Duffy Pad Leak


• SUBJECT:
  Duffy Pad Leak

• PROJECT LEADER:
  Ray Peterson




                    Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                        Quality Control Pillar Board Sterling Heights Assembly
Duffy Pad Leak

                                    Sketch of Defect

                                                                              Flash on Inner
                                                                              Rubber Seal




                 Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                     Quality Control Pillar Board Sterling Heights Assembly
Sketch of Phenomenon




                                                                 Body of Vehicle



                                          Water Leak




                      Excess Flash
                                                                  Gaps Formed
                                                                  from Excess
                                                                     Flash

Quality Control Pillar Board / Sterling Heights Assembly Plant
Data Stratification
 Date     VIN        Problem      Shift found on Water Test Shift problem occurred at on line   11-May   275130    Seated Leak    1   1
 6-Feb   204585   Unseated Leak                1                          N/A                   11-May   277287    Seated Leak    2   2
15-Feb   215413   Unseated Leak                1                          N/A                   11-May   279529    Seated Leak    2   2
25-Feb   221174    Seated Leak                 1                          N/A                   11-May   281480   Unseated Leak   1   2
28-Feb   214748   Unseated Leak                2                          N/A                   11-May   293446    Seated Leak    1   1
 1-Mar   218550    Seated Leak                 1                          N/A                   12-May   279582    Seated Leak    1   1
                                                                                                12-May   289903    Seated Leak    2   1
15-Mar   241553    Seated Leak                 1                          N/A
                                                                                                14-May   282515   Unseated Leak   1   1
19-Mar   242618   Unseated Leak                1                          N/A
                                                                                                14-May   290053    Seated Leak    2   1
20-Mar   238371    Seated Leak                 2                           1
                                                                                                14-May   290892    Seated Leak    2   1
21-Mar   237130   Unseated Leak                2                           1
                                                                                                15-May   284691    Seated Leak    2   1
 5-Apr   251626    Seated Leak                 1                           2                    15-May   297116    Seated Leak    2   1
11-Apr   251126    Seated Leak                 1                           2                    16-May   273110    Seated Leak    2   1
11-Apr   261269    Seated Leak                 1                           1                    16-May   293721    Seated Leak    2   2
12-Apr   237694    Seated Leak                 1                           1                    16-May   297710    Seated Leak    2   1
12-Apr   257161    Seated Leak                 1                           1                    17-May   278894    Seated Leak    2   1
17-Apr   261609   Unseated Leak                1                           1                    17-May   287157   Unseated Leak   1   2
18-Apr   249868   Unseated Leak                2                           1                    17-May   293761    Seated Leak    1   1
20-Apr   274760   Unseated Leak                2                           1                    18-May   293161    Seated Leak    2   1
21-Apr   259582   Unseated Leak                1                           1                    19-May   292517    Seated Leak    2   1
23-Apr   263538    Seated Leak                 1                           2                    19-May   292729    Seated Leak    2   1
25-Apr   262774    Seated Leak                 1                           2                    19-May   297858    Seated Leak    2   2
26-Apr   260977    Seated Leak                 1                           1                    19-May   304397    Seated Leak    2   1
                                                                                                22-May   287393    Seated Leak    2   1
26-Apr   260993   Unseated Leak                1                           2
                                                                                                23-May   293359    Seated Leak    1   2
28-Apr   253956   Unseated Leak                1                           2
                                                                                                24-May   279945    Seated Leak    2   2
28-Apr   262839   Unseated Leak                2                           1
                                                                                                25-May   279921    Seated Leak    1   2
28-Apr   263713   Unseated Leak                1                           2
                                                                                                25-May   284467   Unseated Leak   1   1
28-Apr   267418   Unseated Leak                2                           1                    30-May   263455    Seated Leak    1   1
28-Apr   269070   Unseated Leak                1                           2                    30-May   284284    Seated Leak    1   1
30-Apr   270864   Unseated Leak                1                           1                    31-May   291624    Seated Leak    1   1
 1-May   252326   Unseated Leak                2                           2                    31-May   292691    Seated Leak    1   1
 1-May   253677    Seated Leak                 1                           1                     1-Jun   284861    Seated Leak    1   1
 1-May   261951   Unseated Leak                2                           1                     1-Jun   289076    Seated Leak    1   2
 1-May   262417   Unseated Leak                1                           1                     2-Jun   300447    Seated Leak    2   2
 1-May   266749    Seated Leak                 1                           1                     4-Jun   268538    Seated Leak    1   2
 1-May   271004    Seated Leak                 1                           2                     4-Jun   320724    Seated Leak    1   2
 1-May   277688   Unseated Leak                2                           1                     4-Jun   330254    Seated Leak    2   1
 2-May   267335   Unseated Leak                1                           1                     5-Jun   284773    Seated Leak    1   1
 3-May   265359    Seated Leak                 1                           2                     5-Jun   284892    Seated Leak    1   1
 3-May   269107   Unseated Leak                1                           2                     5-Jun   291247    Seated Leak    2   2
                                                                                                 5-Jun   307234    Seated Leak    1   2
 3-May   275927   Unseated Leak                1                           2
                                                                                                 6-Jun   279885   Unseated Leak   1   2
 4-May   277617   Unseated Leak                1                           1
                                                                                                 6-Jun   311731    Seated Leak    1   1
 4-May   283373   Unseated Leak                2                           2
                                                                                                 6-Jun   323731    Seated Leak    1   1
 7-May   262201   Unseated Leak                2                           1                     7-Jun   309835    Seated Leak    1   2
 7-May   276018   Unseated Leak                1                           2                     7-Jun   325649    Seated Leak    1   2
10-May   278720    Seated Leak                 2                           2                     8-Jun   295732    Seated Leak    1   1
10-May   281449    Seated Leak                 1                           2                     8-Jun   320870    Seated Leak    2   2
10-May   284545    Seated Leak                 2                           2                     8-Jun   325649    Seated Leak    1   2
10-May   289660    Seated Leak                 1                           1                     8-Jun   330364    Seated Leak    1   1
10-May   289722    Seated Leak                 2                           2                    14-Jun   313802    Seated Leak    2   1
10-May   293499    Seated Leak                 2                           1                    14-Jun   330998    Seated Leak    1   2

