CWSS to 163 Habitations inTirunelveli District, Tamil Nadu
Client: Tamil Nadu Water Supply and Drainage Board
Value of the Project: Rs.28.60 Crore
Cofferdam_ River Water CollectionWell_ DI Pipe laying and Testing of about
20kms_PVC Pipe Laying and testing from size 50mm to 200mm diameter for
200kms_ Construction of Clear water sump from 15000 Litre to 6.50 LL cap_Pipe
connection for Proposed Sumps _Pump Room size 6.00 M x 4.00 M - 2 Nos. and
2.00 M x 2.00 M - 25 Nos _Construction of Service Reservoirs - 10,000 Litres cap.
6.00M St.Ht. -9Nos and 40,000 Litres cap. 12M st.ht.-1No.Erection and
Commissioning of vertical Turbine pump sets _Raw water pump set at treatment plant
- 6213 lpm x 19m head_ Construction of Pipe carrying Bridges._Water Treatment
Plant - 8.57MLD_construction of stilling chamber-3.00 m x 2.50 m x 2.50 m
_construction of measuring channel_ construction of flash mixer _ construction of
clarifloculator _ construction of clarified water channel_ construction of filter house
and chemical house _ pipe connection works for treatment unit_ mechanical
arrangements and electrical arrangements at treatment unit _Construction of Wash
water tank 2.00 LL capacity at Treatment works site._ Construction of Clear water
sump from 15000 Litre to 6.50 LL cap_Pipe connection for Proposed Sumps_ Pump
Room size 6.00 M x 4.00 M - 2 Nos. and 2.00 M x 2.00 M - 25 Nos_ Construction of
Service Reservoirs - 10,000 Litres cap. 6.00M St.Ht. -9Nos and 40,000 Litres cap.
12M st.ht.-1No.
Maintenance of the scheme for a period of 12 months.
CWSS to 34 Habitations in Tirunelveli District, Tamil Nadu
Client: Tamil Nadu Water Supply and Drainage Board
Value of the Project: Rs.5.58 Crore
Construction of Infiltration well 4.50 m dia - 2 nos _ Connecting main from
Infiltration well to sump at Head works_ Supply, delivery, erectionand
commissioning of Vertical Open well wet type Submersible Pump sets 561 lpm x
15 m head - 4 nos For Infiltration wells at Head works and 1122 lpm x 41 m head for
sump at Head works_ Construction of sump 80000 Lit. Cap. at Head works
_Construction of Clear Water sumps of capacity ranging from 35000 to 11000 litres
with Pump Rooms_ Construction of Service Reservoirs various sizes - 10000 Lit.
Capacity - 3 nos_30000 Lit. Capacity - 2nos_Pumping Main and Branch Pumping
Main-80kms_Distribution System-7.5kms_Inlet pipe connection for existing Service
Reservoirs and Provision of Water meter_ Supply, delivery, erectionand
commissioning of Vertical Open well wet type Submersible Pump sets_ Maintenance
of the scheme for a period of 12 months .

More Related Content

Similar to Cv_Water

curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
Sunil Singh
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
Awaiz 766
 

Similar to Cv_Water (20)

Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
IVRCL - Company Profile.
IVRCL - Company Profile.IVRCL - Company Profile.
IVRCL - Company Profile.
 
waste_water[1]. .pptx
waste_water[1].                      .pptxwaste_water[1].                      .pptx
waste_water[1]. .pptx
 
