Design of A Portable Hydraulic Water Borehole Drilling Rig
A.R.S. Dienagha1, G.C. Ikenyiri2 and Steve Odi – Owei2
1.
Department of Mechanical Engineering, Niger Delta University, Amassoma, Bayelsa State, Nigeria.
2.
Department of Mechanical Engineering, Rivers State University of Science and Technology, P.M.B. 5080,
Port Harcourt, Nigeria.
* E-mail ayedienagha@yahoo.com
ABSTRACT:
One of mankind’s most important needs – water has been a very scarce commodity in Nigeria. Federal, State and
Local Governments are not doing enough to provide portable water for the Nigerian populace hence borehole drilling
has become a big business. Water boreholes are being drilled with manual methods using the tripod and seismic
systems. These methods do not produce high quality potable water. Borehole drilling rigs that can produce
appropriate quality of water are imported and are costly and borehole drillers can hardly afford them. It therefore
became imperative for Nigerian Engineers to design and produce effective and cheaper water drilling rigs.
Consequently, a hydraulic water drilling rig has been designed. The design satisfies the requirements of drill
diameter and depth and has economic advantage over the imported rigs. The manufacture of the rig in Nigeria will
also enhance the technological development of the country.
KEY WORDS: Design, Portable, Hydraulic, Water, Borehole, Drilling, Rig.
1.0 INTRODUCTION
Water is one of the most important needs of mankind hence both National, State and Local Governments in every
country work towards making potable water available for its population. In Nigeria, provision of water has become a
serious political issue while pipes have remained dry in most cities. The consequences are that (Ikenyiri, 2009):
(i)
(ii)
(iii)
(iv)

Households in neighborhoods operate their own water schemes;
Those who cannot operate their own water schemes purchase water from street hawkers;
Some people use water without adequate treatment; and,
Water - borne diseases like typhoid fever and cholera which hitherto were only heard of, have
become common diseases.

As a result of private water schemes’ development, the demand for water borehole drilling has grown very high. In
the Niger Delta region, oil pollution has rendered dangerous for consumption, river water, rain water and water from
shallow aquifers (Ikenyiri, 2009). This necessitated that water drilling rigs must be rugged enough to withstand the
different rock formations and depth requirements.
The ground water quality, depth of occurrence and methods of drilling are of great importance in borehole output or
productivity (Todd, 1982). The high demand for borehole drilling has made some Nigerians to be drilling boreholes
with manual methods using the tripod and seismic systems (Ikenyiri, 2009). These methods have the following
advantages:
i)
Cheap and very easily affordable.
ii)
Light and very portable and can be transported with pick-up trucks or even wheel barrows (“trucks”).
However, the disadvantages are very grave:
i)
They can only reach limited depths. While the seismic method can only drill to 60m, the tripod method
can only drill to 70m.

18
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

ii)
iii)

www.iiste.org

Oil and other surface contamination can reach these depths, and so the water produced by these
methods could be contaminated.
Water from these sources are difficult to purify and therefore not hygienic.

The drilling rigs that can drill holes of appropriate diameter and depth are imported and are very costly. Only
government and oil companies can afford these rigs. It has therefore become necessary for the Nigerian Engineers to
provide an answer to this important technological problem with a view to providing the necessary designs and
consequently manufacture such drilling rigs within the country.
2.0 DESIGN OBJECTIVES
In order to satisfy the requirements of water quality, borehole depth and rock formations, the design objectives for
the drilling rig were set as follows (Ikenyiri, 2009). The rig should be:
i)
Able to drill boreholes of up to 150mm diameter;
ii)
Able to drill boreholes to a depth of 500m;
iii)
Tough and reliable;
iv)
Simple and easy to maintain.
v)
Light enough to be mounted on a five ton 4×4 wheel truck for easy access to the various terrains of the
Niger Delta and other regions of the country; and,
vi)
The rig should be cost effective when compared with the imported complex drilling rigs.
3.0 DESIGN OF THE DRILLING RIG
In accordance with the above stated objectives, the sub-systems that make up the drilling rig were selected as listed
below:
i)
Carrier truck (4× wheel) with four (4) leveling jacks
4
ii)
Derrick structure with hydraulic ram for raising and lowering
iii)
Crown block assembly
iv)
Travelling block assembly
v)
Top drive assembly, and
vi)
Draw works
A schematic assembly drawing of the rig is shown in Fig.1 (Ikenyiri, 2009).
Other accessories that completed the design of the drilling rig include:
i)
ii)
iii)
iv)
v)

Hydraulic power unit
Mud pump
Mud hose assembly
Hydraulic hoses, and
The drilling stems