                                                        Quality Control Pillar Board / Sterling Heights Assembly Plant
Quality Control Pillar Board / Sterling Heights Assembly Plant
Normalized Data of Defective Duffy Pads
                     1.10



                                                                                                       1.08
                     1.05
                            1.05

                     1.00
C/1000 Occurrences




                     0.95




                     0.90

                                                                         0.91

                     0.85




                     0.80
                             JSC41                                         JSD41                        JS27




                                      Quality Control Pillar Board / Sterling Heights Assembly Plant
Total number of Duffy Pad Leaks by Shift (3/18-6/18)
                       60

                       50

                                                    57
Number of Occurances




                       40                           50
                       30                                                                                                            39
                                                                                                                                      39
                       20

                       10

                        0
                                                   1st Shift                                                                         2nd Shift


                            Seated Duffy Pad Leaks by Shift                                               Unseated Duffy Pad Leaks by Shift
                                     (3/18-6/18)                                                                    (3/18-6/18)
                                      1st shift   2nd shift                                                                    1st Shift    2nd Shift




                                                                                                                               38%
                                     47%
                                                    53%
                                                                                                                                                 62%




                                                              Quality Control Pillar Board / Sterling Heights Assembly Plant
Seated Leaks vs. Unseated Leaks (3/18-6/18)
                        40



                        35



                        30
Number of Occurrences




                        25



                        20
                                                                                                                     Seated Leak
                                                                                                                     Unseated Leak
                        15



                        10



                         5



                         0
                             February     March                    April                     May              June

                                                                  Month



                                             Quality Control Pillar Board / Sterling Heights Assembly Plant
Duffy Pad Leak
``
Line
Machine
Date
                                                                          5W,1H Analysis Sheet
            6/5/2012


Initial Phenomenon:

Duffy pads are experiencing a water leak

           * What does the phenomena look like? What product,
What       machine, material w as being used? What size?                  Water leak on duffy pad through BIW opening located under IP.

           * Whe n did the phenomena occur? When in the sequence
                                                                          The phenomena is discovered during water testing. The phenomena
When       of operation; startup, continuous running, intermittent
           problem, shutdow n, changeover?                                occurred during continuous running.

           * Whe re did you see the phenomena? Where on the
Where      equipment or material did you see the phenomena?               The phenomena has been spotted on the JSC41, JSD41, and the J27.


           * Who does it ef f ect? Everyone? Or is it less of a problem   The phenomenon effects the quality team, SQA, chassis UL, chassis
Who        f or some individuals or teams? (If so, w hat inf o can they
           of f er?) Is it skill related?                                 TL and chassis assembly.

           * Which trend or pattern does the phenomena have? E.g.
           Is the phenomena more f requent on Monday mornings?             The condition is random in nature and affects both shifts. Roughly
Which      Af ter a change-over? Or is it random in nature? Which
           direction does the phenomena happen in? (Note: Not many        fifty-six percent of total defects take place on the first shift.
           phenomena are truly random!)



                                                                          Optimally there should be no water leak on the duffy pad. The rate
           * How is the state of the equipment changed f rom the
How        optimal? How many times does the problem occur?                of apperance of the phenomena has steadly increased since
                                                                          February 2012.

Revised Phenomenon
Water leak on duffy pad through BIW opening located under IP. The phenomena is discovered during water
testing. The phenomena occurred during continuous running. The phenomena has been spotted on the JSC41,
JSD41, and the J27. The phenomenon effects the quality team, SQA, chassis UL, chassis TL and chassis assembly.
The condition is random in nature and affects both shifts. Roughly fifty-six percent of total defects take place on
the first shift. Optimally there should be no water leak on the duffy pad. The rate of apperance of the phenomena
has steadly increased since February 2012.


