This document provides a project charter and plan for improving the affordability of higher education in Michigan. The project aims to lower costs for students through three approaches: educating students about funding options via a scholarship search engine; decreasing costs per student through curriculum acceptance policies; and increasing funding via business incorporation programs. Key milestones include developing the project scope, plans, and documents by February 2015; obtaining stakeholder approval by April 2015; and conducting research and analysis from April to June 2015. The preliminary budget totals $2.11 million, with the largest expenses going towards the scholarship search engine and data storage/organization. Risks include potential delays, lack of stakeholder buy-in, and increased costs.
A Comparison Between Time And Material And Fixed Bid EngagementiBoss Tech Solution
This document compares Time and Material and Fixed Price engagement models for software development projects. Time and Material is suitable when requirements are unclear or changing, as it allows flexibility in resources and billing is based on hours worked. Fixed Price is suitable when requirements are well-defined, as the client pays a fixed price for successful delivery within a scheduled timeframe. The document provides details on when each model is most appropriate and how costs are determined.
Keep your audience glued to their seats with professionally designed PPT slides. This deck comprises of total of sixtyseven slides. It has PPT templates with creative visuals and well researched content. Not just this, our PowerPoint professionals have crafted this deck with appropriate diagrams, layouts, icons, graphs, charts and more. This content ready presentation deck is fully editable. Just click the DOWNLOAD button below. Change the colour, text and font size. You can also modify the content as per your need. Get access to this well crafted complete deck presentation and leave your audience stunned.
Operational Infrastructure Management PowerPoint Presentation Slides is a highly visual custom tool. This PPT theme is loaded with impactful data visualization tools to reflect your asset management plan. Using our PowerPoint slideshow you can cover all the aspects related to enterprise asset management with considerable ease. The comprehensive format and the concise design elements help users to consolidate huge volumes of data without utilizing much room. Take advantage of the engaging graphics of our PPT templates to elucidate the asset management process. The easy-to-follow layout of this workplace infrastructure PowerPoint presentation not only helps users but also the audience. The neat tabular format of our organizational infrastructure PPT slideshow facilitates asset assessment for infrastructure companies. Elaborate on risk assessment and types of deteriorating models through this infrastructure asset management PowerPoint theme. Utilize the KPI metrics and dashboard diagrams to compile key facts and stats. So, download this work infrastructure PPT deck to create an impressive presentation in no time. Our Operational Infrastructure Management PowerPoint Presentation Slides are explicit and effective. They combine clarity and concise expression. https://bit.ly/34ZTySc
Primavera Unifier: How to Tame Complexity and Achieve Successp6academy
Primavera Unifier is an open and highly configurable business process and workflow management tool that is designed to support capital planning, project delivery and cost control requirements. Achieving a successful Unifier implementation requires strong stakeholder support, a detailed analysis of the supported business processes and a project team that can “think outside the box." In this presentation, we will define and review those key areas that can reduce implementation time and costs. We will also show how to identify and avoid specific issues that could jeopardize the success of a Unifier system deployment.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Leading Practices in Multi-Pillar Oracle Cloud ImplementationsAlithya
The document outlines an agenda for a presentation on leading practices in multi-pillar Oracle Cloud implementations. The agenda includes introductions, an Oracle Cloud introduction, typical paths to moving applications to the cloud, customer stories, and Alithya's methodology for multi-pillar Oracle Cloud implementations. It also discusses integrations, conversions, reporting, and master data management.
A presentation given by John Chapman to the APM Planning, Monitoring and Control SIG and guests at the University of Warwick, Coventry 2015.
John Chapman, Touchstone – Benefits dependency diagrams should be simple. Use timelines to identify when benefits realisation will occur.
GitaCloud Webinar - SAP Integrated Business Planning IBP for Make To Order MT...Ashutosh Bansal
This is the presentation deck from the GitaCloud webinar focused on SAP Integrated Business Planning IBP for Make To Order MTO industries. This webinar was moderated by Gabrielle Brignetti from GitaCloud on 12/8/2020.
Kevin Lau and Markus Vogel from Varian Medical presented their SAP Integrated Business Planning IBP success story. Ashutosh Bansal from GitaCloud presented a design showcase to enable SAP IBP for Make To Order MTO industries. Eric Simonson from SAP presented the long term roadmap for SAP IBP Response & Supply to support MTO industries.
For any questions regarding this content, please send an email to connect@gitacloud.com or visit www.gitacloud.com for additional content.
A Comparison Between Time And Material And Fixed Bid EngagementiBoss Tech Solution
This document compares Time and Material and Fixed Price engagement models for software development projects. Time and Material is suitable when requirements are unclear or changing, as it allows flexibility in resources and billing is based on hours worked. Fixed Price is suitable when requirements are well-defined, as the client pays a fixed price for successful delivery within a scheduled timeframe. The document provides details on when each model is most appropriate and how costs are determined.
Keep your audience glued to their seats with professionally designed PPT slides. This deck comprises of total of sixtyseven slides. It has PPT templates with creative visuals and well researched content. Not just this, our PowerPoint professionals have crafted this deck with appropriate diagrams, layouts, icons, graphs, charts and more. This content ready presentation deck is fully editable. Just click the DOWNLOAD button below. Change the colour, text and font size. You can also modify the content as per your need. Get access to this well crafted complete deck presentation and leave your audience stunned.
Operational Infrastructure Management PowerPoint Presentation Slides is a highly visual custom tool. This PPT theme is loaded with impactful data visualization tools to reflect your asset management plan. Using our PowerPoint slideshow you can cover all the aspects related to enterprise asset management with considerable ease. The comprehensive format and the concise design elements help users to consolidate huge volumes of data without utilizing much room. Take advantage of the engaging graphics of our PPT templates to elucidate the asset management process. The easy-to-follow layout of this workplace infrastructure PowerPoint presentation not only helps users but also the audience. The neat tabular format of our organizational infrastructure PPT slideshow facilitates asset assessment for infrastructure companies. Elaborate on risk assessment and types of deteriorating models through this infrastructure asset management PowerPoint theme. Utilize the KPI metrics and dashboard diagrams to compile key facts and stats. So, download this work infrastructure PPT deck to create an impressive presentation in no time. Our Operational Infrastructure Management PowerPoint Presentation Slides are explicit and effective. They combine clarity and concise expression. https://bit.ly/34ZTySc
Primavera Unifier: How to Tame Complexity and Achieve Successp6academy
Primavera Unifier is an open and highly configurable business process and workflow management tool that is designed to support capital planning, project delivery and cost control requirements. Achieving a successful Unifier implementation requires strong stakeholder support, a detailed analysis of the supported business processes and a project team that can “think outside the box." In this presentation, we will define and review those key areas that can reduce implementation time and costs. We will also show how to identify and avoid specific issues that could jeopardize the success of a Unifier system deployment.
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
Leading Practices in Multi-Pillar Oracle Cloud ImplementationsAlithya
The document outlines an agenda for a presentation on leading practices in multi-pillar Oracle Cloud implementations. The agenda includes introductions, an Oracle Cloud introduction, typical paths to moving applications to the cloud, customer stories, and Alithya's methodology for multi-pillar Oracle Cloud implementations. It also discusses integrations, conversions, reporting, and master data management.
A presentation given by John Chapman to the APM Planning, Monitoring and Control SIG and guests at the University of Warwick, Coventry 2015.
John Chapman, Touchstone – Benefits dependency diagrams should be simple. Use timelines to identify when benefits realisation will occur.
GitaCloud Webinar - SAP Integrated Business Planning IBP for Make To Order MT...Ashutosh Bansal
This is the presentation deck from the GitaCloud webinar focused on SAP Integrated Business Planning IBP for Make To Order MTO industries. This webinar was moderated by Gabrielle Brignetti from GitaCloud on 12/8/2020.
Kevin Lau and Markus Vogel from Varian Medical presented their SAP Integrated Business Planning IBP success story. Ashutosh Bansal from GitaCloud presented a design showcase to enable SAP IBP for Make To Order MTO industries. Eric Simonson from SAP presented the long term roadmap for SAP IBP Response & Supply to support MTO industries.
For any questions regarding this content, please send an email to connect@gitacloud.com or visit www.gitacloud.com for additional content.
In this presentation we have done earlier a project for Phillip Morris (Pakistan) for the access control system and canteen management system. It is the project presentation for our subject Planning and Scheduling. i hope it is the best for the understanding Project planning and scheduling.
“You can download this product from SlideTeam.net”
Create a financial proposal using content-ready Financial Proposal PowerPoint Presentation Slides. Add all the relevant templates related to a budget setting with the help of financial proposal PowerPoint slideshow. Set up a budget limit for your next project and include estimation cost, cost factors and assignment, directs costs, etc by adding financial proposal PPT template. This ready-to-use financial proposal PowerPoint slideshow covers topics like proposal outline, executive summary, business performance, business highlights, financial summary, and more. Explain to your sales manager regarding revenue split, competitive landscape, top creditors using financial proposal PPT slides. Not just this, discuss at length about cash flow statement, income statement, balance sheet, key financial ratios, and financial projects. This deck is your one stop solution for financial and budget proposal. Grab this content-ready financial proposal complete PowerPoint presentation now and get start with budget setting using these important PPT templates. Instill faith in your ability to deliver with our Financial Proposal Powerpoint Presentation Slides. Be able to hold the job down. https://bit.ly/3o51Hyi
The document provides a checklist for conducting a project health check to ensure projects are delivering value. It includes questions about the project scope, cost, schedule, staffing, systems, organization, communication, issue management, change control, risk management, quality management, procurement, contingency planning, benefits management, business processes, training, implementation, governance, documentation, and top management support. The questions are meant to evaluate whether key project elements and processes are defined, documented, being followed and delivering as intended.
The document contains interview questions and answers for planning engineers. It includes 18 questions related to scheduling topics like constraints in Primavera, critical path identification, float, schedule development, resource leveling, and the role of a planning engineer. The answers provide explanations of scheduling concepts and best practices.
Sage ERP X3 is an ERP software package designed for mid-sized companies that supports all business processes across finance, distribution, and manufacturing within a single system. It provides flexibility and functionality to manage global business operations more effectively and at a lower cost than comparable ERP systems. Sage ERP X3 uses a web-native design to facilitate collaboration and information sharing between employees, partners, suppliers and customers. It offers configurable workflows and reporting to provide real-time visibility and informed decision-making across the business.
Amazon Web Services (AWS) provides a low cost, reliable and secure foundation for you to use as you build and deliver Software as a Service (SaaS) solutions to customers. For ISVs, the process of transition from a traditional (license based) model to a Software as a Service (SaaS) is a challenge that concerns not only the technical aspect, but also financial and commercial strategy aspects. In this presentation you will find out how AWS can become the ideal partner to support the transformation.
The document provides information on stakeholder management processes including identifying stakeholders, planning stakeholder management, managing stakeholder engagement, and controlling stakeholder engagement. It discusses identifying people/organizations that could impact project success and analyzing their potential impact. It also describes developing strategies to effectively engage stakeholders based on the analysis, and monitoring stakeholder relationships and adjusting engagement strategies.
Earned value analysis is a project management technique that compares the planned value of work scheduled to the actual cost of work performed and work earned. It measures project performance and progress in three dimensions: planned value, earned value, and actual cost. Planned value defines the work that should have been completed, earned value is the budget associated with work actually completed, and actual cost is the total cost incurred so far. Variance analysis using metrics like the cost performance index, schedule performance index, cost variance, and schedule variance allows evaluation of how a project's performance compares to its plan.
GitaCloud SAP IBP for Inventory Webinar May 25th 2018Ashutosh Bansal
This slide deck was used during the webinar jointly hosted by GitaCloud, SAP, and Demand Driven Institute on 25th May, 2018. It focuses on SAP Integrated Business Planning IBP for Inventory 1805 application capabilities.
The content includes:
1. IBP for Inventory Overview from Beatrice Hulde (IBP for Inventory Solution Owner, SAP)
2. Demand Driven MRP Overview from Chad Smith (Co-Partner, Demand Driven Institute)
3. Detailed showcase of SAP IBP for Inventory across MEIO and DDMRP approaches from Ashutosh Bansal (President & CEO, GitaCloud)
SAP IBP for Inventory can improve revenue and margin through a reduction in stock-outs related lost sales, reduction in expedite costs & inventory carrying costs, and help you run a more efficient business by right sizing inventories to release working capital. Interested in evaluating SAP IBP for your business? You can reach out to GitaCloud team at connect@gitacloud.com.
If you would like to ramp-up on IBP on your own, access learning.gitacloud.com for SAP IBP Digital Learning content.
Visit www.gitacloud.com to learn more about GitaCloud.
The document discusses the benefits of hiring a project management consultancy (PMC) for construction projects. It notes that without expertise in construction, clients often face cost overruns, delays, and dissatisfaction with the end product. Hiring a PMC can help control costs, ensure quality, and complete projects on time and on budget through services like planning, scheduling, procurement, cost estimation and monitoring. The document also provides an overview of Raistec, a PMC, outlining their vision, services, experience with different project types, and core team.
PMP Training - 04 project integration managementejlp12
Project Integration Management involves identifying, defining, combining, and coordinating the various processes and activities within the five Project Management Process Groups. It includes developing the project charter and project management plan, directing and managing project execution according to the plan, monitoring and controlling the work, performing integrated change control, and closing the project or phase once complete. The project charter and management plan provide the approved scope, schedule, and cost baselines against which project performance is monitored and measured.
Introduction to Project Portfolio Management (PPM)Kimmy Chen
Introduction to project portfolio management
PPM is generally defined as a strategic, mission driven, dynamic decision making process whereby a business list of active projects is constantly updated and revised [Cooper 2001].