19
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

Fig. 1:

www.iiste.org

Schematic Assembly Drawing of Drilling Rig

3.1
CARRIER TRUCK
The total weight to be carried by the carrier truck is made up of;
(i)
Weight of derrick = 2669kg
(ii)
Weight of travelling block = 200kg
(iii)
Total drill string weight = 1083kg
Total weight of drilling rig assembly is 3952kg
A 5 – ton - 4 wheel drive truck was therefore selected as the rig carrier. Since the truck is to be used on various rough
terrains, it is to be equipped with four (4) leveling jacks.
3.2 DERRICK STRUCTURE WITH HYDRAULIC RAM
The main derrick structure was chosen to be a 200mm×
200mm square steel tube [1]. This choice was made to suit
the complete design. The hollow square section provides for easier attachment and operation of the travelling block,
even though it is known that the hollow circular section has the advantage of having greater stiffness against twisting
(McGinley, 1999). The design is also done such that no twisting moment or torque will be applied to the derrick
structure.
Welded to the upper end of the derrick are brackets for the mounting of the crown block. The lower end of the
hollow square derrick is blinded with a flat plate and a bracket with a pin hole is welded to the flat plate. This feature
is for the attachment of the derrick to a substructure attached to the floor of the carrier truck. A hydraulic cylinder is
attached between the floor of the carrier truck and near the lower end of the derrick (see Fig. 2).
The hydraulic cylinder is to be used to raise the derrick during operation

20
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

Fig.2:

www.iiste.org

Derrick and Hydraulic Cylinder Assembly

and lower it when not in use, respectively. The total weight of the derrick and travelling block was calculated and a
maximum possible weight was put at 500N. A “mill type CD 210” hydraulic cylinder was consequently selected
from Mannesman Rexroth manual (Mannesman). The mill type CD 210 hydraulic cylinder has the following
characteristics:
i)
ii)
iii)
iv)
v)
3.3

Operating pressure
Piston speed
Piston diameter
Rod diameter
Stroke

-

up to 20MPa (200bar)
up to 0.5m.s-1
100mm
56mm
2,400mm.

CROWN BLOCK ASSEMBLY

The crown block is made up of the components as shown in Fig. 3 and Table 1 below.

21
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

www.iiste.org

Fig. 3: Crown Block Assembly

S/No.
1.
2.
3.
4.

TABLE 1: COMPONENTS OF THE CROWN BLOCK
PART NAME
QTY
Base Plate
1
Lock Pin
2
Bolt
4
Crown Wheel
2

MATERIAL
Mild Steel
Mild Steel
Mild Steel
Cast Iron

The crown block assembly is mounted at the top of the derrick with brackets by welding the base plate on to the top
end of the derrick and the brackets.
As shown in Table 1, the crown block consists of a base plate carrying two sheaves over which the drilling line
(cable) from the draw works passes before it is reeved over the sheave in the travelling block and finally attached
back to the base plate of the crown block through a shackle. The diameter of the two equal sheaves was calculated to
be 952mm from the equation

D  34d

(1)

Where D = diameter of the sheave and d = diameter of the cable = 28mm (see section 3.6.1). Consequently, the
sheave diameters were chosen to be 960mm
3.4

TRAVELLING BLOCK ASSEMBLY

The travelling block hangs from the wire rope attached to the crown block through the two pulleys of the crown
block and the winch of the draw works. It serves to carry the top drive system and the drill string during operation. A
schematic assembly drawing of the traveling block assembly is shown on Fig. 4.

22
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

Fig. 4:

www.iiste.org

Schematic Assembly Drawing of Travelling Block.

The traveling block was selected based on the drill string weight. In the design of the drill string, an API standard
drill pipe of 60.3mm outside diameter, 50.7mm inside diameter, 4.8mm wall thickness was selected (Mannesman,
1993). The weight of the drill string was then calculated from the equation (Sedco Forex)

Wdst  N L  Wnom

(2)

where
N L  Total length of drill string  150m
Wnom  Nominal weight  7.22kgm1
Therefore
Wdst  150m  7.22kg/m  1,083kg  9.81ms  2  10,264N
This weight was used to select the traveling block from the manual (), and the one having a weight of 200kg was
chosen.
3.5 TOP DRIVE ASSEMBLY:
The top drive assembly carries the systems that drive the drill string and is therefore made up of the components
shown in Table 2 below. Its main functional systems are a hydraulic motor which drives a swivel mechanism that in
turn drives the drill string rigidly attached to it through screw threads. Also attached to the top drive assembly is a
frame that guides the top drive system during operation. Fig. 5 shows the arrangement of the components of the top

23
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

www.iiste.org

drive system. The hydraulic motor was selected as the KADIBS TDS 1, which has the following characteristics
(Ikenyiri, 2009):
i)
ii)
iii)

Motor speed = 2200 rev./min
Output speed = 220 rev./min
Drilling Torque =2030Nm

TABLE 2: TOP DRIVE ASSEMBLY
S/No.

PART NAME

QUANTITY

MATERIAL

1

Slider Guide

2

Mild Steel

2

Rollers (14mm bore)

4

Mild Steel

3

Hex. Head Bolt(14mm)

4

Mild Steel

4

Motor and Frame

1

Mild Steel

5

Lifting eye

2

Mild Steel

6

Base Frame (channel)

2

Mild Steel

7

Base Frame (channel)

2

Mild Steel

8

Goose Neck

1

Mild Steel

9

Hollow Tube

2

Mild Steel

10

Flange Coupling

1

Mild Steel

11

Hex. Head Bolt & Nut

4

Mild Steel

12

Base Plate

1

Mild Steel

13

Guide (Thick plate)

1

Mild Steel

Fig. 5: Top Drive system Assembly (Plan View)
24
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

3.5

www.iiste.org

DRAW WORK
The draw works consist of a hydraulic winch and a cable which is wound around the drum at one end, and
terminates at the crown block after passing over the two pulleys in the crown block and the pulley in the
travelling block. (See Fig. 1) The draw work and the traveling block work together to raise or lower the drill
string as necessary.

