SlideShare a Scribd company logo
CURRICULUM VITAE
NAME : R.R.RANA
RESIDENTIAL ADDRESS : E-39, SUKOON BUNGLOWS,
NEARWARISPARK/PANCHMAHALCO.OP.SOC.
KARODIYA ROAD, PO:GORVA, PIN CODE: 390016.
STATE: GUJARAT, INDIA.
MOBILE NO : +91 9723420776
E MAIL ID : rasool_ranaa@hotmail.com/rasoolrana18@gmail.com
SKY PE ID : rrasoolrana
BIRTH DATE : 18TH
DEC.1966
PASS PORT NO : K 9361467
PLACE OF ISSUE : AHMEDABAD
DATE OF ISSUE : 16/01/2013
DATE OF EXPIRY : 15/01/2023
IMMIGRATIONSTATUS : ECNR
LANGUAGESKNOWN : ENGLISH, ARABIC, URDU, HINDIAND GUJARATI.
EDUCATION QUALIFICATIONS : NEW SSC (SCIENCESTREAM) 62% OFMARKS
: HSE (SCIENCESTREAM) 51% OF MARKS
TECHNICAL QUALIFICATIONS : DIPLOMA IN MECHANICAL ENGINEERING PASSEDWITH 68%
FROMM.S.UNIVERSITYOFBARODA IN THE YEAR 1990.
COMPUTER KNOWLEDGE : M.S.OFFICE, AUTO CAD.
OTHER TECHNICAL COURSE : NDT LEVEL II (RT/UT/MPT/LPT)
WORKS EXPERIENCE : 20 YEARS, ABRAOD: 5 YRS. & 8 MONTHS, IN INDIA:14 .5 YRS.
WORKS RELATED COURSES COURSES DONE FOR PDO, OMAN.
o H2S TRAINING, 1997, 2005 AND2013.
o BASICFIRE EXTINGUSHER TARAINING
o SUPERVISINGSCAFFOLDING
o JOB HAZARDANALYSIS
o PTW SIGNATORIES (APPLICANT) 1997, 2005 &2013.
o ESSN BASIC,
o GAS TESTING,
o SAFETY SUPERVISOR.
o HSE INDUCTION
COURSESDONE IN THE YEAR 2013, PDO,OMAN.
o PTW SIGNATORIES(APPLICANT)
o IFR(INITIALFIRERESPONSE),
o SAFETY LEADERSHIPFOR SUPERVISOR,,
o HSE TOOLS & SKILLS,
o COACHINGANDMENTORING COURSE,
o FIRE WARDEN,
o AUTHORISE GAS TESTER
COURSES DONE IN INDIA (RELIANCE INDUSTRIES LTD, JAMNAGAR)
 PTW SIGNATORIES(APPLICANT)
 SUPERVISINGSAFETY
 HSE INDUCTION
 BASICFIRE EXTINGUSHER
 H2S AWARENESS
 SCAFFOLDINGSUPERVISOR
 CRANESAFETY TRAINING
CAREER SUMMERY
A MECHANICALENGINEER IN THE FIELD OF ALL TYPES OF PIPING/PIPELINES,WORKS,WORKSOFOIL
STORAGE TANKS,EQUIPMENTSINSTALLATIONS,MAINTENACEWORKSIN SHUT DOWN AND
STRUCTURAL WORKSFABRICATION ANDERECTION ASWELL A QC ENGINEERAND WELDING
ENGINEER.WORKEDASAN ACTINGASSTT.CONST.MANAGERANDSR.MECHANICALANDSR.PIPING
ENGINEER.PLANNINGANDSCHEDULING THE JOB RELATED ACTIVITIES,MAN POWER,EQUIPMENTS
ANDTIME DURATION AS PER JOB ALLOTED.WORKEDAS A SITE INCHARGEAND AS A
CONST.MANAGERIN ABSENCEOF CONST.MANAGER.WORKEDASA WORKSHOPINCHARGE.
WORKING FIELD
OIL ANDGAS, PETROLEUM REFINERIES,LNGANDGAS PLANTS,PETROCHEMICALANDFERTILIZERS
INDUSTRIES.
CLIENTS WORKED WITH
IN INDIA
 IOCL THIRD PARTY INSPECTION BYEIL
 GSFC THIRD PARTY INSPECTION BYLINDE, ICB.
 IPCL THIRD PARTYINSPECTION BYEIL & IPCL.
LNG (PETRONET) INSPECTION BY EIL.
 RELIANCEINDUSTRIES LTD, JAMNAGARINSPECTION BYRELIANCEINDS.LTD.
IN ABROAD
 PETROLEUM DEVELOPMENT OF OMAN
 OMAN REFINERY
 OMAN LNG COMPANY(FOSTER&WHEELER)
 SHELL REFINERYOMAN
 BRITISH PETROLEUM ,OMAN
 NORTHERN REFINERY OF IRAQ (BAIJIREFINERY), IRAQ.
 DUBAI ELECTRICITY AND WATER AUTHORITY, DUBAI.
 NOSCOCOMPANY, SHARJAH.
 CBI, (CHEVRON), ANGOLA.
 PETRODAR, SUDAN.
 PETROFAC, SHARJAH.
 K.S.R.C., UWAITCLIENT KNPC.
 DALEEL PETROLEUM COMPANY, OMAN.
FAMILIER CODES
 ASME SECTION V
 ASME SECTION IX
 ASME B 31.3
 ASME B31.4
 API1104
 API650
 ISO9000
FAMILIER WITH DRAWINGS
 ISOMETRIC DRAWING
 P & ID DRAWING
 GENERAL ARRANGEMENTSDRAWINGS
 PIPINGPLAN DRAWING
 PLOT PLANTDRAWING
 OIL STORAGE TANKAGEDRAWINGS
 STRUCTURAL DRAWING
WORKSEXPERIENCE
M/S NDT SERVICES PVT LTD
POSITION: MECHANICALENGINEER(QUALITY CONTROL)/SR.PIPINGENGINEER
DURATION: NOVEMBER’2013 TO CONTINUE
DOCUMENTATION ANDPREPATION OFALL REPORTSRELATED TO QUALITY OF THE
JOB.CONDUCTINGWELDER’S TEST ANDCHECKING OFTHE JOB COMPLETED ASPER QUALITY
STANDARDS.ALLOTWORKSTOTHE WELDERS ANDGIVE GUIDENS FOR BETTER QUALITY OF THE
JOB.CHECKING FROMISSUINGMATERIALS TO FINISHINGOFTHE JOB.RESPONSIBLEFORALLNDT
WORKS.
M/S ORBITAL PROJECTS AND SERVICES LLC, 0MAN.
POSITION: SR.PIPINGENGR./MECHANICALHEAD/ASSTT.CONST.MANAGER
DURATION: MARCH’2013 TO OCT’2013.
PLANNINGDAILYACTIVITIESASPER SCHEDULE ANDPRIORITY.
PLANNINGOFRESOURSES, EQUIPMENTS AND MAN POWER.
GIVE FEED BACKTO PLANNINGANDEXECUTION ENGINEERSAND SUPERVISORS.
MAKINGALL NECESSARYREPORTSOF THE WORKPROGRESS.
DOCUMENTAION OF THE REPORTSRELATED TO QUALITY CONTROL.
RESPONSIBLEFORALL NDT WORKSANDREPORTS.
CONDUCTINGWELDER’S TEST ANDALLOT WORKS TO THE WELDERS.
RESPONSIBLETO SANCTION MATERIALSANDCONSUMABLESFOR THE JOB.
CHECKINGALL THE ACTIVITYRELATED TO QUALITY CONTROANDEXECUTION FROMTHE STAGE OF
ISSUINGOF THE MATERIALS TO FINISHINGOFTHE JOB.
M/S AMIN ENGINEERS
POSITION : MECHANICAL ENGR. (QA/QC)/SR.PIPING ENGR.
DURATION : SEP.’2011 TO 27/02/2013
RESPONSIBLEOFALL NDT WORKS.DOCUMENTAION ANDALLCLEARANCEREGARDINGOF QUALITY
CONTROL.
CARRIEDOUT ALL TEST ANDINSPECTION OFALL THE TEST REGARDING THE JOB.RELEASE MATS.FOR
FABRICATION.INSPECTION OFFITUP ANDWELDING AND ALL NDT TESTS.
RESPONSIBLEFORPLANNINGOFCONTRACTOR’SWORKS, EQUIPMENTSAND DAY TODAY
ACTIVITIES.MAKINGALLREPORTS REGARDINGPROGRESS,MATERIALS, MANPOWERANDQUALITY
