The document discusses several issues to consider before construction including accessibility to the site, existing underground services, water table levels, soil conditions, site clearance needs, and temporary works. Safety measures for the construction site include fencing, lighting, alarms, security guards and CCTV monitoring. Different trench shoring methods like timbering, stay bracing and sheeting are outlined for varying soil stability situations.