SlideShare a Scribd company logo
Innovate4Climate
Costs and climate impact of
offsetting emissions under CORSIA
Carsten Warnecke, Thomas Day, Harry Fearnehough,
Lambert Schneider
Frankfurt, 22 May 2018
Vulnerability of existing project-
based mitigation activities to
continue abatement
Thomas Day
Vulnerable projects depend on
carbon credit revenues to operate
Which CDM projects are most at risk of discontinuing
mitigation?
What is the potential mitigation impact from supporting
(vulnerable) projects?
What options exist for supporting vulnerable projects?
3www.newclimate.org
Assessing a project’s vulnerability is based on its current dependence on
carbon market revenues to continue GHG abatement activities
The assessment of the current economic conditions of the project does not
offer insight into the additionality of a project at its point of inception
www.newclimate.org 4
Assessing vulnerability
www.newclimate.org 5
Assessing vulnerability
Low – medium risk Potentially high risk
Coal mine methane
EE Industry
EE own generation
EE supply side
Geothermal
Hydro
Solar
Wind
Forests
Fossil fuel switch
Biomass
Fugitive
Landfill gas
Methane avoidance
PFCs+SF6
HFC-23
Household stoves
N2O abatement
Risk of discontinuing
abatement:
-----------------------------------------
Low risk
Low - medium risk (variable)
Low - high risk (variable)
High risk
6
Hydro
Wind
Biomass
N2O
HFCs
Fugitive
CMM
Others
~ 4.6 bn CERs
Total potential CER
supply for 2013 - 2020
Project vulnerability
Generally low
Generally high
Variablevulnerability
Not assessed
CER supply
potential to
2020 by
project
vulnerability
Analysis of the potential supply
of credits for CORSIA from
existing projects under different
eligibility restrictions
Harry Fearnehough
Carbon Offsetting and Reduction
Scheme for International Aviation
Overview
• Overseen by International Civil
Aviation Organisation (UN body)
• Aims to ensure carbon neutral
growth for international aviation
from 2020 through a combination
of abatement measures as well
as offsetting
Scope
• International aviation
• Voluntary participation in pilot
and first phase; compulsory in
second phase
• Exclusively focused on carbon
dioxide emissions
www.newclimate.org 8
End of
pilot
phase
End of
Phase
1
End of
Phase
2
CORSIA
introduction
Carbon dioxide emissions
from international aviation
maintained at 2020 levels
Potential growth of
emissions = demand for
offsets of ~3 bn tCO2
We have analysed the potential
supply from 4 offset programmes
www.newclimate.org 9
For the CDM, we have examined the marginal
cost of supplying offset credits for emission
reductions over the period 2013 - 2020
For all 4 programmes we have analysed the
supply potential for emission reductions over the
period 2013 – 2035
Analysis covers registered projects as well as
the existing pipeline of projects that could
register in the future
Scenarios include vintage and
project type eligibility restrictions
www.newclimate.org 10
Base case
Emission reduction date
vintage
Registration date vintages
Investment date vintage
Excluding low vulnerability
projects
All potential emission reductions over the period
2013-2035
Restricting the use of credits to those issued for
emission reductions post 2016
Restricting the use of credits to projects registered
post 2012 and 2016
Restricting the use of credits to projects that made
their investment decision post 2012 and 2016
Restricting the use of credits to projects dependent
on carbon revenues to continue abatement
Start of operations date
vintage
Restricting the use of credits to projects that
started operations post 2012 and 2016
Eligibility restrictions have a large
impact on the CER supply curve
www.newclimate.org 11
