SlideShare a Scribd company logo
MANCHESTER LEEDS BIRMINGHAM
07947 659461 dsgreenclean.gmail.com
Method Statement
All works undertaken by DS Green Clean will be carried out to the highest standards
possible working within the HSS guidelines. All actions are logged and kept on record
for a period of 4 years. All in-coming jobs must receive a job number From DS Green
clean to confirm the job order; Quotes along with risk assessments are carried out before
any staffs attend places of work. When personal arrive on site to perform services which
have been requested, all hazards or risks are to be identified and shown to them.
Equipment used for various jobs is to be used by personnel whom are sufficiently
competent, or are under the immediate supervision of a qualified operator or trainee,i.e
cleaning equipment.
All our staff is trained in health and safety and first aid along with the individual trades
these are updated every 2 years.
All work is carried out in line with......
1) HASWA, Heath and safetyat work act1974
2) Workplace health& safety& welfare regulations 1992
3) The managementof health & safetyat work regulations 1999
4) The manual handling operations regulations 1992 ACOP-98
5) The control of substances hazardous to health regulations 1999
6) Puwer, The provision and use of work equipment regulations 1998
7) The personal protective equipment at work regulations 1992
8) Reporting of injuries, diseases & dangerous occurrences regulations RIDDOR
9) Code of practice and safetyguides from a number of federations
10) British standard BS8213Part2 1991
www.bemgreen.co.uk
DSGREENCLEAN PAGE 8

More Related Content

Viewers also liked

Philip Arbogast, RHIT, CCS Resume
Philip Arbogast, RHIT, CCS ResumePhilip Arbogast, RHIT, CCS Resume
Philip Arbogast, RHIT, CCS Resume
Philip Arbogast
 
Chelsea portfolio pdf
Chelsea portfolio pdfChelsea portfolio pdf
Chelsea portfolio pdf
Chelsea Wichmann
 
utero artificial
utero artificialutero artificial
utero artificial
Leandro Josue
 
Threshold concepts & information literacy
Threshold concepts & information literacyThreshold concepts & information literacy
Threshold concepts & information literacy
Ruth Collingwood
 
Brazil by ruairi
Brazil by ruairi Brazil by ruairi
Brazil by ruairi
GlinskNS
 
Proteinas bea editado
Proteinas bea editadoProteinas bea editado
Proteinas bea editado
sonia08062014
 
Ciberperiodista y el mundo que gira a su alrededor
Ciberperiodista y el mundo que gira a su alrededor Ciberperiodista y el mundo que gira a su alrededor
Ciberperiodista y el mundo que gira a su alrededor
Universidad de Los Andes
 
Our favourite subjects
Our favourite subjectsOur favourite subjects
Our favourite subjects
Prosv
 
Tema 1 tic - Nuevos escenarios digitales
Tema 1 tic - Nuevos escenarios digitalesTema 1 tic - Nuevos escenarios digitales
Tema 1 tic - Nuevos escenarios digitales
María José Martín Bohórquez
 
Hoja de vida Pablo Franco Salcedo 2016
Hoja de vida Pablo Franco Salcedo 2016Hoja de vida Pablo Franco Salcedo 2016
Hoja de vida Pablo Franco Salcedo 2016
Pablo Franco Salcedo
 
Tfg 2014 15
Tfg 2014 15Tfg 2014 15
Tfg 2014 15
yolbeme
 
Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014
Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014
Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014
poranny24
 
Atracciones turísticas
Atracciones turísticasAtracciones turísticas
Atracciones turísticas
DIMABELO
 
3 DRAEI - Técnicas de diagnóstico e reparação de avarias
3   DRAEI - Técnicas de diagnóstico e reparação de avarias3   DRAEI - Técnicas de diagnóstico e reparação de avarias
3 DRAEI - Técnicas de diagnóstico e reparação de avarias
Sandra Minhós
 
2013年upsr必读的9篇bm karangan
2013年upsr必读的9篇bm karangan2013年upsr必读的9篇bm karangan
2013年upsr必读的9篇bm karangan
Hew Mee Peng
 
Why #startup is worth talking about for sports related University degree subj...
Why #startup is worth talking about for sports related University degree subj...Why #startup is worth talking about for sports related University degree subj...
Why #startup is worth talking about for sports related University degree subj...
Adrian Ashton
 
"Failure is not an options" Slides from our IBM Connections Webinar Series. F...
"Failure is not an options" Slides from our IBM Connections Webinar Series. F..."Failure is not an options" Slides from our IBM Connections Webinar Series. F...
"Failure is not an options" Slides from our IBM Connections Webinar Series. F...
Beck et al. GmbH
 