Pillars of PPM
- Organization (Executive support, PMO, steering committees)
- Processes (Project feasibility to Project Acquisition)
- Technology (Repository, Document management, Knowledge management)
Benefits of PPM
- Right selection of projects
- Alignment with strategic goals
As far as any project cycle is concerned, it’s important to give it a good closure in the form of PPT presentation slide. This project closure is generally the fourth or last stage in any planned project PowerPoint layout. The Project Closure PowerPoint Presentation Slides ensure that project is brought to near completion mode in a carefully structured or professional manner. Whether you are presenting on project completion, project issue, termination or execution, the PPT template ensures every section or segment is given right amount of space and importance. Confirmation about the fact that the work has been rightly done, gaining a formal acceptance and finally completing off with performance rating, all this can be easily recorded and maintained using this presentation layout. As part of management process, it’s important to use professional designs and PPT template to put forward all the deliverables to the customers and timely updating all the stakeholders regarding all project activities. Each PowerPoint slide makes the concept visually engaging and easy to understand. Get folks eager for an exciting experience with our Project Closure Powerpoint Presentation Slides. They ensure a bigger headcount. https://bit.ly/3suHPoS
Hybrid Cloud Journey - Maximizing Private and Public CloudRyan Lynn
This presentation walks through the elements of private and public cloud and how to start looking at use cases for hybrid cloud architectures. It covers benefits, statistics, trends and practical next steps for your hybrid cloud journey.
Live presentation of some of this content: https://www.youtube.com/watch?v=9_5yJr0HKw4&t=13s
The presentation describes approaches how to effectively check project health. Whether as an audit or as a proactive method to mitigate risk of project failure.
JD Edwards EnterpriseOne Real Estate ManagementUBC Corporation
The JD Edwards EnterpriseOne Real Estate Management system is a lease-based system that allows owners and managers to track real estate for financial and reporting needs. It offers features to dynamically update information, adapt to various property management contingencies, and integrate with accounting systems. The primary features include tenant billing, receipt processing, security deposit calculation, sales overage billing, expense passing, lease escalation, holdovers, fee processing and assessment, and rent projections. The system provides a flexible, scalable, and adaptable platform to support real estate portfolio growth and collaboration across organizations.
The document discusses floating storage and regasification units (FSRUs), which are increasingly being used for importing liquefied natural gas (LNG) into small markets. It provides an overview of FSRU technology, current installations and units under construction. Several companies are involved in owning and operating FSRUs, with capital costs to develop an FSRU project ranging from $150-300 million. Operating and maintenance costs are approximately $10-25 per tonne of LNG processed. FSRUs provide a flexible option for new gas markets that do not have sufficient infrastructure or demand to justify permanent onshore facilities.
The processes from the PMBOK® Guide — Sixth Edition are separated into colors according to their respective knowledge areas. Only the main connections are shown in this process flow.
See related content at https://ricardo-vargas.com/pmbok6-processes-flow/
Este documento describe los procesos clave para la gestión del cronograma de un proyecto de ingeniería. Estos incluyen planificar la gestión del cronograma, definir y secuenciar las actividades, estimar los recursos y duración de cada actividad, desarrollar el cronograma utilizando técnicas como el método de la ruta crítica y controlar el cronograma durante la ejecución del proyecto. El documento también explica los diferentes tipos de cronogramas, herramientas y salidas de la programación de proyectos.
This document provides information on business composability including definitions, principles, and how organizations can transition from traditional to composable. It defines a composable business as one that is architected for real-time adaptability and resilience through a mindset of modularity. Key aspects include developing interchangeable business blocks, autonomous teams, and composable technologies and strategies to accelerate change. The document discusses expected changes in areas like strategy, customers, workforce, and operations to achieve a highly composable organization.
The document provides details about the Stick to the Mitten project, which aims to decrease student debt in Michigan by connecting students and businesses through internship opportunities. Key points:
- The project will offer tax incentives to businesses that provide internships and tuition credit to students as part of their compensation to help lower student debt.
- It will launch initially at Michigan's 15 state universities for junior and senior students and expand to community colleges after the first year.
- A project charter, scope, budget, timeline, and other documents are included that outline the goals, deliverables, acceptance criteria, stakeholders, and plans for implementing and measuring the success of the Stick to the Mitten program.
With generous support from AT&T, America’s Promise will invest in two states and three communities to support more young people toward the critical milestone of high school graduation.
Submission deadline is November 8th, 2017
In this presentation we have done earlier a project for Phillip Morris (Pakistan) for the access control system and canteen management system. It is the project presentation for our subject Planning and Scheduling. i hope it is the best for the understanding Project planning and scheduling.
“You can download this product from SlideTeam.net”
Create a financial proposal using content-ready Financial Proposal PowerPoint Presentation Slides. Add all the relevant templates related to a budget setting with the help of financial proposal PowerPoint slideshow. Set up a budget limit for your next project and include estimation cost, cost factors and assignment, directs costs, etc by adding financial proposal PPT template. This ready-to-use financial proposal PowerPoint slideshow covers topics like proposal outline, executive summary, business performance, business highlights, financial summary, and more. Explain to your sales manager regarding revenue split, competitive landscape, top creditors using financial proposal PPT slides. Not just this, discuss at length about cash flow statement, income statement, balance sheet, key financial ratios, and financial projects. This deck is your one stop solution for financial and budget proposal. Grab this content-ready financial proposal complete PowerPoint presentation now and get start with budget setting using these important PPT templates. Instill faith in your ability to deliver with our Financial Proposal Powerpoint Presentation Slides. Be able to hold the job down. https://bit.ly/3o51Hyi
The document provides a checklist for conducting a project health check to ensure projects are delivering value. It includes questions about the project scope, cost, schedule, staffing, systems, organization, communication, issue management, change control, risk management, quality management, procurement, contingency planning, benefits management, business processes, training, implementation, governance, documentation, and top management support. The questions are meant to evaluate whether key project elements and processes are defined, documented, being followed and delivering as intended.
The document contains interview questions and answers for planning engineers. It includes 18 questions related to scheduling topics like constraints in Primavera, critical path identification, float, schedule development, resource leveling, and the role of a planning engineer. The answers provide explanations of scheduling concepts and best practices.
Sage ERP X3 is an ERP software package designed for mid-sized companies that supports all business processes across finance, distribution, and manufacturing within a single system. It provides flexibility and functionality to manage global business operations more effectively and at a lower cost than comparable ERP systems. Sage ERP X3 uses a web-native design to facilitate collaboration and information sharing between employees, partners, suppliers and customers. It offers configurable workflows and reporting to provide real-time visibility and informed decision-making across the business.
Amazon Web Services (AWS) provides a low cost, reliable and secure foundation for you to use as you build and deliver Software as a Service (SaaS) solutions to customers. For ISVs, the process of transition from a traditional (license based) model to a Software as a Service (SaaS) is a challenge that concerns not only the technical aspect, but also financial and commercial strategy aspects. In this presentation you will find out how AWS can become the ideal partner to support the transformation.
The document provides information on stakeholder management processes including identifying stakeholders, planning stakeholder management, managing stakeholder engagement, and controlling stakeholder engagement. It discusses identifying people/organizations that could impact project success and analyzing their potential impact. It also describes developing strategies to effectively engage stakeholders based on the analysis, and monitoring stakeholder relationships and adjusting engagement strategies.
Earned value analysis is a project management technique that compares the planned value of work scheduled to the actual cost of work performed and work earned. It measures project performance and progress in three dimensions: planned value, earned value, and actual cost. Planned value defines the work that should have been completed, earned value is the budget associated with work actually completed, and actual cost is the total cost incurred so far. Variance analysis using metrics like the cost performance index, schedule performance index, cost variance, and schedule variance allows evaluation of how a project's performance compares to its plan.
GitaCloud SAP IBP for Inventory Webinar May 25th 2018Ashutosh Bansal
This slide deck was used during the webinar jointly hosted by GitaCloud, SAP, and Demand Driven Institute on 25th May, 2018. It focuses on SAP Integrated Business Planning IBP for Inventory 1805 application capabilities.
The content includes:
1. IBP for Inventory Overview from Beatrice Hulde (IBP for Inventory Solution Owner, SAP)
2. Demand Driven MRP Overview from Chad Smith (Co-Partner, Demand Driven Institute)
3. Detailed showcase of SAP IBP for Inventory across MEIO and DDMRP approaches from Ashutosh Bansal (President & CEO, GitaCloud)
SAP IBP for Inventory can improve revenue and margin through a reduction in stock-outs related lost sales, reduction in expedite costs & inventory carrying costs, and help you run a more efficient business by right sizing inventories to release working capital. Interested in evaluating SAP IBP for your business? You can reach out to GitaCloud team at connect@gitacloud.com.
If you would like to ramp-up on IBP on your own, access learning.gitacloud.com for SAP IBP Digital Learning content.
Visit www.gitacloud.com to learn more about GitaCloud.
The document discusses the benefits of hiring a project management consultancy (PMC) for construction projects. It notes that without expertise in construction, clients often face cost overruns, delays, and dissatisfaction with the end product. Hiring a PMC can help control costs, ensure quality, and complete projects on time and on budget through services like planning, scheduling, procurement, cost estimation and monitoring. The document also provides an overview of Raistec, a PMC, outlining their vision, services, experience with different project types, and core team.
PMP Training - 04 project integration managementejlp12
Project Integration Management involves identifying, defining, combining, and coordinating the various processes and activities within the five Project Management Process Groups. It includes developing the project charter and project management plan, directing and managing project execution according to the plan, monitoring and controlling the work, performing integrated change control, and closing the project or phase once complete. The project charter and management plan provide the approved scope, schedule, and cost baselines against which project performance is monitored and measured.
Introduction to Project Portfolio Management (PPM)Kimmy Chen
Introduction to project portfolio management
PPM is generally defined as a strategic, mission driven, dynamic decision making process whereby a business list of active projects is constantly updated and revised [Cooper 2001].
Pillars of PPM
- Organization (Executive support, PMO, steering committees)
- Processes (Project feasibility to Project Acquisition)
- Technology (Repository, Document management, Knowledge management)
Benefits of PPM
- Right selection of projects
- Alignment with strategic goals
As far as any project cycle is concerned, it’s important to give it a good closure in the form of PPT presentation slide. This project closure is generally the fourth or last stage in any planned project PowerPoint layout. The Project Closure PowerPoint Presentation Slides ensure that project is brought to near completion mode in a carefully structured or professional manner. Whether you are presenting on project completion, project issue, termination or execution, the PPT template ensures every section or segment is given right amount of space and importance. Confirmation about the fact that the work has been rightly done, gaining a formal acceptance and finally completing off with performance rating, all this can be easily recorded and maintained using this presentation layout. As part of management process, it’s important to use professional designs and PPT template to put forward all the deliverables to the customers and timely updating all the stakeholders regarding all project activities. Each PowerPoint slide makes the concept visually engaging and easy to understand. Get folks eager for an exciting experience with our Project Closure Powerpoint Presentation Slides. They ensure a bigger headcount. https://bit.ly/3suHPoS
Hybrid Cloud Journey - Maximizing Private and Public CloudRyan Lynn
This presentation walks through the elements of private and public cloud and how to start looking at use cases for hybrid cloud architectures. It covers benefits, statistics, trends and practical next steps for your hybrid cloud journey.
Live presentation of some of this content: https://www.youtube.com/watch?v=9_5yJr0HKw4&t=13s
The presentation describes approaches how to effectively check project health. Whether as an audit or as a proactive method to mitigate risk of project failure.
JD Edwards EnterpriseOne Real Estate ManagementUBC Corporation
The JD Edwards EnterpriseOne Real Estate Management system is a lease-based system that allows owners and managers to track real estate for financial and reporting needs. It offers features to dynamically update information, adapt to various property management contingencies, and integrate with accounting systems. The primary features include tenant billing, receipt processing, security deposit calculation, sales overage billing, expense passing, lease escalation, holdovers, fee processing and assessment, and rent projections. The system provides a flexible, scalable, and adaptable platform to support real estate portfolio growth and collaboration across organizations.
The document discusses floating storage and regasification units (FSRUs), which are increasingly being used for importing liquefied natural gas (LNG) into small markets. It provides an overview of FSRU technology, current installations and units under construction. Several companies are involved in owning and operating FSRUs, with capital costs to develop an FSRU project ranging from $150-300 million. Operating and maintenance costs are approximately $10-25 per tonne of LNG processed. FSRUs provide a flexible option for new gas markets that do not have sufficient infrastructure or demand to justify permanent onshore facilities.
The processes from the PMBOK® Guide — Sixth Edition are separated into colors according to their respective knowledge areas. Only the main connections are shown in this process flow.
See related content at https://ricardo-vargas.com/pmbok6-processes-flow/
Este documento describe los procesos clave para la gestión del cronograma de un proyecto de ingeniería. Estos incluyen planificar la gestión del cronograma, definir y secuenciar las actividades, estimar los recursos y duración de cada actividad, desarrollar el cronograma utilizando técnicas como el método de la ruta crítica y controlar el cronograma durante la ejecución del proyecto. El documento también explica los diferentes tipos de cronogramas, herramientas y salidas de la programación de proyectos.
This document provides information on business composability including definitions, principles, and how organizations can transition from traditional to composable. It defines a composable business as one that is architected for real-time adaptability and resilience through a mindset of modularity. Key aspects include developing interchangeable business blocks, autonomous teams, and composable technologies and strategies to accelerate change. The document discusses expected changes in areas like strategy, customers, workforce, and operations to achieve a highly composable organization.
The document provides details about the Stick to the Mitten project, which aims to decrease student debt in Michigan by connecting students and businesses through internship opportunities. Key points:
- The project will offer tax incentives to businesses that provide internships and tuition credit to students as part of their compensation to help lower student debt.
- It will launch initially at Michigan's 15 state universities for junior and senior students and expand to community colleges after the first year.
