This document provides a profile for Ismail Mohd Tahir including his personal details, education history working experience, areas of expertise, and responsibilities in various roles. Some key details include:
- Ismail is married, Malaysian, and received an Associate in Applied Science degree in Marine Technology from a college in Seattle in 1982.
- He has over 30 years of experience working for companies like Petronas, Ay Engineering, and Ramunia Fabricators in roles like Construction Manager, General Manager, and Senior Fabrication Engineer.
- His areas of expertise include fabrication, construction, quality control, and inspection for oil and gas industries.
Heritage Infraspace India Private Limited is as one of the fastest growing in the field of foundation works i.e.Diaphragm wall works,Top Down Construction,Shoring and Piling works, Sheet Piling, Micro Piling,Solar Projects ,Civil Construction and Interior Design and Execution in India and world wide.
Heritage Infraspace India Private Limited is as one of the fastest growing in the field of foundation works i.e.Diaphragm wall works,Top Down Construction,Shoring and Piling works, Sheet Piling, Micro Piling,Solar Projects ,Civil Construction and Interior Design and Execution in India and world wide.
Una solución consolidada y a su medida. Mejora la atención telefónica, incrementa la calidad de servicio y facilita datos estadísticos de la actividad realizada.
Impartido por: José Ferrero, Jusan
FINNISH SPORT SPONSORSHIP AND SPONSORED SOCIAL MEDIA CONTENTLaura Peltonen
In Finnish sports marketing sports organizations' social media networks are used to connect sponsoring brands with the fans. The main objective of this thesis is to help rights-holders and sponsors to recognize and create engaging sponsored social media content that generates desired reaction and engagement among the target audience. This thesis is a case study that investigates how different content factors affect the willingness of Finnish sports consumers to engage with sponsored content posts published by the rights-holders. The research focuses on investigating sponsored posts published by Liiga ice hockey teams on their social media platforms and the reaction they create among the target audience. The case organizations, Liiga ice hockey teams, are 15 Finnish ice hockey teams that compete in Liiga, Finnish top professional ice hockey league. To offer an international benchmark to the research also three NHL ice hockey teams and the sponsored posts published on their social media platforms are included.
The research was conducted by analysing the collected social media content posts with explanatory sequential mixed research method which combines both quantitative and qualitative methods. Based on the research results suggestions and recommendations are given on how sponsored social media content could be developed and targeted more effectively.
In this session, United Way NCA Director of Philanthropic Engagement Stephen Saunders covers goal setting and donor strategy. You can watch the guided webinar recording at UnitedWayNCA.org/domore24training
¿Qué es un SBC Session Border Controller?
1. Esta creciendo el mercado de SIP Trunking?
2. La seguridad en VoIP es un gran problema?
3. Experimentas Audio en un solo sentido?
4. Es difícil la interoperabilidad SIP a SIP entre fabricantes
5. Conoces de alguien que sufrió ataques su PBX ?
La experiencia de gestión de: Hatillo SaludPAGGMunicipal
Ponente: Nairoby Rivas, Directora de Salud del municipio El Hatillo, estado Miranda.
Ier Encuentro Nacional de Política Social y Programas Sociales en el Municipio. Universidad Metropolitana, Caracas 15 y 16 de julio de 2016.
Plan Progresa-Educativo: Superarte y Equípate y edúcate. PAGGMunicipal
Ponente: Nahury Escalona, Directora de Educación y Andrés Moreno, Director de Juventud de la alcaldía del municipio Sucre del estado Miranda.
Ier Encuentro Nacional de Política Social y Programas Sociales en el Municipio. Universidad Metropolitana, Caracas 15 y 16 de julio de 2016.
Why Data Virtualization? An Introduction by DenodoJusto Hidalgo
Data Virtualization means Real-time Data Access and Integration. But why do I need it? This presentation tries to answer it in a simple yet clear way.
By Alberto Pan, CTO of Denodo, and Justo Hidalgo, VP Product Management.
1. PROFILE
NAME : ISMAIL FAMILY NAME : MOHD TAHIR
MARITAL STATUS: :MARRIED
NATIONALITY MALAYSIA
D.O.B :08 APRIL 1941
TELEPHONE (H.P) : +60111-6333910
RELIGION ISLAM
HEALTH : EXCELENT
EDUCATION : ASSOCIATE in APPLIED SCIENCE (MARINE TECHNOLOGY).
COLLAGE / : SEATTLE, USA
UNIVERSITY
YEARS : 1978 – 1982
EMPLOYERS : PETRONAS (MALAYSIAN NATIONAL & GAS COMPANY)
PETRONAS STAFF NO -18538
1982 – 1992.