Viewers also liked (18)

Philip Arbogast, RHIT, CCS Resume
Philip Arbogast, RHIT, CCS ResumePhilip Arbogast, RHIT, CCS Resume
Philip Arbogast, RHIT, CCS Resume
 
Chelsea portfolio pdf
Chelsea portfolio pdfChelsea portfolio pdf
Chelsea portfolio pdf
 
utero artificial
utero artificialutero artificial
utero artificial
 
Threshold concepts & information literacy
Threshold concepts & information literacyThreshold concepts & information literacy
Threshold concepts & information literacy
 
Brazil by ruairi
Brazil by ruairi Brazil by ruairi
Brazil by ruairi
 
Proteinas bea editado
Proteinas bea editadoProteinas bea editado
Proteinas bea editado
 
Ciberperiodista y el mundo que gira a su alrededor
Ciberperiodista y el mundo que gira a su alrededor Ciberperiodista y el mundo que gira a su alrededor
Ciberperiodista y el mundo que gira a su alrededor
 
Our favourite subjects
Our favourite subjectsOur favourite subjects
Our favourite subjects
 
Tema 1 tic - Nuevos escenarios digitales
Tema 1 tic - Nuevos escenarios digitalesTema 1 tic - Nuevos escenarios digitales
Tema 1 tic - Nuevos escenarios digitales
 
Hoja de vida Pablo Franco Salcedo 2016
Hoja de vida Pablo Franco Salcedo 2016Hoja de vida Pablo Franco Salcedo 2016
Hoja de vida Pablo Franco Salcedo 2016
 
Tfg 2014 15
Tfg 2014 15Tfg 2014 15
Tfg 2014 15
 
Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014
Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014
Mieszkanie marzeń Gazeta Współczesna - specjalny dodatek 2014
 
Atracciones turísticas
Atracciones turísticasAtracciones turísticas
Atracciones turísticas
 
3 DRAEI - Técnicas de diagnóstico e reparação de avarias
3   DRAEI - Técnicas de diagnóstico e reparação de avarias3   DRAEI - Técnicas de diagnóstico e reparação de avarias
3 DRAEI - Técnicas de diagnóstico e reparação de avarias
 
2013年upsr必读的9篇bm karangan
2013年upsr必读的9篇bm karangan2013年upsr必读的9篇bm karangan
2013年upsr必读的9篇bm karangan
 
Why #startup is worth talking about for sports related University degree subj...
Why #startup is worth talking about for sports related University degree subj...Why #startup is worth talking about for sports related University degree subj...
Why #startup is worth talking about for sports related University degree subj...
 
"Failure is not an options" Slides from our IBM Connections Webinar Series. F...
"Failure is not an options" Slides from our IBM Connections Webinar Series. F..."Failure is not an options" Slides from our IBM Connections Webinar Series. F...
"Failure is not an options" Slides from our IBM Connections Webinar Series. F...
 
4 етап
4 етап4 етап
4 етап
 

Similar to DSGREENCLEAN PAGE 8

Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
Dr Madhu Aman Sharma
 
DD Profile
DD ProfileDD Profile
IIPP-skjengineering
IIPP-skjengineeringIIPP-skjengineering
IIPP-skjengineering
Jim Olesh
 
HSE O-CV
HSE O-CVHSE O-CV
HSE O-CV
SANJAY P. GUNGE
 
WILMOR CONSTRUCTION COMPANY LTD
WILMOR CONSTRUCTION COMPANY LTDWILMOR CONSTRUCTION COMPANY LTD
WILMOR CONSTRUCTION COMPANY LTD
Nigel Williams
 
Cleaning Assurance
Cleaning AssuranceCleaning Assurance
Cleaning Assurance
Sales Remedy
 
HSE Mahmoud Farag
HSE Mahmoud FaragHSE Mahmoud Farag
HSE Mahmoud Farag
mahmoud anany
 
Full HS policy
Full HS policyFull HS policy
Full H&S policy
Full H&S policyFull H&S policy
Full H&S policy
SG-S
 
Design studio occupational health & safety policy
Design studio occupational health & safety policyDesign studio occupational health & safety policy
Design studio occupational health & safety policy
G M
 
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
TyCarreg
 
Firstcool electromechanical works llc
Firstcool electromechanical works llcFirstcool electromechanical works llc
Firstcool electromechanical works llc
MohamedAwaad23
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
firstpick
 
