Curriculum Vitae (CV)
Beudeker Frank
Email: frbeudeker@gmail.com
Tel. nr.: +84 (0)91 9033728
Address: Phan Tru Trinh 55/16, Vung Tau City, Vietnam
Nationality: Belgian (residing in Vietnam)
Civil status: Married, one child
1. Proposed Position COMMISSIONING IR
2. Name of Firm FREE LANCE CONTRACTOR
3. Name BEUDEKER FRANK P. P.
4. Date of Birth 13/07/1963 Nationality: BELGIUM
5. References Gordon Gill company
+32 2 5121444
Mr. Gerhard Hirth
+ 32 492.928.860
+ 33. 631.70.35.48
6. Education T.I.B ANTWERP & TECHNICUM RERUM NOVARUM ANTWERP,
ELECTRICITY DIPLOMA LOWER & HIGH SCHOOL, MATURATY
ACCESS DIPLOMA TO UNIVERCITY (1983)
7. Social &
organisational skills
EASYSOCIAL BEHAVIOUR,GETALONGWITH EVERYBODY,HAVE
ALISTENING EAR. PRO-ACTIVE PROFESSIONALON HANDS ON
PROBLEM SOLVING.
EXPERIENCED IN TROUBLE SHOOTING/CORRECTINGAND
IMPLEMENTINGCOMPLEXENERGYAND PROCESS SYSTEMS.
TEND TO WORK ORDERLYAND STRUCTURED,ORGANISE OWN
WORKAND DELEGATE WORK TO OTHERS. PREFERAPLAIN
COMMUNICATION STYLE.
8. Other Training SPECIALITY COURSE INSTRUMENTATION (ANTWERP,1984),
FIREFIGHTING INDUSTRIAL AT RISK ROTTERDAM, ON JOB
PROCESS EDUCATION 4 YEARS, WEEKLY BASE, 1886 TILL1990
(ANTWERP EXXON)
9. Countries of Work
Experience
KUWAIT,CYPRUS,TRINIDAD,GREECE,GERMANY,QATAR,
BRUNEI,NETHERLANDS,ALGERIA,VIETNAM,USA,ISRAEL, DUBAI,
BRAZIL,SPAIN,TAIWAN,PORTUGAL,POLAND,BELGIUM,INDIA,
EGYPT, IVORY COAST.
10. Languages Speaking Reading Writing
DUTCH FLUENT FLUENT FLUENT
ENGLISH FLUENT FLUENT FLUENT
SPANISH FLUENT FLUENT AVERAGE
FRENCH AVERAGE FLUENT AVERAGE
GERMAN AVERAGE AVERAGE BAD
Basic understanding of Italian and Portugese.
10. Employment Record:
DetailedTask
Assigned
TFA COMBINED CYCLE
HOUSE CONSTRUCTION
Work Undertaken
Name of assignment or project: Azito phase 3
Year: 2014/15 (23/12/14 till 31/08/15
Location: Abidjan, Ivory Coast
Client: AZITO O&M
Main project features: 2GT (Alstom 145MW), 2HRSG’s (Korean),
BOP and ST (GE 150MW)
Positions held: Technical advisor
Activities performed: Follow up and guide through the commissioning
process. Chemical clean, steamblow, DCS configuration and testing,
operator follow up.
Location: Vung Tau, Ba Ria Vung Tau, Vietnam
Year: 02/01/14 to 22/09/14
Client: Private client
MECHANICAL AND
INSTRUMENTATION
TROUBLESHOOTING
AND COMMISSIONING
OF 2 WATER STEAM
CYCLES
Name of assignment or project: Al Zour
Year: 2013 (23/08/13 to 23/11/13)
Location: Kuwait
Client: ALSTOM
Main project features: 5 GT’s (Alstom), 5 HRSG’s divided in 3 + 2
blocks, 2 WSC (BOP) and 2 ST (Alstom)
Positions held: Commissioning engineer.
Activities performed: Field, mechanical, instrumentation (calibration
and adjustments) pre-commissioning and commissioning on WSC’s
COMMISSIONING OF 2
HRSG’S AND BOP
Name of assignment or project: Vasilikos add on 5A/B
Year: 2012 (26/07/12 to 28/11/12)
Location: Cyprus
Client: J&P AVAX
Main project features: 2GT (GE 70MW), 2HRSG’s (NEM), BOP and
ST (Alstom 90MW)
Positions held: Commissioning engineer.
Activities performed: Field: mechanical inspections HRSG’s and BOP,
Instrumentation checks and MOV/pneumatic valve setting and
adjustments, preparations for and follow up chemical clean, follow up on
temporary steam blow piping plus re-instatement before start-up. CCR:
Steam blows, DCS adjustments (ABB assisted for implementation), all
testing required for plant integrity (safety testing, purity runs etc…)
including 50% and 100% rejection load on ST. Operations during
reliability run (including operator training) of the full unit (GT’s,
HRSG’s, BOP and ST)
COMMISSIONING OF 6
HRSG’S
Name of assignment or project:
Year: 2012 (12/04/12 to 16/07/12)
Location: Trinidad
Client: EBE Ferrostaal
Main project features: 6GT’s, 6HRSG’s (China), 2 ST
Positions held: Mechanical and instrumentation commissioning
engineer.
