KEVIN WESTERMAN
16 Gilpin Terrace,
Armley, Leeds
LS12 1HL
07961 343 811
k.westerman@hotmail.com
Personal Details
Date of Birth: 13. 8. 1963
Marital Status: Married
DrivingLicence: NoPenalties
Education
1975 – 1979 Hough Side HighSchool
Work Experience
04/15 Spencers
ConstructionManager, RochesterRail Station
Day to day runningof site.
Labour.
Plant
Site meeting’s
Onsite problemsolveing.
Work’sis 26 MillionpoundNew Rail wayStationBuild,
All groundwork’swithadditionalproblem’s.
All BuildPlatform’sincludingBuilding’sstaff POD’s.
All Meeting’swithsubcontractor’s..
All organisingof M&E Subcontractor’s..
08/14 - 04/15 Trueform Engineering
Works Manager,NottinghamTramlink
04/12 - 08/12 Volker-Fitzpatrick
Works Manager,HornseyRail Depot
100 Millionpoundprojectatrail Thameslinkdepot
08/11 - 04/12 Volker-Fitzpatrick
SeniorWorks Manager, New StreetStationBirmingham
04/11 - 08/11 Volker-Fitzpatrick
Senior General Foreman,Athlete’sVillage StratfordLondon
11/10 - 04/11 Volker-Fitzpatrick
SeniorGeneral Foreman,GravesendA2Cycle path
Organise subcontractorsforworks,Maintainoperational works,
Organise the logisticsof the site
05/10 - 10/10 Balfour Beatty
General Foreman,M25
Organise subcontractorsforworks,Maintainoperational works,
Organise the logisticsof the site
Managementof operational activities,Putintoactionplansforworks
Monitorperformance standards,Check Labour& Plants
05/08 - 04/10 Balfour Beatty Civil Engineering
General Foreman, Olympic Village Stratford London
Duties: Organise subcontractorsforworks,Maintainoperational works,
Organise the logisticsof the site
Managementof operational activities,Putintoactionplansforworks
Monitorperformance standards,Check Labour& Plants
Interface withNetworkRail &OlympicDevelopmentAuthority(O.D.A.)
Ensure all projectsare completedontime andbudget
HeavyCivil,Roads&Bridges
2006 - 04/08 Carillion Rail
General Foreman, East London Line
Duties: Controllingdemolitionof oldRailwayArches
Infill of Shoreditch Cutting
BuildingandInstallingG-E19 Bridge
Ensure all Health& Safety,environmentalandqualityproceduresare maintained
Monitoringperformance standardsonsite
Ensure all plantand equipmentissuitable forpurpose
2002 - 2006 Mowlem Railways
Works Manager
Duties: Site running
InterfacingwithClientandSub-Contractors
InterfacingwithHealth&Safety,Environmental Depts.
Office documentation
Tool Box Talks
Site Discipline
2000 - 2002 Mowlem Telecoms
Duties: OrganisingLabour,Materials,Site Access
MethodStatements
LiaisingwithClients
As BuildsandHandoverDocumentation
1998 - 2000 Kenton’s Utilities
Site Agent
Runningwaterorientatedgangs
1994 - 1997 Biwater International
Duties: To organise andensure the successful operationof mainsrenewal forwatermains,
These methodsincluded:Pipebursting,Opencutting,Swabbing,Scrape andLining
I was alsoresponsible for:
Chlorinatingandsamplingof mains
Installationof loggers
Obtaininggeographicalinformationforthe area
Conformationof mainspressure inthe existingarea
LiaisonwithYorkshire Water,Networks,QCT,site managersandpipe inspectors
Arrangingtrafficmeetingswithlocal highwayauthority
Identifyinglarge orsensitive consumers
Identifyingsupplyproblems
1997 Became Agentincharge of R.A.S.W.A.gang pipe work service
To oversee the dailyinsertionof M.S.M.chambers
1986 - 1994 Yorkshire Water, Leeds
1989 - 1994 Promoted from Higher Grade Operator to District Inspector
Duties: To locate,excavate,repairandrenew mainsandcommunicationspipes
To maintainthe dayto day operationof waterdistributionsystem,
To assistthe general consumerwithroutine waterdistributionfaultsandqueries,
To carry outand regularlyupdate logsonnew watersystem
1979 -1986 The British Army
Parachute Regiment
Qualifications
Personal Track Safety Card (P.T.S.)
NVQ Level3 – Construction Site Supervisor – Building and Engineering
SMSTS Certificate – 5 days
Olympic 2012 Supervising Behavioural Practice Certificate
Ainscough Crane Appreciation
Crane Supervisor CPCS
GF – CSCS H & S Test for Supervisors
G.L – New Roads & Street Works Act – Supervisors
Confined Spaces
Courses
City and Gilds Confined spaces
G.L – Crane Lift Management
G.L – Windows/Word/Excel/Outlook Express
J.C – Medical & Drugs Screening
J.C – Personal Track Safety – 2 Day
J.C – Temporary Works Procedures
Marie – CITB Safety Management 5-Day Course
Marie – IPS 2 – Environmental
Marie – Managing Safety 2002
Marie – Managing Safety 2003
Marie – Manual Handling Office
Marie – RQ – New Roads & Street Works
J.C – Supervisory Skills
Marie – CITB Refresher for 5-day course
Marie – RQ – New Roads & Works

Curriculum_Vitae_Kevin April 15 (2)

  • 1.
