This document outlines the schedule and deliverables for Project 3 of an English 202 course. It lists the work to be completed each week from weeks 7 through 9, including drafting a slidecast presentation, pitch letter, and written review. Peer reviews of these materials are due part way through weeks 8 and 9. The final deliverables for Project 3, including a self-evaluation, slidecast, pitch letter, and written review, are due by Sunday, October 28 by submitting them to the project submission drop box. Students are instructed to verify that their submissions were completed correctly.