                                             Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                                                 Quality Control Pillar Board Sterling Heights Assembly
Duffy Pad Leak

    Revised 4M
                                   Material                                              Man
               Duffy Pad


                                                                                                                  Operator following SWI     OK
    OK    Inner Component                     BIW Hole not to Spec

            OK             Clips


           OK      Rivets                                                                                                 Operator Using Wrong Tool   OK

         NOK      Inner seal                        Paint Sealant covers BIW hole
1
                                                                                                                          Operator Trained




                                                  Non-robust Design



                                                                                                                                                      Seated Duffy Pads
                                                                                                                                                       are Leaking. See
                                                                                                                                                        5W1H for more
                                                                                                                                                            detail.




                                                                                                                  SWI Correct



                                                                                                                  Clear and Understandable   OK
                                                                                                                  Provides Detail   OK



                                                                                                 Improper method of handling material



                                   Machine                                          Method




                                              Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                                                  Quality Control Pillar Board Sterling Heights Assembly
Duffy Pad Leak
                                                                    4 M Investigation Sheet
                                                                  DETAILED ACTIVITIES ON 4M-ANALYSIS
              Description                                    Activity                                                Data                                  Who          Target    Status
            MATERIAL
                                         Checked 50 vehicles/day for two weeks
Is the inside edge of the body where                                                    No signs of jagged edges found after checking a sample
                                         looking for inconsistancies on the inside                                                                      R. Peterson    June 1st    OK
the duffy pad sits flush?                                                               size of 500 vehicles
                                         edge
                                         Checked 50 vehicles/day for two weeks
Is the outside edge of the body where                                                   No signs of jagged edges found after checking a sample
                                         looking for inconsistancies on the outside                                                                     R. Peterson    June 1st    OK
the duffy pad sits flush?                                                               size of 500 vehicles
                                         edge
                                         Compared defective duffy pads against ones     Clips were shown to be resilient regardless if defective or
Are the clips loose on the duffy pad?                                                                                                                   R. Peterson    June 5th    OK
                                         which were shown to be acceptable              not
Are the clips damaged on the duffy       Compared defective duffy pads against ones     Clips were shown to have similar dimensions regardless if
                                                                                                                                                        R. Peterson    June 5th    OK
pad?                                     which were shown to be acceptable              defective or not
Are the duffy pads out of position after
                                         Checked 50 vehicles for unseated duffy pads Duffy pads are correctly seated                                    R. Peterson    June 6th    OK
install?
                                                                                        Slight pressure easily unseats duffy pad regardless if
Are the duffy pads a non-robust          Checked duffy pads after install for any signs
                                                                                        defective or not. However, this issue is not causing the leak   R. Peterson    June 6th    OK
design?                                  of weakness
                                                                                        in the duffy pads
Has the design of the inner
                                         Examined 50 fresh stock along with 10 failed Fresh stock duffy pads were shown to be similar to ones
component of the duffy pad been                                                                                                                         R. Peterson    June 6th    OK
                                         duffy pads                                     which were compromised
compromised?
Are the rivits found on the duffy pads Checked defectve duffy pads along with fresh Rivets on both defective and acceptable duffy pads were
                                                                                                                                                        R. Peterson    June 6th    OK
defective in any way?                    stock                                          shown to be structurally intact
                                                                                        Seal on defective duffy pads differs from those which are
Are the duffy pads that are shipped      Compared defective duffy pads against ones
from the supplier free of defects?       which were shown to be acceptable
                                                                                        acceptable. Defect is approx. 2mm thick, 8mm long, and          R. Peterson    June 7th   NOK      1
                                                                                        10mm left of the longest clip
                 MAN
Are operators following SWI for duffy    Observe operator's installing duffy pads on
                                                                                        Operator performed install per SWI                              R. Peterson.   May 29th    OK
pad install?                             20 vehicles for consistency.
Are operators using the wrong tool to    Observe operator's installing duffy pads on
                                                                                        Operator performed install per SWI                              R. Peterson.   May 29th    OK
perform install?                         20 vehicles for consistency.

             METHOD
Is SWI clear and understandable?         Review duffy pad install SWI                   SWI is clear to understand and is written correctly             R. Peterson    May 30th    OK
Does the SWI provide detail on the
                                         Review duffy pad install SWI                   SWI provides in-depth detail on procedure                       R. Peterson    May 30th    OK
job?
             MACHINE
N/A




                                                            Quality Control Pillar Board / Sterling Heights Assembly Plant
5-WHY
Effect                 Potential Causes                                                             Corrective Action
Duffy Pad Water Leak      1-WHY           2-WHY            3-WHY           4-WHY        5-WHY               Description         WHO          WHEN




                        Duffy pad is
                                        Excess flash     Inner seal is Lifter located                PIC containment of
                       not fully seated
                           against
                                        on inner seal   defective from at supplier is     PIC       excess flash on inner
                                                                                                                             R. Peterson,
                                                                                                                              E. Lantto,
                                                                                                                                            6/10/2012   1A
                                        of Duffy pad       supplier      damaged                     sealant of duffy pad
                       vehicle's body

                                              1



                                                                                                    OPL created to make

                                                                                         OPL
                                                                                                     operators aware of
                                                                                                    excess flash located
                                                                                                                             R. Peterson,
                                                                                                                                            6/12/2012
                                                                                                                                                        1B
                                                                                                                             G. Marquardt
                                                                                                     on inner seal. OPL
                                                                                                     implemented by TL




