Enterprise Architecture
EA Methods
EA Methods
and
and
Frameworks
Frameworks
EA: Lecture 3
TOGAF
21
e.g. DATA
ENTERPRISE ARCHITECTURE - A FRAMEWORK
Builder
SCOPE
(CONTEXTUAL)
MODEL
(CONCEPTUAL)
ENTERPRISE
Designer
SYSTEM
MODEL
(LOGICAL)
TECHNOLOGY
MODEL
(PHYSICAL)
DETAILED
REPRESEN-
TATIONS
(OUT-OF-
CONTEXT)
Sub-
Contractor
FUNCTIONING
ENTERPRISE
DATA FUNCTION NETW ORK
e.g. Data Definition
Ent = Field
Reln = Address
e.g. Physical Data Model
Ent = Segment/Table/etc.
Reln = Pointer/Key/etc.
e.g. Logical Data Model
Ent = Data Entity
Reln = Data Relationship
e.g. Semantic Model
Ent = Business Entity
Reln = Business Relationship
List of Things Important
to the Business
ENTITY = Class of
Business Thing
List of Processes the
Business Performs
Function = Class of
Business Process
e.g. Application Architecture
I/O = User Views
Proc .= Application Function
e.g. System Design
I/O = Data Elements/Sets
Proc.= Computer F unction
e.g. Program
I/O = Control Block
Proc.= Language Stmt
e.g. FUNCTION
e.g. Business Process Model
Proc. = Business Process
I/O = Business Resources
List of Locations in which
the Business Operates
Node = Major Business
Location
e.g. Business Logistics
System
Node = Business Location
Link = Business Linkage
e.g. Distributed System
Node = I/S Function
(Processor, Storage, etc)
Link = Line Characteristics
e.g. Technology Architecture
Node = Hardware/System
Software
Link = Line Specifications
e.g. Network Architecture
Node = A ddresses
Link = Protocols
e.g. NETWORK
Architecture
Planner
Owner
Builder
ENTERPRISE
MODEL
(CONCEPTUAL)
Designer
SYSTEM
MODEL
(LOGICAL)
TECHNOLOGY
MODEL
(PHYSICAL)
DETAILED
REPRESEN-
TATIONS
(OUT- OF
CONTEXT)
Sub-
Contractor
FUNCTIONING
MOTIVATION
TIME
PEOPLE
e.g. Rule Specification
End = Sub-condition
Means = Step
e.g. Rule Design
End = Condition
Means = Action
e.g., Business Rule Model
End = Structural Assertion
Means =Action Assertion
End = Business Objective
Means = Business Strategy
List of Business Goals/Strat
Ends/Means=Major Bus. Goal/
Critical Success Factor
List of Events Significant
Time = Major Business Event
e.g. Processing Structure
Cycle = Processing Cycle
Time = System Event
e.g. Control Structure
Cycle = Component Cycle
Time = Execute
e.g. Timing Definition
Cycle = Machine Cycle
Time = Interrupt
e.g. SCHEDULE
e.g. Master Schedule
Time = Business Event
Cycle = Business Cycle
List of Organizations
People = Major Organizations
e.g. Work Flow Model
People = Organization Unit
Work = Work Product
e.g. Human Interface
People = Role
Work = Deliverable
e.g. Presentation Architecture
People = User
Work = Screen Format
e.g. Security Architecture
People = Identity
Work = Job
e.g. ORGANIZA
T ION
Planner
Owner
to the Business
Important to the Business
What How Where Who When Why
John A. Zachman, Zachman International (810) 231-0531
SCOPE
(CONTEXTUAL)
Architecture
e.g. STRATEGY
ENTERPRISE
e.g. Business Plan
TM
EA: Lecture 4 2
• Frameworks structure architecture description
techniques by identifying and relating different
architectural viewpoints and the modeling techniques
associated with them.
• Some frameworks are closely connected to a specific
modeling language or set of languages.
EA: Lecture 4 3
• Most architecture frameworks are quite precise in
establishing what elements should be part of an
enterprise architecture.
• To ensure the quality of the enterprise architecture
during its life cycle the adoption of a certain
framework is not sufficient.
EA: Lecture 4 4
• The relations between the different types of
domains, views, or layers of the architecture must
remain clear, and any change should be carried
through methodically in all of them.
• For this purpose, a number of methods are
available, which assist architects through all phases
of the life cycle of architectures.