Supply curves for emission reductions between 2013-2020 for
registered CDM projects under different elegibility restrictions
4,3002,892275
121
690
Up to 3.8bn new CERs
could supply the market
at prices below €1
A large share of projects
do not depend on CER
revenues to continue
emission reductions
Investment date vintage
restriction most likely to
incentivise development
of new projects in
response to new demand
CDM and VCS projects could
supply 5x CORSIA demand
www.newclimate.org 12
Supply potential for emission reductions between 2013-2035 for CDM and
voluntary market projects under different eligibility restrictions
Under several
restriction scenarios
supply from existing
projects exceeds
likely demand from
CORSIA to 2035
Large potential
supply within the
pipeline of CDM
projects
Even excluding the
CDM, the potential
supply would exceed
CORSIA demand in
some scenarios
DRAFT results
27m
190m
+
existing stock: = enough to meet pilot phase demand
~ CORSIA demand
Implications and policy
recommendations for CORSIA
Lambert Schneider
Key findings in a nutshell
1. Supply from existing projects could exceed demand by a factor of 5
2. On the order of 3.8bn CERs could be issued to registered CDM projects at
prices below €1 for emission reductions up to 2020
3. Without eligibility restrictions, demand from CORSIA over the period to 2035
is unlikely to:
Alter the overall level of GHG abatement undertaken; or
Materially impact the current CER price level
 Lose-lose situation:
No benefits for the environment
No benefits for project developers and host countries: no incentives to
implement new projects or continue abatement in vulnerable existing
projects, no value for ”old” CERs
www.newclimate.org 14
How can CORSIA incentivise
further emission reductions?
CORSIA should incentivize further emission reductions that would not occur
without the scheme
Robust eligibility restrictions essential for CORSIA to deliver on its goal
CORSIA demand should be targeted to:
1. Vulnerable projects, i.e. projects that require carbon market or other
revenues to continue GHG abatement, and/or
2. New projects implemented in response to the incentives from CORSIA
www.newclimate.org 15
Which eligibility restrictions are
effective to deliver CORSIA’s goals?
www.newclimate.org 16
Emission reduction date
vintage
Registration date vintages
Investment date vintage
Excluding low vulnerability
projects
• Still significant over-supply
• Many non-vulnerable projects eligible
• Up to 8,000 old, non-registered CDM
projects eligible
• Can effectively limit participation to
newer projects
• Can effectively limits participation to
projects that require support
• More difficult to operationalize
Start of operations date
vintage
• Can effectively limit participation to
newer projects
✓
✘
✓
✘
✓
Robust eligibility criteria essential for CORSIA to deliver on its goal
Simple approach: Limit eligibility to new projects
• Projects with an investment decision date later than X (e.g. 2017, 2020), or
• Projects that started operation later than X (e.g. 2020)
Differentiated approach: Limit eligibility to new or vulnerable projects
• Projects with an investment decision date later than X (e.g. 2017, 2020), or
• Projects that started operation later than X (e.g. 2020)
AND
• Project types that are typically vulnerable to discontinuing GHG abatement
Recommendations
www.newclimate.org 17
Contact details:
Thank you for your attention!
Carsten Warnecke
c.warnecke@newclimate.org
Thomas Day
t.day@newclimate.org
Harry Fearnehough
h.fearnehough@newclimate.org
Lambert Schneider
lambertschneider@googlemail.com
Interested to know more about the
topic? See our recent blog post:
bit.ly/2GFV4hm