                                                                                                    Worked with SQA to       R. Peterson,
                                                                                         SQA
                                                                                                    achieve a clean point     A. Hadorn,
                                                                                                                                            6/22/2012   1C
                                                                                                    on all duffy pad stock     B. Bush,
                                                                                                           incoming          A. Del Real




                                           Quality Control Pillar Board / Sterling Heights Assembly Plant
Duffy Pad Leak

"QC" Pillar - Kaizen Journal of Activities
???? SK   Duffy Pad Leak
  #       Activity                                                            Who                Target      Status              Note

   1      Complete Data Collection                                     R. Peterson, J. Nava     6/18/12


  2       Complete 5W1H and 4M                                             R. Peterson          6/06/12


  3       Complete 5-why                                                   R. Peterson          6/12/12


  4       Review SWI                                                       R. Peterson          6/07/12


          Contacted supplier about excess flesh located               E. Lantto, B. Bush, A.
  5                                                                                             6/08/12
          on inner seal of duffy pad                                         Hadorn

          Add OPL at Chassis install for excess flash on
  7                                                                        R. Peterson          6/12/12
          duffy pad
                                                                                                                      Clean point has been labeled
                                                                        E. Lantto, B. Bush,                           as such since 6/7/12 by US
  8       Clean point achieved by supplier                                                      6/22/12                 Farathane. However as of
                                                                            A. Hadorn                                  6/18/12 clean point has not
                                                                                                                             been achieved.




                                      Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                                          Quality Control Pillar Board Sterling Heights Assembly
Sketch of Solution
                                                                                   After Solution
Before Solution
                                               Flash on Inner
                                                Rubber Seal




                                                                                            No Flash




                  Quality Control Pillar Board / Sterling Heights Assembly Plant
Long Clip: Defect
located 10mm left
of edge




                    Quality Control Pillar Board / Sterling Heights Assembly Plant
Duffy Pad Leaks Found Since Start of Project (5/25-6/18)
                       5
                           1

                       4
Number of Occurances




                       3
                                                                                                           1B


                       2




                       1


                                                                         1A

                       0                                                                                        Series1, 0




                                          Quality Control Pillar Board / Sterling Heights Assembly Plant
1B                                                        ONE POINT LESSON (OPL)
                                                                      Basic Knowledge         Improvement            X    Problem Awareness


      SHAP              Dept: Chassis (9170)    Zone #1    Team # 5           Station 1221     Col H20          Completed by: R. Peterson     Doc #   WCM2012-0612


                         WHAT: Duffy Pad Install (Decking Cell)                                                          Model: JS                      6/12/2012


                                                                                                                        HOW                           WHY
                                                                                                                Before install                If the duffy pad
                                                                                                            d
                                                                                                                check inner seal              has flash on the
                                                                                                                of duffy pad to                 inner seal, it
                                                                                                                make sure that no                will not seat
                                                                                                                excess flash is                    properly.
                                                                                                                present. T he flash
                                                                                                                is located 10mm
                                                                                                                to the left of the
                                                                                                                long clip




     Date of Training

         Trainer
                                                                                                                                                         WCM009-0
          Pupil




                                               Quality Control Pillar Board / Sterling Heights Assembly Plant
Duffy Pad Leak
                                                                  5 Questions for Zero Defects
                                                                                 ANSWER                                                                              SCORE
#             QUESTION                              1                               3                                    5                 PHASE 0   PHASE 1   PHASE 2   PHASE 3   PHASE 4

    Are the material quality
1                                  A list of characteristics exists   The check method exists            It's easy to check                  1         5
    characteristics clear?


    Exist the incoming material    There is no standard, but some Standard of control exists      Effective and efficient control
2                                                                                                                                            1         3
    control standard?              occasional checks exist        (incoming material inspection ) (error/mistake proofing,etc.)


                                   Cpk is too low, and there are
    The supplier capability is                                        1<Cp<1.33, and there are           Cpk>1.33, and there are no
3                                  many problems with the                                                                                    1         3
    sufficient                                                        sporadic problems                  problems
                                   supplier

                                   The part is in Stages 1-4 of the 8 The part is in Stages 5-7 of the 8 The part is in Stage 8 of the 8
    Which stage of QC incoming
4                                  Stages of Incoming Material        Stages of Incoming Material        Stages of Incoming Material         1         1
    material it's guarantied
                                   Control                            Control                            Control


                                                                      Standard countermeasures are A robust process exists and can
    Is it easy to restore a correct No, the incoming material must
5                                                                  applied to compensate           compensate for material                   3         3
    material characteristic?        be scrapped
                                                                      (process adjustment, etc.)   anomalies

                                                                                                                     TOTAL                  28%       60%       0%         0%       0%




                                                              Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                                                                  Quality Control Pillar Board Sterling Heights Assembly
Duffy Pad Leak

                     Initial Benefit/Cost Analysis
Cost includes team root cause                                                              B/C = 7.22
analysis        $1,283.28
Benefit includes annualized
repair/re-process cost
avoidance, and over-manning
elimination
               $9,269.64