EA: Lecture 4 5
1. Enterprise Architecture Methods
• An architecture method is a structured collection of
techniques and process steps for creating and
maintaining an enterprise architecture.
• Methods typically specify:
• the various phases of an architecture’s life cycle,
• what deliverables should be produced at each stage, and
• how they are verified or tested.
• The following methods for architecture
development are worth mentioning:
EA: Lecture 4 6
1. Although meant for software development, the
Rational Unified Process (RUP) (Jacobson et al.
1999) is of interest here, as it defines an iterative
process, as opposed to the classical waterfall
process, that realizes software by adding
functionality to the architecture at each increment.
An extension towards enterprise IT architecture is
given by McGovern et al. (2004) in the form of the
Enterprise Unified Process.
EA: Lecture 4 7
2. The UN/CEFACT Modeling Methodology
(UMM) is an incremental business process and
information model construction methodology. The
scope is intentionally restricted to business
operations, omitting technology-specific aspects.
The Business Collaboration Framework (BCF), is a
specialization of the UMM aimed at defining an
enterprise’s external information exchanges and
their underlying business activities.
EA: Lecture 4 8
3. The four phase/twenty-step methodology to
establish an EA program and implement the six EA
documentation elements of EA3 Cube Framework
provided by Scott A. Bernard . It contains four
phases Phase I:EA Program Establishment, Phase
II:EA Framework and Tool Selection, Phase III:
Documentation of the EA and Phase IV: Use and
Maintain the EA
EA: Lecture 4 9
4. The TOGAF Architecture Development Method
(ADM), developed by The Open Group, provides a
detailed and well-described phasing for developing
an IT architecture. The current version of TOGAF
(The Open Group 2011) provides a framework and
development method for developing enterprise
architectures.
EA: Lecture 4 10
5. The Chief Information Officers Council has created
The Federal Enterprise Architecture Framework
(FEAF) accompanied by a practical and useful
manual for developing enterprise architecture for
governmental organizations (CIO Council 2004).
Other initiatives of the US government include the
Federal Enterprise Architecture (FEA) of the
Federal Enterprise Architecture Program
Management Office (FEAPMO 2004) and the
Treasury Architecture Development Process by the
Department of the Treasury (US Treasury 2004).
EA: Lecture 4 11
• Various consulting companies have developed their
own architecture methods and frameworks.
• Examples include Sogeti’s DYA, Capgemini’s IAF,
IBM’s Enterprise Architecture method, and
Microsoft’s Motion.
EA: Lecture 4 12
Types of EA Frameworks
• EA frameworks can be categorized into the
following types:
1. Consortia-developed frameworks
2. Defense industry frameworks
3. Government frameworks
4. Open-source frameworks
5. Proprietary frameworks
EA: Lecture 4 13
Consortia-developed frameworks
• ARCON : A Reference Architecture for Collaborative
Networks – not focused on a single enterprise but
rather on networks of enterprises
• GERAM : Generalized Enterprise Reference
Architecture and Methodology
• RM-ODP : the Reference Model of Open Distributed
Processing
• ISO/IEC 10746: defines an enterprise architecture
framework for structuring the specifications of open
distributed systems.
EA: Lecture 4 14
Consortia-developed frameworks
• IDEAS Group :a four-nation effort to develop a
common ontology for architecture interoperability
• ISO 19439: Framework for enterprise modeling
• TOGAF : The Open Group Architecture Framework –
a widely used framework including an architectural
Development Method and standards for describing
various types of architecture.
EA: Lecture 4 15
Defense industry frameworks
• AGATE : the France DGAArchitecture Framework
• DNDAF : the DND/CF Architecture Framework
(CAN)
• DoDAF : the US Department of Defense Architecture
Framework
• MODAF : the UK Ministry of Defence Architecture
Framework
• NAF : the NATO Architecture Framework
EA: Lecture 4 16
Government frameworks
• ESAAF : European Space Agency Architectural Framework, a
framework for European space-based Systems of Systems
• GEA : Government Enterprise Architecture, common
framework legislated for use by departments of the Queensland
Government
• FDIC Enterprise Architecture Framework
• FEAF : Federal Enterprise Architecture Framework, a
framework produced in 1999 by the US Federal CIO
Council for use within the US Government (not to be confused
with the 2002 Federal Enterprise Architecture (FEA) guidance
on categorizing and grouping IT investments, issued by the US
Federal Office of Management and Budget
EA: Lecture 4 17
Government frameworks
• NORA : Nederlandse Overheid Referentie
Architectuur , a reference framework from the Dutch
Government E-overheid NORA
• NIST Enterprise Architecture Model
• TEAF : Treasury Enterprise Architecture Framework,
a framework for treasury, published by the US
Department of Treasuryin July 2000
EA: Lecture 4 18
Open-source frameworks
• MEGAF : is an infrastructure for realizing architecture
frameworks that conform to the definition of architecture
framework provided in ISO/IEC/IEEE 42010.