3.6.1 SELECTION OF WIRE ROPE
The wire rope that is wound round the drum of the hydraulic winch and terminates at the crown block carries the
full weight of the top drive system, the traveling block and its own weight (Hamrock et al, 1999). It is a very
critical component of the drilling rig as its failure will not only stop the operation of the rig but will also
endanger the lives of the operators. Consequently, it was properly selected by the use of equations and tables
outlined in reference (Hamrock et al, 1999).
In order to satisfy the operational conditions of the drilling rig, a 28mm, 6× standard hoisting wire rope was
19
selected. The material selected was the mild plow steel which has
i)
ii)

E  80.68GPa (12 x10 6 psi)
Strength (allowable stress)  551.2MPa (80Kpsi)
Modulus of elasticity

A safety factor of 5 was used in the calculations (Hamrock et al, 1999).
4.0 ACCESSORIES
4.1 HYDRAULIC UNIT
The hydraulic unit is the main unit that supplies hydraulic fluid to all the systems at appropriate pressures. It
consists of a reservoir tank, and a pump. The pump supplies hydraulic fluid to the hydraulic motor that drives
the winding drum of the draw works, the hydraulic motor of the top drive system, the hydraulic cylinder that
positions the derrick and the mud pump.
The pump which is a positive displacement pump, was selected to have the following characteristics [6]:
(i)
Type:
A2FO, series 6
(ii)
Displacement: 10 to 250m3
(iii)
Maximum speed: 315 to 1450 rev./min
(iv)
Maximum Power:
218KW
(v)
High Pressure: 450bar
To drive the pump, a 250KW diesel engine was selected. A v – belt system was also selected to transmit torque from
the engine to the pump.
4.2
MUD PUMP
The drilling mud requirement was determined to be 1.8m3/min. Consequently, a mission type centrifugal pump No.
C200 was selected. The pump has the following characteristics
(i)
Size:
3x4R and C
(ii)
Drive: 25KWx285 bar hydraulic motor.
Hydraulic fluid is supplied to the pump by the main hydraulic unit.
5.0
ECONOMIC COMPARISON
The cost of producing the prototype of the hydraulic drilling rig as designed is Ten Million, Three Hundred and
Twenty Four Thousand Naira (N10,324,000.00). A break down of the cost is as shown in table3 below.
Thus, a reasonable market price at which a prospective buyer can acquire the rig has been put at Twelve Million,
Three Hundred and Eighty Eight Thousand, Eight Hundred Naira (N12,388,800.00) [1].
The price of comparable drilling rigs in the United States of America (USA) range from Twenty Million, Two
Hundred and Fifty Thousand Naira (N20,250,000.00) to Thirty One Million, Two Hundred and Fifty Thousand Naira

25
Innovative Systems Design and Engineering
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol.4, No.14, 2013

www.iiste.org

(N31,250,000.00) using an exchange rate of One Hundred and Fifty Naira to the dollar. These prices do not include
freight charges and custom duties [8]. This shows that significant savings can be made if the hydraulic drilling rig
designed is produced in Nigeria as compared to importing the comparable drilling rig from other countries.
TABLE 3:
SUMMARY OF DRILL RIG COSTING
S/#
DESCRIPTION
QTY
1
Used 4 – wheel truck
1
2
Leveling jacks (hydraulic cylinders)
4
3
Hydraulic raising cylinder (ram)
1
4
Square tube derrick structure
1
5
Hydraulic winch (Dawworks)
1
6
Base plate (Derrick sub-structure)
1
7
Crown block assembly
1
8
Traveling block assembly
1
9
Top drive system
1
10
Mud hose assembly
1
11
Hydraulic hose assy (TDS loop)
1
12
Guide dolly system assembly
1
13
Hydraulic hose assy (Hydraulic power unit)
1
14
Hydraulic power unit
1
15
Centrifugal mud pump
1
16
Goose neck swivel
1
17
Drilling stems
100
Add 20% miscellaneous and other handling
cost
Total

COST
6,000,000.00
200,000.00
50,000.00
100,000.00
320,000.00
60,000.00
155,000.00
135,000.00
280,000.00
45,000.00
55,000.00
50,000.00
60,000.00
800,000.00
450,000.00
10,000.00
500,000.00
1,054,000.00

REMARK

10,324,000.00

6.0
CONCLUSION:
From the above, it can be concluded that the hydraulic borehole drilling rig designed satisfies all the design
objectives. Specifically, the design has significant economic advantage over imported drilling rigs. Its manufacture in
Nigeria will also advance the needed technological development of Nigeria.
7.0
1.

2.
3.
4.
5.
6.
7.

