SlideShare a Scribd company logo
1 of 1
Download to read offline
www.ekitistate.gov.ng
EKITI STATE GOVERNMENT OF NIGERIA




 BUREAU OF INFRASTRUCTURE AND PUBLIC UTILITIES
3RD NATIONAL URBAN WATER SECTOR REFORM PROJECT
(NUWSRP 3)
PROJECT DESCRIPTION
Ekiti State intends to take a loan from the World Bank under the 3rd National Urban Water Sector Reform
Project, to finance the reform of the water sector in the state. The desired outcome of the project is to provide
good quality water in a sustainable manner to the citizens of the state.
VACANCY
Applications are hereby invited from qualified candidates to fill the following positions in the PROJECT
IMPLEMENTATION UNIT (PIU) of the above mentioned Project.
i. Project Coordinator
ii. Environmental Safeguard Specialist
iii. Procurement Specialist
iv. Water and Sanitation Engineer
v. Human Resources Development Officer (HRDO)
The full Terms of Reference (TOR) for each position are attached on this URL - http://ekitistate.gov.ng/media-
centre/downloads/?category=107.
Go to www.ekitistate.gov.ng => Media Centre => Downloads => BIPU – Terms of Refernce.
Interested candidates should please send the soft copy of their CVs to ekitiurbanwater@ekitistate.gov.ng not
later than one week after this publication.
Signed.
Permanent Secretary
Bureau of Infrastructure and Public Utilities
Governors’ Office, Ado-Ekiti
Ekiti State.

More Related Content

Similar to Ekiti State Government Of Nigeria PIU Advert

IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...IRJET Journal
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...OECD Environment
 
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...IJAEMSJORNAL
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030DRatal2505
 
The Opportunities and Challenges of Renewable Energy Integration With Low-Car...
The Opportunities and Challenges of Renewable Energy Integration With Low-Car...The Opportunities and Challenges of Renewable Energy Integration With Low-Car...
The Opportunities and Challenges of Renewable Energy Integration With Low-Car...OECD Environment
 
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...Government of Ekiti State, Nigeria
 
Hydro power policies and guidelines
Hydro power policies and guidelinesHydro power policies and guidelines
Hydro power policies and guidelinesProbodh Mallick
 
Indian domestic sector and the need for promoting community based microgenera...
Indian domestic sector and the need for promoting community based microgenera...Indian domestic sector and the need for promoting community based microgenera...
Indian domestic sector and the need for promoting community based microgenera...eSAT Publishing House
 
CV_Sunday_IGBORO_-_updated_2014
CV_Sunday_IGBORO_-_updated_2014CV_Sunday_IGBORO_-_updated_2014
CV_Sunday_IGBORO_-_updated_2014Igboro Bamidele
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arunKartikeya Pandey
 
IRJET-Assessment of Feasibility of Minor Irrigation Project
IRJET-Assessment of Feasibility of Minor Irrigation ProjectIRJET-Assessment of Feasibility of Minor Irrigation Project
IRJET-Assessment of Feasibility of Minor Irrigation ProjectIRJET Journal
 

Similar to Ekiti State Government Of Nigeria PIU Advert (20)

Cz32629632
Cz32629632Cz32629632
Cz32629632
 
Cz32629632
Cz32629632Cz32629632
Cz32629632
 
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...IRJET-  	  Flood Disaster Management and Reconstruction of Damaged Residentia...
IRJET- Flood Disaster Management and Reconstruction of Damaged Residentia...
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...
 
Updated CV Nov 26 2015
Updated CV Nov 26 2015Updated CV Nov 26 2015
Updated CV Nov 26 2015
 
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030
 
The Opportunities and Challenges of Renewable Energy Integration With Low-Car...
The Opportunities and Challenges of Renewable Energy Integration With Low-Car...The Opportunities and Challenges of Renewable Energy Integration With Low-Car...
The Opportunities and Challenges of Renewable Energy Integration With Low-Car...
 
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
Water And Sanitation Engineer And Head Of Water And Sanitation Department - S...
 
