DAMS
TERMINOLOGY for DAMS
 Dam.........................................................baraj
 Small dam...............................................bent veya gölet
 Reservoir................................................hazne veya göl alanı
 Leakage..................................................su kaçağı
 Seepage..................................................sızma
 Storage...................................................depolama
 Coffer dam..............................................batardo
 Upstream coffer dam.............................memba batardosu
 Downstream coffer dam........................mansap batardosu
 Core.........................................................baraj çekirdeği
 Filter.........................................................filtre veya geçirgen katman
 Diversion tunnel.....................................derivasyon tüneli – çevirme tüneli
 Rip-rap.....................................................koruyucu kaya dolgu
 Cut-off.....................................................hendek
 Toe-drain.................................................topuk drenajı
 Right side................................................sağ yan – sağ sahil
 Left side..................................................sol yan – sol sahil
 River side.....................................nehir içi
 Butress.........................................payanda
 Foundation...................................temel
 Embankment................................sedde
 Base-width....................................taban genişliği
 Crest..............................................tepe
 Cut-off trench...............................saplama hendeği
 Expansion joint............................genişleme derzi (dilatasyon)
 Spillway........................................dolusavak
 Gravity dam..................................ağırlık barajı
 Tail water......................................çıkan su
 Head water...................................giren su
 Arch dam......................................kemer baraj
 Abutment......................................yan dayanak
 Multiple arch dam........................çok kemerli baraj veya payandalı baraj
 Extrados.......................................dış yüzey
 Intrados........................................iç yüzey
 Parapet...............................................korkuluk
 Rock fill dam......................................kaya dolgu baraj
 Compacted rock fill...........................sıkıştırılmış kaya dolgu
 Dumped rock fill................................dökme kaya dolgu
 Foot wall.............................................topuk duvarı
 Earth dam...........................................toprak baraj
 Watertight core..................................geçirimsiz çekirdek
 Watertight diaphram.........................geçirimsiz perde
 Retaining wall....................................istinat (dayanma) duvarı
 Hard ground......................................sağlam zemin
 Impervious ground...........................geçirimsiz zemin
 Grout curtain.....................................enjeksiyon (harçlama) perdesi
 Overburden.......................................sıyrılacak katman
 Bedrock.............................................yerli kaya
DISTRIBUTION of WATER RESOURCES
 In Turkey, 536 large dams have been built and
being operated. On the other hand, Small
Hydraulic Works Department has built 42 small
dams.
 Here, 50 storage facilities that are not considered
as dam due to their low heights (<15m) and low
storage capatcities (<2 hm3) have not been taken
into account.
 By now, construction of 100 dams and
hydroelectric powerplants is going on.
Definition
 A dam is a structure which prevents the flow
of water and accumulates it in a reservoir
Karakaya Dam/Diyarbakır Atatürk Dam/Şanlıurfa
Needs for Dam Construction
1. Drinking and domestic water supply
2. Flood control
3. Irrigation
4. Industrial water supply
5. Hydroelectric energy production
6. Retention and control of sediments
and Inland navigation, Improvement of water quality,
Fish Farming, Recreation facilities
BREAKDOWN by PURPOSE of DAMS in EUROPE
CLASSIFICATION OF
DAMS
ACCORDING to the SIZE of the DAM
1. Large (Big) dam
2. Small dam
 International Commision on Large Dams, (ICOLD) assumes a dam
as big when its height is bigger than 15m.
 If the height of the dam is between 10m and 15m and matches the
following criteria, then ICOLD accepts the dam as big:
 If the crest length is bigger than 500m
 If the reservoir capacity is larger than 1 million m3
 If the flood discharge is more than 2000 m3/s
 If there are some difficulties in the construction of foundation
ACCORDING to HEIGHT of DAM
 High Dam or Large Dam
 If the height of the dam is bigger than 100m
 Medium Dam