Activities performed: Mechanical follow up and instrument/MOV
adjustments.
COMMISSIONING OF
ASU
Name of assignment or project:
Year: 2012 (16/12/11 to 23/12/11 and 08/01/12 to 18/01/12)
Location: Elefsina, Greece
Client: AIR PRODUCTS
Main project features: ASU
Positions held: Commissioning engineer
Activities performed: Field follow up, dry out and production
COMMISIONING CO2
PILOT PLANT
Name of assignment or project:
Year: 2011 (20/11/11 to 15/12/11)
Location: Vattenfall, Germany
Client: AIR PRODUCTS
Main project features: CO2 recovery pilot plant
Positions held: Commissioning engineer
Activities performed: CCR start-up and production
COMMISSIONING AND
TROUBLESHOOTING
ON 4 HRSG’s, FIELD &
CCR
Name of assignment or project:
Year: 2011 (30/01/11 to 07/03/11)
Location: Ras Laffan, Qatar
Client: NEM
Main project features: 4HRSG’s, ST (Siemens)
Positions held: TFA
Activities performed: Follow up and trouble shooting, assist in CCR
COMMISSIONING 1
HRSG IN FIELD
Name of assignment or project: Shell BLNG
Year: 2010 (20/08/10 to 19/12/10)
Location: Lumut, Brunei
Client: NEM/SHELL
Main project features: GT (GE), 1 HRSG, ST (Siemens)
Positions held: TFA
Activities performed: Field mechanical check ups pre start and during
shut down. Adaption on piping.
COMMISIONING OF 2
HRSG’S AND BOP
Name of assignment or project: Vasilikos add on 4A/B
Year: 2009 (06/04/09 to 20/07/09)
Location: Cyprus
Client: J&P AVAX
Main project features: 2GT (GE 70MW), 2HRSG’s (NEM), BOP and
ST (Alstom 90MW)
Positions held: Commissioning engineer.
Activities performed: Field: mechanical inspections HRSG’s and BOP,
Instrumentation checks and MOV/pneumatic valve setting and
adjustments preparations for and follow up chemical clean, follow up on
temporary steam blow piping plus re-instatement before start-up.
CCR: Steam blows, DCS adjustments (ABB assisted for
implementation), all testing required for plant integrity (safety testing,
purity runs etc…) including 50% and 100% rejection load on ST.
Operations during reliability run (including operator training) of the full
unit (GT’s, HRSG’s, BOP and ST)
Name of assignment or project: Construction
Year: 2008 (26/12/07 to 22/08/08 and 18/12/08 to 06/04/09)
Location: Tri Ton, Vietnam
Client: Private
Main project features: House construction
Positions held: Lead
Activities performed: Construction of 56 foundation points to support
house and water wall of 3800m3 granite
PRE-COMMISIONING
2 DUAL HRSG’S
Name of assignment or project:
Year: 2007 (06/06/07 to 22/12/07)
Location: Rotterdam, Netherlands
Client: AIR LIQUIDE/SHELL
Main project features: 2GT’s (GE 125MW), 2 dual HRSG’s
Positions held: Commissioning engineer.
Activities performed: Finalizing construction, pre-commissioning of 2
dual HRSG’s, loop checks, BPS check (boiler protection system).
COMMISSIONING
HELIUM RECOVERY
PLANT
Name of assignment or project: Helium recovery/liquifier
Year: 2006 (31/05/06 to 21/12/06)
Location: Skikda Algeria
Client: LINDE BV.
Main project features: Helium and nitrogen recovery (from LNG
plants) and liquifiers. Loading docks. Return purified gas (GAN, CH4)
back for processing.
Positions held: Commissioning engineer.
Activities performed: commissioning (compressor, compander, dry
out), start up included operator training.
COMMISSIONING
MANAGER 2 HRSG’S
Name of assignment or project: Phu Mi 2.2
Year: 2004/2005 (05/01/04 to 27/01/05)
Location: Phu Mi, Vietnam
Client: NEM
Main project features: 2 GT (GE 260MW), 2 HRSG’s (NEM), 1 ST
(GE 290MW).
Positions held: Commissioning manager (HRSG’s only)
Activities performed: Responsible for on time delivery of both units, in
charge of 1 commissioning ir., 1 construction/ commissioning ir. And 4
operators (including logistics) also hands on commissioning from my
part. Main contractor EDF.
LAY UP OF HRSG’S
STOPPED IN
CONSTRUCTION
Name of assignment or project:
Year: 2003 (20/09/03 to 16/10/03 and 11/11/03 to 27/11/03)
Location: Dresden, Ohio, USA
Client: NEM
Main project features: HRSG units stopped during construction
Positions held: TFA
Activities performed: Dry out and nitrogen lay up on unit stopped
during construction (i.e. none of the main piping welded). N2
preservation of piping, bundles on the unit and lay down yard piping.