                                           Initial Benefit / Cost Analysis
        Repair             18/month=>216/year           Root Cause Analysis Hours           Peterson               30
   Hours Repair/Year               216                                                   Ken (Water Test)          9
   Hourly Cost Repair            $37.96                                                       Heavy                9
                                $8,199.36                                                                          48

Cost of Replacement Part         $4.96                                                  Hourly Rate Intern       $20.00
 Replacement Parts/yr          $1,070.28                                               Hourly Rate for Repair    $37.96
                                                                                       Total Manpower Cost      $1,283.28
     Total Benefit             $9,269.64
      Total Cost               $1,283.28
      B/C Ratio                   7.22


                           Quality Control Pillar Board / Sterling Heights Assembly Plant Plant
                               Quality Control Pillar Board Sterling Heights Assembly

More Related Content

Recently uploaded

LinkedIn for Your Job Search June 17, 2024
LinkedIn for Your Job Search June  17, 2024LinkedIn for Your Job Search June  17, 2024
LinkedIn for Your Job Search June 17, 2024
Bruce Bennett
 
0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf
Thomas GIRARD BDes
 
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
nguqayx
 
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
waldorfnorma258
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
Bruce Bennett
 
一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理
一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理
一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理
aweuwyo
 
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
balliuvilla512
 
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
uhynup
 
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
yhkox
 
5 key differences between Hard skill and Soft skills
5 key differences between Hard skill and Soft skills5 key differences between Hard skill and Soft skills
5 key differences between Hard skill and Soft skills
RuchiRathor2
 
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
concepsionchomo153
 
欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】
欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】
欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】
karimimorine448
 
0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf
Thomas GIRARD BDes
 
Parabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position FeedbackParabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position Feedback
StevenPatrick17
 
22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.
Manu Mitra
 
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
zukou
 
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
ahmedendrise81
 
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
lemike859
 
欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】
欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】
欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】
mukeshomran942
 
Untitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohkUntitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohk
Excellence Tecnology
 

Recently uploaded (20)

LinkedIn for Your Job Search June 17, 2024
LinkedIn for Your Job Search June  17, 2024LinkedIn for Your Job Search June  17, 2024
LinkedIn for Your Job Search June 17, 2024
 
0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf0624.CV_studentscholarandacademic-02.pdf
0624.CV_studentscholarandacademic-02.pdf
 
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
 
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
 
一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理
一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理
一比一原版(uwm毕业证书)美国威斯康星大学密尔沃基分校毕业证如何办理
 
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
美洲杯投注-美洲杯投注比分-美洲杯投注比分投注|【​网址​🎉ac44.net🎉​】
 
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
一比一原版(dmu毕业证书)英国德蒙福特大学毕业证如何办理
 
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
 
5 key differences between Hard skill and Soft skills
5 key differences between Hard skill and Soft skills5 key differences between Hard skill and Soft skills
5 key differences between Hard skill and Soft skills
 
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
 
欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】
欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】
欧洲杯外围-欧洲杯外围赛程-欧洲杯外围压注|【​网址​🎉ac99.net🎉​】
 
0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf0624.CV_studentscholarandacademic-01.pdf
0624.CV_studentscholarandacademic-01.pdf
 
Parabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position FeedbackParabolic antenna alignment system with Real-Time Angle Position Feedback
Parabolic antenna alignment system with Real-Time Angle Position Feedback
 
22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.22. Certificate of Appreciation Deepika.
22. Certificate of Appreciation Deepika.
 
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
一比一原版(kcl毕业证书)英国金斯顿大学毕业证如何办理
 
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
欧洲杯买球-欧洲杯买球买球推荐-欧洲杯买球买球推荐网站|【​网址​🎉ac10.net🎉​】
 
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩体育投注-欧洲杯足彩投注网站|【​网址​🎉ac99.net🎉​】
 
欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】
欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】
欧洲杯投注-欧洲杯投注投注官方网站-欧洲杯投注买球投注官网|【​网址​🎉ac99.net🎉​】
 
Untitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohkUntitled presentation.pptx jklyvtguhiohk
Untitled presentation.pptx jklyvtguhiohk
 

Featured

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
GetSmarter
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
Alireza Esmikhani
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Project for Public Spaces & National Center for Biking and Walking
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
Erica Santiago
 

Featured (20)