REFERENCES
Ikenyiri, G. C. (2009) Design of a Portable Water Borehole Drilling Rig, Unpublished M. Tech. Thesis,
Department of Mechanical Engineering, Rivers State University of Science and Technology, Port Harcourt.
Pp 11
Todd, David Keith, (1982) Ground Water Hydrology, John Wiley and Sons Inc., New York, Pp 115 -131.
Mac Ginley, T. J. (1999) Structural Steelwork Calculations and Detailing, Baterworths and Co., United
Kingdom, Pp 105 -107.
Hamrock, B.J., et al, (1999) Fundamentals of Machine Elements, MacGraw Hill Book Company, New
York, Pp 841 – 845.
Mannesman Rexroth, Component Program information Manual, RE00204/03.87, Germany, Pp 14
Mission Centrifugal Pump Manual Cat. No. C200, Pp 6.
www.youtube.com/watch; rigs @sunmachinery.com, Bore Master Hydraulic Rigs

26
This academic article was published by The International Institute for Science,
Technology and Education (IISTE). The IISTE is a pioneer in the Open Access
Publishing service based in the U.S. and Europe. The aim of the institute is
Accelerating Global Knowledge Sharing.
More information about the publisher can be found in the IISTE’s homepage:
http://www.iiste.org
CALL FOR JOURNAL PAPERS
The IISTE is currently hosting more than 30 peer-reviewed academic journals and
collaborating with academic institutions around the world. There’s no deadline for
submission. Prospective authors of IISTE journals can find the submission
instruction on the following page: http://www.iiste.org/journals/
The IISTE
editorial team promises to the review and publish all the qualified submissions in a
fast manner. All the journals articles are available online to the readers all over the
world without financial, legal, or technical barriers other than those inseparable from
gaining access to the internet itself. Printed version of the journals is also available
upon request of readers and authors.
MORE RESOURCES
Book publication information: http://www.iiste.org/book/
Recent conferences: http://www.iiste.org/conference/
IISTE Knowledge Sharing Partners
EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open
Archives Harvester, Bielefeld Academic Search Engine, Elektronische
Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial
Library , NewJour, Google Scholar

More Related Content

What's hot

Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
IRJET- Comparative Study of Rc Structure with Different Infill Materials
IRJET-  	  Comparative Study of Rc Structure with Different Infill MaterialsIRJET-  	  Comparative Study of Rc Structure with Different Infill Materials
IRJET- Comparative Study of Rc Structure with Different Infill MaterialsIRJET Journal
 
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...IRJET Journal
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road aheadVR M
 
IRJET - A Review On Bubble Deck Slab
IRJET -  	  A Review On Bubble Deck SlabIRJET -  	  A Review On Bubble Deck Slab
IRJET - A Review On Bubble Deck SlabIRJET Journal
 
Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in IndiaVR M
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectationsVR M
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...IRJET Journal
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET Journal
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
Sontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of CoalSontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of CoalAnurag Jha
 
Design of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of RamagundamDesign of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of RamagundamVR M
 
IRJET- Composite Floors using Profiled Deck Sheet in Steel Structure
IRJET- Composite Floors using Profiled Deck Sheet in Steel StructureIRJET- Composite Floors using Profiled Deck Sheet in Steel Structure
IRJET- Composite Floors using Profiled Deck Sheet in Steel StructureIRJET Journal
 

What's hot (20)

Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
IRJET- Comparative Study of Rc Structure with Different Infill Materials
IRJET-  	  Comparative Study of Rc Structure with Different Infill MaterialsIRJET-  	  Comparative Study of Rc Structure with Different Infill Materials
IRJET- Comparative Study of Rc Structure with Different Infill Materials
 
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road ahead
 
Adriyala longwall paper
Adriyala  longwall  paperAdriyala  longwall  paper
Adriyala longwall paper
 
Is.1893.4.2005
Is.1893.4.2005Is.1893.4.2005
Is.1893.4.2005
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016
 
IRJET - A Review On Bubble Deck Slab
IRJET -  	  A Review On Bubble Deck SlabIRJET -  	  A Review On Bubble Deck Slab
IRJET - A Review On Bubble Deck Slab
 
Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in India
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectations
 
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
Comparative Study of MIVAN Formwork with Tunnel form System for High Rise Bui...
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
 
Sontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of CoalSontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of Coal
 
Design of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of RamagundamDesign of Longwall for 2 seam of Ramagundam
Design of Longwall for 2 seam of Ramagundam
 
Mivan tech
Mivan techMivan tech
Mivan tech
 
MIVAN TECHNOLOGY
MIVAN TECHNOLOGY MIVAN TECHNOLOGY
MIVAN TECHNOLOGY
 
IRJET- Composite Floors using Profiled Deck Sheet in Steel Structure
IRJET- Composite Floors using Profiled Deck Sheet in Steel StructureIRJET- Composite Floors using Profiled Deck Sheet in Steel Structure
IRJET- Composite Floors using Profiled Deck Sheet in Steel Structure
 

Similar to Design of a portable hydraulic water borehole drilling rig

Lateral Load Analysis of Elevated Intze Water Tank By STAAD.PRO
Lateral Load Analysis of Elevated Intze Water Tank By STAAD.PROLateral Load Analysis of Elevated Intze Water Tank By STAAD.PRO
Lateral Load Analysis of Elevated Intze Water Tank By STAAD.PROIRJET Journal
 
Design & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro SoftwareDesign & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro SoftwareIRJET Journal
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technologyAbhishek Paul
 
IRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical InterfaceIRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical InterfaceIRJET Journal
 
IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...
IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...
IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...IRJET Journal
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyIRJET Journal
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methodsHalim Rahman
 
Design of Flyover Transverse Vertically by using Hydraulic Jack
Design of Flyover Transverse Vertically by using Hydraulic JackDesign of Flyover Transverse Vertically by using Hydraulic Jack
Design of Flyover Transverse Vertically by using Hydraulic JackIRJET Journal
 
ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...
ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...
ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...IRJET Journal
 
Project Report on flexible drill machine
Project Report on flexible drill machineProject Report on flexible drill machine
Project Report on flexible drill machineomkarmohol99
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elementssubbu lakshmi
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxMailapalliJayaRaju
 
IRJET- Optimization of Industrial Truss
IRJET- Optimization of Industrial TrussIRJET- Optimization of Industrial Truss
IRJET- Optimization of Industrial TrussIRJET Journal
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET Journal
 
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...IRJET Journal
 

Similar to Design of a portable hydraulic water borehole drilling rig (20)

Lateral Load Analysis of Elevated Intze Water Tank By STAAD.PRO
Lateral Load Analysis of Elevated Intze Water Tank By STAAD.PROLateral Load Analysis of Elevated Intze Water Tank By STAAD.PRO
Lateral Load Analysis of Elevated Intze Water Tank By STAAD.PRO
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Design & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro SoftwareDesign & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro Software
 
presentation on shotcrete technology
presentation on shotcrete technologypresentation on shotcrete technology
presentation on shotcrete technology
 
IRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical InterfaceIRJET- Estimation of Intze Water Tank by User Graphical Interface
IRJET- Estimation of Intze Water Tank by User Graphical Interface
 
IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...
IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...
IRJET- Study on Comparison Analysis of Circular and Intze Water Tank on Slopi...
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 
Design of Flyover Transverse Vertically by using Hydraulic Jack
Design of Flyover Transverse Vertically by using Hydraulic JackDesign of Flyover Transverse Vertically by using Hydraulic Jack
Design of Flyover Transverse Vertically by using Hydraulic Jack
 
ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...
ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...
ANALYSIS AND DESIGN OF RCC OVERHEAD WATER TANK FOR TAMGAON USING IS CODE IS 3...
 
Project Report on flexible drill machine
Project Report on flexible drill machineProject Report on flexible drill machine
Project Report on flexible drill machine
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elements
 
Foundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptxFoundations for SPAR Platforms1.pptx
Foundations for SPAR Platforms1.pptx
 
IRJET- Optimization of Industrial Truss
IRJET- Optimization of Industrial TrussIRJET- Optimization of Industrial Truss
IRJET- Optimization of Industrial Truss
 
Delhi metro presention
Delhi   metro presentionDelhi   metro presention
Delhi metro presention
 
Infusion of Standards in Water Drilling Rig Fabrication in Nigeria
Infusion of Standards in Water Drilling Rig Fabrication in NigeriaInfusion of Standards in Water Drilling Rig Fabrication in Nigeria
Infusion of Standards in Water Drilling Rig Fabrication in Nigeria
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
 
Intze tank design
Intze tank designIntze tank design
Intze tank design
 
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...
IRJET- Parametric Study of RC Deck Slab Bridge with Varying Thickness: Techni...
 

More from Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inAlexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesAlexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksAlexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dAlexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceAlexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifhamAlexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaAlexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenAlexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksAlexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget forAlexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabAlexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalAlexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesAlexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbAlexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloudAlexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveragedAlexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenyaAlexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health ofAlexander Decker
 

More from Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Recently uploaded

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 

Recently uploaded (20)