PRE-COMMISSIONING
AND COMMISSIONING
2 HRSG’S
Name of assignment or project: Possom Point
Year: 2003 (23/03/03 to 16/06/03)
Location: Dumfries, USA
Client: NEM
Main project features: 2 HRSG,s, SCR, burners
Positions held: TA
Activities performed: pre-commissioning and commissioning of 2 units
including SCR bay (Hitachi) and burner bay (DeJong Coen)
STAND-IN
COMMISSIONING ON 4
HRSG’S
Name of assignment or project:
Year: 2002 (25/10/02 to 18/12/02)
Location: Hagit, Israel
Client: NEM
Main project features: 4 GT’s (GE 100MW), 4 HRSG’s vertical
(NEM), 1 ST (ABB 110MW)
Positions held: TA
Activities performed: Stand in for NEM personnel on leave. During this
period 3 HRSG’s economizers failed. Preparation for works to be started
on repairs (equipment, personnel)
TECHNICAL ADVISOR
ON PRE-
COMMISIONING AND
COMMISSIONING OF 2
HRSG’S
Name of assignment or project:
Year: 2002 (13/09/02 to 04/10/02)
Location: Rise, Rhode Island, USA
Client: NEM
Main project features: GT’s (Siemens), 2 HRSG’s (NEM)
Positions held: TA
Activities performed: Advise on pre-commissioning and
commissioning.
RE-COMMISSIONING
BURNER BAY ON
HRSG’S
Name of assignment or project:
Year: 2002 (03/08/02 to 21/08/02)
Location: Dubai, UAE
Client: NEM
Main project features: 2 HRSG’s
Positions held: TA
Activities performed: Burner modifications after internal explosion.
Burner lanses disengaged from supports after the blast. Installation of
explosion bumpers (external) and refurbish the burner supports (internal)
OUTAGE OVERHAUL
HRSG’S
Name of assignment or project:
Year: 2002 (19/06/02 to 23/07/02)
Location: Uruguaiana, Brazil
Client: NEM
Main project features: HRSG’s
Positions held: TA, commissioning engineer
Activities performed: Outage repairs and modifications on internal
insulation and piping/casing penetrations.
STAND-IN
COMMISSIONING ON 2
HRSG’S
Name of assignment or project:
Year: 2002 (28/05/02 to 19/06/02)
Location: Castellon, Spain
Client: NEM
Main project features: 2 GT (GE 260MW), 2 HRSG,s (NEM), 1 ST
(GE 290MW)
Positions held: TA
Activities performed: Stand in for NEM personnel on leave.
Mechanical modifications during SD
TECHNICAL ADVISOR
ON 4 HRSG’S
Name of assignment or project: Redhawk
Year: 2002 (31/01/02 to 26/05/02)
Location: Arlington, Arizona, USA
Client: NEM
Main project features: 4 GT (GE 160MW), 4 HRSG’s (NEM), 2ST
(ABB 190MW)
Positions held: TA
Activities performed: Pre- commissioning, commissioning, iso checks,
support modifications, P&ID checks, DCS compliance with BPS.
TECHNICAL ADVISOR
ON 2 HRSG’S
Name of assignment or project: Santee Cooper
Year: 2001 (10/05/01 to 16/11/01)
Location: Anderson, South Carolina, USA
Client: NEM
Main project features: 2 GT (GE 160MW), 2 HRSG’s (NEM), 1 ST
(GE 140MW)
Positions held: TA
Activities performed: Pre-commissioning checks (iso, P&ID,
expansions internal and external etc…). Advise and follow up on
commissioning (chem. clean, steam blow, operations).
COMMISSIONING IR Name of assignment or project: Ba Ria
Year: 1999/2000 (06/06/99 to 18/09/99 and 27/03/00 to 02/05/00)
Location: Ba Ria, Vietnam
Client: NEM
Main project features: 3 GT,s (30MW), 3 HRSG’s (NEM), 1 ST
(Siemens)
Positions held: Commissioning engineer.
Activities performed: Mechanical inspections and corrections.
Instrumentation, pneumatic valves & MOV,s. Chem clean, steam blows,
production, operator training.
COMMISSIONING IR Name of assignment or project: Haifu
Year: 1999/2000 (15/03/99 to 16/04/99 and 19/09/99 to 26/03/00)
Location: Haifu, Taipei, Taiwan
Client: AE&E
Main project features: 4 GT’s (ABB 160MW), 4 HRSG’S (AE&E), 2
ST’s (ABB 160MW)
Positions held: Commissioning engineer
Activities performed: Pre-commissioning checks (iso, P&ID
verification), instrumentation, mechanical commissioning. Pressure
testing, chem. clean, steam blows, safety valves testing, chemistry skids
commissioning.
COMMISSIONING IR Name of assignment: Tapada
Year: 1998 (16/02/98 to 16/10 98)
Location: Tapada di Outeiro, Oporto, Portugal
Client: NEM
Main project features: 3 GT’s/ST’s Single shaft (Siemens GT
220MW/ST 110MW each), 3 HRSG’s (NEM)
Positions held: Commissioning engineer
Activities performed: Pre-commissioning checks (iso, P&ID
verification), instrumentation, mechanical commissioning. Pressure
testing, chem. clean, steam blows, safety valve testing, reliability run
follow up.
COMMISSIONING IR Name of assignment:
Year: 1997 (24/10/97 to 06/12/97)
Location: Oporto (Tapada) & Lisbon, Portugal
Client: KTI/MANNESMANN
Main project features: In line warm bath gas heaters at let down
stations.
