SlideShare a Scribd company logo
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural and Built Environments
ELEMENTS IN NATURAL AND BUILT ENVIRONMENT (ARC30105)
PROJECT 2 – BUILT ENVIRONMENT : BETTER TOWN OF THE FUTURE
20% Individual work + 20% Group work
Presentation Part A (Individual) : 6th November 2014
Presentation Part B ( Group ) : 4th December 2014
3. Part A : (Individual 20%) – Submission Date and Presentation : 6th November 2014
4. Part B : (Group 20%) – Submission Date and Presentation : 4th December 2014
Part A : A4 report (Individual 20%) – Submission Date: 6th November 2014
Part A : Video Presentation – Submission Date: 6th November 2014
g. Leaders of each tutorial group should collect all of the video on 5th November and prepare it for
the presentation.
Part B : The Model – Presentation & Submission – 4th December 2014
a. The size of the model should not exceed A2 size board as the base. The height should not
Exceed 600mm. There is no minimum size.
b. Students are free to choose any materials to make the model, however you can consider to use
any recyclable materials integrated in your model such as straws, metal wire etc. You may have
different colours in your model as for certain reason i.e as identification of different zoning and
functions etc. Do get advices from your respective tutor regarding the scale, colour and materials
for the model. However, students are encouraged to look for inspiration first prior to build up the
model.
c. Please prepare a casing for the model for storage purposes and safety during construction.
d. Please label your model with your group member’s name, lecturer’s name, batch and Taylor’s
University logo (Digitally prepared)
e. You are given 5 minutes to give a verbal presentation.
f. Please document the process, the final product and the presentation session and upload it in
your E-portfolio.
The A2 Presentation Boards & Submission – 4th December 2014
Enbe project2

More Related Content

Viewers also liked

Idj1
Idj1Idj1
Idj1
tfkc1212
 
Project03finalprojectbriefing 141217105844-conversion-gate01
Project03finalprojectbriefing 141217105844-conversion-gate01Project03finalprojectbriefing 141217105844-conversion-gate01
Project03finalprojectbriefing 141217105844-conversion-gate01
tfkc1212
 
Enbe.doc99
Enbe.doc99Enbe.doc99
Enbe.doc99
tfkc1212
 
Product design
Product designProduct design
Product design
tfkc1212
 
Ici final project
Ici final projectIci final project
Ici final project
tfkc1212
 
111232
111232111232
111232
tfkc1212
 
Idj2
Idj2Idj2
Idj2
tfkc1212
 
Project 1
Project 1Project 1
Project 1
tfkc1212
 
drawingproject3brief-2014-141202194201-conversion-gate01.pdf
drawingproject3brief-2014-141202194201-conversion-gate01.pdfdrawingproject3brief-2014-141202194201-conversion-gate01.pdf
drawingproject3brief-2014-141202194201-conversion-gate01.pdf
tfkc1212
 

Viewers also liked (9)

Idj1
Idj1Idj1
Idj1
 
Project03finalprojectbriefing 141217105844-conversion-gate01
Project03finalprojectbriefing 141217105844-conversion-gate01Project03finalprojectbriefing 141217105844-conversion-gate01
Project03finalprojectbriefing 141217105844-conversion-gate01
 
Enbe.doc99
Enbe.doc99Enbe.doc99
Enbe.doc99
 
Product design
Product designProduct design
Product design
 
Ici final project
Ici final projectIci final project
Ici final project
 
111232
111232111232
111232
 
Idj2
Idj2Idj2
Idj2
 
Project 1
Project 1Project 1
Project 1
 
drawingproject3brief-2014-141202194201-conversion-gate01.pdf
drawingproject3brief-2014-141202194201-conversion-gate01.pdfdrawingproject3brief-2014-141202194201-conversion-gate01.pdf
drawingproject3brief-2014-141202194201-conversion-gate01.pdf
 