• Praxeme, an open enterprise methodology, contains an
enterprise architecture framework called the Enterprise System
Topology (EST)
• TRAK : a general systems-oriented framework based on
MODAF1.2 and released under GPL/GFDL.
• SABSA is an open framework and methodology for Enterprise
Security Architecture and Service Management, that is risk
based and focuses on integrating security into business and IT
management.
EA: Lecture 4 19
Proprietary frameworks
• ASSIMPLER Framework – an architecture framework,
based on the work of Mandar Vanarse at Wipro in 2002
• AM : Avancier Methods Processes and documentation
advice for enterprise and solution architects, supported
by training and certification.
• BRM : Build-Run-Manage Framework, an architecture
framework created by Sanjeev "Sunny" Mishra during
his early days at IBM in 2000.
• IAF : Capgemini Integrated Arcitecture Framework,
from Capgemini company in 1993
EA: Lecture 4 20
Proprietary frameworks
• Dragon1 : An open Visual Enterprise Architecture Method
recently recognized by The Open Group as Architecture
Framework
• DYA framework developed by Sogeti since 2004.
• Dynamic Enterprise Enterprise architecture concept based
on Web 2.0 technology
• Extended Enterprise architecture Framework from Institute
For Enterprise Architecture Developments in 2003
• EACOE Framework : an Enterprise Architecture
framework, as an elaboration of the work of John Zachman
EA: Lecture 4 21
Proprietary frameworks
• IFW : IBM Information Framework, conceived by
Roger Evernden in 1996
• PEAF : Pragmatic Enterprise Architecture
Framework, part of Pragmatic Family of Frameworks
developed by Kevin Lee Smith, Pragmatic EA, from
2008
• Purdue Enterprise Reference Architecture developed
by Theodore J. Williams at the Purdue University early
1990s.
EA: Lecture 4 22
Proprietary frameworks
• SAP Enterprise Architecture Framework
• SOMF : Service-Oriented Modeling Framework based
on the work of Michael Bell
• SAM : Solution Architecting Mechanism, A coherent
architecture framework consisting of a set of integral
modules.
• Zachman Framework, an architecture framework,
based on the work of John Zachman at IBM in the
1980s
EA: Lecture 4 23
2. The Zachman Framework
• In 1987, John Zachman introduced the first and best-
known enterprise architecture framework (Zachman
1987), although back then it was called ‘Framework
for Information Systems Architecture’.
• The framework as it applies to enterprises is simply
a logical structure for classifying and organizing the
descriptive representations of an enterprise that are
significant to the management of the enterprise as
well as to the development of the enterprise’s
systems.
EA: Lecture 4 24
EA: Lecture 4 25
• The framework in its most simple form depicts the
design artefacts that constitute the intersection
between the roles in the design process: that is,
owner, designer, and builder; and the product
abstractions: that is, what (material) it is made of,
how (process) it works and where (geometry) the
components are relative to one another.
EA: Lecture 4 26
• Empirically, in the older disciplines, some other
‘artefacts’ were observable that were being used for
scoping and for implementation purposes.
• These roles are somewhat arbitrarily labeled planner
and subcontractor and are included in the
framework graphic that is commonly exhibited.
EA: Lecture 4 27
• From the very inception of the framework, some
other product abstractions were known to exist
because it was obvious that in addition to what, how,
and where, a complete description would necessarily
have to include the remaining primitive
interrogatives: who, when and why.
• These three additional interrogatives would be
manifest as three additional columns of models that,
in the case of enterprises, would depict: who does
what work, when do things happen, and why are
various choices made?
EA: Lecture 4 28
• Advantages of the Zachman framework are that it is easy to
understand, it addresses the enterprise as a whole, it is defined
independently of tools or methodologies, and any issues can
be mapped against it to understand where they fit.