Positions held: Commissioning engineer.
Activities performed: Gas line blows, instrumentation disassembly
function testing and reconstruction. Burner adjustments and emission
testing.
OPERATIONS Name of assignment:
Year: 1997 (30/06/97 to 28/07/97)
Location: Amsterdam, The Netherlands
Client: SHELL
Main project features: Boilers, service air compressors, water treatment
and back up power generator.
Positions held: operator
Activities performed: Shift operator
COMMISSIONING IR Name of assignment:
Year: 1997 (06/04/97 to 15/06/97)
Location: Plock, Poland
Client: KTI
Main project features: 110000NM3/h multiple feed hydrogen unit.
Positions held: Commissioning engineer
Activities performed: Pre-commissioning gas line blows, leak testing,
mechanical checks, catalyst loading. Commissioning, refractory dry-out,
reformer piping adjustments, steam system blow-out and safety popping,
ID/FD fan modifications, start up.
OPERATIONS Name of assignment:
Year: 1997 (14/03/97 to 06/04/97)
Location: Antwerp, Belgium
Client: FINA
Main Project features: Ethylene unit
Positions held: Commissioning engineer
Activities performed: Burner adjustments
START-UP OPERATIONS Name of assignment: Carilon
Year: 1996 (26/08/96 to 31/10/96)
Location: Amsterdam. The Netherlands
Client: SHELL
Main project features: Batch process carillon pilot plant
Positions held: Start-up operator
Activities performed: Start up and shut down on carillon batch process
unit.
OPERATIONS Name of assignment:
Year: 1996 (15/07/96 to28/07/96)
Location: Rozenburg, Rotterdam, The Netherlands
Client: AIR PRODUCTS
Main project features: Hydrogen and CO unit with loading docks
Positions held: Operator
Activities performed: Field shift operator
COMMISSIONING IR Name of assignment:
Year: 1996 (17/04/96 to 30/06/96)
Location: Mangalore, India
Client: KTI
Main project features: 400000m3/h multiple feed hydrogen unit.
Positions held: Commissioning engineer
Activities performed: Pre-commissioning gas line blows, leak testing,
mechanical checks, catalyst loading. Commissioning, refractory dry-out,
reformer piping adjustments, steam system blow-out and safety popping,
ID/FD fan modifications, start up.
OPERATIONS Name of assignment:
Year: 1995/1996 (29/09/95 to 27/12/95 and 04/02/96 to 03/04/96)
Location: Pernis, Rotterdam, The Netherlands
Client: AIR PRODUCTS
Main project features: Demin unit, steam street and power generator
Positions held: Operator
Activities performed: Field shift operator
COMMISSIONING IR Name of assignment: Damanhour/Mahmoudia
Year: 1994/1995 (30/11/94 to 24/02/95 and 20/05/95 to 24/09/95)
Location: Damanhour/ Mahmoudia, Egypt
Client: NEM
Main project features: Damanhour: 4 GT’s, 4 HRSG’s, 1 ST,
Mahmoudia: 8 GT’s, 8 HRSG’s, 2 ST’s
Positions held: Commissioning engineer
Activities performed: Pre-commissioning, i.e. instrumentation, MOV’s,
mechanical inspections support checks, iso and P&ID checks, pressure
testing, alkaline boil-out, steam blows, DCS adjustments, start up and
reliability runs
COMMISSIONING IR Name of assignment: RFA Bernburg
Year: 1994 (01/09/94 to 21/11/94)
Location: Bernburg, East Germany
Client: KTI
Main project features: 6500Nm3/h Hydrogen unit
Positions held: Commissioning engineer
Activities performed: Pre-commissioning gas line blows, leak testing,
mechanical checks, catalyst loading. Commissioning, refractory dry-out,
reformer piping adjustments, steam system blow-out and safety popping,
ID/FD fan modifications, start up.
Name of assignment:
Year: 1992/1993 (01/05/92 to 01/11/93)
Location: Balen, Antwerp, Belgium
Client: Private
Main project features: Reconstruction house
Positions held: Lead
Activities performed: Partially rebuild a 350m2 farm house and full
restoration.
OPERATIONS Name of assignment:
Year: 1991/1992 (01/09/91 to 01/12/91 and 01/03/92 to 01/05/92)
Location: Rozenburg, Rotterdam, The Netherlands
Client: AIR PRODUCTS
Main project features: Hydrogen/ co plant with loading docks
Positions held: Operator
Activities performed: Field shift operator
OPERATIONS Name of assignments:
Year: 1986/1990 (01/01/86 to 01/08/90)
Location: Antwerp, Belgium
Client: EXXON
Main project features: Refinery
Positions held: Operator
Activities performed: operator on atmospheric crude distillation,
LGO/HGO hydrofining, Kero-Varsol splitters, Waste treatment furnace,
slop recuperation, ballast tanks, BIOX water treatment.