JOIND AY ENGINEERING – 1992 – 1996
NOTIFICATION OF EMPLOYMENT ONE (20) DAYS
Preferable area Middle-East
PROFESSIONAL COURSE / CERTIFICATE OBTAIN
MEMBER of AWS 5 NOVEMBER 1985 -
WELDING INSPECTION & QUALITY CONTROL – 4 / 10 / 1985
( American Society Of Metal )
NDT : NON DESTRUCTIVE TESTING
ASNT LEVEL 11. - 8 FABUARY 1985
SSPC.SWIDISH STANDARD for PAINTING
COATING & COATING INSPECTION – JANUARY 1983
( STEEL PROTECTION BUREAU - AMERICA)
AREA OF CONCERN
FABRICATION / CONSTRUCTION of OIL & GAS INDUSTRIES
QUALITY CONTROL / INSPECTION
September 2014 – PRESENT INSPECTION OF VESSELS AND ITS RELETED
FESILITIES. INSTALLATION OF RISER GUARDS,
CONDUCTOR AND PILES.
September 2010- : BKT FRASER THERMAL TECHNOLOGY SDN BHD.
POSITION : CONSTRUCTION MANAGER
FABRICATION PRESSURE VESSELS, HEAT EXCHANGERS, AIR
COOLED HEAT EXCHANGERS, BOILERS, FIRED HEAT
EXCHANGERS AND DOUBLE PIPE & HAIRPIN HEAT
EXCHANGERS.
RESPONSIBILITIES : TO APPROVE FABRICATION PROCEDURES AS PER CLIENT’S
SCOPE OF WORKS.
INVOLVED IN KICK-OF-MEETING WITH PETRONAS REFINERY,
MELACCA, PETROBRAS BRAZIL, ONGC, MOPUSTOR – YME
FIELD REDEVOLOPMENT PROJECT.
May 2007 – : RAMUNIA FABRICATORS SDN. BHD.
POSITION : CONSTRUCTION MANAGER
PROJECT : BELUMUT A NEW FIELD
1
2. NOV 1992 – 1997 : AY FABRICATOR SDN. BHD
POSITION : GENERAL MANAGER
(FABRICATION)
PROJECT INVOLVED : TEBENGO JACKET, PILES & CONDUCTO
SELIGI JACKETS, PILES & CONDUCTOR
GUNTONG D JACKET & JACKET CAP, PILES & CONDUCTOR
RESPONSIBILITIES
MAKE MONITORING PROGRESS AND PERFORMANCE OF DONE
TO IMPLEMENT SAFETY RULES AND REGULATION AT WORK SITE INCLUDING HOUSE-
KEEPING
? MONITORING MATERIAL RECEIVING AND STORAGE AREA
? SCHEDULES OF WORK
? EQUIPMENT AND MANPOWER LOADING AND PLANNING.
? REVIEW FABRICATION AND ERRECTIION SEQUENCE'
.MONITOR LIFTING AND WEIGHING OF JACKET AND TOPSIDE
TO REVIEW PROJECT PROGRESS AND WORKSCOOPING OF SUB
C ONTRACTOR.. .ANALYSE PROJECT PROBLEM..
IDENTIFY RECEIVING AND STORAGE AREA
SCHEDULES OF WORK
EQUIPMENT AND MANPOWER LOADING.
- SUPERVISE PROJECT TEAM ON FABRICATION, ERECTION AND
INSTALLATION WORKS.TO REVIEW ANY CATCH UP PLAN IN
- VIEW OF DELAYS TO SCHEDULE
JAN 1992 - APRIL 1992 : TENDER COMITEE FOR BAP-AA ROJECT DURING THE
BIDDING PHASE.
PROJECT INVOLVED : BAP-AA PROJECT. TO LEAD A GROUP OF ENGINEERS
DURING THE TENDER EVALUATION OF THE PROJECT.
MAKE RECOMMENDATION TO TENDER COMMITTEE
FOR AWARD.
JAN 1991 - DEC 1992
: PETRONAS CARIGALI SDN BHD
POSITION : SENIOR FABRICATION ENGINEER
PROJECT INVOLVED FABRICATION OF BARAM B & Q PROJECT AT AYE YARD PASIR
GUDANG
OCT 1990 - DEC 1990 : PETRONAS CARIGALI SDN BH
POSITION : CONSTRUCTION LIAISON ENGINEER
PROJECT INVOLVED : ATTACHED TO CARIGALI / SHELL FOR BDO
(BARAM DELTA OPERATION) FOR THE
REINSTATEMENT OF MCOT (MIRI CRUDE OIL TERMINAL
(STORAGE TANKS )
FEB 1990 - SEPT 1990 : PETRONAS CARIGALI SDN BHD
POSITION : DNV COORDINATOR FOR DEPARTMENT
JOBS INVOLVED : TO LIASE WITH SAFETY AND TECHNICAL GROUP
(CARIGALI) AND DULANG PROJECT TEAM. TO CONDUCT
INSPECTION TECHNICAL AUDIT ON ALL THE
FABRICATION YARD.