- A project charter, scope, budget, timeline, and other documents are included that outline the goals, deliverables, acceptance criteria, stakeholders, and plans for implementing and measuring the success of the Stick to the Mitten program.
With generous support from AT&T, America’s Promise will invest in two states and three communities to support more young people toward the critical milestone of high school graduation.
Submission deadline is November 8th, 2017
This document provides a summary of several articles in a newsletter from the Michigan Department of Career Development. It discusses changes to the requirements to qualify for Michigan Merit Awards, including raising the WorkKeys test score levels. It also describes a new Michigan Career Readiness Certificate that can be earned through WorkKeys testing, and notes expanded opportunities for WorkKeys testing across the state. Finally, it summarizes an article about the growing importance of technology education in schools.
Project Proposal Example
Project Proposal Essay
Reserch Proposal Example
Essay On Asda Group
Research Proposal
Proposal Paper
Sample Grant Proposal Essay
Business Architectural Proposal Essay examples
Crime Research Proposal
Sample Proposal Letter Essay
Teen Suicide Case Study Essay
- The document provides updates on enrollment numbers, an ongoing dean search, and upcoming events at Louisiana Tech University's College of Business. First-time freshman enrollment was up 13% and total enrollment in the college of business was 1147, a 3.1% increase. The search committee for a new dean hopes to make recommendations in February.
- The computer information systems program at Louisiana Tech prepares students with both technical and business skills for careers in fields like software development, database administration, and project management. The program partners with local companies like Computer Sciences Corporation and CenturyLink to provide career opportunities for graduates.
- Dr. Christie Fuller of the College of Business recently obtained the CISSP (Certified Information Systems Security Professional
Julie discussionHi everyone,Jamestown College is my selected.docxcroysierkathey
Julie discussion
Hi everyone,
Jamestown College is my selected institution. My program evaluation has yielded three areas of recommendation for continuous improvement. It is suggested that five more sections of introductory-level engineering classes are added into the curriculum in order to improve graduation career prospects. According to the text, “in 2012, 88 percent of respondents to the freshman survey conducted by the Cooperative Institutional Research Program indicated that “to be able to get a better job” was a very important reason for deciding to go to college …” (Banta, 2015, p. 145) and so we see that career prospects are important to students. It is recommended that the Mathematics department roll out a strategic enrollment plan to increase the number of women and underrepresented minority groups to the major. Lastly, it is recommended that the College create a stronger workforce development program by introducing an applied project, “…allowing students to practice problem-solving skills, communication skills, and if they are working in a group, teamwork skills as well” (Banta, 2015, p. 159).
It will cost an average of $62,000 per year to hire a Ph.D. level Engineering adjunct professor to teach five sections of 100-level Engineering courses. We have learned in previous modules that careers in Mathematics are looking for some working knowledge of Engineering and the curriculum, as it stands right now, does not offer that.
The recommendation to increase enrollment is to specifically recruit women and underrepresented minority groups to the Science, Technology, Engineering, and Mathematics majors, also known as STEM. Using the model described in Information Systems Education Journal, this growth in enrollment should come from a combination of faculty outreach to the community through classroom visits to community colleges, and by appointing these newly recruited students to a formal grant-funded “scholars” program. My recommendation would be for Jamestown College to hire a contract grant writer to the Mathematics program for $35,000 per year with no benefits. This grant writer should work to secure a grant from the National Science Foundation to fund a “scholars” program which will, “provide guidance and continued support to women and underrepresented minorities from the beginning of their experiences in higher education until they reach their goal of a career in science, technology, and mathematics” (Tupper, D.H., 2005, p. 4).
Enhancing workforce development through an applied project is recommended for the Mathematics major at Jamestown College. “Because applied projects include a product or report that is shared with clients, clients are generally involved in project evaluation” (Banta, 2015, p. 159 ). I believe that forming employer-partner relationships could be done by hosting some “lunch and learn” style events on campus, where employers would come to campus for faculty to present the offer of their stude ...
Performance Based Funding – A new era in accountability?InsideTrack
Data visualization of "Performance Based Funding – A new era in accountability?" Many states are now reconsidering the funding by enrollment model for state appropriations.
1 ms business plan executive summary v4.2Brandon Smith
The 1st Maker Space concept plans to disrupt K12 education and vocational training by leveraging their experience in 3D printing. They have developed curriculum and trained over 250 students in 3D modeling. They plan to generate revenue through after-school/summer camp programs in maker spaces developed in partner schools. Additional revenue will come from certification programs for young adults and consulting services to help schools develop maker programs. An investment of $500k is requested to expand these initiatives.
This document summarizes challenges and solutions for measuring outcomes of youth workforce development projects. It discusses indicator frameworks for measuring outputs and outcomes of activities like training, mentoring, loans and employment. Case studies from Partner Microcredit Foundation and Education Development Center highlight challenges in tracking employment, businesses and impact over time. Small group discussions focused on selecting appropriate indicators and evaluating two specific projects. The document emphasizes the importance of measuring outcomes beyond just employment.
This document proposes developing the first program dedicated to addressing the technology skills gap in Latin America's growing economies. It would offer online courses in fields like AI, data analysis, and algorithmic trading. Participants would take MOOC courses and receive income share agreements to fund the program. The program aims to prepare participants for jobs in multinational corporations and Latin American startups. Case studies on existing income share agreement programs at universities are provided. Financial projections estimate the potential for $50 million in revenue from 1,000 participants over 10 years. The goal is to launch an MVP over the next 6 months to test the model in Colombia.
This document discusses competency-based education and its role in increasing student completion rates. It argues that competency-based models focus on what students learn rather than how long they spend in the classroom. Students can earn credits by demonstrating their mastery of skills. The document outlines how competency-based strategies can help more students complete their education through options like online learning, credit for prior experience, and accelerated learning. It also discusses the process institutions must follow to implement competency-based programs and earn federal financial aid eligibility. Overall, the document promotes competency-based education as an effective way to increase student completion and better serve nontraditional students like adult learners.
This document provides details about a project to develop a plan to better utilize new software called Rapid Insight to change how an admissions office manages undergraduate inquiries and focuses their recruitment efforts. The goals are to develop an alternative inquiry management system to more effectively market to prospective students, create a list of inquiries ranked by likelihood of applying, and train another person to use Rapid Insight. Stakeholders include various admissions administrators and staff. The project aims to increase enrollment numbers through more targeted outreach while reducing resources spent on inquiries unlikely to apply.
Ross discussionI attended Southern New Hampshire University (SN.docxhealdkathaleen
Ross discussion:
I attended Southern New Hampshire University (SNHU) for my undergraduate program. My program was a bachelor’s in liberal arts: General Studies. The program outcomes are located at https://www.snhu.edu/online-degrees/bachelors/ba-in-general-studies.
A general studies degree allowed me to bring over credits that I had earned earlier in life, while allowing me to focus on my area of concentration. The program outcomes included learning how to apply critical thinking into the areas of study that were of interest. It provided a broad base of courses that I was able to customize to my needs ("General Degree," 2019).
Southern New Hampshire University’s mission, vision and goals are as follows “SNHU transforms the lives of learners. Our success is defined by our learners’ success. By relentlessly challenging the status quo and providing the best support in higher education, SNHU expands access to education by creating high-quality, affordable, and innovative pathways to meet the unique needs of each and every learner” ("About Us," 2019, para. 2). The SNHU vision states, “Make the world a better and more just place through our work, one learner at a time” ("SNHU Strategic Plan," n.d., p. 9, para.2). Core values are key to the university, exude passion, challenge the status quo, do the right thing every time, exhibit grit and embrace diversity.
The mission and vision and core values can be found at: https://snhu-externalaffairs.app.box.com/s/7k526w442reszti50fdtceyrre2f1il8.
In my experience the university met not only the program outcomes, but it also met it’s mission, vision and core values in my undergraduate program. I was supported by the university, challenged and was offered educational opportunities that were greater than the status quo found at other institutions. The staff and instructors were passionate about the material being taught and always treated me with the utmost respect and when I had concerns or issues with grading or materials they always sought to offer me options that were right for me and my learning disabilities.
Program assessment begins with a clear explanation of the mission, vision, gals and desired learning outcomes of the program. Statements should include what the graduates of the program should know, do and value by the time they complete their studies. The assessment of learning outcomes will help to identify if the program is accomplishing what has benn set to provide and allow for continuous improvement of the program (Banta & Palomba, 2015).
Mark Discussion:
I attended Granite State College for my undergraduate degree in Human Resources Management. The program has since changed the title to Human Resource Administration. As can be seen in many individual program’s outcomes, there is a general failure to tie back to the overall organization’s mission, vision and goals.
Granite State College’s mission and vision can be found at https://www.granite.edu/about/mission/ . From there follow the li ...
RDU works to:
- Identify strategies to improve existing operations and products
- Assess feasibility for new products through market research and consumer insight
- Design and pilot new products and processes
- Explore and manage “finance-plus” initiatives and partnerships
This document outlines action items schools can take to lower their cohort default rates. It recommends filing challenges and appeals, analyzing defaulter data to find patterns, reviewing enrollment reporting processes, synchronizing retention and default prevention plans, committing to financial education, creating or revising student success plans, and considering outsourcing borrower communication to USA Funds. The document provides context on why cohort default rates matter and consequences of high rates, and gives examples from Iowa community colleges of insights gained from analyzing defaulter data.
New & Next Webinar Series | Top Facilities and Operations Challenges Facing C...Morgan Noonan
Cushman & Wakefield’s Education Practice Group is a full-service, integrated advisory team focused on real estate solutions for the education sector. Join the Group’s Global Leader, Craig Cassell, as he shares thoughts and ideas on recent trends in the industry regarding enhancing the student experience, driving operational savings, and funding new buildings and renovating existing ones.
FSM aims to increase higher education access and success for youth from foster care in Michigan. From 2012-2014, FSM focused on short-term outcomes. It established 12 on-campus support programs, up from 5 originally. It provided backbone support to these programs through its Higher Education Consortium. Enrollment of youth from foster care in higher education increased over this period as well. While progress was made on short-term goals, longer-term outcomes like graduation rates and career transition success will require continued effort.
Supporting statements are usually the most significant parts of the employment applications because the allow to justify the reasons you should be taken. If well written, it can give one an edge over other applicants. It avails one the opportunity to buttress other points that would have otherwise been impossible on the application form
Wake Technical Community College plans to train 450 people for information technology (IT) jobs in healthcare, cybersecurity, manufacturing, and financial services through Project SECURE — Supporting and Enhancing Cybersecurity through Upwardly Mobile Retraining and Education.
Master's Degree in Social Media - Information PacketAndrew Selepak
Information packet on the University of Florida's Master's in Mass Communication Degree with a specialization in Social Media from the College of Journalism and Communication
2. Page | 1
GoldenConsulting Group, LLC
(Endorsed by Western Michigan University)
Golden Consulting Group provides comprehensive project management consulting services.
Our commitment to innovation, and finding ways to draw upon our knowledge and
experiences, brings you faster, smarter, more cost effective solutions. Success in the field has
marked us as one of the best up and coming firms in West Michigan. We serve leading
businesses, government, and not for profit organizations. Our mission is to help our clients
make lasting improvements to their environment, productivity, and performance. We provide
the structure and resources needed to reach each clients’ most important goals.
Golden Consulting Group was founded in 2014. All consultants associated with GCG received
their education at Western Michigan University in Kalamazoo Michigan. The team gathered
together as a group of young professionals seeking to further their education and their careers.
The mix of professional areas of study offers the team a unique experience in which they gain
by learning from each other. GCG is people based and knowledge driven. Every experience
teaches the group that well planned change will lead to exponential results.
Team Member Project Role
Kaitlyn Maybee Project Manager
Devan Clements Human Resources Administrator
Kimberly Pound Research and Development
Joseph Burkhead Director of Information Technology
Thomas Spitzer Director of Finance and Operations
Jeremy Hatter Research and Development
3. Page | 2
Abstract
The cost of higher education for students in Michigan has become increasingly less affordable.
With Michigan being one of the most expensive states to attend college in, we look for
solutions to this crisis. In the following document we have created ways to fund students that
will not add debt to the State of Michigan or demand tax payer dollars. We present ways to
educate students about funding options, decrease the amount spent per student, and increase
the amount of funding available. The purpose of this document is to demonstrate how
Michigan officials can lower costs for students in their state.
Source: University of Michigan- Understanding Tuition
4. Page | 3
TABLE OF CONTENTS
Project Charter .................................................................................................. 4
Project Scope Document.................................................................................. 11
Work Breakdown Structure.............................................................................. 16
Stakeholder Management Plan......................................................................... 20
Roles and Responsibility Matrix........................................................................ 24
Communications Plan ...................................................................................... 30
High Level Budget ............................................................................................ 35
Detailed level timeline with dependancies ........................................................ 37
Glossary........................................................................................................... 44
Approvals........................................................................................................ 45
Approvals........................................................................................................ 46
Change History ................................................................................................ 47
5. Page | 4
Project Charter
Project Name: Improving the Affordability of Higher Education in Michigan
Project Manager: Kaitlyn Maybee and Devan Clements
Executive Sponsor: Governor Rick Snyder
Purpose of the Project
The purpose of this project is to lower the cost of attending college in the State of Michigan.
Michigan currently ranks the 5th highest in average tuition per student. Sixty three percent of
Michigan students graduate with debt associated to their higher education. The top twenty
colleges across Michigan report an average cost of $39,625 for the full four years.
Due to reductionsinthe budget and an increasing number of studentsattendingcollege,
government funding for students has been decreasing since 2008. Current Michigan residents
and voters agree the cost of higher education is almost too much to bear. Students statewide
find themselves asking if their education was worth the price tag. With Governor Rick Snyder
working hard to decrease Michigan’s deficit, it is important to find alternative ways to help
students enter the work force with less debt.