ELECTRO TECHNICAL
DESIGN AND DRAWING
Name of assignments:
Year: 1985/1986 (01/10/85 to 01/01/86)
Location: Antwerp, Belgium
Client: EGEMIN
Main project features: Transport systems (various)
Positions held: Electro technical design and drawing
Activities performed: Custom design transport systems with additional
electro technical drawings
ARMY SERVICE Year: 1985 (01/01/85 to 01/10/85)
ELECTRIC LAB
ASSISTENT
Name of assignment:
Year: 1984
Location: Antwerp, Belgium
Client: ATLAS COPCO AIRPOWER
Main project features: Test cells
Positions held: Electric lab assistant
Activities performed: Installation of test cells for prototype
compressors

CV BEUDEKER Frank int

  • 1.
    Curriculum Vitae (CV) BeudekerFrank Email: frbeudeker@gmail.com Tel. nr.: +84 (0)91 9033728 Address: Phan Tru Trinh 55/16, Vung Tau City, Vietnam Nationality: Belgian (residing in Vietnam) Civil status: Married, one child 1. Proposed Position COMMISSIONING IR 2. Name of Firm FREE LANCE CONTRACTOR 3. Name BEUDEKER FRANK P. P. 4. Date of Birth 13/07/1963 Nationality: BELGIUM 5. References Gordon Gill company +32 2 5121444 Mr. Gerhard Hirth + 32 492.928.860 + 33. 631.70.35.48 6. Education T.I.B ANTWERP & TECHNICUM RERUM NOVARUM ANTWERP, ELECTRICITY DIPLOMA LOWER & HIGH SCHOOL, MATURATY ACCESS DIPLOMA TO UNIVERCITY (1983) 7. Social & organisational skills EASYSOCIAL BEHAVIOUR,GETALONGWITH EVERYBODY,HAVE ALISTENING EAR. PRO-ACTIVE PROFESSIONALON HANDS ON PROBLEM SOLVING. EXPERIENCED IN TROUBLE SHOOTING/CORRECTINGAND IMPLEMENTINGCOMPLEXENERGYAND PROCESS SYSTEMS. TEND TO WORK ORDERLYAND STRUCTURED,ORGANISE OWN WORKAND DELEGATE WORK TO OTHERS. PREFERAPLAIN COMMUNICATION STYLE.
  • 2.
    8. Other TrainingSPECIALITY COURSE INSTRUMENTATION (ANTWERP,1984), FIREFIGHTING INDUSTRIAL AT RISK ROTTERDAM, ON JOB PROCESS EDUCATION 4 YEARS, WEEKLY BASE, 1886 TILL1990 (ANTWERP EXXON) 9. Countries of Work Experience KUWAIT,CYPRUS,TRINIDAD,GREECE,GERMANY,QATAR, BRUNEI,NETHERLANDS,ALGERIA,VIETNAM,USA,ISRAEL, DUBAI, BRAZIL,SPAIN,TAIWAN,PORTUGAL,POLAND,BELGIUM,INDIA, EGYPT, IVORY COAST. 10. Languages Speaking Reading Writing DUTCH FLUENT FLUENT FLUENT ENGLISH FLUENT FLUENT FLUENT SPANISH FLUENT FLUENT AVERAGE FRENCH AVERAGE FLUENT AVERAGE GERMAN AVERAGE AVERAGE BAD Basic understanding of Italian and Portugese. 10. Employment Record: DetailedTask Assigned TFA COMBINED CYCLE HOUSE CONSTRUCTION Work Undertaken Name of assignment or project: Azito phase 3 Year: 2014/15 (23/12/14 till 31/08/15 Location: Abidjan, Ivory Coast Client: AZITO O&M Main project features: 2GT (Alstom 145MW), 2HRSG’s (Korean), BOP and ST (GE 150MW) Positions held: Technical advisor Activities performed: Follow up and guide through the commissioning process. Chemical clean, steamblow, DCS configuration and testing, operator follow up. Location: Vung Tau, Ba Ria Vung Tau, Vietnam Year: 02/01/14 to 22/09/14 Client: Private client MECHANICAL AND INSTRUMENTATION TROUBLESHOOTING AND COMMISSIONING OF 2 WATER STEAM CYCLES Name of assignment or project: Al Zour Year: 2013 (23/08/13 to 23/11/13) Location: Kuwait Client: ALSTOM Main project features: 5 GT’s (Alstom), 5 HRSG’s divided in 3 + 2 blocks, 2 WSC (BOP) and 2 ST (Alstom) Positions held: Commissioning engineer. Activities performed: Field, mechanical, instrumentation (calibration and adjustments) pre-commissioning and commissioning on WSC’s COMMISSIONING OF 2 HRSG’S AND BOP Name of assignment or project: Vasilikos add on 5A/B Year: 2012 (26/07/12 to 28/11/12) Location: Cyprus Client: J&P AVAX Main project features: 2GT (GE 70MW), 2HRSG’s (NEM), BOP and ST (Alstom 90MW)
  • 3.
