2. Why do we need an EIA in Ausgrid
Due to the Environmental Planning legislation
(Environmental Planning and Assessment Act
1979)
All new work requires an assessment
To ensure that the environment is considered
As an environmental planning instrument / tool
To consider ecologically Sustainable Development
3. Why do we need an EIA in Ausgrid
network construction & maintenance
Consequences of breaching the legislation
Severe penalties
For corporations , Directors, Managers and individuals
Fines up to
1.1m – EP& A NSW planning
$5m – POEO – NSW Pollution
$5.5m – EPBC – Federal environmental
Up to 7 years Jail
Remediation and other additional costs
4. Typical Ausgrid network Projects
that are covered by an EIA
Distribution substations
Kiosks
Pole transformers (PT)
Distributors
Underground cables
Overhead power lines
5. Typical Activities covered in an
Ausgrid EIA
Construction
Excavation
Traffic disruptions
After hours works
Vegetation clearing
Using heavy machinery
Storing materials &
equipment
Staging areas
Discharging water
Operation
Construction Noise
Handling oil
Oil filled equipment
EMF
Maintenance
Traffic disruptions
Excavation
Vehicle access
6. Things to be aware of about
Ausgrid EIA document
EIA is a legal Document
EIA will be used in court as evidence for and
against you
EIA Is a document to be taken seriously by both
parties and will form part of the contract with
the Construction Company
7. The Ausgrid EIA Worksheet is divided
basically into four tables following
Table 1 – project details including a description of the
environment where the works will take place
Table 2 – possible approval and licences which may be
required
Table 3 - sensitive areas and issues that be affected by
the project. etc. sulphate soils
Table 4 – Project specific environmental controls that are
required in addition to the controls already listed in
Environmental handbook
8. Typical Ausgrid network project that required
the EIA Document provisions to be reviewed
Project location
Yerroulbin St
Birchgrove
CCO016339
Field service representative
Peter Maroz
CCL representative
David King
Construction Company
Dunmain pty Ltd
Ausgrid Project officer
Nesta Penna
10. Ausgrid proposed Network project
located at Yerroulbin st Birchgrove
The following EIA did not
address the issue of the
close proximately of the
harbour foreshore and
the associated risk in
polluting this prestige
area. This issue was
raised at the pre-works
and the EIA was
amended
16. Amended EIA Document for Yerroulbin st
Birchgrove (Not all pages shown)
New EIA addresses the
issue of the waterways
and has requested that
an Erosion and
sedimentation plan to be
produced and approved
by Environmental services
group
Please see the following 5
slides showing the plan
17. Existing
kiosk
Trial hole (trench)
Propertyline
TemporarySecurityFencing
Property
111 D
Louisa Rd
Future
Temp
kiosk
Property
113
Louisa Rd
Yerroulbin Rd
Sediment Fencing
Sediment Fencing
Minimum 1 meter
Minimum 0.5 meter
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 1 OF 4
TRIAL HOLE
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Minimum 1 meter
Must exceed
1 meter
Slope
approx
1 :10
Slope
approx
1 :10
Grassed area where:
- excavation may take place, or
- surface soil cover is disturbed
Legend
Sandbag
bund wall
Minimum 0.2 meter
18. Existing
kiosk
Excavation to install
compacted road base
(instead of piers)
Propertyline
TemporarySecurityFencing
Property
111 D
Louisa Rd
Future
Temp
kiosk
Property
113
Louisa Rd
Yerroulbin Rd
Sediment Fencing
Sediment Fencing
Minimum 0.5 meter
Minimum 0.5 meter
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 2 OF 4
EXCAVATION & INSTALLTION OF COMPACTED ROAD BASE (INSTEAD OF PIERS) FOR TEMP KIOSK -
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Minimum 1 meter
Must exceed
1 meter
Slope
approx
1 :10
Slope
approx
1 :10
Slope
approx
1 :10
Grassed area where:
- excavation may take place, or
- surface soil cover is disturbed
Legend
Sandbag
bund wall
Minimum 0.2 meter
19. Existing
kiosk
Excavation to install &
connect new cables
Propertyline
TemporarySecurityFencing
Property
111 D
Louisa Rd
Temp
kiosk
Property
113
Louisa Rd
Yerroulbin Rd
Sediment Fencing
Sediment Fencing
Minimum 0.5meter
Minimum 0.5 meter
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 3 OF 4
EXCAV TO INSTALL & CONNECT NEW CABLES , INSTAL PIERS FOR PERMANENT KIOSK -
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Minimum 1 meter
Must exceed
1 meter
Slope
approx
1 :10
Slope
approx
1 :10
Grassed area where:
- surface soil cover might be disturbed
Legend
Sandbag
bund wall
Minimum 0.2 meter
Pump out of trench water
permissible over site
grass – NO sediment into
water ways.
20. Existing
kiosk
Bulkheads in trench
every 6 meters
or trench backfilled after
each length of conduits
installed
Property line
Property
111 D
Louisa Rd
Temp
kiosk
Property
113
Louisa Rd
YerroulbinRd
Sediment Fencing
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 4 OF 4
EXCAVATION & INSTALLATION OF NEW CONDUITS -
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Slope
approx
1 :10
Grassed area
v
Legend
Sandbag
bund wall
New
trench &
conduits
2 on 2
Baulk head -
extending at
least 1 meter
on either side of
bund wall
Conduits sealed to prevent
water ingress.
Louisa Rd
Slope
approx
1 :10
Sealed area ( asphalt & concrete)
v
Excavation covered with
plywood /steel plates &
sealed with cold mix at
edges to minimise water
ingress
Pump out of trench water
permissible over site
grass – NO sediment into
water ways.
21.
22. Another project that the EIA
Document needed to be revised due do
to the changes in the scope of works
Project location
Ewos St Cronulla
CCO016191
Field service representative
Matt mobile 0421 416 329
CCL representative
Stephen Brennan
Construction Company
CLM
Ausgrid Project officer
David King
23. Ewos St Cronulla CCO016191
The proposed Low Voltage
jointbay original position was
to be excavated adjacent the
pole. Unfortunately due to the
location of the existing cable
this would have raised the
issue of maintaining
pedestrian access and also the
bending radius / length of the
existing cable in the jointbay
With consultation with the field
service representative it was
proposed the jointbay be
moved into the park area to
follow the existing cable
24. Ewos St Cronulla CCO016191
Unfortunately the EIA
only covered the
excavation works in the
carriageway & footway
area.
The EIA did not address
the issue of the close
proximately of the
waterway and the
associated risk in
polluting this prestige
area.
25. Ewos St Cronulla CCO016191
The issue was raised with the
field service representative and
work in the park was put on
hold until the matter was
resolved.
Outcome was to minimise the
impact of the works .
Additional sediment measure
was initiated in the park area
and the jointbay was only
excavated on the morning of
the commissioning of the new
cable . Backfilled same day
26. Summary
EIA documents are legal
documents
EIA document are to minimise
the risks to Ausgrid & the
environment
If the EIA document supplied
with the Ausgrid works order
does not cover or seems not to
cover the proposed work please
refer the matter to your Ausgrid
representative assigned to that
project
Be aware of your Ausgrid
responsibilities -see
environmental code of conduct
Not banana bread was harmed in the produce of this presentation