• An important drawback is the large number of cells, which is
an obstacle for the practical applicability of the framework.
• Also, the relations between the different cells are not that well
specified.
• Not with standing these drawbacks, Zachman is to be credited
with providing the first comprehensive framework for
enterprise architecture, and his work is still widely used.
EA: Lecture 4 29
EA: Lecture 4 30
EA: Lecture 4 31
The Zachman Framework
The Spewak EA Planning Method (1992)
EA: Lecture 4 32
The EA³ Cube Framework (2004)
provided by Scott A. Bernard
EA: Lecture 4 33
EA: Lecture 4 34
Level EA Components EA Artifacts
Goals and Initiatives x Strategic Plan
x E-Commerce/E-Government Plan
x Strategic Plan (S-1)
x SWOT Analysis (S-2)
x Concept of Operations Scenario (S-3)
x Concept of Operations Diagram (S-4)
x Balanced Scorecard™ (S-5)
Products & Services x Business Services
x Business Products
x IT Capital Planning Portfolio
x Business Plan (B-1)
x Node Connectivity Diagram (B-2)
x Swim Lane Process Diagram (B-3)
x Business Process/Service Model (B-4)
x Business Process/Product Matrix (B-5)
x Use Case Narrative and Diagram (B-7)
x Investment Business Case (B-8)
Data and Information x Knowledge Warehouses
x Information Systems
x Databases
x Knowledge Management Plan (D-1)
x Information Exchange Matrix (D-2)
x Object State-Transition Diagram (D-3)
x Object Event Sequence Diagram (D-4)
x Logical Data Model (D-5)
x Physical Data Model (D-6)
x Activity/Entity (CRUD) Matrix (D-7)
x Data Dictionary/Object Library (D-8)
Level EA Components EA Artifacts
Systems and
Applications
x Software Applications
x Web Services
x Service Bus and Middleware
x Enterprise Resource Planning (ERP ) Solutions
x Operating Systems
x System Interface Diagram (SA-1)
x System Communication Diagram (SA-2)
x System Interface Matrix (SA-3)
x System Data Flow Diagram (SA-4)
x System/Operations Matrix (SA-5)
x Systems Data Exchange Matrix (SA06)
x System Performance Matrix (SA-7)
x System Evolution Diagram (SA-8)
x Web Application Diagram (SA-9)
Network &
Infrastructure
x Data Networks
x Telecommunications Networks
x Video Networks
x Mobile Networks
x Cable and Wireless Backbones
x Security Solutions
x Buildings and Server Rooms
x Equipment
x Network Connectivity Diagram (NI-1)
x Network Inventory (NI-2)
x Capital Equipment Inventory (NI-3)
x Building Blueprints (NI-4)
x Network Center Diagram (NI-5)
x Cable Plant Diagram (NI-6)
x Rack Elevation Diagram (NI-7)
EA: Lecture 4 35
Level EA Components EA Artifacts
Security x Security and Privacy Plan (SP-1)
x Security Solutions Description (SP-2)
x System Accreditation Document (SP-3)
x Continuity Of Operations Plan (SP-4)
x Disaster Recovery Procedures (SP-5)
Standards x Technical Standards Profile (ST-1)
x Technology Forecast (ST-2)
Workforce Skills x Workforce Plan (W-1)
x Organization Chart (W-2)
x Knowledge and Skills Profile (W-3)
EA: Lecture 4 36
EA: Lecture 4 37

EA-Lecture 3 EA Methods and Frameworks.ppt

  • 1.