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 

Design of a portable hydraulic water borehole drilling rig

  • 1. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 www.iiste.org Design of A Portable Hydraulic Water Borehole Drilling Rig A.R.S. Dienagha1, G.C. Ikenyiri2 and Steve Odi – Owei2 1. Department of Mechanical Engineering, Niger Delta University, Amassoma, Bayelsa State, Nigeria. 2. Department of Mechanical Engineering, Rivers State University of Science and Technology, P.M.B. 5080, Port Harcourt, Nigeria. * E-mail ayedienagha@yahoo.com ABSTRACT: One of mankind’s most important needs – water has been a very scarce commodity in Nigeria. Federal, State and Local Governments are not doing enough to provide portable water for the Nigerian populace hence borehole drilling has become a big business. Water boreholes are being drilled with manual methods using the tripod and seismic systems. These methods do not produce high quality potable water. Borehole drilling rigs that can produce appropriate quality of water are imported and are costly and borehole drillers can hardly afford them. It therefore became imperative for Nigerian Engineers to design and produce effective and cheaper water drilling rigs. Consequently, a hydraulic water drilling rig has been designed. The design satisfies the requirements of drill diameter and depth and has economic advantage over the imported rigs. The manufacture of the rig in Nigeria will also enhance the technological development of the country. KEY WORDS: Design, Portable, Hydraulic, Water, Borehole, Drilling, Rig. 1.0 INTRODUCTION Water is one of the most important needs of mankind hence both National, State and Local Governments in every country work towards making potable water available for its population. In Nigeria, provision of water has become a serious political issue while pipes have remained dry in most cities. The consequences are that (Ikenyiri, 2009): (i) (ii) (iii) (iv) Households in neighborhoods operate their own water schemes; Those who cannot operate their own water schemes purchase water from street hawkers; Some people use water without adequate treatment; and, Water - borne diseases like typhoid fever and cholera which hitherto were only heard of, have become common diseases. As a result of private water schemes’ development, the demand for water borehole drilling has grown very high. In the Niger Delta region, oil pollution has rendered dangerous for consumption, river water, rain water and water from shallow aquifers (Ikenyiri, 2009). This necessitated that water drilling rigs must be rugged enough to withstand the different rock formations and depth requirements. The ground water quality, depth of occurrence and methods of drilling are of great importance in borehole output or productivity (Todd, 1982). The high demand for borehole drilling has made some Nigerians to be drilling boreholes with manual methods using the tripod and seismic systems (Ikenyiri, 2009). These methods have the following advantages: i) Cheap and very easily affordable. ii) Light and very portable and can be transported with pick-up trucks or even wheel barrows (“trucks”). However, the disadvantages are very grave: i) They can only reach limited depths. While the seismic method can only drill to 60m, the tripod method can only drill to 70m. 18
  • 2. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 ii) iii) www.iiste.org Oil and other surface contamination can reach these depths, and so the water produced by these methods could be contaminated. Water from these sources are difficult to purify and therefore not hygienic. The drilling rigs that can drill holes of appropriate diameter and depth are imported and are very costly. Only government and oil companies can afford these rigs. It has therefore become necessary for the Nigerian Engineers to provide an answer to this important technological problem with a view to providing the necessary designs and consequently manufacture such drilling rigs within the country. 2.0 DESIGN OBJECTIVES In order to satisfy the requirements of water quality, borehole depth and rock formations, the design objectives for the drilling rig were set as follows (Ikenyiri, 2009). The rig should be: i) Able to drill boreholes of up to 150mm diameter; ii) Able to drill boreholes to a depth of 500m; iii) Tough and reliable; iv) Simple and easy to maintain. v) Light enough to be mounted on a five ton 4×4 wheel truck for easy access to the various terrains of the Niger Delta and other regions of the country; and, vi) The rig should be cost effective when compared with the imported complex drilling rigs. 3.0 DESIGN OF THE DRILLING RIG In accordance with the above stated objectives, the sub-systems that make up the drilling rig were selected as listed below: i) Carrier truck (4× wheel) with four (4) leveling jacks 4 ii) Derrick structure with hydraulic ram for raising and lowering iii) Crown block assembly iv) Travelling block assembly v) Top drive assembly, and vi) Draw works A schematic assembly drawing of the rig is shown in Fig.1 (Ikenyiri, 2009). Other accessories that completed the design of the drilling rig include: i) ii) iii) iv) v) Hydraulic power unit Mud pump Mud hose assembly Hydraulic hoses, and The drilling stems 19