MAR 1989 - JAN 1990 : PETRONAS CARIGALI REP.
PROJECT INVOLVED : MEMBER OF DULANG PROJECT TEAM AT MALAYSIA
SHIPYARD & ENGINEERING, PASIR GUDANG, JOHOR.
TO MONITOR FABRICATION ACTIVITIES.
TO ADVISE THE RESIDENT ENGINEER WITH REGARD TO
QUALITY CONTROL / ASSURANCE MATTERS / HSH
FEB 1986 - JUNE 1988 : SIME SMBAWANG ENGINEERING PASIR GUDANG
: HEAD OF QA/QC DEPARTMENT.
PROJECT INVOLVED : ESSO PRODUCTION MALAYSIA INC.
- GUNTONG ‘B’ & GUNTONG ‘C’
- SELIGI ‘B’ & ‘C’
- PALAS ‘A’
JOB INCLUDE OF SETTING UP WELDING DEPARTMET
AUG 1986 - DEC 1986 : PETRONAS CARIGALI REP.
PROJECT INVOLVED : ONBOARD MV DIPLOMA TFOR SUBSEA
INSPECTION OF DUYUNG COMPLEX AND ITS RELATED
2
3. FACILITIES INCLUDING PIPELINE SURVEY FROM
DUYUNG COMPLEX TO ONSHORE, KERTEH - 170 KM LONG
WITNESS UNDER WATER TESTING USING ROV SYSTEM
MAY 1985 - FEB 1986 : PETRONAS CARIGALI SDN BHD
POSITION : SENIOR CONSTUCTION ENGINEER
PROJECT INVOLVED : CONSTRUCTION OF ONSHORE SLUGCATCHER AND ITS
RELATED FACILITIES IN KERTEH. TO MONITOR
INSPECTORS AND ENGINEERING DAILY ACTIVITIES.
MAR 1985 - MAY 1985 : PETRONAS CARIGALI SDN BHD
POSITION : SENIOR INSTALLATION SUPERVISOR
PROJECT INVOLVED : LAYING OF 170 KM BARGE SUBMARINE PIPELINE
FROM DUYUNG COMPLEX TO ONSHORE KERTEH.
MONITORING INSTALLER’S ACTIVITIES.
JAN 1984 - MAR 1984 : TO HOUSTON (USA) TO QUALIFIED WPQT (WELDING
PROCEDURE QUALIFYING TEST) FOR BROWN & ROOT
ON RESOURCES AND GUTTER AUTOMATIC WELDING
MACHINE AND HYPERBARIC WELDING PROCEDURE
FOR TYLOR DIVING IN NEW ORLEAN
1983 - LATE 1983 : PETRONAS CARIGALI SDN BHD
POSITION : ASST RESIDENT ENGINEER AT BREDERO PRICE
COATING YARD - KUANTAN.
PROJECT INVOLVED : COATING OF 170 KM PIPELINE FROM DUYUNG
OFFSHORE COMPLEX TO ONSHORE SLUGCATCHER AT
KERTEH.
MAY 1981 – OCT 1982 : PETRONAS CARIGALI SDN. BHD.
POSITION : ASST. RESIDENT ENGINEER
PROJECT INVOLVED : FABRICATION OF 2 UNITS OF 4 LEGGED JACKET OF
DUYUNG FIELD
RESPONSIBLE FOR ALL THE FABRICATION ACTIVITIES.
CONDUCT PROGRESS MEETING WITH THE Fabricator
LIAISE WITH CARIGALI OFFICE IN KUALA LUMPUR WITH
REGARD TO THE PROGRESS / STATUS.
RESPONSIBILITIES
- MANAGE PROJECT CONSTRUCTION, COMMISSIONING &
PERFORMANCE TESTING AND START-UP PROJECT.
- TO ENSURE THAT ALL CONSTRUCTION ACTIVITIES ARE CONDUCTED
INLINE TO SAFETY STANDARD
HOLDING WEEKLY CONSTRUCTION AND SAFETY MEETING WITH CONTRACTOR. MONITOR
EQUIPMENT DELIVERY STATUS
- REVIEW CONTRACTOR CONSTRUCTION PROGRESS REPORT
- REVIEW CONSTRUCTION OF SCHEDULE CONTRACTOR CPM (CRITICAL
PATH NETWORK)
- REVIEW WEEKLY & MONTHLY REPORT CONSTRUCTION STATUS.
- REVIEW VENDOR DRAWING.
- TO ENSURING VARIOUS PROJECT AS PER ENGINEERING STANDARD,
DEFINE SCOPE OF WORK AND PERFORM COMMISSIONING
3