    Enterprise Architecture EA Methods EAMethods and and Frameworks Frameworks EA: Lecture 3 TOGAF 21 e.g. DATA ENTERPRISE ARCHITECTURE - A FRAMEWORK Builder SCOPE (CONTEXTUAL) MODEL (CONCEPTUAL) ENTERPRISE Designer SYSTEM MODEL (LOGICAL) TECHNOLOGY MODEL (PHYSICAL) DETAILED REPRESEN- TATIONS (OUT-OF- CONTEXT) Sub- Contractor FUNCTIONING ENTERPRISE DATA FUNCTION NETW ORK e.g. Data Definition Ent = Field Reln = Address e.g. Physical Data Model Ent = Segment/Table/etc. Reln = Pointer/Key/etc. e.g. Logical Data Model Ent = Data Entity Reln = Data Relationship e.g. Semantic Model Ent = Business Entity Reln = Business Relationship List of Things Important to the Business ENTITY = Class of Business Thing List of Processes the Business Performs Function = Class of Business Process e.g. Application Architecture I/O = User Views Proc .= Application Function e.g. System Design I/O = Data Elements/Sets Proc.= Computer F unction e.g. Program I/O = Control Block Proc.= Language Stmt e.g. FUNCTION e.g. Business Process Model Proc. = Business Process I/O = Business Resources List of Locations in which the Business Operates Node = Major Business Location e.g. Business Logistics System Node = Business Location Link = Business Linkage e.g. Distributed System Node = I/S Function (Processor, Storage, etc) Link = Line Characteristics e.g. Technology Architecture Node = Hardware/System Software Link = Line Specifications e.g. Network Architecture Node = A ddresses Link = Protocols e.g. NETWORK Architecture Planner Owner Builder ENTERPRISE MODEL (CONCEPTUAL) Designer SYSTEM MODEL (LOGICAL) TECHNOLOGY MODEL (PHYSICAL) DETAILED REPRESEN- TATIONS (OUT- OF CONTEXT) Sub- Contractor FUNCTIONING MOTIVATION TIME PEOPLE e.g. Rule Specification End = Sub-condition Means = Step e.g. Rule Design End = Condition Means = Action e.g., Business Rule Model End = Structural Assertion Means =Action Assertion End = Business Objective Means = Business Strategy List of Business Goals/Strat Ends/Means=Major Bus. Goal/ Critical Success Factor List of Events Significant Time = Major Business Event e.g. Processing Structure Cycle = Processing Cycle Time = System Event e.g. Control Structure Cycle = Component Cycle Time = Execute e.g. Timing Definition Cycle = Machine Cycle Time = Interrupt e.g. SCHEDULE e.g. Master Schedule Time = Business Event Cycle = Business Cycle List of Organizations People = Major Organizations e.g. Work Flow Model People = Organization Unit Work = Work Product e.g. Human Interface People = Role Work = Deliverable e.g. Presentation Architecture People = User Work = Screen Format e.g. Security Architecture People = Identity Work = Job e.g. ORGANIZA T ION Planner Owner to the Business Important to the Business What How Where Who When Why John A. Zachman, Zachman International (810) 231-0531 SCOPE (CONTEXTUAL) Architecture e.g. STRATEGY ENTERPRISE e.g. Business Plan TM
  • 2.
  • 3.
    • Frameworks structurearchitecture description techniques by identifying and relating different architectural viewpoints and the modeling techniques associated with them. • Some frameworks are closely connected to a specific modeling language or set of languages. EA: Lecture 4 3
  • 4.
    • Most architectureframeworks are quite precise in establishing what elements should be part of an enterprise architecture. • To ensure the quality of the enterprise architecture during its life cycle the adoption of a certain framework is not sufficient. EA: Lecture 4 4
  • 5.
    • The relationsbetween the different types of domains, views, or layers of the architecture must remain clear, and any change should be carried through methodically in all of them. • For this purpose, a number of methods are available, which assist architects through all phases of the life cycle of architectures. EA: Lecture 4 5
  • 6.
    1. Enterprise ArchitectureMethods • An architecture method is a structured collection of techniques and process steps for creating and maintaining an enterprise architecture. • Methods typically specify: • the various phases of an architecture’s life cycle, • what deliverables should be produced at each stage, and • how they are verified or tested. • The following methods for architecture development are worth mentioning: EA: Lecture 4 6
  • 7.
    1. Although meantfor software development, the Rational Unified Process (RUP) (Jacobson et al. 1999) is of interest here, as it defines an iterative process, as opposed to the classical waterfall process, that realizes software by adding functionality to the architecture at each increment. An extension towards enterprise IT architecture is given by McGovern et al. (2004) in the form of the Enterprise Unified Process. EA: Lecture 4 7
  • 8.
    2. The UN/CEFACTModeling Methodology (UMM) is an incremental business process and information model construction methodology. The scope is intentionally restricted to business operations, omitting technology-specific aspects. The Business Collaboration Framework (BCF), is a specialization of the UMM aimed at defining an enterprise’s external information exchanges and their underlying business activities. EA: Lecture 4 8
  • 9.