 If the height of the dam is between 50m and 100m
 Low Dam or Small Dam
 If the height of the dam is lower than 50m
ACCORDING to the STATICAL DESIGN of
DAM BODY
 Gravity Dams (Sarıyar, Çubuk I, Kemer, Sır II
Karacaören II)
 Arch Dams (Gökçekaya, Karakaya,
Oymapınar, Gezende)
 Butress Dams (Elmalı II)
 Embankment Dams (Atatürk, Seyhan, Aslantaş)
 Composite Dams (Keban)
GRAVITY DAMS
 Gravity Dams use their triangular shape and the sheer
weight of their rock and concrete structure to hold back
the water in the reservoir.
Sarıyar Dam – Sakarya River;
Height= 90 m
Reservoir Capacity= 1.9 billion m3
ARCH DAMS
 Arch Dams utilize the strength of an arch to displace the
load of water behind it onto the rock walls that it is built
into.
Karakaya Dam – Fırat River;
Height= 173 m
Reservoir Capacity= 9,5 billion m3
BUTRESS DAMS
 Buttress Dams use multiple reinforced columns to
support a dam that has a relatively thin structure.
Because of this, these dams often use half as much
concrete as gravity dams
Elmalı II – Göksu River;
Height= 42.5 m
Reservoir Capacity= 10 million m3
EMBANKMENT DAMS
(Rock Fill or Earth Fill Dams)
 They are mostly composed of natural materials such
as, clay, sand, gravel etc...
 Impervious core is placed in the middle of the
embankment body
 Generally riprap is used to control erosion
Atatürk Dam – Fırat River;
Height= 169 m;
Reservoir Capacity= 48,7 billion m3
COMPOSITE DAMS
 Composite dams are combinations of one or more dam
types. Most often a large section of a dam will be either
an embankment or gravity dam, with the section
responsible for power generation being a buttress or
arch.
Keban Dam – Fırat River;
Height= 163 m;
Reservoir Capacity= 31 billion m3
Gravity & Rock Fill
ENGINEERING GEOLOGICAL
STUDIES for DAM
CONSTRUCTION
1. RECONNAISSANCE STUDY
1. Evaluation of the data having at archives of MTA, DSI, EIE,
Universities,......etc
2. Field investigation for limited time (Reconnaissance Study)
3. Some maps in small scale, for example 1/25.000 or 1/50.000
4. Some hydraulic data about
a. Basin
b. Precipitation area
c. Runoff, maximum discharge {Q=R/t (m3/s)}
d. Modulus of Runoff (R/t/m2 ~ R/t/km2)
5. Some approach to the reservoir area, dam site and type of dam
and height of dam...etc
6. Photogeological studies
7. A preliminary report
2. PRELIMINARY STUDIES at the
RESERVOIR AREA and DAM SITE
1. Dam site investigations
1. Location of dam axis
2. Location of diversion tunnel
3. Location of spillway
4. Location of powerhouse...etc
2. Geological studies
3. Geophysical surveying
4. Underground investigations
1. Boreholes
2. Investigation galleries
3. Pitholes
5. Surveying for materials
1. Field surveying
2. Laboratory tests
6. Slope stability investigations
7. Earthquake hazard & risk analysis
8. Environmental studies
9. Leakage possibilities from reservoir area
10. Leakage possibilities from dam site
11. Erosion, sedimentation & siltation
DETAILED INVESTIGATION at DAM SITE
1. Topographic surveyings
2. Geological mappings
1/5000 – 1/1000 or 1/500
3. Underground explorations
Boreholes, adits....etc
4. Hydrogeological studies
5. Slope stability analysis
FACTORS AFFECTING to the DAM TYPE
SELECTION
 Topography
 Geology
 Bearing capacity of the underlying soil
 Foundation settlements
 Permeability of the foundation soil
 Material availability
 Spillway position
 Earthquakes
 Safety
 Height
 Aesthetic view
 Qualified labour
 Cost
FACTORS AFFECTING to the PLACE of
the DAM AXIS
 Topography
 Geology
 Materials
 Spillway location availability
 Derivation
 Sediments in the flowing water
 Water quality
 Expropriation costs
 Earthquake possibility
 Downstream water rights
RIVER BASINS in TURKEY
Turkey has been separated into 26 main river basins for the
hydrological studies.
ENVIRONMENTAL
IMPACTS OF DAMS
ENVIRONMENTAL IMPACTS of
CONSTRUCTION PHASE of DAMS
 River pollution
 Erosion
 Loss of aesthetic view
 Air pollution
 Noise pollution
 Dust
ENVIRONMENTAL IMPACTS of
RESERVOIRS
 Loss of land
 Habitat Destruction :
 The area that is covered by the reservoir is destroyed, killing
whatever habitat existed there beforehand.
 Loss of archeological and histrorical places
 Loss of mineral deposits
 Loss of special geological formations
 Aesthetic view reduction
 Sedimentation
 Change in river flow regime and flood effects
 Reservoir induced seismicity
 Change in climate and plant species
EFFECTS of DAMS to WATER QUALITY
 Change in temperature
 Turbidity
 Dissolved gases in the water
 Water discharged from the spillway contains 110-120%
saturated nitrogen. This amount may be destructive for fish
life.
 Eutrophication
 It means increase in vegetation. If moss and other plants
exist in water, quality of that water gets worse.
SOME DAMS from SPACE
Dams.ppt
Dams.ppt
Dams.ppt
Dams.ppt
Dams.ppt