    KEVIN WESTERMAN 16 GilpinTerrace, Armley, Leeds LS12 1HL 07961 343 811 k.westerman@hotmail.com Personal Details Date of Birth: 13. 8. 1963 Marital Status: Married DrivingLicence: NoPenalties Education 1975 – 1979 Hough Side HighSchool Work Experience 04/15 Spencers ConstructionManager, RochesterRail Station Day to day runningof site. Labour. Plant Site meeting’s Onsite problemsolveing. Work’sis 26 MillionpoundNew Rail wayStationBuild, All groundwork’swithadditionalproblem’s. All BuildPlatform’sincludingBuilding’sstaff POD’s. All Meeting’swithsubcontractor’s.. All organisingof M&E Subcontractor’s.. 08/14 - 04/15 Trueform Engineering Works Manager,NottinghamTramlink 04/12 - 08/12 Volker-Fitzpatrick Works Manager,HornseyRail Depot 100 Millionpoundprojectatrail Thameslinkdepot 08/11 - 04/12 Volker-Fitzpatrick SeniorWorks Manager, New StreetStationBirmingham 04/11 - 08/11 Volker-Fitzpatrick Senior General Foreman,Athlete’sVillage StratfordLondon
  • 2.
    11/10 - 04/11Volker-Fitzpatrick SeniorGeneral Foreman,GravesendA2Cycle path Organise subcontractorsforworks,Maintainoperational works, Organise the logisticsof the site 05/10 - 10/10 Balfour Beatty General Foreman,M25 Organise subcontractorsforworks,Maintainoperational works, Organise the logisticsof the site Managementof operational activities,Putintoactionplansforworks Monitorperformance standards,Check Labour& Plants 05/08 - 04/10 Balfour Beatty Civil Engineering General Foreman, Olympic Village Stratford London Duties: Organise subcontractorsforworks,Maintainoperational works, Organise the logisticsof the site Managementof operational activities,Putintoactionplansforworks Monitorperformance standards,Check Labour& Plants Interface withNetworkRail &OlympicDevelopmentAuthority(O.D.A.) Ensure all projectsare completedontime andbudget HeavyCivil,Roads&Bridges 2006 - 04/08 Carillion Rail General Foreman, East London Line Duties: Controllingdemolitionof oldRailwayArches Infill of Shoreditch Cutting BuildingandInstallingG-E19 Bridge Ensure all Health& Safety,environmentalandqualityproceduresare maintained Monitoringperformance standardsonsite Ensure all plantand equipmentissuitable forpurpose 2002 - 2006 Mowlem Railways Works Manager Duties: Site running InterfacingwithClientandSub-Contractors InterfacingwithHealth&Safety,Environmental Depts. Office documentation Tool Box Talks Site Discipline 2000 - 2002 Mowlem Telecoms
  • 3.
    Duties: OrganisingLabour,Materials,Site Access MethodStatements LiaisingwithClients AsBuildsandHandoverDocumentation 1998 - 2000 Kenton’s Utilities Site Agent Runningwaterorientatedgangs 1994 - 1997 Biwater International Duties: To organise andensure the successful operationof mainsrenewal forwatermains, These methodsincluded:Pipebursting,Opencutting,Swabbing,Scrape andLining I was alsoresponsible for: Chlorinatingandsamplingof mains Installationof loggers Obtaininggeographicalinformationforthe area Conformationof mainspressure inthe existingarea LiaisonwithYorkshire Water,Networks,QCT,site managersandpipe inspectors Arrangingtrafficmeetingswithlocal highwayauthority Identifyinglarge orsensitive consumers Identifyingsupplyproblems 1997 Became Agentincharge of R.A.S.W.A.gang pipe work service To oversee the dailyinsertionof M.S.M.chambers 1986 - 1994 Yorkshire Water, Leeds 1989 - 1994 Promoted from Higher Grade Operator to District Inspector Duties: To locate,excavate,repairandrenew mainsandcommunicationspipes To maintainthe dayto day operationof waterdistributionsystem, To assistthe general consumerwithroutine waterdistributionfaultsandqueries, To carry outand regularlyupdate logsonnew watersystem 1979 -1986 The British Army Parachute Regiment Qualifications Personal Track Safety Card (P.T.S.) NVQ Level3 – Construction Site Supervisor – Building and Engineering SMSTS Certificate – 5 days Olympic 2012 Supervising Behavioural Practice Certificate Ainscough Crane Appreciation Crane Supervisor CPCS GF – CSCS H & S Test for Supervisors G.L – New Roads & Street Works Act – Supervisors
  • 4.
    Confined Spaces Courses City andGilds Confined spaces G.L – Crane Lift Management G.L – Windows/Word/Excel/Outlook Express J.C – Medical & Drugs Screening J.C – Personal Track Safety – 2 Day J.C – Temporary Works Procedures Marie – CITB Safety Management 5-Day Course Marie – IPS 2 – Environmental Marie – Managing Safety 2002 Marie – Managing Safety 2003 Marie – Manual Handling Office Marie – RQ – New Roads & Street Works J.C – Supervisory Skills Marie – CITB Refresher for 5-day course Marie – RQ – New Roads & Works