SlideShare a Scribd company logo
1 of 27
Download to read offline
Environmental Impact Assessment
Awareness Training
By
David King
Why do we need an EIA in Ausgrid
 Due to the Environmental Planning legislation
(Environmental Planning and Assessment Act
1979)
 All new work requires an assessment
 To ensure that the environment is considered
 As an environmental planning instrument / tool
 To consider ecologically Sustainable Development
Why do we need an EIA in Ausgrid
network construction & maintenance
Consequences of breaching the legislation
Severe penalties
 For corporations , Directors, Managers and individuals
Fines up to
 1.1m – EP& A NSW planning
 $5m – POEO – NSW Pollution
 $5.5m – EPBC – Federal environmental
 Up to 7 years Jail
 Remediation and other additional costs
Typical Ausgrid network Projects
that are covered by an EIA
Distribution substations
 Kiosks
 Pole transformers (PT)
Distributors
 Underground cables
 Overhead power lines
Typical Activities covered in an
Ausgrid EIA
Construction
 Excavation
 Traffic disruptions
 After hours works
 Vegetation clearing
 Using heavy machinery
 Storing materials &
equipment
 Staging areas
 Discharging water
Operation
 Construction Noise
 Handling oil
 Oil filled equipment
 EMF
Maintenance
 Traffic disruptions
 Excavation
 Vehicle access
Things to be aware of about
Ausgrid EIA document
 EIA is a legal Document
 EIA will be used in court as evidence for and
against you
 EIA Is a document to be taken seriously by both
parties and will form part of the contract with
the Construction Company
The Ausgrid EIA Worksheet is divided
basically into four tables following
 Table 1 – project details including a description of the
environment where the works will take place
 Table 2 – possible approval and licences which may be
required
 Table 3 - sensitive areas and issues that be affected by
the project. etc. sulphate soils
 Table 4 – Project specific environmental controls that are
required in addition to the controls already listed in
Environmental handbook
Typical Ausgrid network project that required
the EIA Document provisions to be reviewed
 Project location
 Yerroulbin St
Birchgrove
CCO016339
Field service representative
Peter Maroz
CCL representative
David King
Construction Company
Dunmain pty Ltd
Ausgrid Project officer
Nesta Penna
Ausgrid proposed network project located at
Yerroulbin St Birchgrove
Ausgrid proposed Network project
located at Yerroulbin st Birchgrove
The following EIA did not
address the issue of the
close proximately of the
harbour foreshore and
the associated risk in
polluting this prestige
area. This issue was
raised at the pre-works
and the EIA was
amended
Original EIA Document for Ausgrid located at
Yerroulbin st Birchgrove
Original EIA Document for Yerroulbin
st Birchgrove areas highlights are deficient
Original EIA Document for Yerroulbin st
Birchgrove areas highlights are deficient
Original EIA Document for Yerroulbin st
Birchgrove areas highlights are deficient
Amended EIA Document for Yerroulbin st
Birchgrove (Not all pages shown)
Amended EIA Document for Yerroulbin st
Birchgrove (Not all pages shown)
 New EIA addresses the
issue of the waterways
and has requested that
an Erosion and
sedimentation plan to be
produced and approved
by Environmental services
group
 Please see the following 5
slides showing the plan
Existing
kiosk
Trial hole (trench)
Propertyline
TemporarySecurityFencing
Property
111 D
Louisa Rd
Future
Temp
kiosk
Property
113
Louisa Rd
Yerroulbin Rd
Sediment Fencing
Sediment Fencing
Minimum 1 meter
Minimum 0.5 meter
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 1 OF 4
TRIAL HOLE
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Minimum 1 meter
Must exceed
1 meter
Slope
approx
1 :10
Slope
approx
1 :10
Grassed area where:
- excavation may take place, or
- surface soil cover is disturbed
Legend
Sandbag
bund wall
Minimum 0.2 meter
Existing
kiosk
Excavation to install
compacted road base
(instead of piers)
Propertyline
TemporarySecurityFencing
Property
111 D
Louisa Rd
Future
Temp
kiosk
Property
113
Louisa Rd
Yerroulbin Rd
Sediment Fencing
Sediment Fencing
Minimum 0.5 meter
Minimum 0.5 meter
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 2 OF 4
EXCAVATION & INSTALLTION OF COMPACTED ROAD BASE (INSTEAD OF PIERS) FOR TEMP KIOSK -
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Minimum 1 meter
Must exceed
1 meter
Slope
approx
1 :10
Slope
approx
1 :10
Slope
approx
1 :10
Grassed area where:
- excavation may take place, or
- surface soil cover is disturbed
Legend
Sandbag
bund wall
Minimum 0.2 meter
Existing
kiosk
Excavation to install &
connect new cables
Propertyline
TemporarySecurityFencing
Property
111 D
Louisa Rd
Temp
kiosk
Property
113
Louisa Rd
Yerroulbin Rd
Sediment Fencing
Sediment Fencing
Minimum 0.5meter
Minimum 0.5 meter
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 3 OF 4
EXCAV TO INSTALL & CONNECT NEW CABLES , INSTAL PIERS FOR PERMANENT KIOSK -
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Minimum 1 meter
Must exceed
1 meter
Slope
approx
1 :10
Slope
approx
1 :10
Grassed area where:
- surface soil cover might be disturbed
Legend
Sandbag
bund wall
Minimum 0.2 meter
Pump out of trench water
permissible over site
grass – NO sediment into
water ways.
Existing
kiosk
Bulkheads in trench
every 6 meters
or trench backfilled after
each length of conduits
installed
Property line
Property
111 D
Louisa Rd
Temp
kiosk
Property
113
Louisa Rd
YerroulbinRd
Sediment Fencing
Approx 25 meters
to Snails Bay
(Sydney Harbour)
SKETCH 4 OF 4
EXCAVATION & INSTALLATION OF NEW CONDUITS -
Sedimentation Control Plan for Yerroulbin St Rozelle
EA project CCO016339
NTS
Prepared by P. Marosz
ph 9394 6772
08/12/2010
Slope
approx
1 :10
Grassed area
v
Legend
Sandbag
bund wall
New
trench &
conduits
2 on 2
Baulk head -
extending at
least 1 meter
on either side of
bund wall
Conduits sealed to prevent
water ingress.
Louisa Rd
Slope
approx
1 :10
Sealed area ( asphalt & concrete)
v
Excavation covered with
plywood /steel plates &
sealed with cold mix at
edges to minimise water
ingress
Pump out of trench water
permissible over site
grass – NO sediment into
water ways.
Another project that the EIA
Document needed to be revised due do
to the changes in the scope of works
 Project location
 Ewos St Cronulla
CCO016191
Field service representative
Matt mobile 0421 416 329
CCL representative
Stephen Brennan
Construction Company
CLM
Ausgrid Project officer
David King
Ewos St Cronulla CCO016191
 The proposed Low Voltage
jointbay original position was
to be excavated adjacent the
pole. Unfortunately due to the
location of the existing cable
this would have raised the
issue of maintaining
pedestrian access and also the
bending radius / length of the
existing cable in the jointbay
 With consultation with the field
service representative it was
proposed the jointbay be
moved into the park area to
follow the existing cable
Ewos St Cronulla CCO016191
 Unfortunately the EIA
only covered the
excavation works in the
carriageway & footway
area.
 The EIA did not address
the issue of the close
proximately of the
waterway and the
associated risk in
polluting this prestige
area.
Ewos St Cronulla CCO016191
 The issue was raised with the
field service representative and
work in the park was put on
hold until the matter was
resolved.
 Outcome was to minimise the
impact of the works .
Additional sediment measure
was initiated in the park area
and the jointbay was only
excavated on the morning of
the commissioning of the new
cable . Backfilled same day
Summary
 EIA documents are legal
documents
 EIA document are to minimise
the risks to Ausgrid & the
environment
 If the EIA document supplied
with the Ausgrid works order
does not cover or seems not to
cover the proposed work please
refer the matter to your Ausgrid
representative assigned to that
project
 Be aware of your Ausgrid
responsibilities -see
environmental code of conduct
 Not banana bread was harmed in the produce of this presentation
Environmental Impact Assessment colour