Health, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docxHealth, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docx
pooleavelina
 
CURRICULUM VITAE.LKC
CURRICULUM VITAE.LKCCURRICULUM VITAE.LKC
CURRICULUM VITAE.LKC
lalit chavan
 
First engineering contracting
First engineering contractingFirst engineering contracting
First engineering contracting
MohamedAwaad23
 
ROGEL resume up date as of AUG.
ROGEL resume up date as of AUG.ROGEL resume up date as of AUG.
ROGEL resume up date as of AUG.
Rogelio C. Montalbo
 
Triple J Pipelines Orientation 2015
Triple J Pipelines Orientation 2015Triple J Pipelines Orientation 2015
Triple J Pipelines Orientation 2015
James LaRiviere
 
AKEEM CV
AKEEM CVAKEEM CV
AKEEM CV
AKEEM CVAKEEM CV

Similar to DSGREENCLEAN PAGE 8 (20)

Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
DD Profile
DD ProfileDD Profile
DD Profile
 
IIPP-skjengineering
IIPP-skjengineeringIIPP-skjengineering
IIPP-skjengineering
 
HSE O-CV
HSE O-CVHSE O-CV
HSE O-CV
 
WILMOR CONSTRUCTION COMPANY LTD
WILMOR CONSTRUCTION COMPANY LTDWILMOR CONSTRUCTION COMPANY LTD
WILMOR CONSTRUCTION COMPANY LTD
 
Cleaning Assurance
Cleaning AssuranceCleaning Assurance
Cleaning Assurance
 
HSE Mahmoud Farag
HSE Mahmoud FaragHSE Mahmoud Farag
HSE Mahmoud Farag
 
Full HS policy
Full HS policyFull HS policy
Full HS policy
 
Full H&S policy
Full H&S policyFull H&S policy
Full H&S policy
 
Design studio occupational health & safety policy
Design studio occupational health & safety policyDesign studio occupational health & safety policy
Design studio occupational health & safety policy
 
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
 
Firstcool electromechanical works llc
Firstcool electromechanical works llcFirstcool electromechanical works llc
Firstcool electromechanical works llc
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
Health, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docxHealth, Safety and Welfare for Construction and the built Enviro.docx
Health, Safety and Welfare for Construction and the built Enviro.docx
 
CURRICULUM VITAE.LKC
CURRICULUM VITAE.LKCCURRICULUM VITAE.LKC
CURRICULUM VITAE.LKC
 
First engineering contracting
First engineering contractingFirst engineering contracting
First engineering contracting
 
ROGEL resume up date as of AUG.
ROGEL resume up date as of AUG.ROGEL resume up date as of AUG.
ROGEL resume up date as of AUG.
 
Triple J Pipelines Orientation 2015
Triple J Pipelines Orientation 2015Triple J Pipelines Orientation 2015
Triple J Pipelines Orientation 2015
 
AKEEM CV
AKEEM CVAKEEM CV
AKEEM CV
 
AKEEM CV
AKEEM CVAKEEM CV
AKEEM CV
 

DSGREENCLEAN PAGE 8

  • 1. MANCHESTER LEEDS BIRMINGHAM 07947 659461 dsgreenclean.gmail.com Method Statement All works undertaken by DS Green Clean will be carried out to the highest standards possible working within the HSS guidelines. All actions are logged and kept on record for a period of 4 years. All in-coming jobs must receive a job number From DS Green clean to confirm the job order; Quotes along with risk assessments are carried out before any staffs attend places of work. When personal arrive on site to perform services which have been requested, all hazards or risks are to be identified and shown to them. Equipment used for various jobs is to be used by personnel whom are sufficiently competent, or are under the immediate supervision of a qualified operator or trainee,i.e cleaning equipment. All our staff is trained in health and safety and first aid along with the individual trades these are updated every 2 years. All work is carried out in line with...... 1) HASWA, Heath and safetyat work act1974 2) Workplace health& safety& welfare regulations 1992 3) The managementof health & safetyat work regulations 1999 4) The manual handling operations regulations 1992 ACOP-98 5) The control of substances hazardous to health regulations 1999 6) Puwer, The provision and use of work equipment regulations 1998 7) The personal protective equipment at work regulations 1992 8) Reporting of injuries, diseases & dangerous occurrences regulations RIDDOR 9) Code of practice and safetyguides from a number of federations 10) British standard BS8213Part2 1991 www.bemgreen.co.uk