    3. The fourphase/twenty-step methodology to establish an EA program and implement the six EA documentation elements of EA3 Cube Framework provided by Scott A. Bernard . It contains four phases Phase I:EA Program Establishment, Phase II:EA Framework and Tool Selection, Phase III: Documentation of the EA and Phase IV: Use and Maintain the EA EA: Lecture 4 9
  • 10.
    4. The TOGAFArchitecture Development Method (ADM), developed by The Open Group, provides a detailed and well-described phasing for developing an IT architecture. The current version of TOGAF (The Open Group 2011) provides a framework and development method for developing enterprise architectures. EA: Lecture 4 10
  • 11.
    5. The ChiefInformation Officers Council has created The Federal Enterprise Architecture Framework (FEAF) accompanied by a practical and useful manual for developing enterprise architecture for governmental organizations (CIO Council 2004). Other initiatives of the US government include the Federal Enterprise Architecture (FEA) of the Federal Enterprise Architecture Program Management Office (FEAPMO 2004) and the Treasury Architecture Development Process by the Department of the Treasury (US Treasury 2004). EA: Lecture 4 11
  • 12.
    • Various consultingcompanies have developed their own architecture methods and frameworks. • Examples include Sogeti’s DYA, Capgemini’s IAF, IBM’s Enterprise Architecture method, and Microsoft’s Motion. EA: Lecture 4 12
  • 13.
    Types of EAFrameworks • EA frameworks can be categorized into the following types: 1. Consortia-developed frameworks 2. Defense industry frameworks 3. Government frameworks 4. Open-source frameworks 5. Proprietary frameworks EA: Lecture 4 13
  • 14.
    Consortia-developed frameworks • ARCON: A Reference Architecture for Collaborative Networks – not focused on a single enterprise but rather on networks of enterprises • GERAM : Generalized Enterprise Reference Architecture and Methodology • RM-ODP : the Reference Model of Open Distributed Processing • ISO/IEC 10746: defines an enterprise architecture framework for structuring the specifications of open distributed systems. EA: Lecture 4 14
  • 15.
    Consortia-developed frameworks • IDEASGroup :a four-nation effort to develop a common ontology for architecture interoperability • ISO 19439: Framework for enterprise modeling • TOGAF : The Open Group Architecture Framework – a widely used framework including an architectural Development Method and standards for describing various types of architecture. EA: Lecture 4 15
  • 16.
    Defense industry frameworks •AGATE : the France DGAArchitecture Framework • DNDAF : the DND/CF Architecture Framework (CAN) • DoDAF : the US Department of Defense Architecture Framework • MODAF : the UK Ministry of Defence Architecture Framework • NAF : the NATO Architecture Framework EA: Lecture 4 16
  • 17.
    Government frameworks • ESAAF: European Space Agency Architectural Framework, a framework for European space-based Systems of Systems • GEA : Government Enterprise Architecture, common framework legislated for use by departments of the Queensland Government • FDIC Enterprise Architecture Framework • FEAF : Federal Enterprise Architecture Framework, a framework produced in 1999 by the US Federal CIO Council for use within the US Government (not to be confused with the 2002 Federal Enterprise Architecture (FEA) guidance on categorizing and grouping IT investments, issued by the US Federal Office of Management and Budget EA: Lecture 4 17
  • 18.
    Government frameworks • NORA: Nederlandse Overheid Referentie Architectuur , a reference framework from the Dutch Government E-overheid NORA • NIST Enterprise Architecture Model • TEAF : Treasury Enterprise Architecture Framework, a framework for treasury, published by the US Department of Treasuryin July 2000 EA: Lecture 4 18
  • 19.
    Open-source frameworks • MEGAF: is an infrastructure for realizing architecture frameworks that conform to the definition of architecture framework provided in ISO/IEC/IEEE 42010. • Praxeme, an open enterprise methodology, contains an enterprise architecture framework called the Enterprise System Topology (EST) • TRAK : a general systems-oriented framework based on MODAF1.2 and released under GPL/GFDL. • SABSA is an open framework and methodology for Enterprise Security Architecture and Service Management, that is risk based and focuses on integrating security into business and IT management. EA: Lecture 4 19
  • 20.
    Proprietary frameworks • ASSIMPLERFramework – an architecture framework, based on the work of Mandar Vanarse at Wipro in 2002 • AM : Avancier Methods Processes and documentation advice for enterprise and solution architects, supported by training and certification. • BRM : Build-Run-Manage Framework, an architecture framework created by Sanjeev "Sunny" Mishra during his early days at IBM in 2000. • IAF : Capgemini Integrated Arcitecture Framework, from Capgemini company in 1993 EA: Lecture 4 20
  • 21.