CONTROLS.
DEPLOYMENTS OF ENGINEERSAND SUPERVISORSASPER REQUIREMENTS AND PRIORITIESOFTHE
JOB.
M/S PETROSEAM CONST.PVT.LTD.
POSITION HOLD : SR.CONST.ENGR. (EXECUTION/QC)/ASSTT.CONST.MGR.
DURATION : MARCH’2010 TO JULY’2011
RESPONSIBILITIES: ALL EXECUTIONALANDQC WORKSOF PIPING,STRUCTUREAND EQUIPMENTS.
INSPECTION OFISSUEINGOF MATERIALS TO THE FINISHINGOFTHE JOB.
MAKINGALL TYPES OFREPORTS ANDDOCUMENTATION WORKS.
WITNESSALL THE NDT RELATED WORKS.
PLANNINGOFWORKSCHEDULE, MAN POWER DEPLOYMENT ANDARRANGEMENTS OF
EQUIPMENTS.
GIVE FEED BACKTO SUPERVISORSANDCONTRACTORSFORTHE JOB ALLOTED.
TO CALCULATE THE QUANTITY OFMATERIALS FROMDWGS.
DO INSPECTION OFMATS., FIT UP,WELDING
JTS.ALLIGNMENT,MECH.CLEARANCE,HYDROTESTING,FINALBOXUPAND PRECOMISSIONINGWORKS.
M/S PETRO ENERGY, SUDAN.
POSITION HOLD: SR.MECH.ENGR. (EXECUTION/QA &QC)
DURATION: OCT’2009 TO JAN’2010.
RESPONSIBILITIES:RESPONSIBLEFORALLEXECUTION ANDQC WORKS OFTHE JOB .SURVEY OF
MATS.FROMDWGS.REVIEWOF DWGS.
INSPECTION OFMATS, FITUPS, WELDING JTS. ANDALL NDT WORKS OF THE FLOWLINES AND
MECHANICALJOB.
WITNESSALL NDT WORKS.
PREPARINGPROGRESS, DAILYMANPOWER ANDNDT REPORTS.
PLANNINGOFWORK, MANPOWERAND EQUIPMENTS ASPER JOB PROGRESS.
PREPARINGREPORTSOF INSPECTION OFMATS.FITUP, WELDING, ALLIGNMENT, MECH.CLEARANCE,
BOX UP,HYDRO TEST ANDFINALBOX UP.
REPORTINGTO CONST.MANAGERANDGENERAL MANAGER OF PROJECTS.
M/S TOYO ENGG.INDIALTD. (GLOBALTOYO)
PROJECT: LNG PHASEII DAHEJ, GUJARAT, INDIA.
POSITION HOLD: CONST.ENGR. (PIPING&TANKAGE),EXECUTION &QA/QC.
DURATION: AY’2008 TO SEP’2009
RESPONSIBILITIES: CO ORDINATION OF EXECUTION AND QA/QCOFALLMECHANICALWORKS
ALLOTED TO THE CONTRACTORS.
INSPECTION OFTHE FIT UP, WELDING, ALIGNMENT ANDNDT WORKS FROMISSUE OF
MATS.FABRICATION, ERECTION,MECH.CLEARANCE, BOXUP,HYDROTEST,FINALBOX UP ANDPRE
COMISSIONINGWORKS.
WITNESSOF ALL NDT EXAMINATIONSPRIORTOOFFERINGFOR INSPECTION TOTHE THIRD PARTY
INSPECTOR.
MAKE ARRANGEMENTSALL NECESSARY OFEQUIPMENTS AND MATS.REQQ FORTHE JOB.
PLANNINGFORDAILY WORKPROGRESS, QA/QCWORKS
MAKINGALL TYPES OFREPORTS REGARDING PROGRESS, MAN POWER, QUALITY AND WORK
SCHEDULE.
M/S CBI (CHICAGOBRIDGE & INDS)
LOCATION: ABINDA GAS PLANT, ANGOLA.
POSITION HOLD: IELD ENGR.PIPING
DURATION: NOV’2007 TO APRIL 2008.
RESPONSIBILITIES:COORDINATION OFALLEXECUTIONALAND QA/QCACTIVITIESOFTHEFLARE
STACKSANDFLARE PIPING.
TO GIVE FEED BACK TO FOREMANSANDSUPERVISORSFORTHE WORK ALLOTED TO THEM.
ISSUEING ANDINSPECTION OFTHE MATS.REGARDINGTHE ALL QA/QCASPECTS.
CALCULATE THE QTY OF MATS.FROMTHE DWGS ANDREGARDING THE SCOPEOF WORKS.
TO CONTROL ALL WORKSACCORDINGTO EXECUTION, INSPECTION, PRODUCTION ANDPROGRESS.
TO CONVERTDIMENSIONSIN MKS SYSTEM FROM BRITISHSTD.
PREPAREDOCUMENTS ANDTOPICSFOR TOOL BOXTALKS REGARDINGHSE, HAZARDSOFTHE
WORKSAND PRECAUTIONSTOBE TAKEN.
PLANNINGOFWORKAND DEPLOYMENTS OF MAN POWER AND EQUIPMENTS INVOLVEDIN THE
WORK.
WITNESSALL THE NDT WORKS ANDPREPAREALL THE REPORTS REGARDINGTHE QC WORKS FROM
ISSUE OF MATS.TO FINISHOFTHE JOB.
M/S RAINBOW ENGG.ANDCONST.CO.
POSITION HOLD: CO ORDINATOR(EXECUTION &QA/QC)
DURATION: JAN’2006 TO NOV’2007.
RESPONSIBILITIES: CO ORDINATION WORKSWITHCLIENT AND CONTRACTORS.
SELECTION OF CONTRACTORSFORJOB.
PURCHASINGMATS.ANDCONSUMABLES.
PLANNINGOFWORKSCHEDULE AND ALL DOCUMENTATION WORKS
MAKE ALL NECESSARYARRANGEMENTS NEEDED FOR THE JOB, LIKE DWGS,EQUIPMENTS ANDMATS.
WITNESSALL NDT WORKS ANDMAKE ALL REPORTS REGARDING QUALITY OF THE JOB.
WHOLE CONTROLON THE WORK THAT IT WAS DONE IN TIME WITH BEST QUALITY ANDSAFE WAY.
M/S AL TURKI LLC
LOCATION: PDO, NIMR, OMAN.
POSITION HOLD: IPING/QCENGR.
DURATION: JUNE’2005 TO OCT’2005.
RESPONSIBILITIES: TO ISSUE MATS.ASPE BOM, SURVEY OF MATS.FROMDWG.
TO WITNESS ALL NDT WORKSANDMAKES ALL REPORTS ANDDOCUMENTATION WORKD RELATED
TO QA/QCOF THE JOB.
RESPONSIBLEFORDEPLOYMENTS OFMAN POWER , EQUIPMENTS ACCORDINGTHE WORKALLOTED.
TO APPLYPERMIT FOR THE JOB ANDPREPARE THE SITE FOR SAFE WORKWITH GOOD QUALITY AND
BEST PROGRESS.
WITNESSOF FIT UP, WELD JOINTS, MECH CLEARANCE, PUNCHLIST, BOX UP , HYDRO TEST ANDALL
NDT EXAMINATIONS.
MAKINGALL REPORTSLIKE AS PROGRESS, MAN POIWER, FIT UP, WELDING, HYDRO TEST,NDT ETC.
M/S RELIANCE INDUSTRIES LTD (JAMNAGARREFINERY)
POSITION HOLD : CONSULTANT
DURATION: OCT’2003 TO MARCH’2005.
RESPONSIBILITIES: SUPERVISINGALL THE SAFETY OFPERSONNELS, EQUIPMENTS, MACHINERIES
ANDPLANT.
ISUUE THE WORKPERMITS TO THE VARIOUSCONTRACTORSBY DOINGINSPECTION OFWORK PLACE
OCATION FORWORKS TO BE DONE IN THE SAFE WAYS.
RESPONSIBLEFORALLEXECUTION ANDQC WORKSLIKE FABRICATION ,ASSEMBLE,
ERECTION,ALIGNMENTPAINTING,FIREPROOFINGWORKOFTHE HEAVYSTRUCTURES.
SELECTION OF PIPE SPOOLS,INSPECTION OFFITUP,WELDING
JTS,ALIGNMENT,LOCATION,ELEVATION,NDTTESTS,MECH.CLEARANCE,BOXUP.H/T,AIRTEST,FINAL
BOX UP FOR PLANTPIPING.