More Related Content

Viewers also liked

Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessmentParth Patel
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Mr.Allah Dad Khan
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentVinod Burdak
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 

Viewers also liked (6)

Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 

Similar to Environmental Impact Assessment colour

15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statementNECB
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214Naoise
 
Stephen O'Connor - Curriculum Vitae - July 2016
Stephen O'Connor - Curriculum Vitae - July 2016Stephen O'Connor - Curriculum Vitae - July 2016
Stephen O'Connor - Curriculum Vitae - July 2016Steve OConnor
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentationewanbaird
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore RenewablesFarida Ismayilova
 
Supertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - RotherhamSupertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - RotherhamSepehr Aghamehdi
 
Cleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio trackCleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio trackPhil Sinclair
 
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docxFibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docxThandabantu Magengelele
 
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...Christian Olele
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010Tonyamis
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesTorben Haagh
 
Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016
Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016
Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016Pont Samuel-De Champlain Bridge
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeTony O Neill
 
2010 2012-groundwater-plume
2010 2012-groundwater-plume2010 2012-groundwater-plume
2010 2012-groundwater-plumeEric Xanderson
 
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...Nick Bentley
 

Similar to Environmental Impact Assessment colour (20)

15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statement
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
 
Stephen O'Connor - Curriculum Vitae - July 2016
Stephen O'Connor - Curriculum Vitae - July 2016Stephen O'Connor - Curriculum Vitae - July 2016
Stephen O'Connor - Curriculum Vitae - July 2016
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentation
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore Renewables
 
Supertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - RotherhamSupertram - Tram Train Pilot - Sheffield - Rotherham
Supertram - Tram Train Pilot - Sheffield - Rotherham
 
Cleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio trackCleanup_224 Oz landfill buffers - audio track
Cleanup_224 Oz landfill buffers - audio track
 
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docxFibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
FibreCo_NTP2 & 3 Desktop Study Report_Rev0.docx
 
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
Offshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processesOffshore cabeling: Cabling maintenance planning processes
Offshore cabeling: Cabling maintenance planning processes
 
Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016
Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016
Minutes for Verdun / Le sud-ouest Public Information Meeting - may 25 2016
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass Scheme
 
2010 2012-groundwater-plume
2010 2012-groundwater-plume2010 2012-groundwater-plume
2010 2012-groundwater-plume
 
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
RINA - AOG 2017 - Floating nuclear power plants for a safer and cleaner futur...
 