More Related Content

Similar to Dams.ppt

Similar to Dams.ppt (20)

DAMS
DAMSDAMS
DAMS
 
Dams and reservoirs by Deepansh Jain
Dams and reservoirs  by Deepansh JainDams and reservoirs  by Deepansh Jain
Dams and reservoirs by Deepansh Jain
 
First assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfFirst assignment group (2) presentation.pdf
First assignment group (2) presentation.pdf
 
Dams
DamsDams
Dams
 
Eg unit v
Eg unit vEg unit v
Eg unit v
 
Unit 6
Unit 6Unit 6
Unit 6
 
types of dam
types of damtypes of dam
types of dam
 
Storage works
Storage worksStorage works
Storage works
 
Hydraulic structure-I.pptx
Hydraulic structure-I.pptxHydraulic structure-I.pptx
Hydraulic structure-I.pptx
 
Presentation1-hydrolic-st.pptx
Presentation1-hydrolic-st.pptxPresentation1-hydrolic-st.pptx
Presentation1-hydrolic-st.pptx
 
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
Infrastructure for water resource development_ Sushil Kumar (NWA)_2011
 
Dam
DamDam
Dam
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.Role of Engineering Geology In Resevoirs,Dams & Tunneling.
Role of Engineering Geology In Resevoirs,Dams & Tunneling.
 
FIELD TOUR REPORT TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...
FIELD TOUR REPORT  TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...FIELD TOUR REPORT  TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...
FIELD TOUR REPORT TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...
 
OK
OKOK
OK
 
Dam
DamDam
Dam
 
Dams.ppt
Dams.pptDams.ppt
Dams.ppt
 
Ijciet 10 02_037
Ijciet 10 02_037Ijciet 10 02_037
Ijciet 10 02_037
 
Possibilty of Dam failures
Possibilty of Dam failuresPossibilty of Dam failures
Possibilty of Dam failures
 

More from NachiketKadlag1

mk ppt.pptx
mk ppt.pptxmk ppt.pptx
mk ppt.pptx
NachiketKadlag1
 

More from NachiketKadlag1 (6)

Geog 102 Topic 7.ppt
Geog 102 Topic 7.pptGeog 102 Topic 7.ppt
Geog 102 Topic 7.ppt
 
Ledford-EPC-Geothermal-Presentation.pptx
Ledford-EPC-Geothermal-Presentation.pptxLedford-EPC-Geothermal-Presentation.pptx
Ledford-EPC-Geothermal-Presentation.pptx
 
mht-cet-2022-round-1-cutoff-AI.pdf
mht-cet-2022-round-1-cutoff-AI.pdfmht-cet-2022-round-1-cutoff-AI.pdf
mht-cet-2022-round-1-cutoff-AI.pdf
 
5_6221983039971394498.pptx
5_6221983039971394498.pptx5_6221983039971394498.pptx
5_6221983039971394498.pptx
 
Design of Gantry Girders (1).pptx
Design of Gantry Girders (1).pptxDesign of Gantry Girders (1).pptx
Design of Gantry Girders (1).pptx
 
mk ppt.pptx
mk ppt.pptxmk ppt.pptx
mk ppt.pptx
 

Recently uploaded

Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
HyderabadDolls
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
gajnagarg
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
balqisyamutia
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
wpkuukw
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
CristineGraceAcuyan
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Nitya salvi
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 

Recently uploaded (20)

Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
❤️ Call Girls Service Amritsar Call Girls (Adult Only) 💯Call Us 🔝 6378878445 ...
❤️ Call Girls Service Amritsar Call Girls (Adult Only) 💯Call Us 🔝 6378878445 ...❤️ Call Girls Service Amritsar Call Girls (Adult Only) 💯Call Us 🔝 6378878445 ...
❤️ Call Girls Service Amritsar Call Girls (Adult Only) 💯Call Us 🔝 6378878445 ...
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 