TO ARRANGEMATS. , EQUIPMENTS, DWGS AND NECESSARYREQUIREMENTS FOR THE WORK
ALLOTED TO THE CONTRACTORS.
INSPECTION OFTHE SCAFFOLDING
LOOPCHECKING, MAKING ASBUILT DWGS.
SELECTION OF CRANESAS PER THE LOADAND AREA OF ERECTION
REMOVAL ANDERECTION OF 12T AND14T EJECTORS AT 40M HEIGHT IN REFINERY.
INCHARGEOF REACTOR FEED PIPINGFORHYDROTREATOR PLANT IN RUNNINGREFINERY.
M/S VIJAY TANKS AND CO.LLC
LOCATION: UAE
POSITION HOLD: WORKSHOP/SITEINCHARGE
DURATION: JULY’2001 TO DEC’2001.
RESPONSIBILITIES:
OVERALLINCHARGE OFWORK SHOP (FABRICATION ANDASSEMBLY )
INCHARGEFOR THE EXECUTION AND QA/QCFORTHE WORKS OFPIPING/TANKSANDSTRUCTURES
PLANNINGOFDAILY MANPOWER, EQUIPMENTSANDWORKPROGRESS
INSPECTION OFMATS. , FABRICATEDITEMS, FIT UP, WELDING ANDALL NDT WORKS.
MAKINGALL REPORTSLIKE PROGRESS, MANPOWER, NDT REPORTS.
ARRANGEMAN POWER ANDALL NECESSARYEQUIPMENTS .MATS AND DWGS FOR TH
M/S PETROCHEM ENGG.ANDCONTRACTORS
LOCATION: NORTHERN REFINERY OF IRAQ, BAIJI, IRAQ.
POSITION HOLD: PIPING/QCENGR. /MAT CO ORDINATOR
RESPONSIBILITIES
ALL CO ORDINATION WORKSOFEXECUTION AND QC
PLANNINGFORMANPOWER, EQUIPMENTS ANDMACHENERIES FOR THE WORK
INSPECTION OFMATS. , FITUP , WELDING,NDTTESTS,H/T ANDPRECONISSIONINGWORKS.
REPAIRANDMAINTENANCEWORKSOF REFINERY
REMOVAL OFOLD PIPESPOOLS, EQUIPMENTS ANDINSTALLATIONSOFNEWONES (PUMPS,
ELECTRICAL HEAVY MOTORS,HEATEXCHANGERS,VESSELSANDTURBINE)
ALL THE WORKSOF PLANTPIPINGFROMMAT ISSUE TO FINALBOXUP STAGE.
PLANNINGDAILYANDWEEKLY REQUIREMENTS OF MATS.ANDARRANGETHEM ACCORDINGTOTHE
PRIORITIESOFTHE WORK.
CONTROLOVER WELDERS FOR THE JOB PROGRESSOF THE WELDING
WITNESSAND INSPECTION OFALLNDT XAMINATIONS.
M/S VIJAY TANKS AND CO.LLC
LOCATION: KUWAIT ANDSULTANATEOF OMAN.
DURATION: JUNE’1996 TO DEC’1998
POSITION HOLD: MECHANICALENGR./SITE INCHARGE
RESPONSIBILITIES:
FABRICATION ANDERECTION WORKSOF OILSTORAGE TANKS (CONEROOF,LOATINGROOF,SINGLE
WALL,SINGLEDECK,DOUBLE DECK )
FABRICATION ANDERECTION OFCLEAN OUT DOORS, SHELL ANDROOF NOZZLES, INTERNALAND
EXTERNAL PIPINGRELATED TO TANKS.
FIXINGOF FOAMSEAL
ALL WORKS RELATED TO NDT, CHALKTEST, AIRTEST, VACCUME TEST (BOTTOMTEST) ANDHYDRO
TEST OFTANKS.
INSPECTION OFIT UP, WELDING ANDALL TYPES OF TESTS REQQ.FORTANKS.
ERECTION OF TANK SHELLS BY HYDAULIC JACKINGSYSTEM.
FABRICATION ANDERECTION OFON PLOT PIPING
REPLACEMENTS OF TANKBOTTOMS, SHELL COURSES, ROOFPLATE, REPAIRALTERATION OF BUCKLE
NIZZLES, SHELL AREAS.
PONTOONS, ROOFSUPPORTINGLEGS, TWISTED ROOFSTRUCTURE.
MODIFICATION OF PIPING, MAINTENANCEWORKS, REMOVALANDINSTALLATIONSOFVALVES,
HEAT EXCHANGERS, PUMPS, MOTORS ANDTRAYS INSILOS.
ASSEMBLY WORKS OF 60M AND 100M FLARE STACKSATLNG, SUR , OMAN.A PROJECTOF FOSTER&
WHEELER.
ERECTION OF 60M FLARE STACK.
PLANNINGANDDEPLOYMENT OFMANPOWER, MACHINERIES AT WORKSITE.
SUPERVISEALL ACTIVITIESOFTHE WORK ANDSAFETY OF THE PERSONNEL.MACHINERIES,
EQUIPMENTS ANDPLANT.
PREPARINGTIME SCHEDULE AND TIME SHEETS
PREPARINGALL TYPES OF REPORTSLIKE MAN POWER,PROGRESS, FITUP, WELDING,
MECH.CLEARANCE, PUNCH LIST, AS BUILT DQG, HYDRO TEST ANDFINALBOX UP REPORTSAND
DOCUMENTATION WORKS.
FABRICATION ANDERECTION OFDOUBLE TANKSWITH CHUTES AT NIMR ANDMARMUL SITESOF
PDO, SULTNATE OF OMAN
ALL THE ABOVEWORKSI HAD SUPERVISEIN VARIOUS SITESLIKE OMAN REFINERY, SHELL REFINERY ,
BRITISH PETROLEUM IN OMAN
I HAD WORKED IN SITES OF PDO LIKE NIMR MARMUL, ALHUWAIZAH, YIBAL
I HAD DONE FABRICATION OF6 TANKSFORKNPCIN THE WORK SHOP OFKSRC IN KUWAIT.
M/S NEWTON ENGG.ANDCONST.CO.LTD
POSITION HOLD: MECHANICALENGR. (PIPING, TANKS)
LOCATION : GSFC,GACL,IOCLBARODA,GUJARAT.,
IOCL NAJIBABAD, UP, INDIA.
DURATION: FEB’1991 TO MAY’1996
RESPONSIBILITIES:
FABRICATION ANDERECTION OFPLAT PIPING, U/G PIPINGANDPIPELINES
CHECKINGOF MATS, FABRICATION OFPIPESPOOLSANDHYDRO TEST OF PIPESPOOLS
ERECTION OF PIPE SPOOLSIN RACK
INSPECTION OFFIT UP, WELDING, ALIGNMENT, NDT TESTS, MECH.CLEARANCE, PUNCHLIST.HYDRO
TEST, AIR TEST, BOXUP
LOOPCHECKING ANDFINALBOX UP REPORTS
PLANNINGOFMAN POWER, MATS AND EQUIPMENTS FORTHE WORK ALLOTED
FABRICATION ANDERECTION OFU/G PIPINGBY BENDINGOF PLATES (20” TO 72”DIA) FOR
AMMONIA IV PLANTOF GSFC, BARODA , GUJARAT.
WITNESSALL NDT TESTS ANDHYDRO TEST FOR PIPESPOOLSANDPIPELINES.
MAKINGALL REPORTSANDDOCUMENTATION WORKOF THE JOB
FABRICATION, ROLLINGOFPLATESFOR SHELL OF THE TANKSFOR CONEROOF ANDFLOATINGROOF
TANKS.
CHECKINGTEMPLETS AND ALL,MARKING, FIT UP, WELDING OF THE SHELL, ROOF, BOTTOMPLATES
FABRICATION OFSHELL ANDROOF NOZZLESANDFIXINGTHEM ON A PLACE
FABRICATION ANDERECTION OF10 NOS TANKSATIOCL, NAJIBABAD, OILDEPOT
WITNESSOF ALL NDT TESTS, VACCUMBOX TEST CHALK TEST, HYDRO TEST FORTANKS
CHECKINGALL LAYOUTS FORMARKING OF STRUCTURE, ROOF STRUCTURE, CURB ANGLE,
BOTTOM,SHELL ANDROOFPLATES MARKING
FABRICATION ANDINSTALLATIONSOFPIPESUPPORTSANDCPS.
FOR 6 MONTHS I HAD WORKEDAT NAJIBABADAS OVERALL INCHARGEOF THE WORK SITE.