Project Description
The cost of higher education for students in Michigan has become increasingly less affordable.
With Michigan being one of the most expensive states to attend college in, we look for
solutions to this crisis.
In the following project plan we resolve to define alternative ways to fund students in the State
of Michigan. It is our objective to present a plan that will not add debt to the state or demand
tax payer dollars. The plan will present ways to educate students about funding options,
decrease the amount spent per student, and increase the amount of funding available.
Together, these three approaches will create a comprehensive plan to reduce the average cost
of attending college for Michigan students.
Through research, implementation, and monitoring the out of pocket cost can greatly decrease.
The purpose of this document is to outline how Michigan officials can implement a plan to
lower costs for students.
6. Page | 5
Scope Statement
The scope of this project is to aid the State of Michigan in its mission to lower the cost of higher
education for its residents. The project will save tax payers dollars by increasing the amount of
external funding available. The project plan outlines a comprehensive solution focusing on 3
areas of improvement; Education and Outreach, Curriculum Acceptance, and Business
Incorporation. Together these three components will decrease out of pocket costs for each
degree seeking student.
Summary Budget
The budget below assumes that wages paid to the workforce will be competitive, contracting
for the data storage service and programming for the GUI will remain at the current market
price, and asks for a 4.4% contingency to cover any unforeseen costs. Please note these
preliminary numbers will change as we lean more about our project.
Expense Activity Percent of
Total Budget
Cost in
Dollars
ScholarshipSearch Engine
Researchers/crawlersto locate the availablescholarships 35.3% $600,000
Data storageand organization 41.2% $700,000
Building the graphicuserinterface (GUI) 11.8% $310,000
Transfer Credits
Administration costs 2.9% $345,000
BusinessInvestment
Recruiting costs 4.4% $75,000
ContingencyAllowance
(requiresstakeholderapproval)
10% $190,000
Totals 100% 2,110.000
Lower
costs for
Michigan
Students
Education
and Outreach
Curriculum
Acceptance
Business
Incorporation
7. Page | 6
Initial Risks
Threat risks
Time
The curriculum requirements must be set forth before August 1, 2016, as outlined in the
project schedule, or it will not be ready for the 2016-2017 school year.
The search engine must be up and running by January 1st, 2016, or it will not be ready
for the scholarship application season.
If tasks become delayed, the release of each phase may lose its effectiveness.
Scope
If the board of education chooses not to endorse and perform the marketing for the
search engine, students may not know the resources available to them in order to save
costs on college.
Michigan businesses may lack of funding to add new positions.
Private schools are not funded by the State of Michigan, so they are not obligated to
accept our programs.
Employers could view our business incentives program as undermining the level of
education undergraduates receive in Michigan.
Cost
Market prices for data storage used for the search engine could increase during the next
two years.
The demand for skilled workers such as researchers and programmers may go up driving
up the cost of staffing the project.
Quality
Internet search engines are take place in a rapidly changing environment with
information constantly being uploaded and modified, so the scholarship search engine’s
system may not be able to accurately and consistently capture all of the potential
information for all the grants and scholarships that are available, thus making it less
effective.
Risk
A surplus of students looking for scholarships may simultaneously visit the new website
and overload the server causing it to crash.
Search engine website could encounter a DDoS Attack.
Opportunity Risks
Businesses may see offering internships as a successful training tool for higher positions
within the company. If a student becomes a good contributor during their internship,
more students could be offered full time employment.
The State of Michigan may not be able to provide adequate funding for the project.
Criteria for a transfer credit system is accepted allowing more students to attend
community college for general education classes and lowering their costs of higher
education.
8. Page | 7
Major Milestone Schedule
Milestone Begin End
ProjectManagement 12/1/14 4/13/15
Phase Gate 1: DocumentSet1 12/1/14 2/5/15
ProjectCharter 12/1/14 2/5/15
ProjectScope 12/1/14 2/5/15
Work BreakdownSchedule 12/1/14 2/5/15
Phase Gate 2: DocumentSet2 2/5/15 3/8/15
StakeholderManagement 2/5/15 3/8/15
Human Resource Management 2/5/15 3/8/15
CommunicationManagement 2/5/15 3/8/15
Time Management 2/5/15 3/8/15
Cost Management 2/5/15 3/8/15
Phase Gate 3: Final ProjectPlan 3/8/15 3/26/15
Phase Gate 4: StakeholderApproval 3/26/15 4/13/15
ResearchandAnalysis 4/13/15 6/30/15
ProjectResearch April 2015 June 2015
ProjectImplementation June 2015 September2016
SearchEngine Live June 2015 January 2016
CurriculumGuideline Accepted August 2015 August 2016
Legislationfortax Incentive September2015 September2016
Monitor September2016 September2017
Close September2017 September2017
Project Close September 2017
9. Page | 8
Success CriteriaStatements
For this project to be considered successful it must be completed according to the schedule. It
must stay within the estimated budget and be fully functional after implementation. The goal of
this project is to help students in three ways; to find scholarships they qualify more easily,
acquire more internships that can pay them better, and help transfer students from having to
retake classes.
Acceptance Criteria
The completion dates that are designated for the projects are based on them being ready in
time for the busiest season for their use. The project will close and be considered completed
successfully when all phases are completed, and they have been approved by the client. It is
only acceptable to fulfill the scope as set forth by this document.
Success will be defined as completing all three phases:
Within the specified budget, including contingency.
On schedule according to the completion dates mentioned above.
Within the scope set forth in the document of this project.
Using limited resources, including capital and human expenses.
Without taking on any additional risks.
Deliverables are done with superior quality and have been removed of all
imperfections.
The overall aimof this project to reduce student costs for higher education by a
minimum of $1,000 per student (for 500,000 students) by project close, or $500 million.
Project Authority Limitations
Each team member has the following roles, responsibilities, and restrictions within the life of
the project:
Kaitlyn Maybee, Project Manager
As Project Manager, Kaitlyn is responsible for setting realistic and achievable boundaries
for the project team. Tasks of the larger project will be assigned to team members by
Kaitlyn. She will ensure the project is completed within the constraints of the scope,
remains on budget, stays on schedule by meeting milestone deadlines, and satisfies the
client’s purpose. She will organize and plan team meetings to ensure efficient use of
time, as well as guide team discussions. Kaitlyn will be the point of contact for the client,
Governor Rick Snyder. Kaitlyn will negotiate changes to the project charter and scope
directly with the client via the change management process. In the event of an issue or
concern Kaitlyn will address these according to the Project Management Body of
Knowledge 5th edition (current international standard).
10. Page | 9
Devan Clements, Human Resource Administrator
As Human Resource Administrator, Devan will provide information regarding the
resources needed to complete the project plan. Devan will be responsible for presenting
contract candidates as necessary. During the life of the project, his main responsibility
will be ensuring all team members meet due dates as set forth by Project Manager,
Kaitlyn Maybee. He will also share the roll of task and resource assignment with Kaitlyn.
In the event of Kaitlyn’s absence, Devan will assume her responsibilities as listed above.
Devan will use MS Project to track progress on milestones. If Devan notices any
discrepancies with the timeline, he will discuss it directly with Project Manager, Kaitlyn
Maybee.
Thomas Spitzer, Director of Finance and Operations
As Director of Finance and Operations, Thomas is responsible for communicating with
the group as to their budgeting needs. Thomas will provide reliable cost estimates from
potential contractors or through extensive research. He will utilize MS project to ensure
the project is staying on budget. If Thomas notices any discrepancy with the budget, he
will discuss it directly with Project Manager, Kaitlyn Maybee.
Jeremy Hatter, Research and Development
As a Research Specialist, Jeremy will provide the team with current and reliable data
from credible sources for use in project development. The data provided will support
project plans. Research will be, but is not limited to: historical data, current statistics,
and information from external contractors. Any information Jeremy presents to the
team should be in a format that is clear, concise, and beneficial. All data provided must
be within the scope and schedule of the project plan.
Kimberly Pound, Research and Development
As a Research Specialist, Kimberly will provide the team with current and reliable data
from credible sources for use in project development. The data provided will support
project plans. Research will be, but is not limited to: historical data, current statistics,
and information from external contractors. Any information Kimberly presents to the
team should be in a format that is clear, concise, and beneficial. All data provided must
be within the scope and schedule of the project plan.
Joseph Burkhead, Director of Information Technology
As Director of Information Technology, Joseph will provide technical direction, design,
and support to the project team. Joseph will give the team reliable information
regarding tasks and costs of all technical projects within the project plan. As the
information technology expert Joseph will be asked to define constraints, exclusions,
and assumptions regarding all technical projects.
11. Page | 10
EscalationPath
The Project Teamwill go through the following path of escalation of any issues outside of the
Project Manager’s authority:
1. Project Team
Communication in peer to peer setting
2. Project Manager, Kaitlyn Maybee
3. Contract Manager
If applicable; The manager of the specific contracted team in which the issue is
associated
4. Michigan Board of Education, President John Austin
5. Executive Sponsor, Governor Rick Snyder
Project
Team
Project
Manager
Contract
Manager
Michigan
Board of
Education
Executive
Sponsor
12. Page | 11
Project Scope Document
Project Scope
The scope of this project is to aid the State of Michigan in its mission to lower the cost of higher
education for its residents. The project will save taxpayers’ dollars by increasing the amount of
funding from non-government sources. The project plan outlines a comprehensive solution
focusing on three areas of improvement; Education and Outreach, Curriculum Acceptance, and
Business Incorporation. Together these three components will decrease out of pocket costs for
each degree-seeking student.
Our plan reduces costs for Michigan students in three different ways. After the implementation
of this plan, students will be able to easily locate scholarships they qualify for, more easily use
credits obtained in high school and in the community college setting toward a bachelor’s
degree, and locate paid internships in their field of study to help curb the tuition burden on
each family.
Project Deliverables
Our team will accomplish this goal by offering three areas of improvements. This will aid the
state by giving them multiple ways to implement improvements with low startup costs.
• Focuses on the communities’ knowledge of financial aid available to them. The
team recommends the implementation of a user friendly search engine for
Michigan students to locate scholarships and grants that apply to their needs.
Education and Outreach
• Addresses the need for a standard guideline for high school advanced
placement (AP) courses and community college general education courses that
can be transferred. This will improve the transfer credit systemhelping students
transfer credits earned through high school and community college programs
to universities programs for continued education on their degree path. These
alternative education paths offer lower overall tuition costs.
Curriculum Acceptance
• Focuses on the communities’ knowledge of financial aid available to them. The
team recommends the implementation of a user friendly search engine for
Michigan students to locate scholarships and grants that apply to their needs.
Business Incorporation
13. Page | 12
Deliverable Specific AcceptanceCriteria
The project will close and be considered completed successfully when, any changes to budget,
schedule, scope, or major milestones negotiated and approved by the client. It is only
acceptable to fulfill the scope as set forth by this document. Success will be defined as
completing all three phases on budget, on schedule, within scope, using limited resources, at
low risk, and high quality. The project will also be considered a success by the effectiveness of
each of our strategies.
Education and Outreach
The search engine should increase the average scholarship funding per student in
Michigan by either one extra scholarship or $500 per student.
When measuring the traffic to the website, we should reach 10,000 users per day the
end of January 2017.
To determine if we meet our goal of building a private and secure website, this can only
be met if there are no breaches of user information.
Curriculum Acceptance
The average amount of credits hours spent on an Associate’s degree per student should
be reduced from 80 credits to 75 credits (required for graduation is typically 60 hours).
The average amount of credit hours spent on a Bachelor’s degree should decrease from
136.5 to 132 (required for graduation is typically 124 hours).
Business Incorporation
Increase the amount of students that currently participate in a work-study or internship
program while enrolled full-time by at least 20%.
Budget
Resources spent during research and implementation are at or below approved budget
of $1,700,000 including contingency.
The approved budget includes a contingency that requires stakeholder approval before
use.
Schedule
Project management phase is complete by April 13th, 2015.
Implementation begins no later than May 11th, 2015.
Total Implementation
Reduce student costs for higher education by a minimum of $1,000 per student (for
500,000 students) by project close.
14. Page | 13
HighLevel Requirements
Education and Outreach
The search engine website shall handle high traffic during peak scholarship and
grant application deadlines.
The search engine shall provide accurate online results.
The search engine shall use dedicated servers to provide a “four nines” network
connection to students.
The search engine shall be free to students in high school and enrolled in college,
requiring certain criteria to be met to access the database. This also adds an extra
layer of security and less spam.
The database that is built for the search engine must be able to store 4TB of data.
The search engine shall store data on the cloud using Google Drive.
The website must utilize industry standard encryption to protect student’s personal
information.
Curriculum Acceptance
The State of Michigan Department of Education must provide one set of standard
curriculum criteria for each general education course that will qualify for open
transfer across Michigan universities.
All public universities that receive government funding in Michigan must participate
in the Curriculum Acceptance plan, therefore assuring their general education
courses meet the standard curriculum criteria.
Business Incorporation
Businesses shallhire more students to obtain the newly implemented tax incentives.
15. Page | 14
Major Milestone Schedule
WBS
Task #
Task Date Complete
1 Project Management 4/13/15
1.1 Phase Gate 1: Document Set 1 2/5/15
1.2 Phase Gate 2: Document Set 2 3/8/15
1.3 Phase Gate 3: Final Project Plan 3/26/15
1.4 Phase Gate 4: Project Due 4/13/15
2 Research And Analysis 6/30/15
2.1 Research of search engine tools 5/30/15
2.2 Research current transfer credit system 5/30/15
2.3 Research business investment opportunities 5/30/15
3 Execution 9/1/17
3.1 Implementation of Education and Outreach 1/1/16
3.2 Implementation of Curriculum Acceptance 8/1/16
3.3 Implementation of Business Incorporation 9/1/16
4 Project Closeout Activities 9/30/17
4.1 Review implementation results with executive sponsor 9/8/17
16. Page | 15
Scope Exclusions, Assumptions, andConstraints
The following sections on exclusions, assumptions, and constraints that define the reach of the
project are based upon the triple triangle. The three constraints that guide these sections are
scope, time (schedule), and cost (budget). Exclusions will be items that are outside the project
teams responsibility based on the three constraints. Assumptions are the basis of project
success. Without these true assumptions the status of the project will need to be reevaluated.