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 

Duffy pad project

  • 1. Duffy Pad Leak • SUBJECT: Duffy Pad Leak • PROJECT LEADER: Ray Peterson Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly
  • 2. Duffy Pad Leak Sketch of Defect Flash on Inner Rubber Seal Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly
  • 3. Sketch of Phenomenon Body of Vehicle Water Leak Excess Flash Gaps Formed from Excess Flash Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 4. Data Stratification Date VIN Problem Shift found on Water Test Shift problem occurred at on line 11-May 275130 Seated Leak 1 1 6-Feb 204585 Unseated Leak 1 N/A 11-May 277287 Seated Leak 2 2 15-Feb 215413 Unseated Leak 1 N/A 11-May 279529 Seated Leak 2 2 25-Feb 221174 Seated Leak 1 N/A 11-May 281480 Unseated Leak 1 2 28-Feb 214748 Unseated Leak 2 N/A 11-May 293446 Seated Leak 1 1 1-Mar 218550 Seated Leak 1 N/A 12-May 279582 Seated Leak 1 1 12-May 289903 Seated Leak 2 1 15-Mar 241553 Seated Leak 1 N/A 14-May 282515 Unseated Leak 1 1 19-Mar 242618 Unseated Leak 1 N/A 14-May 290053 Seated Leak 2 1 20-Mar 238371 Seated Leak 2 1 14-May 290892 Seated Leak 2 1 21-Mar 237130 Unseated Leak 2 1 15-May 284691 Seated Leak 2 1 5-Apr 251626 Seated Leak 1 2 15-May 297116 Seated Leak 2 1 11-Apr 251126 Seated Leak 1 2 16-May 273110 Seated Leak 2 1 11-Apr 261269 Seated Leak 1 1 16-May 293721 Seated Leak 2 2 12-Apr 237694 Seated Leak 1 1 16-May 297710 Seated Leak 2 1 12-Apr 257161 Seated Leak 1 1 17-May 278894 Seated Leak 2 1 17-Apr 261609 Unseated Leak 1 1 17-May 287157 Unseated Leak 1 2 18-Apr 249868 Unseated Leak 2 1 17-May 293761 Seated Leak 1 1 20-Apr 274760 Unseated Leak 2 1 18-May 293161 Seated Leak 2 1 21-Apr 259582 Unseated Leak 1 1 19-May 292517 Seated Leak 2 1 23-Apr 263538 Seated Leak 1 2 19-May 292729 Seated Leak 2 1 25-Apr 262774 Seated Leak 1 2 19-May 297858 Seated Leak 2 2 26-Apr 260977 Seated Leak 1 1 19-May 304397 Seated Leak 2 1 22-May 287393 Seated Leak 2 1 26-Apr 260993 Unseated Leak 1 2 23-May 293359 Seated Leak 1 2 28-Apr 253956 Unseated Leak 1 2 24-May 279945 Seated Leak 2 2 28-Apr 262839 Unseated Leak 2 1 25-May 279921 Seated Leak 1 2 28-Apr 263713 Unseated Leak 1 2 25-May 284467 Unseated Leak 1 1 28-Apr 267418 Unseated Leak 2 1 30-May 263455 Seated Leak 1 1 28-Apr 269070 Unseated Leak 1 2 30-May 284284 Seated Leak 1 1 30-Apr 270864 Unseated Leak 1 1 31-May 291624 Seated Leak 1 1 1-May 252326 Unseated Leak 2 2 31-May 292691 Seated Leak 1 1 1-May 253677 Seated Leak 1 1 1-Jun 284861 Seated Leak 1 1 1-May 261951 Unseated Leak 2 1 1-Jun 289076 Seated Leak 1 2 1-May 262417 Unseated Leak 1 1 2-Jun 300447 Seated Leak 2 2 1-May 266749 Seated Leak 1 1 4-Jun 268538 Seated Leak 1 2 1-May 271004 Seated Leak 1 2 4-Jun 320724 Seated Leak 1 2 1-May 277688 Unseated Leak 2 1 4-Jun 330254 Seated Leak 2 1 2-May 267335 Unseated Leak 1 1 5-Jun 284773 Seated Leak 1 1 3-May 265359 Seated Leak 1 2 5-Jun 284892 Seated Leak 1 1 3-May 269107 Unseated Leak 1 2 5-Jun 291247 Seated Leak 2 2 5-Jun 307234 Seated Leak 1 2 3-May 275927 Unseated Leak 1 2 6-Jun 279885 Unseated Leak 1 2 4-May 277617 Unseated Leak 1 1 6-Jun 311731 Seated Leak 1 1 4-May 283373 Unseated Leak 2 2 6-Jun 323731 Seated Leak 1 1 7-May 262201 Unseated Leak 2 1 7-Jun 309835 Seated Leak 1 2 7-May 276018 Unseated Leak 1 2 7-Jun 325649 Seated Leak 1 2 10-May 278720 Seated Leak 2 2 8-Jun 295732 Seated Leak 1 1 10-May 281449 Seated Leak 1 2 8-Jun 320870 Seated Leak 2 2 10-May 284545 Seated Leak 2 2 8-Jun 325649 Seated Leak 1 2 10-May 289660 Seated Leak 1 1 8-Jun 330364 Seated Leak 1 1 10-May 289722 Seated Leak 2 2 14-Jun 313802 Seated Leak 2 1 10-May 293499 Seated Leak 2 1 14-Jun 330998 Seated Leak 1 2 Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 5. Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 6. Normalized Data of Defective Duffy Pads 1.10 1.08 1.05 1.05 1.00 C/1000 Occurrences 0.95 0.90 0.91 0.85 0.80 JSC41 JSD41 JS27 Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 7. Total number of Duffy Pad Leaks by Shift (3/18-6/18) 60 50 57 Number of Occurances 40 50 30 39 39 20 10 0 1st Shift 2nd Shift Seated Duffy Pad Leaks by Shift Unseated Duffy Pad Leaks by Shift (3/18-6/18) (3/18-6/18) 1st shift 2nd shift 1st Shift 2nd Shift 38% 47% 53% 62% Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 8. Seated Leaks vs. Unseated Leaks (3/18-6/18) 40 35 30 Number of Occurrences 25 20 Seated Leak Unseated Leak 15 10 5 0 February March April May June Month Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 9. Duffy Pad Leak `` Line Machine Date 5W,1H Analysis Sheet 6/5/2012 Initial Phenomenon: Duffy pads are experiencing a water leak * What does the phenomena look like? What product, What machine, material w as being used? What size? Water leak on duffy pad through BIW opening located under IP. * Whe n did the phenomena occur? When in the sequence The phenomena is