More Related Content

Similar to CV MECH QC

Updated CV 2015 Mohamed Anvar
Updated CV 2015 Mohamed AnvarUpdated CV 2015 Mohamed Anvar
Updated CV 2015 Mohamed Anvar
Mohamed anvar Abdul javad
 
Shibu Thomas-CV
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CV
SHIBU THOMAS
 
2015seniorwicv
2015seniorwicv2015seniorwicv
2015seniorwicv
gordon adamson
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
jignesh kadam
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
Meshak Mathew
 
Abid hussain qaiser
Abid hussain qaiserAbid hussain qaiser
Abid hussain qaiser
abid qaiser
 
FEDERICO MORTERA JR CV
FEDERICO MORTERA JR CVFEDERICO MORTERA JR CV
FEDERICO MORTERA JR CV
FEDERICO, JR. MORTERA
 
Markson Isaac Curriculum Vitae
Markson Isaac Curriculum VitaeMarkson Isaac Curriculum Vitae
Markson Isaac Curriculum Vitae
Isaac Markson
 
OIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CVOIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CV
afsar Sayed
 
LINGAM
LINGAMLINGAM
Site Engineer 2 (QC Mechanical)
Site Engineer 2 (QC Mechanical)Site Engineer 2 (QC Mechanical)
Site Engineer 2 (QC Mechanical)
MUHAMMAD ZUBAIR JUNEJO
 