Any assumptions that no longer remain true will follow the escalation path as agreed upon in
the project charter. Finally, the constraints will represent any project component that may
hinder project completion as planned. If any constraint is not overcame it shall follow the
escalation process as agreed upon in the project charter.
Scope
Time
Cost
17. Page | 16
Exclusions
● The utilization of profits from the Michigan Lottery to offset education costs.
● Determine incentive details for businesses should be handled by the state legislature.
● The implementation of a Loan forgiveness plan to students by the federal government.
● Determining the appropriate expenses for universities.
● The time needed beyond implementation for search engine maintenance.
● The time it takes for legislation to be passed into law shall not be included in the project
schedule.
● Wages spent and fees acquired through maintaining the search engine website.
● Salaries of state legislators for time spent on creation of the tax incentive law.
Assumptions
● We assume that staffing for these projects will be readily available.
● We assume students will be familiar with how to use a search engine.
● We assume that a Decision Matrix for transfer credits will be decided by the Michigan
Department of Education.
● We assume that it is feasible to conduct research and create a search engine by January
2016
● We assume the State of Michigan will spend time to pass legislation on tax incentives
for Michigan business that provide internships to Michigan college students
● We assume that universities are unable to cut any spending.
● We assume that the State of Michigan has good reason that they have been recently
decreasing funding for students.
● We assume that funding for the project plan will be provided by the State of Michigan.
Constraints
● Professors refuse to adopt curriculum guideline and edit their course plan for upcoming
semesters.
● The search engine must be ready for implementation by January 30th of 2016, the peak
season for students to apply for financial aid during the year.
● The Department of Education must provide a curriculum guideline by August 1st, 2016
to implement changes for the 2016-2017 school year.
● The legislation regarding tax incentives to businesses could be delayed if there is not an
agreement on the conditions in the Michigan court system, delaying the
implementation of the Business Incentive plan.
● The cost prohibitive nature of creating a search engine.
● The costs of hiring student interns in some programs, could result in companies
spending more than on alternatives, such as outsourcing.
21. Page | 20
Stakeholder Management Plan
Stakeholder Register
The Stakeholder Management Plan is a necessary part of the planning process aimed at building
and maintaining constructive relationships with project contributors. By defining stakeholder’s
expectations of gain from their participation in the project plan, we clarify the roles and
responsibilities of each party. Each stakeholder is affected by the project plan and is therefore
a main part of its success. The elicit expectations of all stakeholders can be found on the
Stakeholder Register, Table 1.2. These expectations have helped the project team define the
scope and success criteria of this project.
Register Definitions Table 1.1
Term Definition
Name The name of the stakeholder or point of contact.
Position The employment title that gives the stakeholder authority to act on project
elements.
Project Role The function one assumes within the project to work toward task completion
Address The mailing location of the stakeholder.
Email The preferred electronic mailing address of the stakeholder
Requirements The high-level items that the stakeholder requires for project completion.
Expectations The items the stakeholder expects as a result of the project
Influence The portion of the project the stakeholder has the capacity to change or affect.
Classifications Internal- stakeholder that are inside the project team.
External- stakeholders outside the project group.
Supporter- a person that approves of and encourages the project.
Type People- a human being in general or a collective group.
Consultant Organization- provides expert advice and skills professionally
Organization- an organized body of people with a particular purpose,
especially a business, society, association, etc.
Government- the governing body of the State of Michigan
Committee- a group of people appointed from a larger group for a specific
function.
Legislator- the law making body of government in the State of Michigan
Public- concerning the people as a whole.
Senate- the smaller upper assembly in the Michigan legislative group.
House- the larger lower assembly in the Michigan legislative group.
22. Stakeholder Register Table 1.2
Name Position Project Role Address Email Requirements Expectations Influence Classification Type
Rick Snyder Governor Executive sponsor to
approve projectshape
scope and appointhigh
level management
P.O. Box 30013 Lansing,Michigan
48909
Rick.Snyder@michigan.gov Communication
and Coordination
Increase
education
affordability with
minimal costs
Project
approval,
government
influenceand
funding
Internal
Supporter
People
Kaitlyn
Maybee
Project Manager Manage project
development
Western Michigan University 3340
Schneider Hall 1903 W Michigan
Avenue Kalamazoo,MI 49008-5412
USA
Kaitlyn.Maybee@wmich.edu Communication
and Coordination
Remain up to
date on project
development
Manage
development
Internal
Supporter
People
Devan
Clements
Human Resource
Administrator
Insuremembers are on
task and meeting
deadlines
Western Michigan University 3340
Schneider Hall 1903 W Michigan
Avenue Kalamazoo,MI 49008-5412
USA
Devan.Clements@wmich.edu Communication
and Coordination
Remain up to
date on project
development
Manage
personnel
Internal
Supporter
People
Thomas
Spitzer
Director of Finance
and Operations
Oversee financeand
operation development
Western Michigan University 3340
Schneider Hall 1903 W Michigan
Avenue Kalamazoo,MI 49008-5412
USA
Thomas.Spitzer@wmich.edu Communication
and Coordination
Remain up to
date on project
financial and
operations
development
Develop the
financial and
operations
control plan
Internal
Supporter
People
Jeremy Hatter Research and
Development
Research different
strategies and methods to
assistin goal completion
Western Michigan University 3340
Schneider Hall 1903 W Michigan
Avenue Kalamazoo,MI 49008-5412
USA
Jeremy.Hatter@wmich.edu Communication
and Coordination
Remain up to
date on project
research and
development
Provide
background
information
and support
Internal
Supporter
People
Kimberly
Pound
Research and
Development
Research different
strategies and methods to
assistin goal completion
Western Michigan University 3340
Schneider Hall 1903 W Michigan
Avenue Kalamazoo,MI 49008-5412
USA
Kimberly.Pound@wmich.edu Communication
and Coordination
Remain up to
date on project
research and
development
Provide
background
information
and support
Internal
Supporter
People
Joseph
Burkhead
Director of
Information
Technology
IT goal setting and scope
definition for webpage
and search engine
Western Michigan University 3340
Schneider Hall 1903 W Michigan
Avenue Kalamazoo,MI 49008-5412
USA
Joseph.Burkhead@wmich.edu Communication
and Coordination
Remain up to
date on IT
project
development
Project IT
development
Internal
Supporter
People
23. Name Position Project Role Address Email Requirements Expectations Influence Classification Type
Rich Astley Webly Consulting
Pointof Contact
Manage the Webly
ConsultingGroup in the
development of front end
webpage for search
engine
168 W. Michigan Kalamazoo,mi
49006
Rich.Astley@mi.web Web page
completion
within project
parameters
Completed
Webpage, On-
time, and with-in
budget and
within scope
Web page
creation
External
Supporter
Consultant
organization
Jenna Smith Seamless Search
Pointof Contact
Manage Seamless Search
in Search Engine and
algorithmdevelopment
598 Howard St. Kalamazoo,mi 49007 Jenna.Smith@mi.sea Communication
and search
engine
development
Completion of
search algorithm
Search
algorithm
creation
External
Supporter
Consultant
organization
Eugene Driker Michigan Education
Board of Governors
Pointof Contact
Represent and manage
clientelefor curriculum
acceptance
Michigan E.Driker@msu.edu Low cost
implementation
Acceptance of
new transfer
creditguidelines
Provide
feedback
External
Supporter
Organizations
John C. Austin Michigan Board of
Education
Pointof Contact
Represent the Michigan
Board of education in
project approval and
feedback discussions
608 W. Allegan Street P.O. Box 30008
Lansing,MI 48909
Michigan.Education@mi.gov Education
standards
Approve of
education
changes to
conform with
standards
Provide
feedback
External
Supporter
Government
Jennifer
Zeeland
MACRAO
Pointof Contact
Providefeedback on
curriculumacceptance
standards and assistin
implementation
Lansing,Michigan MACRAOmail@gmail.com Easy to use
education
standards
Feedback on
transfer credit
changes
Provide
feedback
External
Supporter
Organization
Jeff Fordam Michigan Business
Association
Pointof Contact
Represent the Michigan
Business Association in
applicableproject
planningdiscussions and
assistin implementation
Michigan JefferyFordam@glp.com Make programs
that help
increaseprofits
Providefeedback
on legislation and
supportbusiness
integration with
Michigan
universities
Feedback External
Supporter
Private/public
businesses
Fred Durhal House
Representative
Bill sponsorship Michigan
House of Representatives
607 W. Allegan Street P.O. Box 30008
Lansing,MI 48909
FredDurhal@house.mi.gov Communication,
Coordination
Tax incentivebill
writingand bill
sponsorship
Implementation
support
External
Supporter
House
Legislator
House Action
Committee
Michigan Houseof
Representative Bill
Specific Committee
Approval and adaptation
of bill
608 W. Allegan Street P.O. Box 30008
Lansing,MI 48909
Not applicable Coordination
with House
members
Passabletax
incentive
legislation
Bill adaptation External
Supporter
House
committee
24. Name Position Project Role Address Email Requirements Expectations Influence Classification Type
Geoff Hansen Senate
Representative
Bill sponsorship Michigan
Senate
609 W. Allegan Street P.O. Box
30008 Lansing,MI 48909
SenGHansen@senate.michigan.gov Coordination
with Senate
members
Tax incentivebill
writingand bill
sponsorship
Bill adaptation External
Supporter
Senate
Legislator
Senate Action
Committee
Committee Approval and adaptation
of bill
610 W. Allegan Street P.O. Box
30008 Lansing,MI 48909
Not applicable Coordination
with Senate
members
PassableTax
incentive
legislation
Bill adaptation External
Supporter
Senate
committee
Coordination
Committee
Committee Approval and adaptation
of bill
611 W. Allegan Street P.O. Box
30008 Lansing,MI 48909
Not applicable Coordination
with House and
Senate members
PassableTax
incentive
legislation
Bill adaptation External
Supporter
Committee
Robert Harris Michigan
Department of
Treasury
Pointof Contact
Bill enforcement and
incorporation into tax
code.
Michigan Department of
Treasury
Lansing,Michigan 48922
RCHarris@treasury.michigan.gov Communication
of tax regulation
Incorporation of
tax legislation
into tax code
Bill language External
Supporter
Government
Dashia
Abdulnor
State of Michigan
Resource Control
Specialist
Recruit and sign up
Michigan companies for
Business Incorporation
Plan
580 W. Allegan Street
Lansing,MI 48909
DashiaAbdulor@michigan.gov Business
standards and
incentives
Business
participation in
internship
program
Recruit
participants
External
Supporter
Government
Michigan
Students
Students Beneficiaries Michigan Not applicable Simplified use
and access to
services
Easier grant
search,more
transfer credit
ability,more
internship
opportunities,
and lower
education costs
Project
suggestions
External
Supporter
Public
25. Roles and Responsibility Matrix
After all of the stakeholders have been identified on the register, it is essential to outline who is
responsible, accountable, consulted, and informed on each task in the work breakdown
schedule. This outline can be found on the Roles and Responsibility Matrix, Table 1.3.The
clarification of roles allows stakeholders to know the level of participation that is expected
throughout the course of the project. Only one party will be identified as accountable for each
task. However, it is possible that several stakeholders may be responsible, consulted, or
informed on a single task.