discovered during water testing. The phenomena When of operation; startup, continuous running, intermittent problem, shutdow n, changeover? occurred during continuous running. * Whe re did you see the phenomena? Where on the Where equipment or material did you see the phenomena? The phenomena has been spotted on the JSC41, JSD41, and the J27. * Who does it ef f ect? Everyone? Or is it less of a problem The phenomenon effects the quality team, SQA, chassis UL, chassis Who f or some individuals or teams? (If so, w hat inf o can they of f er?) Is it skill related? TL and chassis assembly. * Which trend or pattern does the phenomena have? E.g. Is the phenomena more f requent on Monday mornings? The condition is random in nature and affects both shifts. Roughly Which Af ter a change-over? Or is it random in nature? Which direction does the phenomena happen in? (Note: Not many fifty-six percent of total defects take place on the first shift. phenomena are truly random!) Optimally there should be no water leak on the duffy pad. The rate * How is the state of the equipment changed f rom the How optimal? How many times does the problem occur? of apperance of the phenomena has steadly increased since February 2012. Revised Phenomenon Water leak on duffy pad through BIW opening located under IP. The phenomena is discovered during water testing. The phenomena occurred during continuous running. The phenomena has been spotted on the JSC41, JSD41, and the J27. The phenomenon effects the quality team, SQA, chassis UL, chassis TL and chassis assembly. The condition is random in nature and affects both shifts. Roughly fifty-six percent of total defects take place on the first shift. Optimally there should be no water leak on the duffy pad. The rate of apperance of the phenomena has steadly increased since February 2012. Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly
  • 10. Duffy Pad Leak Revised 4M Material Man Duffy Pad Operator following SWI OK OK Inner Component BIW Hole not to Spec OK Clips OK Rivets Operator Using Wrong Tool OK NOK Inner seal Paint Sealant covers BIW hole 1 Operator Trained Non-robust Design Seated Duffy Pads are Leaking. See 5W1H for more detail. SWI Correct Clear and Understandable OK Provides Detail OK Improper method of handling material Machine Method Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly
  • 11. Duffy Pad Leak 4 M Investigation Sheet DETAILED ACTIVITIES ON 4M-ANALYSIS Description Activity Data Who Target Status MATERIAL Checked 50 vehicles/day for two weeks Is the inside edge of the body where No signs of jagged edges found after checking a sample looking for inconsistancies on the inside R. Peterson June 1st OK the duffy pad sits flush? size of 500 vehicles edge Checked 50 vehicles/day for two weeks Is the outside edge of the body where No signs of jagged edges found after checking a sample looking for inconsistancies on the outside R. Peterson June 1st OK the duffy pad sits flush? size of 500 vehicles edge Compared defective duffy pads against ones Clips were shown to be resilient regardless if defective or Are the clips loose on the duffy pad? R. Peterson June 5th OK which were shown to be acceptable not Are the clips damaged on the duffy Compared defective duffy pads against ones Clips were shown to have similar dimensions regardless if R. Peterson June 5th OK pad? which were shown to be acceptable defective or not Are the duffy pads out of position after Checked 50 vehicles for unseated duffy pads Duffy pads are correctly seated R. Peterson June 6th OK install? Slight pressure easily unseats duffy pad regardless if Are the duffy pads a non-robust Checked duffy pads after install for any signs defective or not. However, this issue is not causing the leak R. Peterson June 6th OK design? of weakness in the duffy pads Has the design of the inner Examined 50 fresh stock along with 10 failed Fresh stock duffy pads were shown to be similar to ones component of the duffy pad been R. Peterson June 6th OK duffy pads which were compromised compromised? Are the rivits found on the duffy pads Checked defectve duffy pads along with fresh Rivets on both defective and acceptable duffy pads were R. Peterson June 6th OK defective in any way? stock shown to be structurally intact Seal on defective duffy pads differs from those which are Are the duffy pads that are shipped Compared defective duffy pads against ones from the supplier free of defects? which were shown to be acceptable acceptable. Defect is approx. 2mm thick, 8mm long, and R. Peterson June 7th NOK 1 10mm left of the longest clip MAN Are operators following SWI for duffy Observe operator's installing duffy pads on Operator performed install per SWI R. Peterson. May 29th OK pad install? 20 vehicles for consistency. Are operators using the wrong tool to Observe operator's installing duffy pads on Operator performed install per SWI R. Peterson. May 29th OK perform install? 