  • 3. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 Fig. 1: www.iiste.org Schematic Assembly Drawing of Drilling Rig 3.1 CARRIER TRUCK The total weight to be carried by the carrier truck is made up of; (i) Weight of derrick = 2669kg (ii) Weight of travelling block = 200kg (iii) Total drill string weight = 1083kg Total weight of drilling rig assembly is 3952kg A 5 – ton - 4 wheel drive truck was therefore selected as the rig carrier. Since the truck is to be used on various rough terrains, it is to be equipped with four (4) leveling jacks. 3.2 DERRICK STRUCTURE WITH HYDRAULIC RAM The main derrick structure was chosen to be a 200mm× 200mm square steel tube [1]. This choice was made to suit the complete design. The hollow square section provides for easier attachment and operation of the travelling block, even though it is known that the hollow circular section has the advantage of having greater stiffness against twisting (McGinley, 1999). The design is also done such that no twisting moment or torque will be applied to the derrick structure. Welded to the upper end of the derrick are brackets for the mounting of the crown block. The lower end of the hollow square derrick is blinded with a flat plate and a bracket with a pin hole is welded to the flat plate. This feature is for the attachment of the derrick to a substructure attached to the floor of the carrier truck. A hydraulic cylinder is attached between the floor of the carrier truck and near the lower end of the derrick (see Fig. 2). The hydraulic cylinder is to be used to raise the derrick during operation 20
  • 4. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 Fig.2: www.iiste.org Derrick and Hydraulic Cylinder Assembly and lower it when not in use, respectively. The total weight of the derrick and travelling block was calculated and a maximum possible weight was put at 500N. A “mill type CD 210” hydraulic cylinder was consequently selected from Mannesman Rexroth manual (Mannesman). The mill type CD 210 hydraulic cylinder has the following characteristics: i) ii) iii) iv) v) 3.3 Operating pressure Piston speed Piston diameter Rod diameter Stroke - up to 20MPa (200bar) up to 0.5m.s-1 100mm 56mm 2,400mm. CROWN BLOCK ASSEMBLY The crown block is made up of the components as shown in Fig. 3 and Table 1 below. 21
  • 5. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 www.iiste.org Fig. 3: Crown Block Assembly S/No. 1. 2. 3. 4. TABLE 1: COMPONENTS OF THE CROWN BLOCK PART NAME QTY Base Plate 1 Lock Pin 2 Bolt 4 Crown Wheel 2 MATERIAL Mild Steel Mild Steel Mild Steel Cast Iron The crown block assembly is mounted at the top of the derrick with brackets by welding the base plate on to the top end of the derrick and the brackets. As shown in Table 1, the crown block consists of a base plate carrying two sheaves over which the drilling line (cable) from the draw works passes before it is reeved over the sheave in the travelling block and finally attached back to the base plate of the crown block through a shackle. The diameter of the two equal sheaves was calculated to be 952mm from the equation D  34d (1) Where D = diameter of the sheave and d = diameter of the cable = 28mm (see section 3.6.1). Consequently, the sheave diameters were chosen to be 960mm 3.4 TRAVELLING BLOCK ASSEMBLY The travelling block hangs from the wire rope attached to the crown block through the two pulleys of the crown block and the winch of the draw works. It serves to carry the top drive system and the drill string during operation. A schematic assembly drawing of the traveling block assembly is shown on Fig. 4. 22
  • 6. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 Fig. 4: www.iiste.org Schematic Assembly Drawing of Travelling Block. The traveling block was selected based on the drill string weight. In the design of the drill string, an API standard drill pipe of 60.3mm outside diameter, 50.7mm inside diameter, 4.8mm wall thickness was selected (Mannesman, 1993). The weight of the drill string was then calculated from the equation (Sedco Forex) Wdst  N L  Wnom (2) where N L  Total length of drill string  150m Wnom  Nominal weight  7.22kgm1 Therefore Wdst  150m  7.22kg/m  1,083kg  9.81ms  2  10,264N This weight was used to select the traveling block from the manual (), and the one having a weight of 200kg was chosen. 3.5 TOP DRIVE ASSEMBLY: The top drive assembly carries the systems that drive the drill string and is therefore made up of the components shown in Table 2 below. Its main functional systems are a hydraulic motor which drives a swivel mechanism that in turn drives the drill string rigidly attached to it through screw threads. Also attached to the top drive assembly is a frame that guides the top drive system during operation. Fig. 5 shows the arrangement of the components of the top 23
  • 7. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 www.iiste.org drive system. The hydraulic motor was selected as the KADIBS TDS 1, which has the following characteristics (Ikenyiri, 2009): i) ii) iii) Motor speed = 2200 rev./min Output speed = 220 rev./min Drilling Torque =2030Nm TABLE 2: TOP DRIVE ASSEMBLY S/No. PART NAME QUANTITY MATERIAL 1 Slider Guide 2 Mild Steel 2 Rollers (14mm bore) 4 Mild Steel 3 Hex. Head Bolt(14mm) 4 Mild Steel 4 Motor and Frame 1 Mild Steel 5 Lifting eye 2 Mild Steel 6 Base Frame (channel) 2 Mild Steel 7 Base Frame (channel) 2 Mild Steel 8 Goose Neck 1 Mild Steel 9 Hollow Tube 2 Mild Steel 10 Flange Coupling 1 Mild Steel 11 Hex. Head Bolt & Nut 4 Mild Steel 12 Base Plate 1 Mild Steel 13 Guide (Thick plate) 1 Mild Steel Fig. 5: Top Drive system Assembly (Plan View) 24
  • 8. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 3.5 www.iiste.org DRAW WORK The draw works consist of a hydraulic winch and a cable which is wound around the drum at one end, and terminates at the crown block after passing over the two pulleys in the crown block and the pulley in the travelling block. (See Fig. 1) The draw work and the traveling block work together to raise or lower the drill string as necessary. 3.6.1 SELECTION OF WIRE ROPE The wire rope that is wound round the drum of the hydraulic winch and terminates at the crown block carries the full weight of the top drive system, the traveling block and its own weight (Hamrock et al, 1999). It is a very critical component of the drilling rig as its failure will not only stop the operation of the rig but will also endanger the lives of the operators. Consequently, it was properly selected by the use of equations and tables outlined in reference (Hamrock et al, 1999). In order to satisfy the operational conditions of the drilling rig, a 28mm, 6× standard hoisting wire rope was 19 selected. The material selected was the mild plow steel which has i) ii) E  80.68GPa (12 x10 6 psi) Strength (allowable stress)  551.2MPa (80Kpsi) Modulus of elasticity A safety factor of 5 was used in the calculations (Hamrock et al, 1999). 