RACI Chart Definitions
Responsible- Refers to the team member who is responsible for defining the
parameters of how to perform the work and then tracking the progress of work being
completed, while escalating issues/concerns as appropriate
Accountable- This is the team member who is ultimately held accountable for
tasks/work being completed within the agreed upon parameters
Consulted- Provides input to the responsible and accountable parties as needed to
facilitate completion of activities
Informed- This refers to the stakeholders who need informed of decisions being made
to provide the greatest level of communication
Page | 24
26. RACI Chart Table 1.3
Higher Education Affordability Project RACI
WBS # Item Description
RickSnyder
KaitlynMaybee
DevanClements
ThomasSpitzer
JeremyHatter
KimberlyPound
JosephBurkhead
RichAstley
JennaSmith
EugeneDriker
JohnC.Austin
JenniferZeeland
JeffFordam
FredDurhal
HouseAction
Committee
GeoffHansen
SenateAction
Committee
Coordination
Committee
RobertHarris
DsahiaAbdullnor
MichiganStudents
1 Project Management
1.1 Phase Gate 1
1.1.1 Project Scope C A C R R C C
1.1.2 Project Charter C A R C C C C
1.1.3 Project Work Breakdown I A C C C R R
1.2 Phase Gate 2
1.2.1 Stakeholder Register I A R I C C I
1.2.2 Roles and Responsibility Matrix I A R I I I I
1.2.3 Communication Management I A I R R I I
1.2.4 Timeline C A I I I R R
1.2.5 High-level Budget C A I C C R R
1.3 Phase Gate 3
1.3.1 Change Log I A C R C C R
1.3.2 Executive Score Card C A R R I I I
1.3.3 Project Book I A R C C C C
1.4 Phase Gate 4
1.4.1 Obtain Acceptance C A R I I I I
1.4.2 Lessons Learned A C R C C C
27. Higher Education Affordability Project RACI
WBS # Item Description
RickSnyder
KaitlynMaybee
DevanClements
ThomasSpitzer
JeremyHatter
KimberlyPound
JosephBurkhead
RichAstley
JennaSmith
EugeneDriker
JohnC.Austin
JenniferZeeland
JeffFordam
FredDurhal
HouseAction
Committee
GeoffHansen
SenateAction
Committee
Coordination
Committee
RobertHarris
DashiaAbdulnor
MichiganStudents
2 Research and Analysis
2.1 Research Search Engine
2.1.1 Crawlers R C A R C
2.1.1.1 Costs R C A R C C C I
2.1.1.2 Identify Implementation Partners R C A R I I
2.1.2 Data Storage and Organization R A R C C
2.1.2.1 Technology R A R C C
2.1.2.1.1 Constraints/ Limitations R A R C C
2.1.2.1.2 Competitors R A R C C
2.1.2.1.3 Storage Needs/Limitations R A R C C
2.1.3 Building Graphic User Interface R A R C C
2.1.3.1 GUI Development Partners R A R C C
2.1.3.2 Wireframe Analysis R A R C C
2.1.3.3 Back-End Language Analysis R A R C C
2.2 Transfer Credits
2.2.1 Administration Costs R C R A C C I
2.2.1.1 Current System Utilization R C R A C C C
2.2.1.2 Current System Limitations R C R A C C C
2.2.1.2.1 University vs College Transfer Limitations R C R A C C C
28. Higher Education Affordability Project RACI
WBS # Item Description
RickSnyder
KaitlynMaybee
DevanClements
ThomasSpitzer
JeremyHatter
KimberlyPound
JosephBurkhead
RichAstley
JennaSmith
EugeneDriker
JohnC.Austin
JenniferZeeland
JeffFordam
FredDurhal
HouseAction
Committee
GeoffHansen
SenateAction
Committee
Coordination
Committee
RobertHarris
DashiaAbdulnor
MichiganStudents
2.2.1.2.2 Accreditation Bodies R C R A C C C
2.2.1.2.3 Out of State Transfers R C R A C C
2.2.1.3 Current Costs R C R A C C I
2.3 Business Incorporation
2.3.1 Recruiting Costs R C C A I
2.3.1.1 Skills Sets Needed R R A C I
2.3.1.1.1 Local Markets R R A I
2.3.1.1.2 State Wide R R A I
2.3.1.2 Relocation Services R R A C I
2.3.1.3 Networking Events R C A C
2.3.1.3.1 Job Fairs R C A C
2.3.1.3.2 Local Chapter Meetings R R A C I
2.3.1.3.3 Rotary Club Meetings R R A I
3 Execution
3.1 Implementation of Education and Outreach
3.1.1 Define Search Engine Requirements I R A R
3.1.1.1 Security R A R
3.1.1.1.1 Firewall R A R
3.1.1.1.2 Anti-malware R A R
29. Higher Education Affordability Project RACI
WBS # Item Description
RickSnyder
KaitlynMaybee
DevanClements
ThomasSpitzer
JeremyHatter
KimberlyPound
JosephBurkhead
RichAstley
JennaSmith
EugeneDriker
JohnC.Austin
JenniferZeeland
JeffFordam
FredDurhal
HouseAction
Committee
GeoffHansen
SenateAction
Committee
Coordination
Committee
RobertHarris
DashiaAbdulnor
MichiganStudents
3.1.1.2 Usability R A R I
3.1.1.2.1 Search by Major R A R I I
3.1.1.2.2 Search by Location R A R I I
3.1.1.2.3 Search by Organization R A R I
3.1.1.3 Speed R R A
3.1.1.3.1 Response Time Per Search R R A
3.1.1.4 Accuracy R R A I
3.1.1.4.1 Maintenance on Data Tables R R A
3.1.2 Hire Web Design Contractor A C R R
3.1.2.1 Design User Interface R R A
3.1.2.2 Input Data R C C R A
3.1.2.3 Test R R A
3.1.3 Purchase Server Space I R A I
3.1.4 Purchase Domain Name I R A I
3.2 Implementation of Curriculum Acceptance
3.2.1 Department of Education Support R A C C I I I I I I
3.2.1.1 Requirements Defined R A C C C
3.2.1.1.1 Survey R A C C C
3.2.1.1.2 Group Interview R A C C C
3.2.2 Department of Education Implementation R A R R I I I I I I I
30. Higher Education Affordability Project RACI
WBS # Item Description
RickSnyder
KaitlynMaybee
DevanClements
ThomasSpitzer
JeremyHatter
KimberlyPound
JosephBurkhead
RichAstley
JennaSmith
EugeneDriker
JohnC.Austin
JenniferZeeland
JeffFordam
FredDurhal
HouseAction
Committee
GeoffHansen
SenateAction
Committee
Coordination
Committee
RobertHarris
DashiaAbdulnor
MichiganStudents
3.2.2.1 Public Universities Accept Changes I R A R R I I
3.2.2.1.1 Edit Curriculum R A R R I I
3.3 Implementation of Business Incorporation
3.3.1 Legislation for Tax Incentives R A C R C R C C I
3.3.2 State Worker Defined as Liaison R A C C C
3.3.3 Recruit Companies to Participate A C R C
3.3.3.1 Update Companies on Tax Law A C R
3.3.3.2 Cold Call A R
3.3.3.3 Student Organizations A R I I
3.3.3.4 Press Release R A R C I
3.3.4 Locate Candidates A R R C I
3.3.4.1 Interview Candidates A R R C I
3.3.4.1.1 Offer Internships A R R C I
4 Project Closeout Activities
4.1 Review Results With Executive Sponsor
4.1.1 Obtain Approval and Signoff C A R R R C C C C
4.1.2 Project Closeout Activities A R
4.1.2.1 Remit final Payment to Contractors R A
4.1.2.2 Complete Lessons Learned A R
4.1.2.3 Closeout Project Documentation I A R
4.1.2.3.1 Archive Project Documents A R
31. Communications Plan
Communications Management Approach
The Communications Plan Document will detail the communication process between all
involved parties. This includes the project sponsor, project manager, project team members,
and the stakeholders. The communication plan will define when meetings will be held, who will
be involved in those meetings, who will plan the meetings, and what information will be
discussed at the meetings. Also included in the communication plan is a communication matrix
that will clearly show all of the planned meetings with a summary of what will be discussed and
who will be attending.
During the project, team members need to be able to share information and communicate in
real time. When problems arise it is the duty of the project manager to resolve any issues. The
way that team members will communicate will be the use of phone, text, email and web
conferencing. Web conferencing will be done via the company’s account on
www.gotomeeting.com. Documents and other media will be delivered through email or on
Google Drive.
Maintaining clear and effective communication throughout this project will be the
responsibility of the project manager. Although there are many supporting documents to be
provided by team members and stakeholders, it is up to the project manager to ensure timely
and thorough distribution of all materials and reports. The project manager will use the details
laid out in the communication matrix to keep the project on track.
Any changes to the communication plan must be approved by the project manager. Changes
include the cancellation or addition of meetings, the planned method of any meetings, the
format type of work documents or technologies being used in communication, or what
information will be discussed at the meetings. Any changes that occur in the communication
plan shall be recorded by the project manager in the change log. The project manager is also
required to notify any affected stakeholders.
Page | 30
32. Communications Management Constraints
Time:
Meetings must be attended by everyone involved as detailed in the communication
matrix. Tardiness and absence from these meetings will cause delays.
Scope:
The project sponsor and project stakeholders may not always be available to
communicate in a timely manner.
Political discussions about proposed legislation may take longer than expected,
potentially delaying parts of the project.
Cost:
The budget for communicating during the project will be limited to the sunken
membership cost of using gotomeeting.com.
Resource:
Technology related issues such as documents formatted incorrectly could result in
delays due to the loss of data or not being able to access data.
Project members including managers and leaders, may have conflicting work schedules,
hindering the availability to communicate.
Quality:
There could be some miscommunication from some of the specialized terminology
being used by different involved parties, such as the search engine team using technical
terms not understood by our team members.
Communications Management Assumptions
For the project to be successful, assumptions need to be made regarding the project. The
project assumptions are crucial for the communications matrix to be created and to be
successful. Assumptions regarding the team members, managers, and stakeholders are needed
for the completion of the communication matrix. Assumptions for this project are as follows:
The team members will have reliable access to the Internet.
Responsible parties will attend all meetings as scheduled.
The primary forms of communication during the project will be Google Drive, personal
email and gotomeeting.com, with all project information being stored on Google Drive.
Team members are familiar with using email, gotomeeting.com and Google Drive.
The project manager will access information regarding the project via Google Drive.
The team is responsible for updating and storing all information and resources in a
timely manner, ensuring that all documents are up to date.
The team leaderswill be the primarycontactsforthe project,ensuringthatinformationis
distributedtothe appropriate parties,andactionsare delegatedeffectively.
Methodfor Updating and Refining
All team members will use Google Drive as the primary method of document storage. Format of
documents uploaded should be in Microsoft Word, with the ability for any team member to
edit or add to the material.
Page | 31
33. Communications Methods
Meetings will take place involving all team members and the team’s mentor. At these meetings,
deliverables will be discussed, collaborative thinking will take place, and work will be
distributed to individuals or teams to be completed before the next scheduled meeting (include
meeting with search engine team). The way that team members will communicate will be the
use of phone, text, email, and group chat on the Google Drive.
Communication Frequency-Meetings will be held on a weekly or biweekly basis.
Communication between team members shall be done daily or as needed. Documents need to
be submitted by the due date determined by the Project Manager.
Page | 32
34. Communications Matrix Table 2.2
Meeting Type Audience Method Frequency Responsible Information Reason/Message
ProjectPlanning ProjectManager - In Person Once ProjectManager
KaitlynMaybee
Agenda
MeetingMinutes
Planning
To discussthe initial startof the project, present
the goalsof the project,andanswerany questions
the sponsoror any stakeholdersmay have.
ProjectTeam
ProjectSponsor
ProjectStakeholders
ProjectTeam
Meetings
ProjectManager - In Person
- WebConference
Weekly ProjectManager
KaitlynMaybee
Agenda
MeetingMinutes
ProjectTasks
To make sure all tasksare beingcompletedina
timelymanner.Discussworkpackagesinprogress
and anywork yetto be completed.The teamwill
alsoaddressany issuesand collaborate tofind
solutions.
ProjectTeam
Team Leaders
StakeholderStatus
Update
ProjectManager - Secure Share Drive
Postvia ProjectStatus
ReportTemplate
Monthly ProjectManager
KaitlynMaybee
Team MeetingReport
ProjectTasks
StatusReport
To update the projectsponsorand stakeholders
on the progressof the project,future goals,and
any issuesthatmayhave come up.
ProjectSponsor
ProjectStakeholders
Software
Development
Meetings
ProjectManager - WebConference
- Secure Share Drive via
Software StatusReport
Template
Weekly During
Development
Phase
Directorof
Information
Technology
JosephBurkhead
StatusReport
Bug Fixes
TestingResults
To discussthe progressof software deliverables
and ensure the projectisonschedule.Discussand
potential issuesandcollaborate to findsolutions.
Appropriate ProjectTeam
Members
Appropriate Stakeholders
Phase Gate
Meeting
ProjectManager - In PersonatOffsite
Facility
Upon Completion
of Each Phase
ProjectManager
KaitlynMaybee
Phase Results To celebrate the projectteam'scompletionof
each phase,recognize hardworkbeingdone,
voice anyquestionsorconcerns,andto keep
morale high.
ProjectTeam
Appropriate Stakeholders
BudgetReports ProjectSponsor - Secure Share Drive Biweekly Directorof
Finance and
Operations
ThomasSpitzer
BudgetReports To prepare a detailedreportof the currentstatus
of the projectbudget,any discrepanciesfromthe
approvedbudgetwill be noted inthe status
report.
LessonsLearned ProjectManager - In PersonatOffsite
Facility
Upon Completion
of Each Phase
ProjectManager
KaitlynMaybee
ProjectResults To detail the outcomesof the phase,aswell asany
future actionsthatmay needtotake place.This
includes maintenance todeliverables of the
project. The teamwill outline future
improvements.
Project Team
Appropriate Stakeholders
35. Project Team Directory
Table 2.3
Name Position Email Phone
Kaitlyn Maybee Project Manager kaitlyn.m.maybee@wmich.edu 248-462-3440
Devan
Clements
Human Resources
Administrator
devan.a.clements@wmich.edu 248-880-1449
Kimberly Pound Research and
Development
kimberly.k.pound@wmich.edu 269-903-9740
Joseph
Burkhead
Director of Information
Technology
joseph.w.burkhead@wmich.edu 269-364-9296
Thomas Spitzer Director of Finance and
Operations
thomas.r.spitzer@wmich.edu 269-223-9449
Rick Snyder Executive Sponsor Rick.Snyder@michigan.gov 517-313-8000
Rick Astley Webley Consulting PoC Rich.Astley@mi.web 616-647-2245
Jenna Smith Seamless Search PoC Jenna.Smith@mi.sea 616-648-8787
Eugene Driker Michigan Education
Board of Governors
E.Driker@msu.edu 517-534-7851
John Austin Michigan Board of
Education President and
PoC
Michigan.Education@mi.gov 517-227-3801
Jennifer
Zeeland
MACRAO PoC MACRAOmail@gmail.com 517-245-9002
Jeff Fordam Michigan Business
Association
Point of Contact
JeffFordam@glp.com 248-252-6735
Fred Durhal House Representative FredDurhal@house.mi.gov 517-318-8951
Geoff Hansen Senate Representative SenGHansen@senate.michigan.gov 517-216-1154
Robert Harris Michigan Department of
Treasury
Point of Contact
RCHarris@treasury.michigan.gov 517-910-6632
Dashia
Abdulnor
State of Michigan
Resource Control
Specialist
DashiaAbdulor@michigan.gov 517-926-7736
36. High Level Budget
HighLevel Budget Summary
The high level budget is calculated by combining resources hourly rates and item charges for
each WBS item. The calculation used so each category can be seen in the second column. Each
portion of the budget is found using a set of assumptions that allows the team to determine
which costs belong in the project budget. These assumptions support the scope of the project
and are essential to its success.