20 vehicles for consistency. METHOD Is SWI clear and understandable? Review duffy pad install SWI SWI is clear to understand and is written correctly R. Peterson May 30th OK Does the SWI provide detail on the Review duffy pad install SWI SWI provides in-depth detail on procedure R. Peterson May 30th OK job? MACHINE N/A Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 12. 5-WHY Effect Potential Causes Corrective Action Duffy Pad Water Leak 1-WHY 2-WHY 3-WHY 4-WHY 5-WHY Description WHO WHEN Duffy pad is Excess flash Inner seal is Lifter located PIC containment of not fully seated against on inner seal defective from at supplier is PIC excess flash on inner R. Peterson, E. Lantto, 6/10/2012 1A of Duffy pad supplier damaged sealant of duffy pad vehicle's body 1 OPL created to make OPL operators aware of excess flash located R. Peterson, 6/12/2012 1B G. Marquardt on inner seal. OPL implemented by TL Worked with SQA to R. Peterson, SQA achieve a clean point A. Hadorn, 6/22/2012 1C on all duffy pad stock B. Bush, incoming A. Del Real Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 13. Duffy Pad Leak "QC" Pillar - Kaizen Journal of Activities ???? SK Duffy Pad Leak # Activity Who Target Status Note 1 Complete Data Collection R. Peterson, J. Nava 6/18/12 2 Complete 5W1H and 4M R. Peterson 6/06/12 3 Complete 5-why R. Peterson 6/12/12 4 Review SWI R. Peterson 6/07/12 Contacted supplier about excess flesh located E. Lantto, B. Bush, A. 5 6/08/12 on inner seal of duffy pad Hadorn Add OPL at Chassis install for excess flash on 7 R. Peterson 6/12/12 duffy pad Clean point has been labeled E. Lantto, B. Bush, as such since 6/7/12 by US 8 Clean point achieved by supplier 6/22/12 Farathane. However as of A. Hadorn 6/18/12 clean point has not been achieved. Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly
  • 14. Sketch of Solution After Solution Before Solution Flash on Inner Rubber Seal No Flash Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 15. Long Clip: Defect located 10mm left of edge Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 16. Duffy Pad Leaks Found Since Start of Project (5/25-6/18) 5 1 4 Number of Occurances 3 1B 2 1 1A 0 Series1, 0 Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 17. 1B ONE POINT LESSON (OPL) Basic Knowledge Improvement X Problem Awareness SHAP Dept: Chassis (9170) Zone #1 Team # 5 Station 1221 Col H20 Completed by: R. Peterson Doc # WCM2012-0612 WHAT: Duffy Pad Install (Decking Cell) Model: JS 6/12/2012 HOW WHY Before install If the duffy pad d check inner seal has flash on the of duffy pad to inner seal, it make sure that no will not seat excess flash is properly. present. T he flash is located 10mm to the left of the long clip Date of Training Trainer WCM009-0 Pupil Quality Control Pillar Board / Sterling Heights Assembly Plant
  • 18. Duffy Pad Leak 5 Questions for Zero Defects ANSWER SCORE # QUESTION 1 3 5 PHASE 0 PHASE 1 PHASE 2 PHASE 3 PHASE 4 Are the material quality 1 A list of characteristics exists The check method exists It's easy to check 1 5 characteristics clear? Exist the incoming material There is no standard, but some Standard of control exists Effective and efficient control 2 1 3 control standard? occasional checks exist (incoming material inspection ) (error/mistake proofing,etc.) Cpk is too low, and there are The supplier capability is 1<Cp<1.33, and there are Cpk>1.33, and there are no 3 many problems with the 1 3 sufficient sporadic problems problems supplier The part is in Stages 1-4 of the 8 The part is in Stages 5-7 of the 8 The part is in Stage 8 of the 8 Which stage of QC incoming 4 Stages of Incoming Material Stages of Incoming Material Stages of Incoming Material 1 1 material it's guarantied Control Control Control Standard countermeasures are A robust process exists and can Is it easy to restore a correct No, the incoming material must 5 applied to compensate compensate for material 3 3 material characteristic? be scrapped (process adjustment, etc.) anomalies TOTAL 28% 60% 0% 0% 0% Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly
  • 19. Duffy Pad Leak Initial Benefit/Cost Analysis Cost includes team root cause B/C = 7.22 analysis $1,283.28 Benefit includes annualized repair/re-process cost avoidance, and over-manning elimination $9,269.64 Initial Benefit / Cost Analysis Repair 18/month=>216/year Root Cause Analysis Hours Peterson 30 Hours Repair/Year 216 Ken (Water Test) 9 Hourly Cost Repair $37.96 Heavy 9 $8,199.36 48 Cost of Replacement Part $4.96 Hourly Rate Intern $20.00 Replacement Parts/yr $1,070.28 Hourly Rate for Repair $37.96 Total Manpower Cost $1,283.28 Total Benefit $9,269.64 Total Cost $1,283.28 B/C Ratio 7.22 Quality Control Pillar Board / Sterling Heights Assembly Plant Plant Quality Control Pillar Board Sterling Heights Assembly