. - SPAF is defined as a family who loses over 25% of its total land holdings or whose land is reduced to an uneconomic holding or who is being displaced. - Resettlement and Rehabilitation Plan has been prepared to clarify the entitlements for resettlement and for compulsory purchase of land and other matters for compensation. -Alternatively land will be given together with sufficient compensation to enable families to build & move to new houses as preferred such that the AFs will have better living standard or are no worse off than if they were not affected.
  • 27. Budhigandaki Hydropower Project - Some of the cultural sites, temples and major local importance existed within the RoW of the proposed alignment will be relocated at the appropriate places as requested by locals during the time of compensation distribution in the Construction Phase.
  • 28. Compensation for structures, plants and fruits
  • 29. Corrective Measures Vs Preventive Measures
  • 30. Thank you for listening