Expense Assumptions
For each task of the project a member of Golden Consulting Group will supervise directly, with
the other team members acting as consultants. Task supervision will vary based on specialties
and time availability.
Golden Consulting Group will be utilizing an outside firm to develop the search engine. The firm
will be contracted at a set rate, and will be in charge of employee assignment and the
development of the search engine and all associated tasks.
For any event that promoters are sent to an attempt will be made to use available venues and
meeting sites to lower costs wherever possible. These can include rotary clubs, job fairs, and/or
chapter meetings. This will keep the venue costs lower and make meeting places as convenient
for all parties as possible. Venue costs were found by taking average costs of venues that are
sized to our needs.
The servers will be protected using Michigan government standards for information security. It
will be housed in common government facilities using pre-approved hardware and software to
ensure total operational harmony.
Research will be done by a group of interns, who will be paid a flat rate of $10/hour and will be
involved as needed in the project. All reports will be presented to Golden Consulting Group for
final review and authorization.
The cost for the university implementation is based upon how much it cost for high schools to
implement a similar program with local colleges. We then took this and extrapolated it to find
the cost of implementing it on a larger scale.
Page | 35
37. High Level Budget Table 3.2
WBS Project Team and Project Planning Cost Cost Type Calculation Cost
Kaitlyn Maybee Consulting-Project Manager $ 80/hr* 2038 hrs $163,040
Devan Clements Consulting-Project Team $ 75/hr* 1723 hrs $129,225
Kimberly Pound Consulting-Project Team $ 60/hr* 1619 hrs $97,140
Joseph Burkhead Consulting-Project Team $ 60/hr* 1875 hrs $112,500
Thomas Spitzer Consulting-Project Team $ 60/hr* 1056 hrs $63,360
Jeremy Hatter Consulting-Project Team $ 62/hr* 1292 hrs $80,104
Total: $645,369
Research and Analysis
2.1 Scholarship Search Engine Labor-Research
2.1.3 Consulting Charge- Front End Design Labor-Research $ 20/hr* 30 hrs $600
2.1.2 Consulting Charge- Back End Operations Labor-Research $ 20/hr* 16 hrs $320
2.2 Transfer Credit Program Labor-Research
2.2.1.2 Lunch Interviews Labor-Research $ 30/person * 31 ppl $930
2.3 Business Investments Labor-Research
2.3.1 Lunch Interviews Labor-Research $ 30/person * 45 ppl $1,350
Research and Analysis Subtotal $3,200
Project Execution
3.1 Scholarship Search Engine
3.1.1 Contract Charge- Webly Consulting Labor-Outsourced $ 75/hr* 91 hrs $6,825
3.1.1 Contract Charge- Seamless Search Labor-Outsourced $ 75/hr* 64 hrs $4,800
3.1.3 Purchase Redundant Data Base Server Expense-Materials One time charge $43,080
3.1.3 Server Maintenance (5-year) Expense-Materials $ 42,000/yr * 5 yrs $190,000
3.2 Transfer Credit Program
3.2.1.1 Survey and Group Interview Incentives Labor-Research $ 15/gift * 75 ppl $2,250
3.2.1.1 Printing and Paper charges Expense-Materials Deductive estimate $600
3.2.2 University Implementation Labor-Implementation $ 14,000/ college * 77 colleges $1,010,427
3.3 Business Investments
3.3.3 Large Conference Room Rentals Expense-Recruitment $ 575/room * 18 meetings $10,350
3.3.3 Printing and Paper charges Expense-Materials Deductive estimate $600
3.3.3 Travel to Job Fairs and Professional Organizations Labor-Recruitment $ 2.50/gal* (1800 mi/ 32 mi/gal) $141
Project Execution Subtotal $1,269,073
Project Closeout
Celebration Bowling Outing Expense-Morale $ 12/person * 18 people $216
Closeout Subtotal $216
Project Subtotal $1,917,858
Contingency (10%) $191,786
Grand Total $2,109,644
HEA High Level Budget
38. Detailed Timeline with Dependencies and Costing
DetailedTimeline withDependencies andCosting Summary
The following section is detailed timeline of the HEA Project Plan. It includes all of the work
packages featured on its’ WBS. The detailed schedule found on Table 4.2 illustrates the
dependency relationships throughout the project, as well as the costs associated with each
task. A glossary is provided at the end of the project book, please use this as reference for table
headers on this detailed timeline. Each resources’ hourly charge, used in the calculation of our
project costs can be located in Table 4.1.
The following information applies to the DetailedTimeline withDependenciesandCosting
Table 4.2:
= Table Headers
= Project Total
= Phase Total
= Primary Summary Task
= Secondary Summary Task
= Smallest Work Package
Please note that on the timeline below working hours are Monday through Friday 8:00am to
12:00pm and 1:00pm to 5:00pm.
The following days have been noted as exclusions to this rule for holiday vacation. These days
are non-working days and have been excluded from the timeline.
2014: December 24th and December 25th
2015: January 1st, September 7th, November 26th, December 24th and December 25th
2016: January 1st, March 27th, May 30th
Page | 37
39. Costing Table Table 4.1
ID Name Max
Units
Standard
Rate
0 100% $0.00/h
1 Kaitlyn Maybee 100% $80.00/h
2 Devan Clements 100% $75.00/h
3 Kimberly Pound 100% $60.00/h
4 Joseph Burkhead 100% $60.00/h
5 Thomas Spitzer 100% $60.00/h
6 Jeremy Hatter 100% $62.00/h
7 Rich Astley- Research 100% $20.00/h
8 Jenna Smith- Research 100% $20.00/h
9 Rich Astley- Design and Implement 100% $75.00/h
10 Jenna Smith- Design and implement 100% $75.00/h
11 Eugene Driker 100% $30.00/h
12 John Austin 100% $30.00/h
13 Jennifer Zeeland 100% $30.00/h
14 Jeff Fordam 100% $30.00/h
15 Fred Durhal Paid by current employer
16 Geoff Hansen Paid by current employer
17 Robert Harris Paid by current employer
Page | 38
40. DetailedTimeline withDependencies andCosting Table Table 4.2
ID WBS ID Name Duration Start Finish Predecessors Successors Costs Resources
0 HEA Project 423 days 12/2/14 7/27/16 $ 1,917,858
1 1 Project Management 89 days Tue 12/2/14 Wed 4/8/15 19 $ 190,667
2 1.1 Phase Gate 1: Document Set 1 45 days Tue 12/2/14 Thu 2/5/15 6 $ 23,560
3 1.1.1 Project Scope 20 days Tue 12/2/14 Wed 12/31/14 Root 4,5 $ 9,300 Devan Clements, Kaitlyn Maybee
4 1.1.2 Project Charter 20 days Tue 12/2/14 Wed 12/31/14 Root 3,5 $ 6,200 Jeremy Hatter, Thomas Spitzer
5 1.1.3 Project Work Breakdown Structure 25 days Fri 1/2/15 Thu 2/5/15 3,4 6,7 $ 8,060 Joseph Burkhead, Kimberly Pound
6 1.2 Phase Gate 2: Document Set 2 22 days Fri 2/6/15 Mon 3/9/15 2 12 $ 31,980
7 1.2.1 Stakeholder Register 6 days Fri 2/6/15 Fri 2/13/15 2 8 $ 5,735 Devan Clements, Kaitlyn Maybee
8 1.2.2 Roles and Responsibility Matrix 2 days Mon 2/16/15 Tue 2/17/15 7 9 $ 3,875 Devan Clements, Kaitlyn Maybee
9 1.2.3 Communication Management Plan 14 days Wed 2/18/15 Mon 3/9/15 8 10 $ 6,355 Jeremy Hatter, Thomas Spitzer
10 1.2.4 Timeline 14 days Wed 2/18/15 Mon 3/9/15 8 11 $ 9,300 Joseph Burkhead, Kaitlyn Maybee
11 1.2.5 High-level Budget 14 days Wed 2/18/15 Mon 3/9/15 8 12, 13 $ 6,665 Kaitlyn Maybee,, Kimberly Pound
12 1.3 Phase Gate 3: Final Project Plan 14 days Tue 3/10/15 Fri 3/27/15 6 16 $ 15,217
13 1.3.1 Change Log 14 days Tue 3/10/15 Fri 3/27/15 11 14 $ 4,367
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
14 1.3.2 Executive Summary 14 days Tue 3/10/15 Fri 3/27/15 11 15 $ 3,255
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
15 1.3.3 Project Book 14 days Tue 3/10/15 Fri 3/27/15 11 16, 17 $ 7,595
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
16 1.4 Phase Gate 4: Presentation 8 days Mon 3/30/15 Wed 4/8/15 12 19 $ 4,367
17 1.4.1 Acceptance 8 days Mon 3/30/15 Wed 4/8/15 15 18 $ 2,382
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
18 1.4.2 Lessons learned 8 days Mon 3/30/15 Wed 4/8/15 15 19,20 $ 1,985
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
41. ID WBS ID Name Duration Start Finish Predecessors Successors Costs Resources
19 2 Research and Analysis 111 days Thu 4/9/15 Fri 9/11/15 18 51,52,53 $ 83,760
20 2.1 Research search engine tools 52 days Thu 4/9/15 Fri 6/19/15 18 21,22 $ 26,460
21 2.1.1 Identify crawlers 10 days Thu 4/9/15 Wed 4/22/15 18 24 $ 4,140
22 2.1.1.1 Determine cost 5 days Thu 4/9/15 Wed 4/15/15 18 23 $ 2,860
Kimberly Pound, Jenna Smith-
Research
23 2.1.1.2 Identify implementation partners 5 days Thu 4/16/15 Wed 4/22/15 22 24 $ 1,280
Kimberly Pound, Jenna Smith-
Research
24 2.1.2 Data storage and organization 12 days Thu 4/23/15 Fri 5/8/15 21 29 $ 7,680
25 2.1.2.1 Technology 12 days Thu 4/23/15 Fri 5/8/15 21 26 $ 7,680
26 2.1.2.1.1 Constraints/limitations 4 days Thu 4/23/15 Tue 4/28/15 21 27 $ 2,560
Kimberly Pound, Jenna Smith-
Research
27 2.1.2.1.2 Competitors 4 days Wed 4/29/15 Mon 5/4/15 26 28 $ 2,560
Kimberly Pound, Jenna Smith-
Research
28 2.1.2.1.3 Storage needs/limitations 4 days Tue 5/5/15 Fri 5/8/15 27 29 $ 2,560
Kimberly Pound, Jenna Smith-
Research
29 2.1.3 Building graphic user interface 31 days Fri 5/8/15 Fri 6/19/15 24 33 $ 14,640
30 2.1.3.1 GUI development partners research 10 days Mon 5/11/15 Fri 5/22/15 24 31 $ 5,280 Kimberly Pound, Rich Astley- Research
31 2.1.3.2 Wireframe analysis 10 days Mon 5/25/15 Fri 6/5/15 30 32 $ 4,480 Kimberly Pound, Rich Astley- Research
32 2.1.3.3 Back-end languageanalysis 10 days Mon 6/8/15 Fri 6/19/15 31 33 $ 4,880 Kimberly Pound, Rich Astley- Research
33 2.2 Transfer Credits 40 days Mon 6/22/15 Fri 8/14/15 20 41 $ 39,780
34 2.2.1 Determine Administration Costs 28 days Mon 6/22/15 Wed 7/29/15 20 35 $ 4,500
35 2.2.1.1 Question current systems utilization 28 days Mon 6/22/15 Wed 7/29/15 20 36 $ 4,500 Jeremy Hatter, Eugene Driker
36 2.2.1.2 Determine Current systems limitations 12 days Thu 7/30/15 Fri 8/14/15 34 37 $ 35,280
37 2.2.1.2.1
Question university vs collegetransfer
limitations 12 days Thu 7/30/15 Fri 8/14/15 35 38 $ 8,820
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
38 2.2.1.2.3 Question accreditation bodies 12 days Thu 7/30/15 Fri 8/14/15 35 39 $ 8,820
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
39 2.2.1.2.3 Question out of state transfers 12 days Thu 7/30/15 Fri 8/14/15 35 40 $ 8,820
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
40 2.2.1.3 Question current costs 12 days Thu 7/30/15 Fri 8/14/15 35 41 $ 8,820
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
41 2.3 Business Involvement 19 days Mon 8/17/15 Fri 9/11/15 33 51 $ 17,520
42 2.3.1 Recruiting costs 19 days Mon 8/17/15 Fri 9/11/15 33 43, 47 $ 17,520
43 2.3.1.1 Determine skills sets needed 11 days Mon 8/17/15 Mon 8/31/15 33 44 $ 8,940
42. ID WBS ID Name Duration Start Finish Predecessors Successors Resources
44 2.3.1.1.1 Ask Local markets 4 days Mon 8/17/15 Thu 8/20/15 33 45 $ 2,980 Jeff Fordam, Kaitlyn Maybee
45 2.3.1.1.2 Ask state wide representatives 4 days Fri 8/21/15 Wed 8/26/15 44 46 $ 2,980 Jeff Fordam, Kaitlyn Maybee
46 2.3.1.2 Determine relocation services 3 days Thu 8/27/15 Mon 8/31/15 45 47 $ 2,980 Jeff Fordam, Kaitlyn Maybee
47 2.3.1.3 Networking events 8 days Tue 9/1/15 Fri 9/11/15 43 51 $ 8,580
48 2.3.1.3.1 Go to Job fairs 8 days Tue 9/1/15 Fri 9/11/15 43 49 $ 5,500 Jeff Fordam, Kaitlyn Maybee
49 2.3.1.3.2 Go to local chapter meetings 8 days Tue 9/1/15 Fri 9/11/15 43 50 $ 1,320 Jeff Fordam, Kaitlyn Maybee
50 2.3.1.3.3 Go to rotary club meetings 8 days Tue 9/1/15 Fri 9/11/15 43 51 $ 1,760 Jeff Fordam, Kaitlyn Maybee
51 3 Execution 198 days Mon 9/14/15 Wed 6/22/16 50 52 $ 1,719,708
52 3.1
Implementation of Education and
Outreach 86 days Mon 9/14/15 Fri 1/15/16 50 53, 65 $ 405,223