    Positions held: Commissioningengineer. Activities performed: Field: mechanical inspections HRSG’s and BOP, Instrumentation checks and MOV/pneumatic valve setting and adjustments, preparations for and follow up chemical clean, follow up on temporary steam blow piping plus re-instatement before start-up. CCR: Steam blows, DCS adjustments (ABB assisted for implementation), all testing required for plant integrity (safety testing, purity runs etc…) including 50% and 100% rejection load on ST. Operations during reliability run (including operator training) of the full unit (GT’s, HRSG’s, BOP and ST) COMMISSIONING OF 6 HRSG’S Name of assignment or project: Year: 2012 (12/04/12 to 16/07/12) Location: Trinidad Client: EBE Ferrostaal Main project features: 6GT’s, 6HRSG’s (China), 2 ST Positions held: Mechanical and instrumentation commissioning engineer. Activities performed: Mechanical follow up and instrument/MOV adjustments. COMMISSIONING OF ASU Name of assignment or project: Year: 2012 (16/12/11 to 23/12/11 and 08/01/12 to 18/01/12) Location: Elefsina, Greece Client: AIR PRODUCTS Main project features: ASU Positions held: Commissioning engineer Activities performed: Field follow up, dry out and production COMMISIONING CO2 PILOT PLANT Name of assignment or project: Year: 2011 (20/11/11 to 15/12/11) Location: Vattenfall, Germany Client: AIR PRODUCTS Main project features: CO2 recovery pilot plant Positions held: Commissioning engineer Activities performed: CCR start-up and production COMMISSIONING AND TROUBLESHOOTING ON 4 HRSG’s, FIELD & CCR Name of assignment or project: Year: 2011 (30/01/11 to 07/03/11) Location: Ras Laffan, Qatar Client: NEM Main project features: 4HRSG’s, ST (Siemens) Positions held: TFA Activities performed: Follow up and trouble shooting, assist in CCR COMMISSIONING 1 HRSG IN FIELD Name of assignment or project: Shell BLNG Year: 2010 (20/08/10 to 19/12/10) Location: Lumut, Brunei Client: NEM/SHELL Main project features: GT (GE), 1 HRSG, ST (Siemens) Positions held: TFA Activities performed: Field mechanical check ups pre start and during shut down. Adaption on piping.
  • 4.
    COMMISIONING OF 2 HRSG’SAND BOP Name of assignment or project: Vasilikos add on 4A/B Year: 2009 (06/04/09 to 20/07/09) Location: Cyprus Client: J&P AVAX Main project features: 2GT (GE 70MW), 2HRSG’s (NEM), BOP and ST (Alstom 90MW) Positions held: Commissioning engineer. Activities performed: Field: mechanical inspections HRSG’s and BOP, Instrumentation checks and MOV/pneumatic valve setting and adjustments preparations for and follow up chemical clean, follow up on temporary steam blow piping plus re-instatement before start-up. CCR: Steam blows, DCS adjustments (ABB assisted for implementation), all testing required for plant integrity (safety testing, purity runs etc…) including 50% and 100% rejection load on ST. Operations during reliability run (including operator training) of the full unit (GT’s, HRSG’s, BOP and ST) Name of assignment or project: Construction Year: 2008 (26/12/07 to 22/08/08 and 18/12/08 to 06/04/09) Location: Tri Ton, Vietnam Client: Private Main project features: House construction Positions held: Lead Activities performed: Construction of 56 foundation points to support house and water wall of 3800m3 granite PRE-COMMISIONING 2 DUAL HRSG’S Name of assignment or project: Year: 2007 (06/06/07 to 22/12/07) Location: Rotterdam, Netherlands Client: AIR LIQUIDE/SHELL Main project features: 2GT’s (GE 125MW), 2 dual HRSG’s Positions held: Commissioning engineer. Activities performed: Finalizing construction, pre-commissioning of 2 dual HRSG’s, loop checks, BPS check (boiler protection system). COMMISSIONING HELIUM RECOVERY PLANT Name of assignment or project: Helium recovery/liquifier Year: 2006 (31/05/06 to 21/12/06) Location: Skikda Algeria Client: LINDE BV. Main project features: Helium and nitrogen recovery (from LNG plants) and liquifiers. Loading docks. Return purified gas (GAN, CH4) back for processing. Positions held: Commissioning engineer. Activities performed: commissioning (compressor, compander, dry out), start up included operator training. COMMISSIONING MANAGER 2 HRSG’S Name of assignment or project: Phu Mi 2.2 Year: 2004/2005 (05/01/04 to 27/01/05) Location: Phu Mi, Vietnam Client: NEM Main project features: 2 GT (GE 260MW), 2 HRSG’s (NEM), 1 ST (GE 290MW).
  • 5.