More Related Content

What's hot

Blue Growth focus area - topics not funded by SC5
Blue Growth focus area - topics not funded by SC5Blue Growth focus area - topics not funded by SC5
Blue Growth focus area - topics not funded by SC5
European Commission - Executive Agency for SMEs (EASME)
 
NAMA Development in Chile
NAMA Development in ChileNAMA Development in Chile
NAMA Development in Chile
CIFOR-ICRAF
 
Raw materials - Horizon 2020 Societal Challenge 5
Raw materials - Horizon 2020 Societal Challenge 5Raw materials - Horizon 2020 Societal Challenge 5
Raw materials - Horizon 2020 Societal Challenge 5
European Commission - Executive Agency for SMEs (EASME)
 
National adaptation M&E and the NAP process
National adaptation M&E and the NAP processNational adaptation M&E and the NAP process
National adaptation M&E and the NAP process
NAP Events
 
General International Trends and Efforts in Coping with Climate Change
General International Trends and Efforts in Coping with Climate ChangeGeneral International Trends and Efforts in Coping with Climate Change
General International Trends and Efforts in Coping with Climate Change
ICF
 
H2020 insurance meeting with ec dg s april 2020 vs4 final
H2020 insurance meeting with ec dg s april 2020 vs4 finalH2020 insurance meeting with ec dg s april 2020 vs4 final
H2020 insurance meeting with ec dg s april 2020 vs4 final
Oasis Innovation Hub for Catastrophe and Climate
 

What's hot (6)

Blue Growth focus area - topics not funded by SC5
Blue Growth focus area - topics not funded by SC5Blue Growth focus area - topics not funded by SC5
Blue Growth focus area - topics not funded by SC5
 
NAMA Development in Chile
NAMA Development in ChileNAMA Development in Chile
NAMA Development in Chile
 
Raw materials - Horizon 2020 Societal Challenge 5
Raw materials - Horizon 2020 Societal Challenge 5Raw materials - Horizon 2020 Societal Challenge 5
Raw materials - Horizon 2020 Societal Challenge 5
 
National adaptation M&E and the NAP process
National adaptation M&E and the NAP processNational adaptation M&E and the NAP process
National adaptation M&E and the NAP process
 
General International Trends and Efforts in Coping with Climate Change
General International Trends and Efforts in Coping with Climate ChangeGeneral International Trends and Efforts in Coping with Climate Change
General International Trends and Efforts in Coping with Climate Change
 
H2020 insurance meeting with ec dg s april 2020 vs4 final
H2020 insurance meeting with ec dg s april 2020 vs4 finalH2020 insurance meeting with ec dg s april 2020 vs4 final
H2020 insurance meeting with ec dg s april 2020 vs4 final
 

Similar to Costs and climate impact of offsetting emissions under CORSIA

Offsetting emissions under CORSIA - Analysing the potential supply of credits
Offsetting emissions under CORSIA - Analysing the potential supply of creditsOffsetting emissions under CORSIA - Analysing the potential supply of credits
Offsetting emissions under CORSIA - Analysing the potential supply of credits
NewClimate Institute
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
Avanceon
 
Webinar: The business case for CCS in the power industry: a case study of the...
Webinar: The business case for CCS in the power industry: a case study of the...Webinar: The business case for CCS in the power industry: a case study of the...
Webinar: The business case for CCS in the power industry: a case study of the...
Global CCS Institute
 
Development and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy SourcesDevelopment and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy Sources
ACX
 
Climate Change
Climate ChangeClimate Change
Climate Change
nooone
 
The potential impact of transitioning CDM units and activities to the Paris A...
The potential impact of transitioning CDM units and activities to the Paris A...The potential impact of transitioning CDM units and activities to the Paris A...
The potential impact of transitioning CDM units and activities to the Paris A...
Oeko-Institut
 
CCS Financing January 09
CCS Financing January 09CCS Financing January 09
CCS Financing January 09
Chris Littlecott
 
Overview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEA
Overview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEAOverview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEA
Overview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEA
OECD Environment
 
2009 07-breaking the-climate_deadlock-cn
2009 07-breaking the-climate_deadlock-cn2009 07-breaking the-climate_deadlock-cn
2009 07-breaking the-climate_deadlock-cn
wiriana
 
Competition scope and funding revised
Competition scope and funding revisedCompetition scope and funding revised
Competition scope and funding revised
KTN
 
CCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptx
CCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptxCCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptx
CCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptx
PaulZakkour1
 
Carbon Credit Credibility.pdf
Carbon Credit Credibility.pdfCarbon Credit Credibility.pdf
Carbon Credit Credibility.pdf
CalvinWong58696
 