Dams.ppt

  • 1.
  • 3. TERMINOLOGY for DAMS  Dam.........................................................baraj  Small dam...............................................bent veya gölet  Reservoir................................................hazne veya göl alanı  Leakage..................................................su kaçağı  Seepage..................................................sızma  Storage...................................................depolama  Coffer dam..............................................batardo  Upstream coffer dam.............................memba batardosu  Downstream coffer dam........................mansap batardosu  Core.........................................................baraj çekirdeği  Filter.........................................................filtre veya geçirgen katman  Diversion tunnel.....................................derivasyon tüneli – çevirme tüneli  Rip-rap.....................................................koruyucu kaya dolgu  Cut-off.....................................................hendek  Toe-drain.................................................topuk drenajı  Right side................................................sağ yan – sağ sahil  Left side..................................................sol yan – sol sahil
  • 4.  River side.....................................nehir içi  Butress.........................................payanda  Foundation...................................temel  Embankment................................sedde  Base-width....................................taban genişliği  Crest..............................................tepe  Cut-off trench...............................saplama hendeği  Expansion joint............................genişleme derzi (dilatasyon)  Spillway........................................dolusavak  Gravity dam..................................ağırlık barajı  Tail water......................................çıkan su  Head water...................................giren su  Arch dam......................................kemer baraj  Abutment......................................yan dayanak  Multiple arch dam........................çok kemerli baraj veya payandalı baraj  Extrados.......................................dış yüzey  Intrados........................................iç yüzey
  • 5.  Parapet...............................................korkuluk  Rock fill dam......................................kaya dolgu baraj  Compacted rock fill...........................sıkıştırılmış kaya dolgu  Dumped rock fill................................dökme kaya dolgu  Foot wall.............................................topuk duvarı  Earth dam...........................................toprak baraj  Watertight core..................................geçirimsiz çekirdek  Watertight diaphram.........................geçirimsiz perde  Retaining wall....................................istinat (dayanma) duvarı  Hard ground......................................sağlam zemin  Impervious ground...........................geçirimsiz zemin  Grout curtain.....................................enjeksiyon (harçlama) perdesi  Overburden.......................................sıyrılacak katman  Bedrock.............................................yerli kaya
  • 7.
  • 8.  In Turkey, 536 large dams have been built and being operated. On the other hand, Small Hydraulic Works Department has built 42 small dams.  Here, 50 storage facilities that are not considered as dam due to their low heights (<15m) and low storage capatcities (<2 hm3) have not been taken into account.  By now, construction of 100 dams and hydroelectric powerplants is going on.
  • 9. Definition  A dam is a structure which prevents the flow of water and accumulates it in a reservoir Karakaya Dam/Diyarbakır Atatürk Dam/Şanlıurfa
  • 10. Needs for Dam Construction 1. Drinking and domestic water supply 2. Flood control 3. Irrigation 4. Industrial water supply 5. Hydroelectric energy production 6. Retention and control of sediments and Inland navigation, Improvement of water quality, Fish Farming, Recreation facilities
  • 11. BREAKDOWN by PURPOSE of DAMS in EUROPE
  • 13. ACCORDING to the SIZE of the DAM 1. Large (Big) dam 2. Small dam  International Commision on Large Dams, (ICOLD) assumes a dam as big when its height is bigger than 15m.  If the height of the dam is between 10m and 15m and matches the following criteria, then ICOLD accepts the dam as big:  If the crest length is bigger than 500m  If the reservoir capacity is larger than 1 million m3  If the flood discharge is more than 2000 m3/s  If there are some difficulties in the construction of foundation