Coastline
CoastlineCoastline
Coastline
 
Coastline2
Coastline2Coastline2
Coastline2
 

Environmental Impact Assessment colour

  • 2. Why do we need an EIA in Ausgrid  Due to the Environmental Planning legislation (Environmental Planning and Assessment Act 1979)  All new work requires an assessment  To ensure that the environment is considered  As an environmental planning instrument / tool  To consider ecologically Sustainable Development
  • 3. Why do we need an EIA in Ausgrid network construction & maintenance Consequences of breaching the legislation Severe penalties  For corporations , Directors, Managers and individuals Fines up to  1.1m – EP& A NSW planning  $5m – POEO – NSW Pollution  $5.5m – EPBC – Federal environmental  Up to 7 years Jail  Remediation and other additional costs
  • 4. Typical Ausgrid network Projects that are covered by an EIA Distribution substations  Kiosks  Pole transformers (PT) Distributors  Underground cables  Overhead power lines
  • 5. Typical Activities covered in an Ausgrid EIA Construction  Excavation  Traffic disruptions  After hours works  Vegetation clearing  Using heavy machinery  Storing materials & equipment  Staging areas  Discharging water Operation  Construction Noise  Handling oil  Oil filled equipment  EMF Maintenance  Traffic disruptions  Excavation  Vehicle access
  • 6. Things to be aware of about Ausgrid EIA document  EIA is a legal Document  EIA will be used in court as evidence for and against you  EIA Is a document to be taken seriously by both parties and will form part of the contract with the Construction Company
  • 7. The Ausgrid EIA Worksheet is divided basically into four tables following  Table 1 – project details including a description of the environment where the works will take place  Table 2 – possible approval and licences which may be required  Table 3 - sensitive areas and issues that be affected by the project. etc. sulphate soils  Table 4 – Project specific environmental controls that are required in addition to the controls already listed in Environmental handbook
  • 8. Typical Ausgrid network project that required the EIA Document provisions to be reviewed  Project location  Yerroulbin St Birchgrove CCO016339 Field service representative Peter Maroz CCL representative David King Construction Company Dunmain pty Ltd Ausgrid Project officer Nesta Penna
  • 9. Ausgrid proposed network project located at Yerroulbin St Birchgrove
  • 10. Ausgrid proposed Network project located at Yerroulbin st Birchgrove The following EIA did not address the issue of the close proximately of the harbour foreshore and the associated risk in polluting this prestige area. This issue was raised at the pre-works and the EIA was amended
  • 11. Original EIA Document for Ausgrid located at Yerroulbin st Birchgrove
  • 12. Original EIA Document for Yerroulbin st Birchgrove areas highlights are deficient
  • 13. Original EIA Document for Yerroulbin st Birchgrove areas highlights are deficient
  • 14. Original EIA Document for Yerroulbin st Birchgrove areas highlights are deficient
  • 15. Amended EIA Document for Yerroulbin st Birchgrove (Not all pages shown)
  • 16. Amended EIA Document for Yerroulbin st Birchgrove (Not all pages shown)  New EIA addresses the issue of the waterways and has requested that an Erosion and sedimentation plan to be produced and approved by Environmental services group  Please see the following 5 slides showing the plan
  • 17. Existing kiosk Trial hole (trench) Propertyline TemporarySecurityFencing Property 111 D Louisa Rd Future Temp kiosk Property 113 Louisa Rd Yerroulbin Rd Sediment Fencing Sediment Fencing Minimum 1 meter Minimum 0.5 meter Approx 25 meters to Snails Bay (Sydney Harbour) SKETCH 1 OF 4 TRIAL HOLE Sedimentation Control Plan for Yerroulbin St Rozelle EA project CCO016339 NTS Prepared by P. Marosz ph 9394 6772 08/12/2010 Minimum 1 meter Must exceed 1 meter Slope approx 1 :10 Slope approx 1 :10 Grassed area where: - excavation may take place, or - surface soil cover is disturbed Legend Sandbag bund wall Minimum 0.2 meter