Similar to Enbe project2

Design project one - brief- feb intake (1)
Design   project one - brief- feb intake (1)Design   project one - brief- feb intake (1)
Design project one - brief- feb intake (1)
suehwa533
 
Design project one - brief- feb intake (2)
Design   project one - brief- feb intake (2)Design   project one - brief- feb intake (2)
Design project one - brief- feb intake (2)
karolinabondarenko
 
Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)
Flenny Wong
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
shensin1015
 
Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)
Lam Yu
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
Hanis A.Badri
 
Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)
Sarah Esa
 

Similar to Enbe project2 (7)

Design project one - brief- feb intake (1)
Design   project one - brief- feb intake (1)Design   project one - brief- feb intake (1)
Design project one - brief- feb intake (1)
 
Design project one - brief- feb intake (2)
Design   project one - brief- feb intake (2)Design   project one - brief- feb intake (2)
Design project one - brief- feb intake (2)
 
Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
 
Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)Drawing project 1 july 2015_integration (1)
Drawing project 1 july 2015_integration (1)
 
Drawing project 1 july 2015_integration
Drawing project 1 july 2015_integrationDrawing project 1 july 2015_integration
Drawing project 1 july 2015_integration
 
Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)Drawing project 1 july 2015_integration(1)
Drawing project 1 july 2015_integration(1)
 

More from tfkc1212

Building economic
Building economicBuilding economic
Building economic
tfkc1212
 
Financial management (group assignment)
Financial management (group assignment)Financial management (group assignment)
Financial management (group assignment)
tfkc1212
 
Pp2 presentation
Pp2 presentationPp2 presentation
Pp2 presentation
tfkc1212
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
tfkc1212
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
tfkc1212
 
Estimating presentation (1)
Estimating presentation (1)Estimating presentation (1)
Estimating presentation (1)
tfkc1212
 
Professional practice 1
Professional practice 1Professional practice 1
Professional practice 1
tfkc1212
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)
tfkc1212
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
tfkc1212
 
People dynamic
People dynamicPeople dynamic
People dynamic
tfkc1212
 
Safety 2doc
Safety 2docSafety 2doc
Safety 2doc
tfkc1212
 
The issues of electrical hazards at site and steps to prevent.
The issues of electrical hazards at site  and steps to prevent.The issues of electrical hazards at site  and steps to prevent.
The issues of electrical hazards at site and steps to prevent.
tfkc1212
 
Bs assignment
Bs assignmentBs assignment
Bs assignment
tfkc1212
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
tfkc1212
 
Installation of hot water supply for hotel (recovered)
Installation of hot water supply for hotel (recovered)Installation of hot water supply for hotel (recovered)
Installation of hot water supply for hotel (recovered)
tfkc1212
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Tj3
Tj3Tj3
Project1experientiallandscape 141202203306-conversion-gate02
Project1experientiallandscape 141202203306-conversion-gate02Project1experientiallandscape 141202203306-conversion-gate02
Project1experientiallandscape 141202203306-conversion-gate02
tfkc1212
 
Magazine 141202200845-conversion-gate02
Magazine 141202200845-conversion-gate02Magazine 141202200845-conversion-gate02
Magazine 141202200845-conversion-gate02
tfkc1212
 
111
111111

More from tfkc1212 (20)

Building economic
Building economicBuilding economic
Building economic
 
Financial management (group assignment)
Financial management (group assignment)Financial management (group assignment)
Financial management (group assignment)
 
Pp2 presentation
Pp2 presentationPp2 presentation
Pp2 presentation
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
 
Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Estimating presentation (1)
Estimating presentation (1)Estimating presentation (1)
Estimating presentation (1)
 
Professional practice 1
Professional practice 1Professional practice 1
Professional practice 1
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
People dynamic
People dynamicPeople dynamic
People dynamic
 
Safety 2doc
Safety 2docSafety 2doc
Safety 2doc
 
The issues of electrical hazards at site and steps to prevent.
The issues of electrical hazards at site  and steps to prevent.The issues of electrical hazards at site  and steps to prevent.
The issues of electrical hazards at site and steps to prevent.
 
