Vision for efficient organizational improvements through effective use of program resources By Tim Ayres timayres01@gmail.com Linkedin: http://www.linkedin.com/in/timothyayressrsystemsengineer
Integrated Life Cycle Management Framework Tim Ayres will help you achieve the six tenants of Integrated Life Cycle Management Framework(ILCM) Life cycle planning and integration Expectation management Collaborative and continuous requirements management Life cycle systems engineering Technology planning and insertion Continual, integrated testing
Life Cycle Planning and Integration ILCM ensures the program is actively managed throughout its entire lifespan from conception and requirements generation to technology and product development and testing, and throughout manufacturing and field operations until the system or product is retired and disposed Three major parallel management and execution structures support life cycle planning and integration Capabilities-based requirements development System acquisition and sustainment Capabilities-based test and evaluation Execution framework provides a roadmap for ILCM stakeholders and process owners to use in the integrated management of programs across their entire life cycle
Expectation Management Expectation management establishes program credibility and accountability through formal, recurring communication among stakeholders and is the cornerstone of the ILCM process. Significant reasons to actively manage expectations: Developers, users, and sustainers often interpret requirements differently program changes occur throughout development and are not always documented which impacts cost, schedule, performance, and risk which affect end-item deliverables different users may have different views of probability of success expectations can drift apart over time through leadership/personnel changes.
Collaborative and Continuous Requirements Management Collaborative requirements development requires the user, acquirer, enterprise architect, developer, tester and sustainer to operate as one team. Continuous management is monitoring and controlling the system requirements baseline throughout the program life cycle. While the user is responsible for identifying the required capability, this must be accomplished in a collaborative environment with all stakeholders in order to understand and communicate the objectives.
Life Cycle Systems Engineering Life cycle systems engineering is the overarching process governing the transition from a stated capability need to an operationally effective and suitable system. Systems engineering addresses architecture, requirements development and management, design, technical management and control, and test and evaluation (T&E) / verification and validation (V&V). It is the integrating mechanism for balanced solutions. The systems engineering process begins early in concept definition and covers all efforts across all life cycle phases, to include sustainment and disposal.
Technology Planning and Insertion Technology planning and insertion is the timely maturation and incorporation of relevant technology throughout the program life cycle to ensure an operationally effective and suitable system. Technology planning and the assessment of technology readiness levels include consideration of such factors as reliability, producibility, testability, sustainability and operational performance. Successful technology planning and insertion as part of program life cycle management results in higher fidelity time-phased requirements with a more realistic schedule and improved cost estimates.
Continual, Integrated Testing Continual, integrated testing structures Test and Evaluation (T&E) to reduce the time it takes to field effective and suitable systems by providing qualitative and quantitative information to decision makers throughout the program‘s life cycle. Integrated testing minimizes the distinction between contractor, developmental, and operational testing by implementing integrated testing techniques and objectives to the maximum extent possible. Key stakeholders share all information in open T&E databases, identify problems early, engage contractors to fix deficiencies sooner, and ensure systems are ready to enter dedicated operational testing and fielding with a high probability of success.
The Challenge Budgets are reducing while capability is increasing The customer must find ways to do more with less Our mission is to provide seamless governance, transparency and integration of all aspects of systems acquisition and sustainment management This mission and resulting objectives must be used in conjunction with capabilities-based requirements development It starts with a strategic plan and completes with approval of requirements validation
Challenge (con’t) Continual improvement in organizational relations is critical to the fielding of effective and suitable systems providing objective information to decision makers Do we have objective reality? Organizational planning and continual development improves our chances for success
Effective Organizations Build upon the synergy of form, fit and function by combination or even collaboration between elements Greater than the sum of its parts Requires being comfortable in the interaction of responsibilities between organizations Trusting and believing when elements and resulting sub-functions seem most disconnected If they are allowed to operate freely, it will come back together in a new and better configuration
Dysfunctional organizations and silos Dysfunctional organizations live and function in silos, defend them and resist anything that tries to pull them apart. Organizations that operate in the form silo resist pressure from the function (and certainly the analytic) silo to focus on numbers vs. the emotional experience so important to style. And organizations that exist in the function silo resist pressure from the form silo to lighten and loosen up and not be so unconcerned. Such adjacent silos too often interact from a “zero sum game” mindset.
Synergy Synergy transcends that transactional stalemate Effective lifecycle management practices fuel that synergy by being able to see into the customers’ future to products overflowing with style, precision and functionality beyond what they can imagine. Organizations must not be constricted by living in a single silo, but flow naturally between them. Our goal is to go from divergent, expansive thinking to convergent, focused doing on a consistently sustainable basis. This can be applied to any company where competing functions and departments are so concerned with turf erosion and so protective with CYA survival strategies that they can never see beyond either and into their customers’ futures and beyond.
Planning Synergy begins with planning Implementation of systems engineering practices and planning is the organizational future for acquisitions and sustainment. Provides the common agreement for silos to coexist and move freely amongst each other Starts with a Systems Engineering Plan (SEP) or even a strategic vision to develop and maintain the SEP See details on SEP development and implementation.