    Proprietary frameworks • Dragon1: An open Visual Enterprise Architecture Method recently recognized by The Open Group as Architecture Framework • DYA framework developed by Sogeti since 2004. • Dynamic Enterprise Enterprise architecture concept based on Web 2.0 technology • Extended Enterprise architecture Framework from Institute For Enterprise Architecture Developments in 2003 • EACOE Framework : an Enterprise Architecture framework, as an elaboration of the work of John Zachman EA: Lecture 4 21
  • 22.
    Proprietary frameworks • IFW: IBM Information Framework, conceived by Roger Evernden in 1996 • PEAF : Pragmatic Enterprise Architecture Framework, part of Pragmatic Family of Frameworks developed by Kevin Lee Smith, Pragmatic EA, from 2008 • Purdue Enterprise Reference Architecture developed by Theodore J. Williams at the Purdue University early 1990s. EA: Lecture 4 22
  • 23.
    Proprietary frameworks • SAPEnterprise Architecture Framework • SOMF : Service-Oriented Modeling Framework based on the work of Michael Bell • SAM : Solution Architecting Mechanism, A coherent architecture framework consisting of a set of integral modules. • Zachman Framework, an architecture framework, based on the work of John Zachman at IBM in the 1980s EA: Lecture 4 23
  • 24.
    2. The ZachmanFramework • In 1987, John Zachman introduced the first and best- known enterprise architecture framework (Zachman 1987), although back then it was called ‘Framework for Information Systems Architecture’. • The framework as it applies to enterprises is simply a logical structure for classifying and organizing the descriptive representations of an enterprise that are significant to the management of the enterprise as well as to the development of the enterprise’s systems. EA: Lecture 4 24
  • 25.
  • 26.
    • The frameworkin its most simple form depicts the design artefacts that constitute the intersection between the roles in the design process: that is, owner, designer, and builder; and the product abstractions: that is, what (material) it is made of, how (process) it works and where (geometry) the components are relative to one another. EA: Lecture 4 26
  • 27.
    • Empirically, inthe older disciplines, some other ‘artefacts’ were observable that were being used for scoping and for implementation purposes. • These roles are somewhat arbitrarily labeled planner and subcontractor and are included in the framework graphic that is commonly exhibited. EA: Lecture 4 27
  • 28.
    • From thevery inception of the framework, some other product abstractions were known to exist because it was obvious that in addition to what, how, and where, a complete description would necessarily have to include the remaining primitive interrogatives: who, when and why. • These three additional interrogatives would be manifest as three additional columns of models that, in the case of enterprises, would depict: who does what work, when do things happen, and why are various choices made? EA: Lecture 4 28
  • 29.
    • Advantages ofthe Zachman framework are that it is easy to understand, it addresses the enterprise as a whole, it is defined independently of tools or methodologies, and any issues can be mapped against it to understand where they fit. • An important drawback is the large number of cells, which is an obstacle for the practical applicability of the framework. • Also, the relations between the different cells are not that well specified. • Not with standing these drawbacks, Zachman is to be credited with providing the first comprehensive framework for enterprise architecture, and his work is still widely used. EA: Lecture 4 29
  • 30.
  • 31.
    EA: Lecture 431 The Zachman Framework
  • 32.
    The Spewak EAPlanning Method (1992) EA: Lecture 4 32
  • 33.
    The EA³ CubeFramework (2004) provided by Scott A. Bernard EA: Lecture 4 33
  • 34.
    EA: Lecture 434 Level EA Components EA Artifacts Goals and Initiatives x Strategic Plan x E-Commerce/E-Government Plan x Strategic Plan (S-1) x SWOT Analysis (S-2) x Concept of Operations Scenario (S-3) x Concept of Operations Diagram (S-4) x Balanced Scorecard™ (S-5) Products & Services x Business Services x Business Products x IT Capital Planning Portfolio x Business Plan (B-1) x Node Connectivity Diagram (B-2) x Swim Lane Process Diagram (B-3) x Business Process/Service Model (B-4) x Business Process/Product Matrix (B-5) x Use Case Narrative and Diagram (B-7) x Investment Business Case (B-8) Data and Information x Knowledge Warehouses x Information Systems x Databases x Knowledge Management Plan (D-1) x Information Exchange Matrix (D-2) x Object State-Transition Diagram (D-3) x Object Event Sequence Diagram (D-4) x Logical Data Model (D-5) x Physical Data Model (D-6) x Activity/Entity (CRUD) Matrix (D-7) x Data Dictionary/Object Library (D-8)
  • 35.