Old resume forman
Old resume formanOld resume forman
Old resume forman
sanjeetsingh125
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
EZAZ ALAM
 
resume pdf
resume  pdfresume  pdf
resume pdf
chalee meekaew
 
RESUME
RESUMERESUME
RESUME
Edly Omar
 
VIKAS CV
VIKAS CVVIKAS CV
VIKAS CV
vikas chandra
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
Mohd Hafizan Ahmad
 
ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016
ASHISH GULERIA
 
SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15
Samuel Alabi
 

Similar to CV MECH QC (20)

Updated CV 2015 Mohamed Anvar
Updated CV 2015 Mohamed AnvarUpdated CV 2015 Mohamed Anvar
Updated CV 2015 Mohamed Anvar
 
Shibu Thomas-CV
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CV
 
2015seniorwicv
2015seniorwicv2015seniorwicv
2015seniorwicv
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Abid hussain qaiser
Abid hussain qaiserAbid hussain qaiser
Abid hussain qaiser
 
FEDERICO MORTERA JR CV
FEDERICO MORTERA JR CVFEDERICO MORTERA JR CV
FEDERICO MORTERA JR CV
 
Markson Isaac Curriculum Vitae
Markson Isaac Curriculum VitaeMarkson Isaac Curriculum Vitae
Markson Isaac Curriculum Vitae
 
OIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CVOIL GAS Sr.INST, TEL TECHNICIAN CV
OIL GAS Sr.INST, TEL TECHNICIAN CV
 
LINGAM
LINGAMLINGAM
LINGAM
 
Site Engineer 2 (QC Mechanical)
Site Engineer 2 (QC Mechanical)Site Engineer 2 (QC Mechanical)
Site Engineer 2 (QC Mechanical)
 
Old resume forman
Old resume formanOld resume forman
Old resume forman
 
E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
resume pdf
resume  pdfresume  pdf
resume pdf
 
RESUME
RESUMERESUME
RESUME
 
VIKAS CV
VIKAS CVVIKAS CV
VIKAS CV
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016
 
SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15
 

CV MECH QC

  • 1. CURRICULUM VITAE NAME : R.R.RANA RESIDENTIAL ADDRESS : E-39, SUKOON BUNGLOWS, NEARWARISPARK/PANCHMAHALCO.OP.SOC. KARODIYA ROAD, PO:GORVA, PIN CODE: 390016. STATE: GUJARAT, INDIA. MOBILE NO : +91 9723420776 E MAIL ID : rasool_ranaa@hotmail.com/rasoolrana18@gmail.com SKY PE ID : rrasoolrana BIRTH DATE : 18TH DEC.1966 PASS PORT NO : K 9361467 PLACE OF ISSUE : AHMEDABAD DATE OF ISSUE : 16/01/2013 DATE OF EXPIRY : 15/01/2023 IMMIGRATIONSTATUS : ECNR LANGUAGESKNOWN : ENGLISH, ARABIC, URDU, HINDIAND GUJARATI. EDUCATION QUALIFICATIONS : NEW SSC (SCIENCESTREAM) 62% OFMARKS : HSE (SCIENCESTREAM) 51% OF MARKS TECHNICAL QUALIFICATIONS : DIPLOMA IN MECHANICAL ENGINEERING PASSEDWITH 68% FROMM.S.UNIVERSITYOFBARODA IN THE YEAR 1990. COMPUTER KNOWLEDGE : M.S.OFFICE, AUTO CAD. OTHER TECHNICAL COURSE : NDT LEVEL II (RT/UT/MPT/LPT) WORKS EXPERIENCE : 20 YEARS, ABRAOD: 5 YRS. & 8 MONTHS, IN INDIA:14 .5 YRS. WORKS RELATED COURSES COURSES DONE FOR PDO, OMAN. o H2S TRAINING, 1997, 2005 AND2013. o BASICFIRE EXTINGUSHER TARAINING o SUPERVISINGSCAFFOLDING o JOB HAZARDANALYSIS o PTW SIGNATORIES (APPLICANT) 1997, 2005 &2013. o ESSN BASIC,
  • 2. o GAS TESTING, o SAFETY SUPERVISOR. o HSE INDUCTION COURSESDONE IN THE YEAR 2013, PDO,OMAN. o PTW SIGNATORIES(APPLICANT) o IFR(INITIALFIRERESPONSE), o SAFETY LEADERSHIPFOR SUPERVISOR,, o HSE TOOLS & SKILLS, o COACHINGANDMENTORING COURSE, o FIRE WARDEN, o AUTHORISE GAS TESTER COURSES DONE IN INDIA (RELIANCE INDUSTRIES LTD, JAMNAGAR)  PTW SIGNATORIES(APPLICANT)  SUPERVISINGSAFETY  HSE INDUCTION  BASICFIRE EXTINGUSHER  H2S AWARENESS  SCAFFOLDINGSUPERVISOR  CRANESAFETY TRAINING CAREER SUMMERY A MECHANICALENGINEER IN THE FIELD OF ALL TYPES OF PIPING/PIPELINES,WORKS,WORKSOFOIL STORAGE TANKS,EQUIPMENTSINSTALLATIONS,MAINTENACEWORKSIN SHUT DOWN AND STRUCTURAL WORKSFABRICATION ANDERECTION ASWELL A QC ENGINEERAND WELDING ENGINEER.WORKEDASAN ACTINGASSTT.CONST.MANAGERANDSR.MECHANICALANDSR.PIPING ENGINEER.PLANNINGANDSCHEDULING THE JOB RELATED ACTIVITIES,MAN POWER,EQUIPMENTS ANDTIME DURATION AS PER JOB ALLOTED.WORKEDAS A SITE INCHARGEAND AS A CONST.MANAGERIN ABSENCEOF CONST.MANAGER.WORKEDASA WORKSHOPINCHARGE. WORKING FIELD OIL ANDGAS, PETROLEUM REFINERIES,LNGANDGAS PLANTS,PETROCHEMICALANDFERTILIZERS INDUSTRIES. CLIENTS WORKED WITH IN INDIA  IOCL THIRD PARTY INSPECTION BYEIL  GSFC THIRD PARTY INSPECTION BYLINDE, ICB.  IPCL THIRD PARTYINSPECTION BYEIL & IPCL. LNG (PETRONET) INSPECTION BY EIL.  RELIANCEINDUSTRIES LTD, JAMNAGARINSPECTION BYRELIANCEINDS.LTD.
  • 3. IN ABROAD  PETROLEUM DEVELOPMENT OF OMAN  OMAN REFINERY  OMAN LNG COMPANY(FOSTER&WHEELER)  SHELL REFINERYOMAN  BRITISH PETROLEUM ,OMAN  NORTHERN REFINERY OF IRAQ (BAIJIREFINERY), IRAQ.  DUBAI ELECTRICITY AND WATER AUTHORITY, DUBAI.  NOSCOCOMPANY, SHARJAH.  CBI, (CHEVRON), ANGOLA.  PETRODAR, SUDAN.  PETROFAC, SHARJAH.  K.S.R.C., UWAITCLIENT KNPC.  DALEEL PETROLEUM COMPANY, OMAN. FAMILIER CODES  ASME SECTION V  ASME SECTION IX  ASME B 31.3  ASME B31.4  API1104  API650  ISO9000 FAMILIER WITH DRAWINGS  ISOMETRIC DRAWING  P & ID DRAWING  GENERAL ARRANGEMENTSDRAWINGS  PIPINGPLAN DRAWING  PLOT PLANTDRAWING  OIL STORAGE TANKAGEDRAWINGS  STRUCTURAL DRAWING WORKSEXPERIENCE M/S NDT SERVICES PVT LTD POSITION: MECHANICALENGINEER(QUALITY CONTROL)/SR.PIPINGENGINEER DURATION: NOVEMBER’2013 TO CONTINUE
  • 4. DOCUMENTATION ANDPREPATION OFALL REPORTSRELATED TO QUALITY OF THE JOB.CONDUCTINGWELDER’S TEST ANDCHECKING OFTHE JOB COMPLETED ASPER QUALITY STANDARDS.ALLOTWORKSTOTHE WELDERS ANDGIVE GUIDENS FOR BETTER QUALITY OF THE JOB.CHECKING FROMISSUINGMATERIALS TO FINISHINGOFTHE JOB.RESPONSIBLEFORALLNDT WORKS. M/S ORBITAL PROJECTS AND SERVICES LLC, 0MAN. POSITION: SR.PIPINGENGR./MECHANICALHEAD/ASSTT.CONST.MANAGER DURATION: MARCH’2013 TO OCT’2013. PLANNINGDAILYACTIVITIESASPER SCHEDULE ANDPRIORITY. PLANNINGOFRESOURSES, EQUIPMENTS AND MAN POWER. GIVE FEED BACKTO PLANNINGANDEXECUTION ENGINEERSAND SUPERVISORS. MAKINGALL NECESSARYREPORTSOF THE WORKPROGRESS. DOCUMENTAION OF THE REPORTSRELATED TO QUALITY CONTROL. RESPONSIBLEFORALL NDT WORKSANDREPORTS. CONDUCTINGWELDER’S TEST ANDALLOT WORKS TO THE WELDERS. RESPONSIBLETO SANCTION MATERIALSANDCONSUMABLESFOR THE JOB. CHECKINGALL THE ACTIVITYRELATED TO QUALITY CONTROANDEXECUTION FROMTHE STAGE OF ISSUINGOF THE MATERIALS TO FINISHINGOFTHE JOB. M/S AMIN ENGINEERS POSITION : MECHANICAL ENGR. (QA/QC)/SR.PIPING ENGR. DURATION : SEP.’2011 TO 27/02/2013 RESPONSIBLEOFALL NDT WORKS.DOCUMENTAION ANDALLCLEARANCEREGARDINGOF QUALITY CONTROL. CARRIEDOUT ALL TEST ANDINSPECTION OFALL THE TEST REGARDING THE JOB.RELEASE MATS.FOR FABRICATION.INSPECTION OFFITUP ANDWELDING AND ALL NDT TESTS. RESPONSIBLEFORPLANNINGOFCONTRACTOR’SWORKS, EQUIPMENTSAND DAY TODAY ACTIVITIES.MAKINGALLREPORTS REGARDINGPROGRESS,MATERIALS, MANPOWERANDQUALITY CONTROLS. DEPLOYMENTS OF ENGINEERSAND SUPERVISORSASPER REQUIREMENTS AND PRIORITIESOFTHE JOB.