  • 14. ACCORDING to HEIGHT of DAM  High Dam or Large Dam  If the height of the dam is bigger than 100m  Medium Dam  If the height of the dam is between 50m and 100m  Low Dam or Small Dam  If the height of the dam is lower than 50m
  • 15. ACCORDING to the STATICAL DESIGN of DAM BODY  Gravity Dams (Sarıyar, Çubuk I, Kemer, Sır II Karacaören II)  Arch Dams (Gökçekaya, Karakaya, Oymapınar, Gezende)  Butress Dams (Elmalı II)  Embankment Dams (Atatürk, Seyhan, Aslantaş)  Composite Dams (Keban)
  • 16. GRAVITY DAMS  Gravity Dams use their triangular shape and the sheer weight of their rock and concrete structure to hold back the water in the reservoir. Sarıyar Dam – Sakarya River; Height= 90 m Reservoir Capacity= 1.9 billion m3
  • 17.
  • 18. ARCH DAMS  Arch Dams utilize the strength of an arch to displace the load of water behind it onto the rock walls that it is built into. Karakaya Dam – Fırat River; Height= 173 m Reservoir Capacity= 9,5 billion m3
  • 19. BUTRESS DAMS  Buttress Dams use multiple reinforced columns to support a dam that has a relatively thin structure. Because of this, these dams often use half as much concrete as gravity dams Elmalı II – Göksu River; Height= 42.5 m Reservoir Capacity= 10 million m3
  • 20. EMBANKMENT DAMS (Rock Fill or Earth Fill Dams)  They are mostly composed of natural materials such as, clay, sand, gravel etc...  Impervious core is placed in the middle of the embankment body  Generally riprap is used to control erosion Atatürk Dam – Fırat River; Height= 169 m; Reservoir Capacity= 48,7 billion m3
  • 21. COMPOSITE DAMS  Composite dams are combinations of one or more dam types. Most often a large section of a dam will be either an embankment or gravity dam, with the section responsible for power generation being a buttress or arch. Keban Dam – Fırat River; Height= 163 m; Reservoir Capacity= 31 billion m3 Gravity & Rock Fill
  • 23. 1. RECONNAISSANCE STUDY 1. Evaluation of the data having at archives of MTA, DSI, EIE, Universities,......etc 2. Field investigation for limited time (Reconnaissance Study) 3. Some maps in small scale, for example 1/25.000 or 1/50.000 4. Some hydraulic data about a. Basin b. Precipitation area c. Runoff, maximum discharge {Q=R/t (m3/s)} d. Modulus of Runoff (R/t/m2 ~ R/t/km2) 5. Some approach to the reservoir area, dam site and type of dam and height of dam...etc 6. Photogeological studies 7. A preliminary report
  • 24. 2. PRELIMINARY STUDIES at the RESERVOIR AREA and DAM SITE 1. Dam site investigations 1. Location of dam axis 2. Location of diversion tunnel 3. Location of spillway 4. Location of powerhouse...etc 2. Geological studies 3. Geophysical surveying 4. Underground investigations 1. Boreholes 2. Investigation galleries 3. Pitholes 5. Surveying for materials 1. Field surveying 2. Laboratory tests
  • 25. 6. Slope stability investigations 7. Earthquake hazard & risk analysis 8. Environmental studies 9. Leakage possibilities from reservoir area 10. Leakage possibilities from dam site 11. Erosion, sedimentation & siltation
  • 26. DETAILED INVESTIGATION at DAM SITE 1. Topographic surveyings 2. Geological mappings 1/5000 – 1/1000 or 1/500 3. Underground explorations Boreholes, adits....etc 4. Hydrogeological studies 5. Slope stability analysis
  • 27. FACTORS AFFECTING to the DAM TYPE SELECTION  Topography  Geology  Bearing capacity of the underlying soil  Foundation settlements  Permeability of the foundation soil  Material availability  Spillway position  Earthquakes  Safety  Height  Aesthetic view  Qualified labour  Cost
  • 28. FACTORS AFFECTING to the PLACE of the DAM AXIS  Topography  Geology  Materials  Spillway location availability  Derivation  Sediments in the flowing water  Water quality  Expropriation costs  Earthquake possibility  Downstream water rights
  • 29. RIVER BASINS in TURKEY Turkey has been separated into 26 main river basins for the hydrological studies.
  • 31. ENVIRONMENTAL IMPACTS of CONSTRUCTION PHASE of DAMS  River pollution  Erosion  Loss of aesthetic view  Air pollution  Noise pollution  Dust
  • 32. ENVIRONMENTAL IMPACTS of RESERVOIRS  Loss of land  Habitat Destruction :  The area that is covered by the reservoir is destroyed, killing whatever habitat existed there beforehand.  Loss of archeological and histrorical places  Loss of mineral deposits  Loss of special geological formations  Aesthetic view reduction  Sedimentation  Change in river flow regime and flood effects  Reservoir induced seismicity  Change in climate and plant species
  • 33. EFFECTS of DAMS to WATER QUALITY  Change in temperature  Turbidity  Dissolved gases in the water  Water discharged from the spillway contains 110-120% saturated nitrogen. This amount may be destructive for fish life.  Eutrophication  It means increase in vegetation. If moss and other plants exist in water, quality of that water gets worse.