Bs assignment
Bs assignmentBs assignment
Bs assignment
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
 
Installation of hot water supply for hotel (recovered)
Installation of hot water supply for hotel (recovered)Installation of hot water supply for hotel (recovered)
Installation of hot water supply for hotel (recovered)
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Tj3
Tj3Tj3
Tj3
 
Project1experientiallandscape 141202203306-conversion-gate02
Project1experientiallandscape 141202203306-conversion-gate02Project1experientiallandscape 141202203306-conversion-gate02
Project1experientiallandscape 141202203306-conversion-gate02
 
Magazine 141202200845-conversion-gate02
Magazine 141202200845-conversion-gate02Magazine 141202200845-conversion-gate02
Magazine 141202200845-conversion-gate02
 
111
111111
111
 

Recently uploaded

按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理
按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理
按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理
1jtj7yul
 
Production.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd ddddddddddddddddddddddddddddddddddProduction.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd dddddddddddddddddddddddddddddddddd
DanielOliver74
 
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
yizxn4sx
 
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
2g3om49r
 
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
xuqdabu
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
nudduv
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
aozcue
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
xuqdabu
 
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
uyesp1a
 
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDARLORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
lorraineandreiamcidl
 
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
snfdnzl7
 
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
8db3cz8x
 
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
nudduv
 
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
1jtj7yul
 
按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理
按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理
按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理
ei8c4cba
 
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
xuqdabu
 
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
zpc0z12
 
一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理
一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理
一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理
kuehcub
 
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
eydeofo
 
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
aozcue
 

Recently uploaded (20)

按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理
按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理
按照学校原版(UVic文凭证书)维多利亚大学毕业证快速办理
 
Production.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd ddddddddddddddddddddddddddddddddddProduction.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd dddddddddddddddddddddddddddddddddd
 
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
 
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
 
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
 
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
 
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDARLORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
 
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
 
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
 
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
 
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
 
按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理
按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理
按照学校原版(AU文凭证书)英国阿伯丁大学毕业证快速办理
 
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
 
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
 
一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理
一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理
一比一原版(KCL文凭证书)伦敦国王学院毕业证如何办理
 
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
 
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
 

Enbe project2

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments ELEMENTS IN NATURAL AND BUILT ENVIRONMENT (ARC30105) PROJECT 2 – BUILT ENVIRONMENT : BETTER TOWN OF THE FUTURE 20% Individual work + 20% Group work Presentation Part A (Individual) : 6th November 2014 Presentation Part B ( Group ) : 4th December 2014
  • 2.
  • 3.
  • 4. 3. Part A : (Individual 20%) – Submission Date and Presentation : 6th November 2014 4. Part B : (Group 20%) – Submission Date and Presentation : 4th December 2014
  • 5. Part A : A4 report (Individual 20%) – Submission Date: 6th November 2014 Part A : Video Presentation – Submission Date: 6th November 2014 g. Leaders of each tutorial group should collect all of the video on 5th November and prepare it for the presentation.
  • 6. Part B : The Model – Presentation & Submission – 4th December 2014 a. The size of the model should not exceed A2 size board as the base. The height should not Exceed 600mm. There is no minimum size. b. Students are free to choose any materials to make the model, however you can consider to use any recyclable materials integrated in your model such as straws, metal wire etc. You may have different colours in your model as for certain reason i.e as identification of different zoning and functions etc. Do get advices from your respective tutor regarding the scale, colour and materials for the model. However, students are encouraged to look for inspiration first prior to build up the model. c. Please prepare a casing for the model for storage purposes and safety during construction. d. Please label your model with your group member’s name, lecturer’s name, batch and Taylor’s University logo (Digitally prepared) e. You are given 5 minutes to give a verbal presentation. f. Please document the process, the final product and the presentation session and upload it in your E-portfolio. The A2 Presentation Boards & Submission – 4th December 2014