53 3.1.1 Define requirements 40 days Mon 9/14/15 Fri 11/6/15 50 54 $ 22,603
54 3.1.1.1 Security 10 days Mon 9/14/15 Fri 9/25/15 50 57 $ 8,184
55 3.1.1.1.1 Firewall 5 days Mon 9/14/15 Fri 9/18/15 50 56 $ 4,092 Joseph Burkhead, Jenna Smith
56 3.1.1.1.2 Anti-Malware 5 days Mon 9/21/15 Fri 9/25/15 55 57 $ 4,092 Joseph Burkhead, Jenna Smith
57 3.1.1.2 Usability 10 days Mon 9/28/15 Fri 10/9/15 54 61 $ 8,550
58 3.1.1.2.1 Search by major 10 days Mon 9/28/15 Fri 10/9/15 54 59 $ 2,850 Joseph Burkhead, Rich Astley
59 3.1.1.2.2 Search by location 10 days Mon 9/28/15 Fri 10/9/15 54 60 $ 2,850 Joseph Burkhead, Rich Astley
60 3.1.1.2.3 Search by organization 10 days Mon 9/28/15 Fri 10/9/15 54 61 $ 2,850 Joseph Burkhead, Rich Astley
61 3.1.1.3 Speed 10 days Mon 10/12/15 Fri 10/23/15 57 63 $ 2,936
62 3.1.1.3.1 Response time per search 10 days Mon 10/12/15 Fri 10/23/15 57 62 $ 2,936 Joseph Burkhead, Jenna Smith
63 3.1.1.4 Accuracy 10 days Mon 10/26/15 Fri 11/6/15 61 65, 64 $ 2,936
64 3.1.1.4.1 Maintenance on data tables 10 days Mon 10/26/15 Fri 11/6/15 61 65 $ 2,936 Joseph Burkhead, Jenna Smith
65 3.1.2 Collaborate with web contractors 46 days Mon 11/9/15 Fri 1/15/16 53 71, 66 $ 382,620
66 3.1.2.1 Design user interface 15 days Mon 11/9/15 Mon 11/30/15 53 67 $ 7,470 Joseph Burkhead, Rich Astley
67 3.1.2.2 Input data 12 days Tue 12/1/15 Wed 12/16/15 66 68 $ 6,030 Joseph Burkhead, Rich Astley
68 3.1.2.3 Test/ Maintain 19 days Thu 12/17/15 Fri 1/15/16 67 69 $ 310,000 Joseph Burkhead, Rich Astley
69 3.1.3 Purchaseserver needs 16 days Mon 11/9/15 Tue 12/1/15 53 70 $ 54,000 Joseph Burkhead, Jenna Smith
70 3.1.4 Purchasedomain name 16 days Mon 11/9/15 Tue 12/1/15 53 71 $ 5,120 Joseph Burkhead, Jenna Smith
71 3.2
Implementation of Curriculum
Acceptance 85 days Mon 1/18/16 Fri 5/13/16 68 72 $ 1,247,110
72 3.2.1 Department of Education support 24 days Mon 1/18/16 Thu 2/18/16 70 73, 76 $ 1,247,110
43. ID WBS ID Name Duration Start Finish Predecessors Successors Costs Resources
73 3.2.1.1 Requirements defined 24 days Mon 1/18/16 Thu 2/18/16 70 74 $ 15,110
74 3.2.1.1.1 Survey 10 days Mon 1/18/16 Fri 1/29/16 68 75 $ 6,385
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
75 3.2.1.1.2 Group interview 14 days Mon 2/1/16 Thu 2/18/16 74 76 $ 8,725
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
76 3.2.2
Department of Education
implementation of acceptance
standards 61 days Fri 2/19/16 Fri 5/13/16 73 77, 79 $ 1,232,000
77 3.2.2.1 Public universities accept changes 61 days Fri 2/19/16 Fri 5/13/16 73 78 $ 1,232,000
78 3.2.2.1.1 Universities adaptcurriculum 61 days Fri 2/19/16 Fri 5/13/16 73 79 $ 1,232,000
Jeremy Hatter, Eugene Driker, John
Austin, Jennifer Zeeland
79 3.3
Implementation of Business
Incorporation 27 days Mon 5/16/16 Wed 6/22/16 71 80, 82 $ 67,375
80 3.3.1 Legislation for tax incentives pushed 16 days Mon 5/16/16 Tue 6/7/16 71 81 $16,625
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
81 3.3.2 State worker defined as liaison 1 day Mon 5/16/16 Mon 5/16/16 71 82 $3,000
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
82 3.3.3 Recruit companies to participate 16 days Mon 5/16/16 Wed 6/8/16 81 83, 87 $34,125
83 3.3.3.1 Update accountingassociations 5 days Mon 5/16/16 Fri 5/20/16 71 84 $ 11,250
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
84 3.3.3.2 Cold call 8 days Mon 5/16/16 Wed 5/25/16 71 85 $11,250
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
85 3.3.3.3 Student Organizations 2 days Mon 5/16/16 Tue 5/17/16 71 86 $ 11,250
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
86 3.3.3.4 Press Release 1 day Mon 5/16/16 Mon 5/16/16 71 87 $ 375
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
87 3.3.4 Companies find college candidates 10 days Wed 6/8/16 Wed 6/22/16 82 88, 90 $ 13,625
88 3.3.4.1 Interview 10 days Wed 6/8/16 Wed 6/22/16 82 89 $ 13,625
89 3.3.4.1.1 Offer internships 10 days Wed 6/8/16 Wed 6/22/16 82 90 $ 13,625
Jeff Fordam, Thomas Spitzer, Kimberly
Pound, Jeremy Hatter
44. ID WBS ID Name Duration Start Finish Predecessors Successors Costs Resources
90 4 Final Closeout Activities 25 days Thu 6/23/16 Wed 7/27/16 79 91 $ 43,723
91 4.1
Review implementation results with
executive sponsor 3 days Thu 6/23/16 Mon 6/27/16 79 92, 93 $ 2,779
92 4.1.1 Obtain approval and signoff 3 days Thu 6/23/16 Mon 6/27/16 79 93 $ 2,779
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
93 4.1.2 Project Closeout Activities 20 days Tue 6/28/16 Mon 7/25/16 91 94, 96 $ 40,494
94 4.1.2.1 Complete lessons learned 15 days Tue 6/28/16 Mon 7/18/16 91 95 $ 38,906
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
95 4.1.2.2 Remit Final Payment to Contractors 5 days Tue 7/19/16 Mon 7/25/16 94 96 $ 1,588
Devan Clements, Jeremy Hatter,
Joseph Burkhead, Kaitlyn Maybee,
Kimberly Pound, Thomas Spitzer
96 4.1.2.3 Closeout Project Documentation 2 days Tue 7/26/16 Wed 7/27/16 93 97 $ 450
97 4.1.2.3.1 Archive ProjectDocuments 2 days Tue 7/26/16 Wed 7/27/16 93 Finish $ 450 Devan Clements
HEA Project 592 days
December 1,
2014 8:00 AM
September 29,
2017 5:00 PM $ 1,917,858
45. Glossary
Term Definition
Duration Calculated amount of time needed for task completion
Predecessor ID number of task which must be completed prior to selected task being started
Successor Task which cannot begin until selected task is complete
Cost Estimated cost of wages paid to research team and staff during the completion of each task
Work Estimated hours of labor needed for task completion
www.gotomeeting.com Web hosting service for holding video conference meetings
Google Drive Cloud based storage service for storing all types of data
PoC Point of contact
MACRAO Michigan Association of Collegiate Registrars and Admissions Officers- informs public of transfer credit information
Term Definition
AP Classes Advanced placement courses taken in the public high school system that qualify each student to take an exam and gain college credit for time spent in
course.
Cloud (Cloud computing) The cloud is a way of storing data and applications over the internet using servers in remote locations
DDos Attack Stands for Distributed Denial of Service. It is an attempt to make an online service unavailable by overwhelming it with traffic from multiple sources.
Four Nines Four Nines is a datacenter standard which provides measurements around network availability resulting in a standard of 52.56 minutes of downtime per
year, 4.32 minutes per month, and 1.01 minutes per week.
Full-Time A student who is enrolled in a minimum of 12 credit hours per full semester. If the student chooses to enroll in an accelerated summer semester 6 credit
hours are required.
GCG Golden Consulting Group, LLC
46. Search Engine A software system designed to search for information
Transfer Credit The credit hours per course that can be used toward degree completion at multiple universities.
Task ID An ID number for each task starting with the earliest tasks on the WBS
47. Approval Requirements
Approving this charter, individuals agree with the content as presented here, agree to use this
charter as a basis for the project, and agree to keep the information in the charter current and
relevant.
List the names and positions of the individuals who must approve the charter, particularly the
project sponsor.
Approvals
Approving this charter, individuals agree to:
the content as presented here
use this charter as the basis for the project
keep the information in the charter current and relevant
Name Position Signature Date
Kaitlyn Maybee Project
Manager
03/30/2015
Michael Rauch Mentor 03/30/2015
John C. Austin Michigan
Board of
Education
President
03/30/2015
Robert Harris Michigan
Treasury
03/30/2015
Governor Rick
Snyder
Executive
Sponsor
03/30/2015
Page | 45
49. Change History
Change ID: Document Title: Description of Change: Submitted
By:
Submission
Date:
Status:
Open
Closed
Pending
Disposition:
Approved
Deferred
Rejected
Date Approved:
001 Abstract Change “lowercostsfor
students” to “lowercostsfor
studentsintheirstate"
K. Maybee 3/25/15 Closed Approved 3/30/15
002 Project Charter In Purpose of the Project,
remove “across the nation”
K. Maybee 3/25/15 Closed Approved 3/30/15
003 Project Charter In Purpose of the Project,
Change “budget cuts” to
“reductionsinthe budget”
K. Maybee 3/25/15 Closed Approved 3/30/15
004 Project Charter In Purpose of the Project,
Change “attendees” to
“students attending college”
K. Maybee 3/25/15 Closed Approved 3/30/15
005 Project Scope In Deliverable Specific
Acceptance Criteria, correct
typo in “May 11th”
K. Maybee 3/25/15 Closed Approved 3/30/15
006 Project Scope Under Scope Exclusions,
Consumption, and Constraints
change “overcame” to
“overcome”
K. Maybee 3/25/15 Closed Approved 3/30/15
007 Golden Consulting In the second paragraph,
remove comma between study
and offers
K. Maybee 3/25/15 Closed Approved 3/30/15
008 Project Charter Under Initial Risks, capitalize
Risks in Threat Risks
K. Maybee 3/25/15 Closed Approved 3/30/15
50. Change ID: Document Title: Description of Change: Submitted
By:
Submission
Date:
Status:
Open
Closed
Pending
Disposition:
Approved
Deferred
Rejected
Date Approved:
009 Project Charter In Project Authority
Limitations, change “Jeremy”
to “Kimberly”
K. Maybee 3/25/15 Closed Approved 3/30/15
010 Project Charter In Project Authority
Limitations, change “asks” to
“asked”
K. Maybee 3/25/15 Closed Approved 3/30/15
011 Project Charter In the Project Description,
Change wording to reflect the
proper tense of the message
K. Maybee 3/25/15 Closed Approved 3/30/15
012 Project Charter Change formatting in the
Initial Risks section. Edit and
add points to clarify risks.
K. Maybee 3/25/15 Closed Approved 3/30/15
013 Project Charter Add “Success Criteria
Statements” section
K. Maybee 3/25/15 Closed Approved 3/30/15
014 Project Charter Change formatting in the
Acceptance Criteria section.
Edit and add points to clarify
risks.
K. Maybee 3/25/15 Closed Approved 3/30/15
015 Project Scope In Project Scope, change
“external funding” to “funding
fromnon-governmentsources”
K. Maybee 3/25/15 Closed Approved 3/30/15
016 Project Scope Change formatting to clarify
Project Deliverable section
K. Maybee 3/25/15 Closed Approved 3/30/15
017 Project Scope Change formatting of High
Level Requirements to add
clarification
K. Maybee 3/25/15 Closed Approved 3/30/15
51. Change ID: Document Title: Description of Change: Submitted
By:
Submission
Date:
Status:
Open
Closed
Pending
Disposition:
Approved
Deferred
Rejected
Date Approved:
018 Project Scope Adjust dates to match WBS
Major Milestone Schedule
K. Maybee 3/25/15 Closed Approved 3/30/15
019 Project Scope In the Major Milestone
Schedule table, change titles of
deliverables to reflect “Phases”
K. Maybee 3/25/15 Closed Approved 3/30/15
020 Deliverable 2
Document Set
Turn individual keys into larger
glossary to place at the end of
project book
K. Maybee 4/1/15 Closed Approved 4/3/15
021 Communications
Management Plan
Clarify and elaborate on
communication strategy
contingences
K. Maybee 4/1/15 Closed Approved 4/3/15
022 WBS Add action words to lowest
level
K. Maybee 4/1/15 Closed Approved 4/3/15
023 WBS Change phase gate names to
match scope and charter
documents
K. Maybee 4/1/15 Closed Approved 4/3/15
024 Communications
Management Plan
Communications management
Plan edited to clarify existing
Points
K. Maybee 4/1/15 Closed Approved 4/3/15
025 Detailed Timeline Change titles to match WBS K. Maybee 4/1/15 Closed Approved 4/3/15