More Related Content

What's hot

Software Product Line
Software Product LineSoftware Product Line
Software Product Line
Himanshu
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
UMT
 
Function Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardFunction Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on Board
DCG Software Value
 
Measurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_CrosstalkMeasurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_Crosstalk
pbaxter
 
How ThreatModeler Benefits Key Stakeholders
How ThreatModeler Benefits Key StakeholdersHow ThreatModeler Benefits Key Stakeholders
How ThreatModeler Benefits Key Stakeholders
reeftim
 
Assessment of cmm and its impact on software quality
Assessment of cmm and its impact on software qualityAssessment of cmm and its impact on software quality
Assessment of cmm and its impact on software quality
IAEME Publication
 
Foresight 4 Cybersecurity
Foresight 4 CybersecurityForesight 4 Cybersecurity
Foresight 4 Cybersecurity
Maganathin Veeraragaloo
 
Strategic vendor evaluation
Strategic vendor evaluationStrategic vendor evaluation
Strategic vendor evaluation
Bradr998
 
EdTech Testing- For Quality Improvement
EdTech Testing- For Quality ImprovementEdTech Testing- For Quality Improvement
EdTech Testing- For Quality Improvement
BugRaptors
 
Selecting a new medical management software system
Selecting a new medical management software systemSelecting a new medical management software system
Selecting a new medical management software system
TCS Healthcare Technologies
 
Kpi methodology
Kpi methodologyKpi methodology
Kpi methodology
mahnath
 
RAP GC 2016
RAP GC 2016RAP GC 2016
Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016
Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016
Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016
StratesysUSA
 
Chapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorChapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success Factor
Sanat Maharjan
 
Validating your-model
Validating your-modelValidating your-model
Validating your-model
Guy VdB
 
Building model trust
Building model trustBuilding model trust
Building model trust
Sébastien Cimon Gagnon
 
1.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 11.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 1
reddvise
 
Increasing the probability of success for your project
Increasing the probability of success for your projectIncreasing the probability of success for your project
Increasing the probability of success for your project
Glen Alleman
 
Qa & qc
Qa & qcQa & qc
Pmp handbook
Pmp handbookPmp handbook

What's hot (20)

Software Product Line
Software Product LineSoftware Product Line
Software Product Line
 
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
 
Function Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardFunction Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on Board
 
Measurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_CrosstalkMeasurement_Information Needs_paper_Crosstalk
Measurement_Information Needs_paper_Crosstalk
 
How ThreatModeler Benefits Key Stakeholders
How ThreatModeler Benefits Key StakeholdersHow ThreatModeler Benefits Key Stakeholders
How ThreatModeler Benefits Key Stakeholders
 
Assessment of cmm and its impact on software quality
Assessment of cmm and its impact on software qualityAssessment of cmm and its impact on software quality
Assessment of cmm and its impact on software quality
 
Foresight 4 Cybersecurity
Foresight 4 CybersecurityForesight 4 Cybersecurity
Foresight 4 Cybersecurity
 
Strategic vendor evaluation
Strategic vendor evaluationStrategic vendor evaluation
Strategic vendor evaluation
 
EdTech Testing- For Quality Improvement
EdTech Testing- For Quality ImprovementEdTech Testing- For Quality Improvement
EdTech Testing- For Quality Improvement
 
Selecting a new medical management software system
Selecting a new medical management software systemSelecting a new medical management software system
Selecting a new medical management software system
 
Kpi methodology
Kpi methodologyKpi methodology
Kpi methodology
 
RAP GC 2016
RAP GC 2016RAP GC 2016
RAP GC 2016
 
Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016
Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016
Stratesys - CAPA Solution OpenText - Flyer+Ebers (USA) - JUNIO2016
 
Chapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorChapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success Factor
 
Validating your-model
Validating your-modelValidating your-model
Validating your-model
 
Building model trust
Building model trustBuilding model trust
Building model trust
 
1.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 11.3 project management process groups & knowledge areas 1
1.3 project management process groups & knowledge areas 1
 
Increasing the probability of success for your project
Increasing the probability of success for your projectIncreasing the probability of success for your project
Increasing the probability of success for your project
 
