Deerns consulting engineers


Deerns Consulting Engineers
  Multidisciplinary engineering company:
  Energy & Sustainability, MEP, Building
  Science, Master planning, R&D
  Founded in 1928
  Over 500 employees worldwide: Netherlands,
  UK, Germany, France,Spain, USA, UAE, China
  Over $65 million revenue
  International client base
  Specialized in energy efficient design of
  critical operational facilities like:
   o Airports
   o Data Centers
   o Hospitals
   o Level 4 bio hazard labs and Clean Rooms
Deerns’ Proven references last 5 years




Total White Space Area: > 2,300,000 ft2 world wide
Total IT power: > 670 MW
Experience: > 500 man-years of datacenter working experience
          Total White Space Area: > 100,000 m2
Personnel: > 60 datacenter M&E > 350 MWand consultants
                Total IT power: specialist
What We Do…




Innovative design of new & operational
(hot) upgrades of existing data centers to:

  Maximize Energy Efficiency
  Assure Uninterrupted Availability
  Mitigate Risk (Tier levels 1, 2, 3, 4)
  Support diverse configurations (racks, suites,
  cages, containers, “special projects”)
  Ensure scalability of facility
Service Offerings



 Overall datacenter design
 Green Scan (Energy Efficiency)
 High level design and specification, SLA development
 Single Point of Failure (SPOF)/Availability analysis
 Site selections
 Risk assessments
 Innovative Cooling Solution development
 Tier Level audits
 Facility construction liaison & management (PM)

Working in partnership with our customers
to ensure tangible results
Services for New Data Centers
What we deliver…bottom line:


    Highest ROI                Total Investment:            10%
 Optimized Phased              Cooling Energy Costs:        80%
    Investment
                               Total Energy Costs:          30%
Short Ramp-Up-Time
   Reduced OPEX
   Minimum Risk
Greenest Data Center


                  Optimized Proven Technologies
                  Short Phased Scalable Growth
    Supports Highest Levels of Redundancy & Survivability
            Implementable Anywhere in the World
                   Average PUE as low as 1.12
Green Cooling for Data Centers©



                80 % Reduction of Cooling Energy
  Save $ 1,750,000 p.a. on 25,000 sq.ft. Data Center (5 MW)



Highly Adaptable                           Phased Investment
                           GC-DC©




 Standardized                              Proven Technology




Sustainability through enhanced Data Center Value Proposition
GC-DC© Free Cooling Cell: How it Works
Case study ROI for the GC-DC©



     25,000 ft2, 200W/ft2
                                  DX CRAC             GC-DC©
          TIER III

Investment                       $ 33,750,000       $ 30,500,000


DC IT Power                         5 MW               5 MW


Cooling Power (% IT Power)          50%                10%
Average per year                   2.5 MW             0.5 MW

Cooling Energy Consumption per
                                  21.9 GWh            4.4 GWh
Year

                                 $100K/GWh           $100K/GWh
Cooling Energy Costs
                                 $ 2,190,000          $ 440,000

                                                 $ 1,750,000 /annum
Saving per year
                                                        80 %
Contact




   Deerns Consulting Engineers

3455 Ringsby Court       155 Gibbs Street
Suite 104                Suite 552
Denver, CO               Rockville, MD

         www.deernsamerica.com
         info@deernsamerica.com

Deerns - Towards Future Proof Data Centers

  • 1.
    Towards Future Proof DataCenters Deerns Data Center Consultancy Infrastructure Green & Upgrade Scan Services August 2011
  • 2.
    Deerns consulting engineers DeernsConsulting Engineers Multidisciplinary engineering company: Energy & Sustainability, MEP, Building Science, Master planning, R&D Founded in 1928 Over 500 employees worldwide: Netherlands, UK, Germany, France,Spain, USA, UAE, China Over $65 million revenue International client base Specialized in energy efficient design of critical operational facilities like: o Airports o Data Centers o Hospitals o Level 4 bio hazard labs and Clean Rooms
  • 3.
    Deerns’ Proven referenceslast 5 years Total White Space Area: > 2,300,000 ft2 world wide Total IT power: > 670 MW Experience: > 500 man-years of datacenter working experience Total White Space Area: > 100,000 m2 Personnel: > 60 datacenter M&E > 350 MWand consultants Total IT power: specialist
  • 4.
    What We Do… Innovativedesign of new & operational (hot) upgrades of existing data centers to: Maximize Energy Efficiency Assure Uninterrupted Availability Mitigate Risk (Tier levels 1, 2, 3, 4) Support diverse configurations (racks, suites, cages, containers, “special projects”) Ensure scalability of facility
  • 5.
    Service Offerings Overalldatacenter design Green Scan (Energy Efficiency) High level design and specification, SLA development Single Point of Failure (SPOF)/Availability analysis Site selections Risk assessments Innovative Cooling Solution development Tier Level audits Facility construction liaison & management (PM) Working in partnership with our customers to ensure tangible results
  • 6.
    Services for NewData Centers
  • 7.
    What we deliver…bottomline: Highest ROI Total Investment: 10% Optimized Phased Cooling Energy Costs: 80% Investment Total Energy Costs: 30% Short Ramp-Up-Time Reduced OPEX Minimum Risk Greenest Data Center Optimized Proven Technologies Short Phased Scalable Growth Supports Highest Levels of Redundancy & Survivability Implementable Anywhere in the World Average PUE as low as 1.12
  • 8.
    Green Cooling forData Centers© 80 % Reduction of Cooling Energy Save $ 1,750,000 p.a. on 25,000 sq.ft. Data Center (5 MW) Highly Adaptable Phased Investment GC-DC© Standardized Proven Technology Sustainability through enhanced Data Center Value Proposition
  • 9.
    GC-DC© Free CoolingCell: How it Works
  • 10.
    Case study ROIfor the GC-DC© 25,000 ft2, 200W/ft2 DX CRAC GC-DC© TIER III Investment $ 33,750,000 $ 30,500,000 DC IT Power 5 MW 5 MW Cooling Power (% IT Power) 50% 10% Average per year 2.5 MW 0.5 MW Cooling Energy Consumption per 21.9 GWh 4.4 GWh Year $100K/GWh $100K/GWh Cooling Energy Costs $ 2,190,000 $ 440,000 $ 1,750,000 /annum Saving per year 80 %
  • 11.
    Contact Deerns Consulting Engineers 3455 Ringsby Court 155 Gibbs Street Suite 104 Suite 552 Denver, CO Rockville, MD www.deernsamerica.com info@deernsamerica.com