SOLA5056 Renewable Energy in Developing Countries - Carbon Markets
SOLA5056 Renewable Energy in Developing Countries - Carbon MarketsSOLA5056 Renewable Energy in Developing Countries - Carbon Markets
SOLA5056 Renewable Energy in Developing Countries - Carbon Markets
agentdeclan
 
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
UNDP Eurasia
 
hydrogen-investor-roadmap.pdf
hydrogen-investor-roadmap.pdfhydrogen-investor-roadmap.pdf
hydrogen-investor-roadmap.pdf
AlaaFaid1
 
Challenges and best practices in financing to accelerate industry decarbonisa...
Challenges and best practices in financing to accelerate industry decarbonisa...Challenges and best practices in financing to accelerate industry decarbonisa...
Challenges and best practices in financing to accelerate industry decarbonisa...
OECD Environment
 
Carbon Finance Risks and Opportunities
Carbon Finance Risks and OpportunitiesCarbon Finance Risks and Opportunities
Carbon Finance Risks and Opportunities
ACX
 
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdfCompetition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
beckycotton1
 
Ricardo aea comm vehs
Ricardo   aea comm vehsRicardo   aea comm vehs
Ricardo aea comm vehs
Roger Atkins
 
2 co making the business case for ccs
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccs
Global CCS Institute
 

Similar to Costs and climate impact of offsetting emissions under CORSIA (20)

Offsetting emissions under CORSIA - Analysing the potential supply of credits
Offsetting emissions under CORSIA - Analysing the potential supply of creditsOffsetting emissions under CORSIA - Analysing the potential supply of credits
Offsetting emissions under CORSIA - Analysing the potential supply of credits
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
Webinar: The business case for CCS in the power industry: a case study of the...
Webinar: The business case for CCS in the power industry: a case study of the...Webinar: The business case for CCS in the power industry: a case study of the...
Webinar: The business case for CCS in the power industry: a case study of the...
 
Development and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy SourcesDevelopment and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy Sources
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
The potential impact of transitioning CDM units and activities to the Paris A...
The potential impact of transitioning CDM units and activities to the Paris A...The potential impact of transitioning CDM units and activities to the Paris A...
The potential impact of transitioning CDM units and activities to the Paris A...
 
CCS Financing January 09
CCS Financing January 09CCS Financing January 09
CCS Financing January 09
 
Overview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEA
Overview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEAOverview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEA
Overview of Article 6 and the Paris Agreement Rulebook - Luca Lo Re, IEA
 
2009 07-breaking the-climate_deadlock-cn
2009 07-breaking the-climate_deadlock-cn2009 07-breaking the-climate_deadlock-cn
2009 07-breaking the-climate_deadlock-cn
 
Competition scope and funding revised
Competition scope and funding revisedCompetition scope and funding revised
Competition scope and funding revised
 
CCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptx
CCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptxCCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptx
CCS cooperation under Article 6_IEA GHG Webinar 23_03_2023.pptx
 
Carbon Credit Credibility.pdf
Carbon Credit Credibility.pdfCarbon Credit Credibility.pdf
Carbon Credit Credibility.pdf
 
SOLA5056 Renewable Energy in Developing Countries - Carbon Markets
SOLA5056 Renewable Energy in Developing Countries - Carbon MarketsSOLA5056 Renewable Energy in Developing Countries - Carbon Markets
SOLA5056 Renewable Energy in Developing Countries - Carbon Markets
 
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
Carbon finance for beginners (Kyoto Protocol and its mechanisms; Current stat...
 
hydrogen-investor-roadmap.pdf
hydrogen-investor-roadmap.pdfhydrogen-investor-roadmap.pdf
hydrogen-investor-roadmap.pdf
 
Challenges and best practices in financing to accelerate industry decarbonisa...
Challenges and best practices in financing to accelerate industry decarbonisa...Challenges and best practices in financing to accelerate industry decarbonisa...
Challenges and best practices in financing to accelerate industry decarbonisa...
 