Qa & qc
Qa & qcQa & qc
Qa & qc
 
Pmp handbook
Pmp handbookPmp handbook
Pmp handbook
 

Viewers also liked

T.I.K bab 2
T.I.K bab 2T.I.K bab 2
T.I.K bab 2
Fadly Fadil
 
Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...
Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...
Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...
Vivian S. Zhang
 
Introduction to bit coin
Introduction to bit coinIntroduction to bit coin
Introduction to bit coin
Vivian S. Zhang
 
Open data meetup nyc 1 23-14
Open data meetup nyc 1 23-14Open data meetup nyc 1 23-14
Open data meetup nyc 1 23-14
Vivian S. Zhang
 
Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...
Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...
Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...
Vivian S. Zhang
 
Visualizing doc graph in gephi june 2013
Visualizing doc graph in gephi june 2013Visualizing doc graph in gephi june 2013
Visualizing doc graph in gephi june 2013
Vivian S. Zhang
 
THE HACK ON JERSEY CITY CONDO PRICES explore trends in public data
THE HACK ON JERSEY CITY CONDO PRICES explore trends in public dataTHE HACK ON JERSEY CITY CONDO PRICES explore trends in public data
THE HACK ON JERSEY CITY CONDO PRICES explore trends in public data
Vivian S. Zhang
 

Viewers also liked (7)

T.I.K bab 2
T.I.K bab 2T.I.K bab 2
T.I.K bab 2
 
Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...
Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...
Data Science Academy Student Demo day--Peggy sobolewski,analyzing transporati...
 
Introduction to bit coin
Introduction to bit coinIntroduction to bit coin
Introduction to bit coin
 
Open data meetup nyc 1 23-14
Open data meetup nyc 1 23-14Open data meetup nyc 1 23-14
Open data meetup nyc 1 23-14
 
Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...
Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...
Data Science Academy Student Demo day--Shelby Ahern, An Exploration of Non-Mi...
 
Visualizing doc graph in gephi june 2013
Visualizing doc graph in gephi june 2013Visualizing doc graph in gephi june 2013
Visualizing doc graph in gephi june 2013
 
THE HACK ON JERSEY CITY CONDO PRICES explore trends in public data
THE HACK ON JERSEY CITY CONDO PRICES explore trends in public dataTHE HACK ON JERSEY CITY CONDO PRICES explore trends in public data
THE HACK ON JERSEY CITY CONDO PRICES explore trends in public data
 

Similar to Efficient organizational improvements

EjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOqEjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOq
E.J. Roley Principal GITSS w/MBA Finance/Info Sec.
 
Business Systems Analyst Interview Questions and Answers
Business Systems Analyst Interview Questions and AnswersBusiness Systems Analyst Interview Questions and Answers
Business Systems Analyst Interview Questions and Answers
HireQuotient
 
The Complete Guide to Building an Effective Enterprise Testing Strategy.pdf
The Complete Guide to Building an Effective Enterprise Testing Strategy.pdfThe Complete Guide to Building an Effective Enterprise Testing Strategy.pdf
The Complete Guide to Building an Effective Enterprise Testing Strategy.pdf
kalichargn70th171
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
JunaidAhmed976315
 
Pyramid Healthcare Brochure
Pyramid Healthcare BrochurePyramid Healthcare Brochure
Pyramid Healthcare Brochure
Sherif Farghal
 
ONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docx
ONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docxONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docx
ONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docx
cherishwinsland
 
Developing quality program
Developing quality programDeveloping quality program
Best Practices for Global MES Rollouts
Best Practices for Global MES RolloutsBest Practices for Global MES Rollouts
Best Practices for Global MES Rollouts
Cognizant
 
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
GAFM Academy of Project Management ® - ISO 29990 Certified International Board of Standards
 
How to Navigate an EHR Implementation Lifecycle
How to Navigate an EHR Implementation LifecycleHow to Navigate an EHR Implementation Lifecycle
How to Navigate an EHR Implementation Lifecycle
Larry Kaiser
 
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
kalichargn70th171
 
Test Environment Management KPI
Test Environment Management KPITest Environment Management KPI
Test Environment Management KPI
Valentine Wats
 
L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1
James McDermott
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
Peter Shirley-Quirk
 
Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
Invensis Learning
 
DEFINITION.docx
DEFINITION.docxDEFINITION.docx
DEFINITION.docx
AbdetaImi
 
A Closer Look at Application Support and Maintenance.pdf
A Closer Look at Application Support and Maintenance.pdfA Closer Look at Application Support and Maintenance.pdf
A Closer Look at Application Support and Maintenance.pdf
VertexplusUS
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
K-MEANS-MAP REDUCED ALGORITHM Guidebook_FINAL
K-MEANS-MAP REDUCED  ALGORITHM Guidebook_FINALK-MEANS-MAP REDUCED  ALGORITHM Guidebook_FINAL
K-MEANS-MAP REDUCED ALGORITHM Guidebook_FINAL
christopher corlett
 