  • 5. M/S PETROSEAM CONST.PVT.LTD. POSITION HOLD : SR.CONST.ENGR. (EXECUTION/QC)/ASSTT.CONST.MGR. DURATION : MARCH’2010 TO JULY’2011 RESPONSIBILITIES: ALL EXECUTIONALANDQC WORKSOF PIPING,STRUCTUREAND EQUIPMENTS. INSPECTION OFISSUEINGOF MATERIALS TO THE FINISHINGOFTHE JOB. MAKINGALL TYPES OFREPORTS ANDDOCUMENTATION WORKS. WITNESSALL THE NDT RELATED WORKS. PLANNINGOFWORKSCHEDULE, MAN POWER DEPLOYMENT ANDARRANGEMENTS OF EQUIPMENTS. GIVE FEED BACKTO SUPERVISORSANDCONTRACTORSFORTHE JOB ALLOTED. TO CALCULATE THE QUANTITY OFMATERIALS FROMDWGS. DO INSPECTION OFMATS., FIT UP,WELDING JTS.ALLIGNMENT,MECH.CLEARANCE,HYDROTESTING,FINALBOXUPAND PRECOMISSIONINGWORKS. M/S PETRO ENERGY, SUDAN. POSITION HOLD: SR.MECH.ENGR. (EXECUTION/QA &QC) DURATION: OCT’2009 TO JAN’2010. RESPONSIBILITIES:RESPONSIBLEFORALLEXECUTION ANDQC WORKS OFTHE JOB .SURVEY OF MATS.FROMDWGS.REVIEWOF DWGS. INSPECTION OFMATS, FITUPS, WELDING JTS. ANDALL NDT WORKS OF THE FLOWLINES AND MECHANICALJOB. WITNESSALL NDT WORKS. PREPARINGPROGRESS, DAILYMANPOWER ANDNDT REPORTS. PLANNINGOFWORK, MANPOWERAND EQUIPMENTS ASPER JOB PROGRESS. PREPARINGREPORTSOF INSPECTION OFMATS.FITUP, WELDING, ALLIGNMENT, MECH.CLEARANCE, BOX UP,HYDRO TEST ANDFINALBOX UP. REPORTINGTO CONST.MANAGERANDGENERAL MANAGER OF PROJECTS. M/S TOYO ENGG.INDIALTD. (GLOBALTOYO) PROJECT: LNG PHASEII DAHEJ, GUJARAT, INDIA. POSITION HOLD: CONST.ENGR. (PIPING&TANKAGE),EXECUTION &QA/QC. DURATION: AY’2008 TO SEP’2009
  • 6. RESPONSIBILITIES: CO ORDINATION OF EXECUTION AND QA/QCOFALLMECHANICALWORKS ALLOTED TO THE CONTRACTORS. INSPECTION OFTHE FIT UP, WELDING, ALIGNMENT ANDNDT WORKS FROMISSUE OF MATS.FABRICATION, ERECTION,MECH.CLEARANCE, BOXUP,HYDROTEST,FINALBOX UP ANDPRE COMISSIONINGWORKS. WITNESSOF ALL NDT EXAMINATIONSPRIORTOOFFERINGFOR INSPECTION TOTHE THIRD PARTY INSPECTOR. MAKE ARRANGEMENTSALL NECESSARY OFEQUIPMENTS AND MATS.REQQ FORTHE JOB. PLANNINGFORDAILY WORKPROGRESS, QA/QCWORKS MAKINGALL TYPES OFREPORTS REGARDING PROGRESS, MAN POWER, QUALITY AND WORK SCHEDULE. M/S CBI (CHICAGOBRIDGE & INDS) LOCATION: ABINDA GAS PLANT, ANGOLA. POSITION HOLD: IELD ENGR.PIPING DURATION: NOV’2007 TO APRIL 2008. RESPONSIBILITIES:COORDINATION OFALLEXECUTIONALAND QA/QCACTIVITIESOFTHEFLARE STACKSANDFLARE PIPING. TO GIVE FEED BACK TO FOREMANSANDSUPERVISORSFORTHE WORK ALLOTED TO THEM. ISSUEING ANDINSPECTION OFTHE MATS.REGARDINGTHE ALL QA/QCASPECTS. CALCULATE THE QTY OF MATS.FROMTHE DWGS ANDREGARDING THE SCOPEOF WORKS. TO CONTROL ALL WORKSACCORDINGTO EXECUTION, INSPECTION, PRODUCTION ANDPROGRESS. TO CONVERTDIMENSIONSIN MKS SYSTEM FROM BRITISHSTD. PREPAREDOCUMENTS ANDTOPICSFOR TOOL BOXTALKS REGARDINGHSE, HAZARDSOFTHE WORKSAND PRECAUTIONSTOBE TAKEN. PLANNINGOFWORKAND DEPLOYMENTS OF MAN POWER AND EQUIPMENTS INVOLVEDIN THE WORK. WITNESSALL THE NDT WORKS ANDPREPAREALL THE REPORTS REGARDINGTHE QC WORKS FROM ISSUE OF MATS.TO FINISHOFTHE JOB. M/S RAINBOW ENGG.ANDCONST.CO. POSITION HOLD: CO ORDINATOR(EXECUTION &QA/QC) DURATION: JAN’2006 TO NOV’2007. RESPONSIBILITIES: CO ORDINATION WORKSWITHCLIENT AND CONTRACTORS.
  • 7. SELECTION OF CONTRACTORSFORJOB. PURCHASINGMATS.ANDCONSUMABLES. PLANNINGOFWORKSCHEDULE AND ALL DOCUMENTATION WORKS MAKE ALL NECESSARYARRANGEMENTS NEEDED FOR THE JOB, LIKE DWGS,EQUIPMENTS ANDMATS. WITNESSALL NDT WORKS ANDMAKE ALL REPORTS REGARDING QUALITY OF THE JOB. WHOLE CONTROLON THE WORK THAT IT WAS DONE IN TIME WITH BEST QUALITY ANDSAFE WAY. M/S AL TURKI LLC LOCATION: PDO, NIMR, OMAN. POSITION HOLD: IPING/QCENGR. DURATION: JUNE’2005 TO OCT’2005. RESPONSIBILITIES: TO ISSUE MATS.ASPE BOM, SURVEY OF MATS.FROMDWG. TO WITNESS ALL NDT WORKSANDMAKES ALL REPORTS ANDDOCUMENTATION WORKD RELATED TO QA/QCOF THE JOB. RESPONSIBLEFORDEPLOYMENTS OFMAN POWER , EQUIPMENTS ACCORDINGTHE WORKALLOTED. TO APPLYPERMIT FOR THE JOB ANDPREPARE THE SITE FOR SAFE WORKWITH GOOD QUALITY AND BEST PROGRESS. WITNESSOF FIT UP, WELD JOINTS, MECH CLEARANCE, PUNCHLIST, BOX UP , HYDRO TEST ANDALL NDT EXAMINATIONS. MAKINGALL REPORTSLIKE AS PROGRESS, MAN POIWER, FIT UP, WELDING, HYDRO TEST,NDT ETC. M/S RELIANCE INDUSTRIES LTD (JAMNAGARREFINERY) POSITION HOLD : CONSULTANT DURATION: OCT’2003 TO MARCH’2005. RESPONSIBILITIES: SUPERVISINGALL THE SAFETY OFPERSONNELS, EQUIPMENTS, MACHINERIES ANDPLANT. ISUUE THE WORKPERMITS TO THE VARIOUSCONTRACTORSBY DOINGINSPECTION OFWORK PLACE OCATION FORWORKS TO BE DONE IN THE SAFE WAYS. RESPONSIBLEFORALLEXECUTION ANDQC WORKSLIKE FABRICATION ,ASSEMBLE, ERECTION,ALIGNMENTPAINTING,FIREPROOFINGWORKOFTHE HEAVYSTRUCTURES. SELECTION OF PIPE SPOOLS,INSPECTION OFFITUP,WELDING JTS,ALIGNMENT,LOCATION,ELEVATION,NDTTESTS,MECH.CLEARANCE,BOXUP.H/T,AIRTEST,FINAL BOX UP FOR PLANTPIPING.