WET IC brochure
WET IC brochureWET IC brochure
WET IC brochure
 
Water Woes of Mumbai City by Mr.P.K.Charankar
Water Woes of Mumbai City by Mr.P.K.CharankarWater Woes of Mumbai City by Mr.P.K.Charankar
Water Woes of Mumbai City by Mr.P.K.Charankar
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Mechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP PipelineMechanical Engineer. WTP Pipeline
Mechanical Engineer. WTP Pipeline
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 
CMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdfCMWSSB_Chennai_PPT_0.pdf
CMWSSB_Chennai_PPT_0.pdf
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2Project management wtp pattuvam scheme feb 10 v2
Project management wtp pattuvam scheme feb 10 v2
 
project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railways
 
Water sustainability at Nandideepa apartments.pdf
Water sustainability at Nandideepa apartments.pdfWater sustainability at Nandideepa apartments.pdf
Water sustainability at Nandideepa apartments.pdf
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Presentation on Kolkata Water Supply.pptx
Presentation on Kolkata Water Supply.pptxPresentation on Kolkata Water Supply.pptx
Presentation on Kolkata Water Supply.pptx
 
CV William 2016
CV William 2016CV William 2016
CV William 2016
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
Efficient water usage improvement
Efficient water usage improvementEfficient water usage improvement
Efficient water usage improvement
 
AMIT 17357.pptx
AMIT 17357.pptxAMIT 17357.pptx
AMIT 17357.pptx
 

Cv_Water

  • 1. CWSS to 163 Habitations inTirunelveli District, Tamil Nadu Client: Tamil Nadu Water Supply and Drainage Board Value of the Project: Rs.28.60 Crore Cofferdam_ River Water CollectionWell_ DI Pipe laying and Testing of about 20kms_PVC Pipe Laying and testing from size 50mm to 200mm diameter for 200kms_ Construction of Clear water sump from 15000 Litre to 6.50 LL cap_Pipe connection for Proposed Sumps _Pump Room size 6.00 M x 4.00 M - 2 Nos. and 2.00 M x 2.00 M - 25 Nos _Construction of Service Reservoirs - 10,000 Litres cap. 6.00M St.Ht. -9Nos and 40,000 Litres cap. 12M st.ht.-1No.Erection and Commissioning of vertical Turbine pump sets _Raw water pump set at treatment plant - 6213 lpm x 19m head_ Construction of Pipe carrying Bridges._Water Treatment Plant - 8.57MLD_construction of stilling chamber-3.00 m x 2.50 m x 2.50 m _construction of measuring channel_ construction of flash mixer _ construction of clarifloculator _ construction of clarified water channel_ construction of filter house and chemical house _ pipe connection works for treatment unit_ mechanical arrangements and electrical arrangements at treatment unit _Construction of Wash water tank 2.00 LL capacity at Treatment works site._ Construction of Clear water sump from 15000 Litre to 6.50 LL cap_Pipe connection for Proposed Sumps_ Pump Room size 6.00 M x 4.00 M - 2 Nos. and 2.00 M x 2.00 M - 25 Nos_ Construction of Service Reservoirs - 10,000 Litres cap. 6.00M St.Ht. -9Nos and 40,000 Litres cap. 12M st.ht.-1No. Maintenance of the scheme for a period of 12 months. CWSS to 34 Habitations in Tirunelveli District, Tamil Nadu Client: Tamil Nadu Water Supply and Drainage Board Value of the Project: Rs.5.58 Crore Construction of Infiltration well 4.50 m dia - 2 nos _ Connecting main from Infiltration well to sump at Head works_ Supply, delivery, erectionand commissioning of Vertical Open well wet type Submersible Pump sets 561 lpm x 15 m head - 4 nos For Infiltration wells at Head works and 1122 lpm x 41 m head for sump at Head works_ Construction of sump 80000 Lit. Cap. at Head works _Construction of Clear Water sumps of capacity ranging from 35000 to 11000 litres with Pump Rooms_ Construction of Service Reservoirs various sizes - 10000 Lit. Capacity - 3 nos_30000 Lit. Capacity - 2nos_Pumping Main and Branch Pumping Main-80kms_Distribution System-7.5kms_Inlet pipe connection for existing Service Reservoirs and Provision of Water meter_ Supply, delivery, erectionand commissioning of Vertical Open well wet type Submersible Pump sets_ Maintenance of the scheme for a period of 12 months .