Hydro power policies and guidelines
Hydro power policies and guidelinesHydro power policies and guidelines
Hydro power policies and guidelines
 
Indian domestic sector and the need for promoting community based microgenera...
Indian domestic sector and the need for promoting community based microgenera...Indian domestic sector and the need for promoting community based microgenera...
Indian domestic sector and the need for promoting community based microgenera...
 
hero
herohero
hero
 
NELSAP News August 2019
NELSAP News August 2019NELSAP News August 2019
NELSAP News August 2019
 
CV_Sunday_IGBORO_-_updated_2014
CV_Sunday_IGBORO_-_updated_2014CV_Sunday_IGBORO_-_updated_2014
CV_Sunday_IGBORO_-_updated_2014
 
NESRA Demonstration Speech
NESRA Demonstration SpeechNESRA Demonstration Speech
NESRA Demonstration Speech
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arun
 
Note sheet
Note sheetNote sheet
Note sheet
 
NELSAP NEWS NOVEMBER 2020.pdf
NELSAP NEWS NOVEMBER 2020.pdfNELSAP NEWS NOVEMBER 2020.pdf
NELSAP NEWS NOVEMBER 2020.pdf
 
IRJET-Assessment of Feasibility of Minor Irrigation Project
IRJET-Assessment of Feasibility of Minor Irrigation ProjectIRJET-Assessment of Feasibility of Minor Irrigation Project
IRJET-Assessment of Feasibility of Minor Irrigation Project
 

More from Government of Ekiti State, Nigeria

2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti StateGovernment of Ekiti State, Nigeria
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Government of Ekiti State, Nigeria
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Government of Ekiti State, Nigeria
 

More from Government of Ekiti State, Nigeria (20)

Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget DetailsEkiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget Details
 
Ekiti State Public Procurement Law
Ekiti State Public Procurement LawEkiti State Public Procurement Law
Ekiti State Public Procurement Law
 
Scholarship for Post Graduate Ng
Scholarship for Post Graduate NgScholarship for Post Graduate Ng
Scholarship for Post Graduate Ng
 
Scholarship for Overseas Students
Scholarship for Overseas StudentsScholarship for Overseas Students
Scholarship for Overseas Students
 
Scholarsrhip for Undergraduate
Scholarsrhip for UndergraduateScholarsrhip for Undergraduate
Scholarsrhip for Undergraduate
 
Physically Challenged
Physically ChallengedPhysically Challenged
Physically Challenged
 
Busary form 1
Busary form 1Busary form 1
Busary form 1
 
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
 
Bursary Award 2012/2013
Bursary Award 2012/2013Bursary Award 2012/2013
Bursary Award 2012/2013
 
Effective service delivery
Effective service deliveryEffective service delivery
Effective service delivery
 
Prof. ade ajayi ad. approved
Prof. ade ajayi ad. approvedProf. ade ajayi ad. approved
Prof. ade ajayi ad. approved
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
 
Champion Newspapers' Governor of the year
Champion Newspapers' Governor of the yearChampion Newspapers' Governor of the year
Champion Newspapers' Governor of the year
 
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
 
One Year After...Moremi Lives on
One Year After...Moremi Lives onOne Year After...Moremi Lives on
One Year After...Moremi Lives on
 
Overview of 2014 Budget
Overview of 2014 BudgetOverview of 2014 Budget
Overview of 2014 Budget
 

Ekiti State Government Of Nigeria PIU Advert

  • 1. www.ekitistate.gov.ng EKITI STATE GOVERNMENT OF NIGERIA 



 BUREAU OF INFRASTRUCTURE AND PUBLIC UTILITIES 3RD NATIONAL URBAN WATER SECTOR REFORM PROJECT (NUWSRP 3) PROJECT DESCRIPTION Ekiti State intends to take a loan from the World Bank under the 3rd National Urban Water Sector Reform Project, to finance the reform of the water sector in the state. The desired outcome of the project is to provide good quality water in a sustainable manner to the citizens of the state. VACANCY Applications are hereby invited from qualified candidates to fill the following positions in the PROJECT IMPLEMENTATION UNIT (PIU) of the above mentioned Project. i. Project Coordinator ii. Environmental Safeguard Specialist iii. Procurement Specialist iv. Water and Sanitation Engineer v. Human Resources Development Officer (HRDO) The full Terms of Reference (TOR) for each position are attached on this URL - http://ekitistate.gov.ng/media- centre/downloads/?category=107. Go to www.ekitistate.gov.ng => Media Centre => Downloads => BIPU – Terms of Refernce. Interested candidates should please send the soft copy of their CVs to ekitiurbanwater@ekitistate.gov.ng not later than one week after this publication. Signed. Permanent Secretary Bureau of Infrastructure and Public Utilities Governors’ Office, Ado-Ekiti Ekiti State.