    Positions held: Commissioningmanager (HRSG’s only) Activities performed: Responsible for on time delivery of both units, in charge of 1 commissioning ir., 1 construction/ commissioning ir. And 4 operators (including logistics) also hands on commissioning from my part. Main contractor EDF. LAY UP OF HRSG’S STOPPED IN CONSTRUCTION Name of assignment or project: Year: 2003 (20/09/03 to 16/10/03 and 11/11/03 to 27/11/03) Location: Dresden, Ohio, USA Client: NEM Main project features: HRSG units stopped during construction Positions held: TFA Activities performed: Dry out and nitrogen lay up on unit stopped during construction (i.e. none of the main piping welded). N2 preservation of piping, bundles on the unit and lay down yard piping. PRE-COMMISSIONING AND COMMISSIONING 2 HRSG’S Name of assignment or project: Possom Point Year: 2003 (23/03/03 to 16/06/03) Location: Dumfries, USA Client: NEM Main project features: 2 HRSG,s, SCR, burners Positions held: TA Activities performed: pre-commissioning and commissioning of 2 units including SCR bay (Hitachi) and burner bay (DeJong Coen) STAND-IN COMMISSIONING ON 4 HRSG’S Name of assignment or project: Year: 2002 (25/10/02 to 18/12/02) Location: Hagit, Israel Client: NEM Main project features: 4 GT’s (GE 100MW), 4 HRSG’s vertical (NEM), 1 ST (ABB 110MW) Positions held: TA Activities performed: Stand in for NEM personnel on leave. During this period 3 HRSG’s economizers failed. Preparation for works to be started on repairs (equipment, personnel) TECHNICAL ADVISOR ON PRE- COMMISIONING AND COMMISSIONING OF 2 HRSG’S Name of assignment or project: Year: 2002 (13/09/02 to 04/10/02) Location: Rise, Rhode Island, USA Client: NEM Main project features: GT’s (Siemens), 2 HRSG’s (NEM) Positions held: TA Activities performed: Advise on pre-commissioning and commissioning. RE-COMMISSIONING BURNER BAY ON HRSG’S Name of assignment or project: Year: 2002 (03/08/02 to 21/08/02) Location: Dubai, UAE Client: NEM Main project features: 2 HRSG’s Positions held: TA Activities performed: Burner modifications after internal explosion. Burner lanses disengaged from supports after the blast. Installation of
  • 6.
    explosion bumpers (external)and refurbish the burner supports (internal) OUTAGE OVERHAUL HRSG’S Name of assignment or project: Year: 2002 (19/06/02 to 23/07/02) Location: Uruguaiana, Brazil Client: NEM Main project features: HRSG’s Positions held: TA, commissioning engineer Activities performed: Outage repairs and modifications on internal insulation and piping/casing penetrations. STAND-IN COMMISSIONING ON 2 HRSG’S Name of assignment or project: Year: 2002 (28/05/02 to 19/06/02) Location: Castellon, Spain Client: NEM Main project features: 2 GT (GE 260MW), 2 HRSG,s (NEM), 1 ST (GE 290MW) Positions held: TA Activities performed: Stand in for NEM personnel on leave. Mechanical modifications during SD TECHNICAL ADVISOR ON 4 HRSG’S Name of assignment or project: Redhawk Year: 2002 (31/01/02 to 26/05/02) Location: Arlington, Arizona, USA Client: NEM Main project features: 4 GT (GE 160MW), 4 HRSG’s (NEM), 2ST (ABB 190MW) Positions held: TA Activities performed: Pre- commissioning, commissioning, iso checks, support modifications, P&ID checks, DCS compliance with BPS. TECHNICAL ADVISOR ON 2 HRSG’S Name of assignment or project: Santee Cooper Year: 2001 (10/05/01 to 16/11/01) Location: Anderson, South Carolina, USA Client: NEM Main project features: 2 GT (GE 160MW), 2 HRSG’s (NEM), 1 ST (GE 140MW) Positions held: TA Activities performed: Pre-commissioning checks (iso, P&ID, expansions internal and external etc…). Advise and follow up on commissioning (chem. clean, steam blow, operations).
  • 7.
    COMMISSIONING IR Nameof assignment or project: Ba Ria Year: 1999/2000 (06/06/99 to 18/09/99 and 27/03/00 to 02/05/00) Location: Ba Ria, Vietnam Client: NEM Main project features: 3 GT,s (30MW), 3 HRSG’s (NEM), 1 ST (Siemens) Positions held: Commissioning engineer. Activities performed: Mechanical inspections and corrections. Instrumentation, pneumatic valves & MOV,s. Chem clean, steam blows, production, operator training. COMMISSIONING IR Name of assignment or project: Haifu Year: 1999/2000 (15/03/99 to 16/04/99 and 19/09/99 to 26/03/00) Location: Haifu, Taipei, Taiwan Client: AE&E Main project features: 4 GT’s (ABB 160MW), 4 HRSG’S (AE&E), 2 ST’s (ABB 160MW) Positions held: Commissioning engineer Activities performed: Pre-commissioning checks (iso, P&ID verification), instrumentation, mechanical commissioning. Pressure testing, chem. clean, steam blows, safety valves testing, chemistry skids commissioning. COMMISSIONING IR Name of assignment: Tapada Year: 1998 (16/02/98 to 16/10 98) Location: Tapada di Outeiro, Oporto, Portugal Client: NEM Main project features: 3 GT’s/ST’s Single shaft (Siemens GT 220MW/ST 110MW each), 3 HRSG’s (NEM) Positions held: Commissioning engineer Activities performed: Pre-commissioning checks (iso, P&ID verification), instrumentation, mechanical commissioning. Pressure testing, chem. clean, steam blows, safety valve testing, reliability run follow up. COMMISSIONING IR Name of assignment: Year: 1997 (24/10/97 to 06/12/97) Location: Oporto (Tapada) & Lisbon, Portugal Client: KTI/MANNESMANN Main project features: In line warm bath gas heaters at let down stations. Positions held: Commissioning engineer. Activities performed: Gas line blows, instrumentation disassembly function testing and reconstruction. Burner adjustments and emission testing. OPERATIONS Name of assignment: Year: 1997 (30/06/97 to 28/07/97) Location: Amsterdam, The Netherlands Client: SHELL Main project features: Boilers, service air compressors, water treatment and back up power generator. Positions held: operator Activities performed: Shift operator
  • 8.