Carbon Finance Risks and Opportunities
Carbon Finance Risks and OpportunitiesCarbon Finance Risks and Opportunities
Carbon Finance Risks and Opportunities
 
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdfCompetition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
Competition_Results_-_The_Sustainable_Innovation_Fund_-_SBRI_Phase_2.pdf
 
Ricardo aea comm vehs
Ricardo   aea comm vehsRicardo   aea comm vehs
Ricardo aea comm vehs
 
2 co making the business case for ccs
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccs
 

Recently uploaded

karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
narinav14
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
Scalabrini Institute for Human Mobility in Africa
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
ahcitycouncil
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
Christina Parmionova
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 

Recently uploaded (20)

karnataka housing board schemes . all schemes
karnataka housing board schemes . all schemeskarnataka housing board schemes . all schemes
karnataka housing board schemes . all schemes
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
PPT Item # 5 - 318 Tuxedo Ave. (sign. review)
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 

Costs and climate impact of offsetting emissions under CORSIA

  • 1. Innovate4Climate Costs and climate impact of offsetting emissions under CORSIA Carsten Warnecke, Thomas Day, Harry Fearnehough, Lambert Schneider Frankfurt, 22 May 2018
  • 2. Vulnerability of existing project- based mitigation activities to continue abatement Thomas Day
  • 3. Vulnerable projects depend on carbon credit revenues to operate Which CDM projects are most at risk of discontinuing mitigation? What is the potential mitigation impact from supporting (vulnerable) projects? What options exist for supporting vulnerable projects? 3www.newclimate.org Assessing a project’s vulnerability is based on its current dependence on carbon market revenues to continue GHG abatement activities The assessment of the current economic conditions of the project does not offer insight into the additionality of a project at its point of inception
  • 5. www.newclimate.org 5 Assessing vulnerability Low – medium risk Potentially high risk Coal mine methane EE Industry EE own generation EE supply side Geothermal Hydro Solar Wind Forests Fossil fuel switch Biomass Fugitive Landfill gas Methane avoidance PFCs+SF6 HFC-23 Household stoves N2O abatement Risk of discontinuing abatement: ----------------------------------------- Low risk Low - medium risk (variable) Low - high risk (variable) High risk
  • 6. 6 Hydro Wind Biomass N2O HFCs Fugitive CMM Others ~ 4.6 bn CERs Total potential CER supply for 2013 - 2020 Project vulnerability Generally low Generally high Variablevulnerability Not assessed CER supply potential to 2020 by project vulnerability
  • 7. Analysis of the potential supply of credits for CORSIA from existing projects under different eligibility restrictions Harry Fearnehough
  • 8. Carbon Offsetting and Reduction Scheme for International Aviation Overview • Overseen by International Civil Aviation Organisation (UN body) • Aims to ensure carbon neutral growth for international aviation from 2020 through a combination of abatement measures as well as offsetting Scope • International aviation • Voluntary participation in pilot and first phase; compulsory in second phase • Exclusively focused on carbon dioxide emissions www.newclimate.org 8 End of pilot phase End of Phase 1 End of Phase 2 CORSIA introduction Carbon dioxide emissions from international aviation maintained at 2020 levels Potential growth of emissions = demand for offsets of ~3 bn tCO2
  • 9. We have analysed the potential supply from 4 offset programmes www.newclimate.org 9 For the CDM, we have examined the marginal cost of supplying offset credits for emission reductions over the period 2013 - 2020 For all 4 programmes we have analysed the supply potential for emission reductions over the period 2013 – 2035 Analysis covers registered projects as well as the existing pipeline of projects that could register in the future