    Level EA ComponentsEA Artifacts Systems and Applications x Software Applications x Web Services x Service Bus and Middleware x Enterprise Resource Planning (ERP ) Solutions x Operating Systems x System Interface Diagram (SA-1) x System Communication Diagram (SA-2) x System Interface Matrix (SA-3) x System Data Flow Diagram (SA-4) x System/Operations Matrix (SA-5) x Systems Data Exchange Matrix (SA06) x System Performance Matrix (SA-7) x System Evolution Diagram (SA-8) x Web Application Diagram (SA-9) Network & Infrastructure x Data Networks x Telecommunications Networks x Video Networks x Mobile Networks x Cable and Wireless Backbones x Security Solutions x Buildings and Server Rooms x Equipment x Network Connectivity Diagram (NI-1) x Network Inventory (NI-2) x Capital Equipment Inventory (NI-3) x Building Blueprints (NI-4) x Network Center Diagram (NI-5) x Cable Plant Diagram (NI-6) x Rack Elevation Diagram (NI-7) EA: Lecture 4 35
  • 36.
    Level EA ComponentsEA Artifacts Security x Security and Privacy Plan (SP-1) x Security Solutions Description (SP-2) x System Accreditation Document (SP-3) x Continuity Of Operations Plan (SP-4) x Disaster Recovery Procedures (SP-5) Standards x Technical Standards Profile (ST-1) x Technology Forecast (ST-2) Workforce Skills x Workforce Plan (W-1) x Organization Chart (W-2) x Knowledge and Skills Profile (W-3) EA: Lecture 4 36
  • 37.

Editor's Notes

  • #9 Enterprise Architecture The Implementation Methodology EA methodology •This chapter describes the EA implementation methodology (EA methodology), • methodology is the first step in coordinating the EA documentation approach, • The value of adopting an EA methodology is that it reduces the risk of creating an ineffective EA program and/or inaccurate EA documentation. ####### •overview of the six basic elements of EA ####### documentation that were presented in ####### Chapter 1 EA analysis and design are accomplished ####### through the following six basic elements: (1) an EA documentation framework, (2) an implementation methodology that ####### support the creation of (3) current (4) future views of the architecture, as well as ####### the development of (5) an EA Management Plan to manage the ####### enterprise’s transition from current to future ####### architectures. (6)There are also several areas common to all ####### levels of the framework that are referred to as ####### “threads” EA methodology This Chapter builds on the basic elements by establishing a four phase/twenty-step methodology to establish an EA program and implement the six EA documentation elements. Step 2: Establish an EA implementation methodology, (stat-up), Step 3: Establish EA governance and links to other management processes, (start-up), Step 4: Develop an EA Communication Plan to gain stakeholder buy-in, (ongoing). Phase II: EA Framework and Tool Selection An EA artifact is a documentation product, such as a text document, system specification, application interface information, diagram, spreadsheet, briefing slides, and/or video clip, Step 5: Select an EA documentation framework, Step 6: Identify EA Lines of Business/Crosscuts and the order of their documentation, Step 7: Identify the EA components to be documented framework-wide, Step 8: Select documentation methods appropriate for the framework, Strategic Level: Strategic Plan, Scenarios, Balanced Scorecard Business Level: IDEF-0 Diagrams, Flowcharts, Swim Lane Charts Information Level: Data Models, Object Diagrams, Data Dictionary Services Level: System Diagrams, Web Service Models, APIs Technology Level: Voice/Data/Video Network Diagrams/Documents Phase III: Documentation of the EA Step 11: Evaluate existing business and technology documentation for use in the EA, Step 12: Document current views of existing EA components in all framework areas (levels/threads). Store artifacts in the on-line repository, Step 13: Develop several future business/technology operating scenarios, Step 14: Identify future planning assumptions for each future scenario, Step 15: Use the scenarios and other program/staff input to drive the documentation of future EA components in all framework areas. Store artifacts in the on-line EA repository, Step 16: Develop an EA Management Plan to sequence planned changes in the EA.