Week_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docx
Week_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docxWeek_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docx
Week_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docx
philipnelson29183
 

Similar to Efficient organizational improvements (20)

EjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOqEjRoley_Philosophy_of_Management_2015-PMOq
EjRoley_Philosophy_of_Management_2015-PMOq
 
Business Systems Analyst Interview Questions and Answers
Business Systems Analyst Interview Questions and AnswersBusiness Systems Analyst Interview Questions and Answers
Business Systems Analyst Interview Questions and Answers
 
The Complete Guide to Building an Effective Enterprise Testing Strategy.pdf
The Complete Guide to Building an Effective Enterprise Testing Strategy.pdfThe Complete Guide to Building an Effective Enterprise Testing Strategy.pdf
The Complete Guide to Building an Effective Enterprise Testing Strategy.pdf
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Pyramid Healthcare Brochure
Pyramid Healthcare BrochurePyramid Healthcare Brochure
Pyramid Healthcare Brochure
 
ONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docx
ONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docxONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docx
ONLINE APPOINTMENT SYSTEM1ONLINE APPOINTMENT SYSTEM18.docx
 
Developing quality program
Developing quality programDeveloping quality program
Developing quality program
 
Best Practices for Global MES Rollouts
Best Practices for Global MES RolloutsBest Practices for Global MES Rollouts
Best Practices for Global MES Rollouts
 
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
 
How to Navigate an EHR Implementation Lifecycle
How to Navigate an EHR Implementation LifecycleHow to Navigate an EHR Implementation Lifecycle
How to Navigate an EHR Implementation Lifecycle
 
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
The Key to Digital Success_ A Comprehensive Guide to Continuous Testing Integ...
 
Test Environment Management KPI
Test Environment Management KPITest Environment Management KPI
Test Environment Management KPI
 
L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
 
Effective Change Management
Effective Change ManagementEffective Change Management
Effective Change Management
 
DEFINITION.docx
DEFINITION.docxDEFINITION.docx
DEFINITION.docx
 
A Closer Look at Application Support and Maintenance.pdf
A Closer Look at Application Support and Maintenance.pdfA Closer Look at Application Support and Maintenance.pdf
A Closer Look at Application Support and Maintenance.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
K-MEANS-MAP REDUCED ALGORITHM Guidebook_FINAL
K-MEANS-MAP REDUCED  ALGORITHM Guidebook_FINALK-MEANS-MAP REDUCED  ALGORITHM Guidebook_FINAL
K-MEANS-MAP REDUCED ALGORITHM Guidebook_FINAL
 
Week_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docx
Week_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docxWeek_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docx
Week_10_Term_Paper_ANS_1429096.docxRunning head Agile Project.docx
 

Recently uploaded

Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
Arijit Dutta
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
IPLTech Electric
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
taqyea
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
Freelance
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
➑➌➋➑➒➎➑➑➊➍
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
irhcs
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
concepsionchomo153
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
dazzjoker
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
Ksquare Energy Pvt. Ltd.
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
Pro Tips for Effortless Contract Management
Pro Tips for Effortless Contract ManagementPro Tips for Effortless Contract Management
Pro Tips for Effortless Contract Management
Eternity Paralegal Services
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 

Recently uploaded (20)

Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN8328958814KALYAN MATKA | MATKA RESULT | KALYAN
8328958814KALYAN MATKA | MATKA RESULT | KALYAN
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
Pro Tips for Effortless Contract Management
Pro Tips for Effortless Contract ManagementPro Tips for Effortless Contract Management
Pro Tips for Effortless Contract Management
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 