  • 10. Scenarios include vintage and project type eligibility restrictions www.newclimate.org 10 Base case Emission reduction date vintage Registration date vintages Investment date vintage Excluding low vulnerability projects All potential emission reductions over the period 2013-2035 Restricting the use of credits to those issued for emission reductions post 2016 Restricting the use of credits to projects registered post 2012 and 2016 Restricting the use of credits to projects that made their investment decision post 2012 and 2016 Restricting the use of credits to projects dependent on carbon revenues to continue abatement Start of operations date vintage Restricting the use of credits to projects that started operations post 2012 and 2016
  • 11. Eligibility restrictions have a large impact on the CER supply curve www.newclimate.org 11 Supply curves for emission reductions between 2013-2020 for registered CDM projects under different elegibility restrictions 4,3002,892275 121 690 Up to 3.8bn new CERs could supply the market at prices below €1 A large share of projects do not depend on CER revenues to continue emission reductions Investment date vintage restriction most likely to incentivise development of new projects in response to new demand
  • 12. CDM and VCS projects could supply 5x CORSIA demand www.newclimate.org 12 Supply potential for emission reductions between 2013-2035 for CDM and voluntary market projects under different eligibility restrictions Under several restriction scenarios supply from existing projects exceeds likely demand from CORSIA to 2035 Large potential supply within the pipeline of CDM projects Even excluding the CDM, the potential supply would exceed CORSIA demand in some scenarios DRAFT results 27m 190m + existing stock: = enough to meet pilot phase demand ~ CORSIA demand
  • 13. Implications and policy recommendations for CORSIA Lambert Schneider
  • 14. Key findings in a nutshell 1. Supply from existing projects could exceed demand by a factor of 5 2. On the order of 3.8bn CERs could be issued to registered CDM projects at prices below €1 for emission reductions up to 2020 3. Without eligibility restrictions, demand from CORSIA over the period to 2035 is unlikely to: Alter the overall level of GHG abatement undertaken; or Materially impact the current CER price level  Lose-lose situation: No benefits for the environment No benefits for project developers and host countries: no incentives to implement new projects or continue abatement in vulnerable existing projects, no value for ”old” CERs www.newclimate.org 14
  • 15. How can CORSIA incentivise further emission reductions? CORSIA should incentivize further emission reductions that would not occur without the scheme Robust eligibility restrictions essential for CORSIA to deliver on its goal CORSIA demand should be targeted to: 1. Vulnerable projects, i.e. projects that require carbon market or other revenues to continue GHG abatement, and/or 2. New projects implemented in response to the incentives from CORSIA www.newclimate.org 15
  • 16. Which eligibility restrictions are effective to deliver CORSIA’s goals? www.newclimate.org 16 Emission reduction date vintage Registration date vintages Investment date vintage Excluding low vulnerability projects • Still significant over-supply • Many non-vulnerable projects eligible • Up to 8,000 old, non-registered CDM projects eligible • Can effectively limit participation to newer projects • Can effectively limits participation to projects that require support • More difficult to operationalize Start of operations date vintage • Can effectively limit participation to newer projects ✓ ✘ ✓ ✘ ✓
  • 17. Robust eligibility criteria essential for CORSIA to deliver on its goal Simple approach: Limit eligibility to new projects • Projects with an investment decision date later than X (e.g. 2017, 2020), or • Projects that started operation later than X (e.g. 2020) Differentiated approach: Limit eligibility to new or vulnerable projects • Projects with an investment decision date later than X (e.g. 2017, 2020), or • Projects that started operation later than X (e.g. 2020) AND • Project types that are typically vulnerable to discontinuing GHG abatement Recommendations www.newclimate.org 17
  • 18. Contact details: Thank you for your attention! Carsten Warnecke c.warnecke@newclimate.org Thomas Day t.day@newclimate.org Harry Fearnehough h.fearnehough@newclimate.org Lambert Schneider lambertschneider@googlemail.com Interested to know more about the topic? See our recent blog post: bit.ly/2GFV4hm