4.0 ACCESSORIES 4.1 HYDRAULIC UNIT The hydraulic unit is the main unit that supplies hydraulic fluid to all the systems at appropriate pressures. It consists of a reservoir tank, and a pump. The pump supplies hydraulic fluid to the hydraulic motor that drives the winding drum of the draw works, the hydraulic motor of the top drive system, the hydraulic cylinder that positions the derrick and the mud pump. The pump which is a positive displacement pump, was selected to have the following characteristics [6]: (i) Type: A2FO, series 6 (ii) Displacement: 10 to 250m3 (iii) Maximum speed: 315 to 1450 rev./min (iv) Maximum Power: 218KW (v) High Pressure: 450bar To drive the pump, a 250KW diesel engine was selected. A v – belt system was also selected to transmit torque from the engine to the pump. 4.2 MUD PUMP The drilling mud requirement was determined to be 1.8m3/min. Consequently, a mission type centrifugal pump No. C200 was selected. The pump has the following characteristics (i) Size: 3x4R and C (ii) Drive: 25KWx285 bar hydraulic motor. Hydraulic fluid is supplied to the pump by the main hydraulic unit. 5.0 ECONOMIC COMPARISON The cost of producing the prototype of the hydraulic drilling rig as designed is Ten Million, Three Hundred and Twenty Four Thousand Naira (N10,324,000.00). A break down of the cost is as shown in table3 below. Thus, a reasonable market price at which a prospective buyer can acquire the rig has been put at Twelve Million, Three Hundred and Eighty Eight Thousand, Eight Hundred Naira (N12,388,800.00) [1]. The price of comparable drilling rigs in the United States of America (USA) range from Twenty Million, Two Hundred and Fifty Thousand Naira (N20,250,000.00) to Thirty One Million, Two Hundred and Fifty Thousand Naira 25
  • 9. Innovative Systems Design and Engineering ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol.4, No.14, 2013 www.iiste.org (N31,250,000.00) using an exchange rate of One Hundred and Fifty Naira to the dollar. These prices do not include freight charges and custom duties [8]. This shows that significant savings can be made if the hydraulic drilling rig designed is produced in Nigeria as compared to importing the comparable drilling rig from other countries. TABLE 3: SUMMARY OF DRILL RIG COSTING S/# DESCRIPTION QTY 1 Used 4 – wheel truck 1 2 Leveling jacks (hydraulic cylinders) 4 3 Hydraulic raising cylinder (ram) 1 4 Square tube derrick structure 1 5 Hydraulic winch (Dawworks) 1 6 Base plate (Derrick sub-structure) 1 7 Crown block assembly 1 8 Traveling block assembly 1 9 Top drive system 1 10 Mud hose assembly 1 11 Hydraulic hose assy (TDS loop) 1 12 Guide dolly system assembly 1 13 Hydraulic hose assy (Hydraulic power unit) 1 14 Hydraulic power unit 1 15 Centrifugal mud pump 1 16 Goose neck swivel 1 17 Drilling stems 100 Add 20% miscellaneous and other handling cost Total COST 6,000,000.00 200,000.00 50,000.00 100,000.00 320,000.00 60,000.00 155,000.00 135,000.00 280,000.00 45,000.00 55,000.00 50,000.00 60,000.00 800,000.00 450,000.00 10,000.00 500,000.00 1,054,000.00 REMARK 10,324,000.00 6.0 CONCLUSION: From the above, it can be concluded that the hydraulic borehole drilling rig designed satisfies all the design objectives. Specifically, the design has significant economic advantage over imported drilling rigs. Its manufacture in Nigeria will also advance the needed technological development of Nigeria. 7.0 1. 2. 3. 4. 5. 6. 7. REFERENCES Ikenyiri, G. C. (2009) Design of a Portable Water Borehole Drilling Rig, Unpublished M. Tech. Thesis, Department of Mechanical Engineering, Rivers State University of Science and Technology, Port Harcourt. Pp 11 Todd, David Keith, (1982) Ground Water Hydrology, John Wiley and Sons Inc., New York, Pp 115 -131. Mac Ginley, T. J. (1999) Structural Steelwork Calculations and Detailing, Baterworths and Co., United Kingdom, Pp 105 -107. Hamrock, B.J., et al, (1999) Fundamentals of Machine Elements, MacGraw Hill Book Company, New York, Pp 841 – 845. Mannesman Rexroth, Component Program information Manual, RE00204/03.87, Germany, Pp 14 Mission Centrifugal Pump Manual Cat. No. C200, Pp 6. www.youtube.com/watch; rigs @sunmachinery.com, Bore Master Hydraulic Rigs 26
  • 10. This academic article was published by The International Institute for Science, Technology and Education (IISTE). The IISTE is a pioneer in the Open Access Publishing service based in the U.S. and Europe. The aim of the institute is Accelerating Global Knowledge Sharing. More information about the publisher can be found in the IISTE’s homepage: http://www.iiste.org CALL FOR JOURNAL PAPERS The IISTE is currently hosting more than 30 peer-reviewed academic journals and collaborating with academic institutions around the world. There’s no deadline for submission. Prospective authors of IISTE journals can find the submission instruction on the following page: http://www.iiste.org/journals/ The IISTE editorial team promises to the review and publish all the qualified submissions in a fast manner. All the journals articles are available online to the readers all over the world without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself. Printed version of the journals is also available upon request of readers and authors. MORE RESOURCES Book publication information: http://www.iiste.org/book/ Recent conferences: http://www.iiste.org/conference/ IISTE Knowledge Sharing Partners EBSCO, Index Copernicus, Ulrich's Periodicals Directory, JournalTOCS, PKP Open Archives Harvester, Bielefeld Academic Search Engine, Elektronische Zeitschriftenbibliothek EZB, Open J-Gate, OCLC WorldCat, Universe Digtial Library , NewJour, Google Scholar