Efficient organizational improvements

  • 1. Vision for efficient organizational improvements through effective use of program resources By Tim Ayres timayres01@gmail.com Linkedin: http://www.linkedin.com/in/timothyayressrsystemsengineer
  • 2. Integrated Life Cycle Management Framework Tim Ayres will help you achieve the six tenants of Integrated Life Cycle Management Framework(ILCM) Life cycle planning and integration Expectation management Collaborative and continuous requirements management Life cycle systems engineering Technology planning and insertion Continual, integrated testing
  • 3. Life Cycle Planning and Integration ILCM ensures the program is actively managed throughout its entire lifespan from conception and requirements generation to technology and product development and testing, and throughout manufacturing and field operations until the system or product is retired and disposed Three major parallel management and execution structures support life cycle planning and integration Capabilities-based requirements development System acquisition and sustainment Capabilities-based test and evaluation Execution framework provides a roadmap for ILCM stakeholders and process owners to use in the integrated management of programs across their entire life cycle
  • 4. Expectation Management Expectation management establishes program credibility and accountability through formal, recurring communication among stakeholders and is the cornerstone of the ILCM process. Significant reasons to actively manage expectations: Developers, users, and sustainers often interpret requirements differently program changes occur throughout development and are not always documented which impacts cost, schedule, performance, and risk which affect end-item deliverables different users may have different views of probability of success expectations can drift apart over time through leadership/personnel changes.
  • 5. Collaborative and Continuous Requirements Management Collaborative requirements development requires the user, acquirer, enterprise architect, developer, tester and sustainer to operate as one team. Continuous management is monitoring and controlling the system requirements baseline throughout the program life cycle. While the user is responsible for identifying the required capability, this must be accomplished in a collaborative environment with all stakeholders in order to understand and communicate the objectives.
  • 6. Life Cycle Systems Engineering Life cycle systems engineering is the overarching process governing the transition from a stated capability need to an operationally effective and suitable system. Systems engineering addresses architecture, requirements development and management, design, technical management and control, and test and evaluation (T&E) / verification and validation (V&V). It is the integrating mechanism for balanced solutions. The systems engineering process begins early in concept definition and covers all efforts across all life cycle phases, to include sustainment and disposal.
  • 7. Technology Planning and Insertion Technology planning and insertion is the timely maturation and incorporation of relevant technology throughout the program life cycle to ensure an operationally effective and suitable system. Technology planning and the assessment of technology readiness levels include consideration of such factors as reliability, producibility, testability, sustainability and operational performance. Successful technology planning and insertion as part of program life cycle management results in higher fidelity time-phased requirements with a more realistic schedule and improved cost estimates.
  • 8. Continual, Integrated Testing Continual, integrated testing structures Test and Evaluation (T&E) to reduce the time it takes to field effective and suitable systems by providing qualitative and quantitative information to decision makers throughout the program‘s life cycle. Integrated testing minimizes the distinction between contractor, developmental, and operational testing by implementing integrated testing techniques and objectives to the maximum extent possible. Key stakeholders share all information in open T&E databases, identify problems early, engage contractors to fix deficiencies sooner, and ensure systems are ready to enter dedicated operational testing and fielding with a high probability of success.
  • 9. The Challenge Budgets are reducing while capability is increasing The customer must find ways to do more with less Our mission is to provide seamless governance, transparency and integration of all aspects of systems acquisition and sustainment management This mission and resulting objectives must be used in conjunction with capabilities-based requirements development It starts with a strategic plan and completes with approval of requirements validation
  • 10. Challenge (con’t) Continual improvement in organizational relations is critical to the fielding of effective and suitable systems providing objective information to decision makers Do we have objective reality? Organizational planning and continual development improves our chances for success
  • 11. Effective Organizations Build upon the synergy of form, fit and function by combination or even collaboration between elements Greater than the sum of its parts Requires being comfortable in the interaction of responsibilities between organizations Trusting and believing when elements and resulting sub-functions seem most disconnected If they are allowed to operate freely, it will come back together in a new and better configuration
  • 12. Dysfunctional organizations and silos Dysfunctional organizations live and function in silos, defend them and resist anything that tries to pull them apart. Organizations that operate in the form silo resist pressure from the function (and certainly the analytic) silo to focus on numbers vs. the emotional experience so important to style. And organizations that exist in the function silo resist pressure from the form silo to lighten and loosen up and not be so unconcerned. Such adjacent silos too often interact from a “zero sum game” mindset.
  • 13. Synergy Synergy transcends that transactional stalemate Effective lifecycle management practices fuel that synergy by being able to see into the customers’ future to products overflowing with style, precision and functionality beyond what they can imagine. Organizations must not be constricted by living in a single silo, but flow naturally between them. Our goal is to go from divergent, expansive thinking to convergent, focused doing on a consistently sustainable basis. This can be applied to any company where competing functions and departments are so concerned with turf erosion and so protective with CYA survival strategies that they can never see beyond either and into their customers’ futures and beyond.
  • 14. Planning Synergy begins with planning Implementation of systems engineering practices and planning is the organizational future for acquisitions and sustainment. Provides the common agreement for silos to coexist and move freely amongst each other Starts with a Systems Engineering Plan (SEP) or even a strategic vision to develop and maintain the SEP See details on SEP development and implementation.