  • 8. TO ARRANGEMATS. , EQUIPMENTS, DWGS AND NECESSARYREQUIREMENTS FOR THE WORK ALLOTED TO THE CONTRACTORS. INSPECTION OFTHE SCAFFOLDING LOOPCHECKING, MAKING ASBUILT DWGS. SELECTION OF CRANESAS PER THE LOADAND AREA OF ERECTION REMOVAL ANDERECTION OF 12T AND14T EJECTORS AT 40M HEIGHT IN REFINERY. INCHARGEOF REACTOR FEED PIPINGFORHYDROTREATOR PLANT IN RUNNINGREFINERY. M/S VIJAY TANKS AND CO.LLC LOCATION: UAE POSITION HOLD: WORKSHOP/SITEINCHARGE DURATION: JULY’2001 TO DEC’2001. RESPONSIBILITIES: OVERALLINCHARGE OFWORK SHOP (FABRICATION ANDASSEMBLY ) INCHARGEFOR THE EXECUTION AND QA/QCFORTHE WORKS OFPIPING/TANKSANDSTRUCTURES PLANNINGOFDAILY MANPOWER, EQUIPMENTSANDWORKPROGRESS INSPECTION OFMATS. , FABRICATEDITEMS, FIT UP, WELDING ANDALL NDT WORKS. MAKINGALL REPORTSLIKE PROGRESS, MANPOWER, NDT REPORTS. ARRANGEMAN POWER ANDALL NECESSARYEQUIPMENTS .MATS AND DWGS FOR TH M/S PETROCHEM ENGG.ANDCONTRACTORS LOCATION: NORTHERN REFINERY OF IRAQ, BAIJI, IRAQ. POSITION HOLD: PIPING/QCENGR. /MAT CO ORDINATOR RESPONSIBILITIES ALL CO ORDINATION WORKSOFEXECUTION AND QC PLANNINGFORMANPOWER, EQUIPMENTS ANDMACHENERIES FOR THE WORK INSPECTION OFMATS. , FITUP , WELDING,NDTTESTS,H/T ANDPRECONISSIONINGWORKS. REPAIRANDMAINTENANCEWORKSOF REFINERY REMOVAL OFOLD PIPESPOOLS, EQUIPMENTS ANDINSTALLATIONSOFNEWONES (PUMPS, ELECTRICAL HEAVY MOTORS,HEATEXCHANGERS,VESSELSANDTURBINE) ALL THE WORKSOF PLANTPIPINGFROMMAT ISSUE TO FINALBOXUP STAGE.
  • 9. PLANNINGDAILYANDWEEKLY REQUIREMENTS OF MATS.ANDARRANGETHEM ACCORDINGTOTHE PRIORITIESOFTHE WORK. CONTROLOVER WELDERS FOR THE JOB PROGRESSOF THE WELDING WITNESSAND INSPECTION OFALLNDT XAMINATIONS. M/S VIJAY TANKS AND CO.LLC LOCATION: KUWAIT ANDSULTANATEOF OMAN. DURATION: JUNE’1996 TO DEC’1998 POSITION HOLD: MECHANICALENGR./SITE INCHARGE RESPONSIBILITIES: FABRICATION ANDERECTION WORKSOF OILSTORAGE TANKS (CONEROOF,LOATINGROOF,SINGLE WALL,SINGLEDECK,DOUBLE DECK ) FABRICATION ANDERECTION OFCLEAN OUT DOORS, SHELL ANDROOF NOZZLES, INTERNALAND EXTERNAL PIPINGRELATED TO TANKS. FIXINGOF FOAMSEAL ALL WORKS RELATED TO NDT, CHALKTEST, AIRTEST, VACCUME TEST (BOTTOMTEST) ANDHYDRO TEST OFTANKS. INSPECTION OFIT UP, WELDING ANDALL TYPES OF TESTS REQQ.FORTANKS. ERECTION OF TANK SHELLS BY HYDAULIC JACKINGSYSTEM. FABRICATION ANDERECTION OFON PLOT PIPING REPLACEMENTS OF TANKBOTTOMS, SHELL COURSES, ROOFPLATE, REPAIRALTERATION OF BUCKLE NIZZLES, SHELL AREAS. PONTOONS, ROOFSUPPORTINGLEGS, TWISTED ROOFSTRUCTURE. MODIFICATION OF PIPING, MAINTENANCEWORKS, REMOVALANDINSTALLATIONSOFVALVES, HEAT EXCHANGERS, PUMPS, MOTORS ANDTRAYS INSILOS. ASSEMBLY WORKS OF 60M AND 100M FLARE STACKSATLNG, SUR , OMAN.A PROJECTOF FOSTER& WHEELER. ERECTION OF 60M FLARE STACK. PLANNINGANDDEPLOYMENT OFMANPOWER, MACHINERIES AT WORKSITE. SUPERVISEALL ACTIVITIESOFTHE WORK ANDSAFETY OF THE PERSONNEL.MACHINERIES, EQUIPMENTS ANDPLANT. PREPARINGTIME SCHEDULE AND TIME SHEETS
  • 10. PREPARINGALL TYPES OF REPORTSLIKE MAN POWER,PROGRESS, FITUP, WELDING, MECH.CLEARANCE, PUNCH LIST, AS BUILT DQG, HYDRO TEST ANDFINALBOX UP REPORTSAND DOCUMENTATION WORKS. FABRICATION ANDERECTION OFDOUBLE TANKSWITH CHUTES AT NIMR ANDMARMUL SITESOF PDO, SULTNATE OF OMAN ALL THE ABOVEWORKSI HAD SUPERVISEIN VARIOUS SITESLIKE OMAN REFINERY, SHELL REFINERY , BRITISH PETROLEUM IN OMAN I HAD WORKED IN SITES OF PDO LIKE NIMR MARMUL, ALHUWAIZAH, YIBAL I HAD DONE FABRICATION OF6 TANKSFORKNPCIN THE WORK SHOP OFKSRC IN KUWAIT. M/S NEWTON ENGG.ANDCONST.CO.LTD POSITION HOLD: MECHANICALENGR. (PIPING, TANKS) LOCATION : GSFC,GACL,IOCLBARODA,GUJARAT., IOCL NAJIBABAD, UP, INDIA. DURATION: FEB’1991 TO MAY’1996 RESPONSIBILITIES: FABRICATION ANDERECTION OFPLAT PIPING, U/G PIPINGANDPIPELINES CHECKINGOF MATS, FABRICATION OFPIPESPOOLSANDHYDRO TEST OF PIPESPOOLS ERECTION OF PIPE SPOOLSIN RACK INSPECTION OFFIT UP, WELDING, ALIGNMENT, NDT TESTS, MECH.CLEARANCE, PUNCHLIST.HYDRO TEST, AIR TEST, BOXUP LOOPCHECKING ANDFINALBOX UP REPORTS PLANNINGOFMAN POWER, MATS AND EQUIPMENTS FORTHE WORK ALLOTED FABRICATION ANDERECTION OFU/G PIPINGBY BENDINGOF PLATES (20” TO 72”DIA) FOR AMMONIA IV PLANTOF GSFC, BARODA , GUJARAT. WITNESSALL NDT TESTS ANDHYDRO TEST FOR PIPESPOOLSANDPIPELINES. MAKINGALL REPORTSANDDOCUMENTATION WORKOF THE JOB FABRICATION, ROLLINGOFPLATESFOR SHELL OF THE TANKSFOR CONEROOF ANDFLOATINGROOF TANKS. CHECKINGTEMPLETS AND ALL,MARKING, FIT UP, WELDING OF THE SHELL, ROOF, BOTTOMPLATES FABRICATION OFSHELL ANDROOF NOZZLESANDFIXINGTHEM ON A PLACE FABRICATION ANDERECTION OF10 NOS TANKSATIOCL, NAJIBABAD, OILDEPOT WITNESSOF ALL NDT TESTS, VACCUMBOX TEST CHALK TEST, HYDRO TEST FORTANKS
  • 11. CHECKINGALL LAYOUTS FORMARKING OF STRUCTURE, ROOF STRUCTURE, CURB ANGLE, BOTTOM,SHELL ANDROOFPLATES MARKING FABRICATION ANDINSTALLATIONSOFPIPESUPPORTSANDCPS. FOR 6 MONTHS I HAD WORKEDAT NAJIBABADAS OVERALL INCHARGEOF THE WORK SITE.