    COMMISSIONING IR Nameof assignment: Year: 1997 (06/04/97 to 15/06/97) Location: Plock, Poland Client: KTI Main project features: 110000NM3/h multiple feed hydrogen unit. Positions held: Commissioning engineer Activities performed: Pre-commissioning gas line blows, leak testing, mechanical checks, catalyst loading. Commissioning, refractory dry-out, reformer piping adjustments, steam system blow-out and safety popping, ID/FD fan modifications, start up. OPERATIONS Name of assignment: Year: 1997 (14/03/97 to 06/04/97) Location: Antwerp, Belgium Client: FINA Main Project features: Ethylene unit Positions held: Commissioning engineer Activities performed: Burner adjustments START-UP OPERATIONS Name of assignment: Carilon Year: 1996 (26/08/96 to 31/10/96) Location: Amsterdam. The Netherlands Client: SHELL Main project features: Batch process carillon pilot plant Positions held: Start-up operator Activities performed: Start up and shut down on carillon batch process unit. OPERATIONS Name of assignment: Year: 1996 (15/07/96 to28/07/96) Location: Rozenburg, Rotterdam, The Netherlands Client: AIR PRODUCTS Main project features: Hydrogen and CO unit with loading docks Positions held: Operator Activities performed: Field shift operator COMMISSIONING IR Name of assignment: Year: 1996 (17/04/96 to 30/06/96) Location: Mangalore, India Client: KTI Main project features: 400000m3/h multiple feed hydrogen unit. Positions held: Commissioning engineer Activities performed: Pre-commissioning gas line blows, leak testing, mechanical checks, catalyst loading. Commissioning, refractory dry-out, reformer piping adjustments, steam system blow-out and safety popping, ID/FD fan modifications, start up.
  • 9.
    OPERATIONS Name ofassignment: Year: 1995/1996 (29/09/95 to 27/12/95 and 04/02/96 to 03/04/96) Location: Pernis, Rotterdam, The Netherlands Client: AIR PRODUCTS Main project features: Demin unit, steam street and power generator Positions held: Operator Activities performed: Field shift operator COMMISSIONING IR Name of assignment: Damanhour/Mahmoudia Year: 1994/1995 (30/11/94 to 24/02/95 and 20/05/95 to 24/09/95) Location: Damanhour/ Mahmoudia, Egypt Client: NEM Main project features: Damanhour: 4 GT’s, 4 HRSG’s, 1 ST, Mahmoudia: 8 GT’s, 8 HRSG’s, 2 ST’s Positions held: Commissioning engineer Activities performed: Pre-commissioning, i.e. instrumentation, MOV’s, mechanical inspections support checks, iso and P&ID checks, pressure testing, alkaline boil-out, steam blows, DCS adjustments, start up and reliability runs COMMISSIONING IR Name of assignment: RFA Bernburg Year: 1994 (01/09/94 to 21/11/94) Location: Bernburg, East Germany Client: KTI Main project features: 6500Nm3/h Hydrogen unit Positions held: Commissioning engineer Activities performed: Pre-commissioning gas line blows, leak testing, mechanical checks, catalyst loading. Commissioning, refractory dry-out, reformer piping adjustments, steam system blow-out and safety popping, ID/FD fan modifications, start up. Name of assignment: Year: 1992/1993 (01/05/92 to 01/11/93) Location: Balen, Antwerp, Belgium Client: Private Main project features: Reconstruction house Positions held: Lead Activities performed: Partially rebuild a 350m2 farm house and full restoration. OPERATIONS Name of assignment: Year: 1991/1992 (01/09/91 to 01/12/91 and 01/03/92 to 01/05/92) Location: Rozenburg, Rotterdam, The Netherlands Client: AIR PRODUCTS Main project features: Hydrogen/ co plant with loading docks Positions held: Operator Activities performed: Field shift operator
  • 10.
    OPERATIONS Name ofassignments: Year: 1986/1990 (01/01/86 to 01/08/90) Location: Antwerp, Belgium Client: EXXON Main project features: Refinery Positions held: Operator Activities performed: operator on atmospheric crude distillation, LGO/HGO hydrofining, Kero-Varsol splitters, Waste treatment furnace, slop recuperation, ballast tanks, BIOX water treatment. ELECTRO TECHNICAL DESIGN AND DRAWING Name of assignments: Year: 1985/1986 (01/10/85 to 01/01/86) Location: Antwerp, Belgium Client: EGEMIN Main project features: Transport systems (various) Positions held: Electro technical design and drawing Activities performed: Custom design transport systems with additional electro technical drawings ARMY SERVICE Year: 1985 (01/01/85 to 01/10/85) ELECTRIC LAB ASSISTENT Name of assignment: Year: 1984 Location: Antwerp, Belgium Client: ATLAS COPCO AIRPOWER Main project features: Test cells Positions held: Electric lab assistant Activities performed: Installation of test cells for prototype compressors