  • 18. Existing kiosk Excavation to install compacted road base (instead of piers) Propertyline TemporarySecurityFencing Property 111 D Louisa Rd Future Temp kiosk Property 113 Louisa Rd Yerroulbin Rd Sediment Fencing Sediment Fencing Minimum 0.5 meter Minimum 0.5 meter Approx 25 meters to Snails Bay (Sydney Harbour) SKETCH 2 OF 4 EXCAVATION & INSTALLTION OF COMPACTED ROAD BASE (INSTEAD OF PIERS) FOR TEMP KIOSK - Sedimentation Control Plan for Yerroulbin St Rozelle EA project CCO016339 NTS Prepared by P. Marosz ph 9394 6772 08/12/2010 Minimum 1 meter Must exceed 1 meter Slope approx 1 :10 Slope approx 1 :10 Slope approx 1 :10 Grassed area where: - excavation may take place, or - surface soil cover is disturbed Legend Sandbag bund wall Minimum 0.2 meter
  • 19. Existing kiosk Excavation to install & connect new cables Propertyline TemporarySecurityFencing Property 111 D Louisa Rd Temp kiosk Property 113 Louisa Rd Yerroulbin Rd Sediment Fencing Sediment Fencing Minimum 0.5meter Minimum 0.5 meter Approx 25 meters to Snails Bay (Sydney Harbour) SKETCH 3 OF 4 EXCAV TO INSTALL & CONNECT NEW CABLES , INSTAL PIERS FOR PERMANENT KIOSK - Sedimentation Control Plan for Yerroulbin St Rozelle EA project CCO016339 NTS Prepared by P. Marosz ph 9394 6772 08/12/2010 Minimum 1 meter Must exceed 1 meter Slope approx 1 :10 Slope approx 1 :10 Grassed area where: - surface soil cover might be disturbed Legend Sandbag bund wall Minimum 0.2 meter Pump out of trench water permissible over site grass – NO sediment into water ways.
  • 20. Existing kiosk Bulkheads in trench every 6 meters or trench backfilled after each length of conduits installed Property line Property 111 D Louisa Rd Temp kiosk Property 113 Louisa Rd YerroulbinRd Sediment Fencing Approx 25 meters to Snails Bay (Sydney Harbour) SKETCH 4 OF 4 EXCAVATION & INSTALLATION OF NEW CONDUITS - Sedimentation Control Plan for Yerroulbin St Rozelle EA project CCO016339 NTS Prepared by P. Marosz ph 9394 6772 08/12/2010 Slope approx 1 :10 Grassed area v Legend Sandbag bund wall New trench & conduits 2 on 2 Baulk head - extending at least 1 meter on either side of bund wall Conduits sealed to prevent water ingress. Louisa Rd Slope approx 1 :10 Sealed area ( asphalt & concrete) v Excavation covered with plywood /steel plates & sealed with cold mix at edges to minimise water ingress Pump out of trench water permissible over site grass – NO sediment into water ways.
  • 21.
  • 22. Another project that the EIA Document needed to be revised due do to the changes in the scope of works  Project location  Ewos St Cronulla CCO016191 Field service representative Matt mobile 0421 416 329 CCL representative Stephen Brennan Construction Company CLM Ausgrid Project officer David King
  • 23. Ewos St Cronulla CCO016191  The proposed Low Voltage jointbay original position was to be excavated adjacent the pole. Unfortunately due to the location of the existing cable this would have raised the issue of maintaining pedestrian access and also the bending radius / length of the existing cable in the jointbay  With consultation with the field service representative it was proposed the jointbay be moved into the park area to follow the existing cable
  • 24. Ewos St Cronulla CCO016191  Unfortunately the EIA only covered the excavation works in the carriageway & footway area.  The EIA did not address the issue of the close proximately of the waterway and the associated risk in polluting this prestige area.
  • 25. Ewos St Cronulla CCO016191  The issue was raised with the field service representative and work in the park was put on hold until the matter was resolved.  Outcome was to minimise the impact of the works . Additional sediment measure was initiated in the park area and the jointbay was only excavated on the morning of the commissioning of the new cable . Backfilled same day
  • 26. Summary  EIA documents are legal documents  EIA document are to minimise the risks to Ausgrid & the environment  If the EIA document supplied with the Ausgrid works order does not cover or seems not to cover the proposed work please refer the matter to your Ausgrid representative assigned to that project  Be aware of your Ausgrid responsibilities -see environmental code of conduct  Not banana bread was harmed in the produce of this presentation